CN211524014U CN201921497079.8U CN201921497079U CN211524014U CN 211524014 U CN211524014 U CN 211524014U CN 201921497079 U CN201921497079 U CN 201921497079U CN 211524014 U CN211524014 U CN 211524014U
Authority
CN
China
Prior art keywords
operation platform
supporting rods
chuck
novel elevator
elevator shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921497079.8U
Other languages
Chinese (zh)
Inventor
侯万亮
谢秋文
靳云法
皇甫天富
王静
刘国营
赵文祥
杨秋双
程郏杞
张联合
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Hongcheng Engineering Construction Co ltd
Original Assignee
Henan Hongcheng Engineering Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Hongcheng Engineering Construction Co ltd filed Critical Henan Hongcheng Engineering Construction Co ltd
Priority to CN201921497079.8U priority Critical patent/CN211524014U/en
Application granted granted Critical
Publication of CN211524014U publication Critical patent/CN211524014U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

A novel elevator shaft shaping operation platform comprises main beams which are arranged in parallel, wherein the main beams are arranged in an inclined manner, parallel vertical supporting rods are arranged on each main beam respectively, the lower ends of the vertical supporting rods are connected with the corresponding main beams respectively, the upper ends of the vertical supporting rods are connected with horizontal supporting rods respectively, and operation platforms are connected to the horizontal supporting rods; the lower end of the main beam is provided with a long chuck and a short chuck, the lower end face of the long chuck is a plane, and the included angle between the long chuck and the short chuck is more than or equal to 90 degrees. The utility model discloses an operating platform utilizes lower one deck structure to do the strong point, provides operating platform for superstructure construction, utilizes the supreme one deck continuous construction of tower crane handling after the construction finishes to can use repeatedly, ensure that the safety of construction layer operation personnel reduces manpower and materials and improves work efficiency.

Description

Novel elevator well design operation platform
Technical Field
The utility model belongs to the technical field of the construction, mainly relate to a novel elevator well design operation platform.
Background
With the appearance of a large number of modern large-scale buildings in China, the traditional scaffold can not meet the requirements of building development, and therefore, the rapid popularization of the novel scaffold is not urgent.
When major structure construction, for the convenience of elevator well template is established, steel pipe scaffold operation platform is upwards set up from the bottom in the well to present job site, and this kind of traditional scaffold frame sets up work load big, extravagant a large amount of manpower and materials, has great potential safety hazard during the construction, falls to the ground the scaffold frame and sets up when exceeding the uniform height, still needs special reinforcement, still needs expert's argument. The foregoing problems are in need of solution.
SUMMERY OF THE UTILITY MODEL
The shaping operation platform (novel scaffold) is adopted in the construction of the elevator shaft, so that the construction is safe and reliable, the operation is simple, and the construction cost is obviously reduced.
In order to solve the technical problem, the utility model provides a novel elevator well design operation platform.
The technical scheme of the utility model is that:
a novel elevator shaft shaping operation platform comprises main beams which are arranged in parallel, wherein the main beams are arranged in an inclined manner, parallel vertical supporting rods are arranged on each main beam respectively, the lower ends of the vertical supporting rods are connected with the corresponding main beams respectively, the upper ends of the vertical supporting rods are connected with horizontal supporting rods respectively, and operation platforms are connected to the horizontal supporting rods; the lower end of the main beam is provided with a long chuck and a short chuck, the lower end face of the long chuck is a plane, and the included angle between the long chuck and the short chuck is more than or equal to 90 degrees.
Preferably, the upper end surface of the horizontal support rod is provided with a hanging ring.
Preferably, the vertical supporting rods are connected with the corresponding main beams through connecting plates.
Preferably, a scaffold board is laid on the two horizontal supporting rods.
Preferably, the horizontal support rod and the operating platform are connected through an operating platform base.
Preferably, the operating platform is a frame structure formed by combining vertical and transverse connecting supports, and a supporting plate is arranged on the transverse connecting support.
Preferably, the horizontal support rods are connected through the adjusting support piece, and the horizontal support rods and the adjusting support piece are connected through screws.
Preferably, the support plate is a square wood plywood panel.
The utility model has the advantages that:
the utility model discloses an operating platform utilizes lower one deck structure to do the strong point, provides operating platform for superstructure construction, utilizes the supreme one deck continuous construction of tower crane handling after the construction finishes to can use repeatedly, ensure that the safety of construction layer operation personnel reduces manpower and materials and improves work efficiency.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
FIG. 2 is a bottom view of FIG. 1;
in the figure: 1-main beam, 2-embedded compression ring, 3-vertical support rod, 4-horizontal support rod, 5-lifting ring, 6-scaffold plate, 7-operation table base, 8-operation table, 9-support plate, 10-connecting plate, 11-adjusting support, 12-reinforced concrete beam and elevator shaft wall; 101-long chuck, 102-short chuck.
Detailed Description
The utility model discloses a concrete implementation mode refers to fig. 1-2, a novel elevator well design operation platform, girder 1 including parallel arrangement, girder 1 is the slope setting, is equipped with parallel vertical support rod 3 on every girder 1 respectively, and vertical support rod 3's lower extreme is connected with corresponding girder 1 respectively, and vertical support rod 3's upper end is connected with horizontal support rod 4 respectively, is connected with operation panel 8 on horizontal support rod 4. The lower end of the main beam 1 is provided with a long clamping head 101 and a short clamping head 102, the lower end face of the long clamping head 101 is a plane, and the included angle between the long clamping head 101 and the short clamping head 102 is larger than or equal to 90 degrees.
The upper end surface of the horizontal support rod 4 is provided with a hanging ring 5.
The vertical support rods 3 are connected with the corresponding main beams 1 through connecting plates 10.
The two horizontal support rods 4 are paved with scaffold boards 6.
The horizontal support bar is connected with the operation table 8 through an operation table base 7, and the operation table base 7 can be a plurality of vertical supports.
The operation panel 8 is a frame structure formed by combining vertical and transverse connected supports, a support plate is arranged on the transverse connected support, the support plate is a square wood veneer panel, and the square wood veneer panel is light in material and convenient to lay.
The horizontal support rods 4 are connected through the adjusting support piece 11, and the horizontal support rods 4 and the adjusting support piece 11 are connected through screws.
Referring to the attached drawings of the specification, an embedded compression ring 2 is embedded in the upper end face of a reinforced concrete beam of an elevator shaft, a long chuck 101 is inserted into the embedded compression ring 2, and a short chuck 102 clamps the inner wall of the reinforced concrete beam. The upper end of the main beam 1 props against the inner wall of the other side of the elevator shaft, the vertical support rod 3 and the corresponding main beam 1 are welded together through the connecting plate 10, and the connection stability is guaranteed. The girder 1, the vertical support rod 3 and the horizontal support rod 4 of homonymy constitute triangle-shaped structure, and triangle-shaped structural stability saves space simultaneously better. The adjacent horizontal supporting rods 4 are connected through the adjusting supporting pieces 11 in a bolt connection mode, and the adjacent horizontal supporting rods 4 can also be connected through two crossed adjusting supporting pieces 11 in a bolt connection mode, so that the whole device can be adjusted as required, is convenient to lift and can be reused. Girder 1, vertical support pole 3 and horizontal support pole 4 all adopt 10# channel-section steel.
The utility model discloses an operating platform utilizes one deck structure to be the strong point down, provides operating platform for superstructure construction, utilizes the continuous construction of the supreme one deck of tower crane handling after the construction finishes to can use repeatedly, ensure that the safety of construction layer operation personnel reduces manpower and materials and improves work efficiency, still have following beneficial effect in addition:
1) the input of materials is as follows: the turnover materials such as a large number of scaffolds and the like occupied for erecting the elevator shaft operating platform in the traditional construction method are saved, the loss and damage of the materials are avoided, and the construction cost is effectively reduced.
2) The operation is simple and convenient: this operation platform belongs to once-through equipment, need not repeated equipment, practices thrift manpower and materials, can follow the increase of floor, relies on tower crane lifting means to reciprocate along the elevator well to repeatedly cyclic utilization reduces construction cycle. The excessive complicated processes in the process of building and dismantling the traditional scaffold are avoided.
3) The safety performance is high: the design operation platform does not receive the influence of floor height, possesses good safety and stability, for the prevention and cure accident leads to the impetus to take place the displacement, the fixed operation platform's of pre-buried clamping ring 2 impetus on the elevator roof beam improves operation platform's security.
4) The construction difficulty of the template is simple and convenient: the template can be directly placed on the operation platform when being installed on the elevator shaft, and can be integrally hoisted in place along with the operation platform after being dismantled, and meanwhile, the quality of the template can be checked and accepted by managers conveniently.
The above-mentioned embodiments are only for describing the preferred embodiments of the present invention, and various modifications and improvements made to the technical solution of the present invention by those skilled in the art should fall within the protection scope defined by the claims of the present invention without departing from the design spirit of the present invention.

Claims (8)

1. A novel elevator shaft shaping operation platform is characterized by comprising main beams which are arranged in parallel, wherein the main beams are arranged in an inclined manner, parallel vertical supporting rods are arranged on each main beam respectively, the lower ends of the vertical supporting rods are connected with the corresponding main beams respectively, the upper ends of the vertical supporting rods are connected with horizontal supporting rods respectively, and an operation platform is connected onto the horizontal supporting rods; the lower end of the main beam is provided with a long chuck and a short chuck, the lower end face of the long chuck is a plane, and the included angle between the long chuck and the short chuck is more than or equal to 90 degrees.
2. The novel elevator shaft shaping operation platform according to claim 1, wherein a lifting ring is arranged on the upper end face of the horizontal support rod.
3. The novel elevator hoistway sizing operation platform according to claim 2, wherein the vertical support rods are connected with the corresponding main beams through connecting plates.
4. The novel elevator shaft sizing operation platform as claimed in claim 3, wherein a scaffold board is laid on the two horizontal support rods.
5. The novel elevator shaft sizing operation platform according to claim 4, wherein the horizontal support rod is connected with the operation platform through an operation platform base.
6. A novel elevator shaft shaping operation platform according to claim 5, wherein the operation platform is a frame structure formed by combining vertical and transverse connecting supports, and supporting plates are arranged on the transverse connecting supports.
7. The novel elevator shaft sizing operation platform according to claim 6, wherein the horizontal support rods are connected through an adjusting support piece, and the horizontal support rods are connected with the adjusting support piece through screws.
8. The novel elevator hoistway sizing operation platform of claim 7, wherein the support plate is a square wood plywood panel.
CN201921497079.8U 2019-09-10 2019-09-10 Novel elevator well design operation platform Expired - Fee Related CN211524014U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921497079.8U CN211524014U (en) 2019-09-10 2019-09-10 Novel elevator well design operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921497079.8U CN211524014U (en) 2019-09-10 2019-09-10 Novel elevator well design operation platform

Publications (1)

Publication Number Publication Date
CN211524014U true CN211524014U (en) 2020-09-18

Family

ID=72439906

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921497079.8U Expired - Fee Related CN211524014U (en) 2019-09-10 2019-09-10 Novel elevator well design operation platform

Country Status (1)

Country Link
CN (1) CN211524014U (en)

Similar Documents

Publication Publication Date Title
CN103643800A (en) Lifting installation system for buckling restrained supporting member and construction method thereof
CN205775852U (en) Acting force conversion support for top of steel structure supporting jig frame
CN114059758A (en) Assembled double-layer integral elevator shaft platform
CN214740171U (en) Ancient building wall body hoist and mount migration device
CN213836318U (en) Bridge floor wet joint hangs mould structure
CN212866793U (en) Assembled construction elevator stops layer platform
CN211524014U (en) Novel elevator well design operation platform
CN115306137B (en) Operation platform structure for installing suspended ceiling at bottom of high-altitude corridor and construction method thereof
CN215291319U (en) Multi-point elevator shaft construction lifting platform
CN210438301U (en) Light slat lifting device for building partition wall
CN210289075U (en) Adjustable elevator shaft operating platform system that can have enough to meet need
CN211257761U (en) Lifting type elevator shaft operating platform
CN209874434U (en) Simple and easy scaffold frame of encorbelmenting of building high latitude
CN211714541U (en) Special handling frame for installing shear wall template in elevator shaft
CN112392245A (en) Assembly type cantilever I-shaped steel beam operation device capable of being turned over without wall penetration and operation method thereof
CN114059658A (en) Construction method of overweight big wood structure vertical frame in historic building reconstruction and restoration
CN220226146U (en) Frame post reinforcement operation platform
CN216380480U (en) Integral movable operation frame
CN217439505U (en) Assembled elevator shaft construction operation platform
CN214885631U (en) Hoisting device for stone curtain wall with ultra-large area
CN216076222U (en) Can have enough to meet need elevartor shaft operating platform subassembly
CN211622525U (en) Can have enough to meet need elevartor shaft construction operation platform
CN213418448U (en) Jacking type construction platform
CN215948934U (en) Construction elevator standard festival bearing support frame device
CN215519871U (en) Combined elevator shaft operating frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200918