CN211523060U - Energy-efficient building construction dust device - Google Patents

Energy-efficient building construction dust device Download PDF

Info

Publication number
CN211523060U
CN211523060U CN201921093929.8U CN201921093929U CN211523060U CN 211523060 U CN211523060 U CN 211523060U CN 201921093929 U CN201921093929 U CN 201921093929U CN 211523060 U CN211523060 U CN 211523060U
Authority
CN
China
Prior art keywords
pipe
water
water tank
branch pipe
communicated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921093929.8U
Other languages
Chinese (zh)
Inventor
陈云衢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Kelian Information Technology Co ltd
Original Assignee
Shandong Kelian Information Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Kelian Information Technology Co ltd filed Critical Shandong Kelian Information Technology Co ltd
Priority to CN201921093929.8U priority Critical patent/CN211523060U/en
Application granted granted Critical
Publication of CN211523060U publication Critical patent/CN211523060U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)

Abstract

The utility model discloses an energy-efficient building construction dust device, including the shallow, shallow bottom surface fixed mounting water tank, the front fixed surface of water tank one side installs the inlet tube that has the control valve, and the inlet tube communicates with each other with the water tank is inside, the front fixed surface of water tank opposite side installation connecting pipe, fixed mounting water pump between connecting pipe and the water tank, the front end fixed mounting L type pipe of connecting pipe. The utility model discloses mechanism reasonable in design, convenient to use can be in time effectual elimination dust, has purified the environment of construction site, has stopped the harm of dust to the staff, and effective guarantee constructor's is healthy, builds a good construction environment for the constructor.

Description

Energy-efficient building construction dust device
Technical Field
The utility model relates to a building engineering technical field specifically is a high-efficient energy-conserving construction dust device.
Background
Construction sites are dusty, especially in the secondary construction and finishing stages of indoor structures. In a windless environment, because the environment is closed, indoor operating personnel can inhale a large amount of dust-containing particles or harmful substances when working; in the past, the health of the operator was greatly impaired.
SUMMERY OF THE UTILITY MODEL
The utility model provides a high-efficient energy-conserving construction dust device to it is not enough to solve prior art.
The utility model discloses a realize above-mentioned purpose, realize through following technical scheme: the water tank is fixedly installed on the bottom surface of the trolley, a water inlet pipe with a control valve is fixedly installed on the front surface of one side of the water tank, the water inlet pipe is communicated with the inside of the water tank, a connecting pipe is fixedly installed on the front surface of the other side of the water tank, a water pump is fixedly installed between the connecting pipe and the water tank, an L-shaped pipe is fixedly installed at the front end of the connecting pipe, the L-shaped pipe and the water tank are both communicated with the inside of the connecting pipe, vertical plates are fixedly installed on the front side and the rear side of the middle part of the top surface of the trolley, supporting rods are fixedly installed on the inner sides above the vertical plates, a transverse water pipe is arranged between the two supporting rods, one end of the water pipe is a closed end, the supporting rods are fixedly connected with the water pipe through bearings, the upper end of the L-shaped, both sides all are equipped with the branch pipe around the water pipe, the both ends of branch pipe are the blind end, the one end of branch pipe passes through cardan shaft fixed connection with the riser, the middle part and the water pipe of branch pipe pass through telescopic hose fixed connection, branch pipe and water pipe all communicate with each other with hose inside, both sides all articulate the connection swivel nut around the inboard of branch pipe and the water pipe, be equipped with a screw rod between two corresponding swivel nuts, the tip of screw rod is located corresponding swivel nut and can be at the swivel nut internal rotation, the several screw is seted up to the branch pipe outer wall, the screw communicates with each other with branch inside, the branch pipe outer wall is equipped with several top screwed nozzle down, the top and the screw of nozzle pass through screw-thread fit.
As above-mentioned an energy-efficient building construction dust device, one side of nozzle be equipped with the stopper, the stopper articulates on the outer wall of branch pipe, the screw and cooperate with the screw can be filled in to the stopper.
According to the efficient and energy-saving building construction dust falling device, the supporting legs of the cart are fixedly connected with the bottom surface of the water tank through the inclined struts.
According to the efficient and energy-saving building construction dust falling device, the top surface opening type water receiving tanks are fixedly mounted on the front side and the rear side of the top surface of the trolley and are located on the right side of the vertical plate, and the water receiving tanks correspond to the nozzles.
The utility model has the advantages that: the utility model discloses mechanism reasonable in design, convenient to use can be in time effectual elimination dust, has purified the environment of construction site, has stopped the harm of dust to the staff, and effective guarantee constructor's is healthy, builds a good construction environment for the constructor. When the utility model is used, water is added into the water tank through the water inlet pipe, the device can be moved through the cart, when the device is moved, the water pump works to convey water in the water tank into the L-shaped pipe through the connecting pipe, the water in the L-shaped pipe can enter the water pipe, the water in the water pipe is sprayed on the road surface through the spray head, the air cylinder works, the movable end of the air cylinder can drive one end of the water pipe to swing up and down, one end of the water pipe drives the spray head to swing up and down through the other end of the water pipe, better dust removal can be realized, when the road surface is wider, the screw rod is rotated to lead the two corresponding screw sleeves to be far away, thereby the distance between the water pipe and the branch pipe can be adjusted, the water in the water pipe enters the branch pipe through the hose, the water in the branch pipe is sprayed on the road surface through the spray nozzle, dust can be effectively eliminated in time, the, effectively ensure the health of constructors and create a good construction environment for the constructors.
Drawings
FIG. 1 is a schematic structural view of the present invention; fig. 2 is a view in the direction a of fig. 1.
Reference numerals: the device comprises a cart, a water tank, a water inlet pipe, a water pump, a connecting pipe, a 6-L-shaped pipe, a vertical plate, a support rod, a 9-water pipe, a 10-spray head, an 11-air cylinder, a 12-branch pipe, a 13-universal shaft, a 14-hose, a 15-threaded sleeve, a 16-screw, a 17-screw hole and an 18-nozzle, wherein the cart is arranged at the position of a vehicle body, the water tank is arranged at the position of the vehicle body, the water inlet pipe is.
Detailed Description
The embodiment specifically discloses a high-efficiency energy-saving building construction dust-settling device, which comprises a cart 1, wherein a water tank 2 is fixedly installed on the bottom surface of the cart 1, a water inlet pipe 3 with a control valve is fixedly installed on the front surface of one side of the water tank 2, the water inlet pipe 3 is communicated with the inside of the water tank 2, a connecting pipe 5 is fixedly installed on the front surface of the other side of the water tank 2, a water pump 4 is fixedly installed between the connecting pipe 5 and the water tank 2, an L-shaped pipe 6 is fixedly installed on the front end of the connecting pipe 5, the L-shaped pipe 6 and the water tank 2 are both communicated with the inside of the connecting pipe 5, risers 7 are fixedly installed on the front side and the rear side of the middle part of the top surface of the cart 1, supporting rods 8 are fixedly installed on the inner side above the risers 7, a transverse water pipe 9 is arranged between the two supporting rods 8, one end of the water, a spray head 10 is fixedly installed at the other end of the water pipe 9, the spray head 10 is communicated with the inside of the water pipe 9, one end of the water pipe 9 is fixedly connected with the top surface of the cart 1 through an air cylinder 11, branch pipes 12 are respectively arranged at the front side and the rear side of the water pipe 9, both ends of each branch pipe 12 are closed ends, one end of each branch pipe 12 is fixedly connected with a vertical plate 7 through a universal shaft 13, the middle part of each branch pipe 12 is fixedly connected with the water pipe 9 through a telescopic hose 14, each branch pipe 12 and the water pipe 9 are communicated with the inside of the hose 14, the inner side of each branch pipe 12 and the front side and the rear side of the water pipe 9 are respectively hinged with a screw sleeve 15, a screw rod 16 is arranged between the two corresponding screw sleeves 15, the end part of each screw rod 16 is positioned in the corresponding screw sleeve 15 and can rotate in the screw sleeve 15, a plurality of screw holes 17 are formed in the, the nozzle 18 communicates with the inside of the screw hole 17. The utility model discloses mechanism reasonable in design, convenient to use can be in time effectual elimination dust, has purified the environment of construction site, has stopped the harm of dust to the staff, and effective guarantee constructor's is healthy, builds a good construction environment for the constructor. When the utility model is used, water is added into the water tank 2 through the water inlet pipe 3, the device can be moved through the cart 1, when the device is moved, the water pump 4 works to convey water in the water tank 2 into the L-shaped pipe 6 through the connecting pipe 5, the water in the L-shaped pipe 6 can enter the water pipe 9, the water in the water pipe 9 is sprayed on the road surface through the spray head 10, the air cylinder 11 works, the movable end of the air cylinder 11 can drive one end of the water pipe 9 to swing up and down, one end of the water pipe 9 drives the spray head 10 to swing up and down through the other end of the water pipe 9, better dust removal can be realized, when the road surface is wider, the screw rod 16 is rotated to lead the two corresponding screw sleeves 15 to be far away, thereby the distance between the water pipe 9 and the branch pipe 12 can be adjusted, the water in the water pipe 9 enters the branch pipe 12 through the hose 14, the water in the branch pipe 12 is sprayed, the environment of a building construction site is purified, the harm of dust to workers is avoided, the health of the workers is effectively guaranteed, and a good construction environment is created for the workers.
Specifically, the nozzle 18 of the present embodiment is provided with a plug at one side thereof, which is hinged to the outer wall of the branch pipe 12, and which is capable of being inserted into the screw hole 17 and engaged with the screw hole 17. When the road surface is narrow, the nozzle 18 which can not be used can be removed, and the plug can be plugged into the screw hole 17, so that the water is saved.
Specifically, the support legs of the cart 1 according to the present embodiment are fixedly connected to the bottom surface of the water tank 2 by the diagonal braces. When the device is used, the connection between the water tank 2 and the cart 1 can be enhanced through the supporting legs 2, so that the connection between the water tank and the cart 1 can be firmer.
Further, the equal fixed mounting top surface open type water receiving tank in both sides around the shallow 1 top surface of this embodiment, the water receiving tank is located the right side of riser 7, and the water receiving tank is corresponding with nozzle 18. When the device is used, the water which is not sprayed to the ground by the nozzle 18 can be received by the water receiving tank, so that the water can be saved.
The embodiments of the present invention have been described with reference to the accompanying drawings, but these descriptions should not be construed as limiting the scope of the present invention, and the technical contents not described in detail in the present invention are known in the art.

Claims (4)

1. The utility model provides an energy-efficient building construction dust device which characterized in that: comprises a cart (1), a water tank (2) is fixedly arranged on the bottom surface of the cart (1), a water inlet pipe (3) with a control valve is fixedly arranged on the front surface of one side of the water tank (2), the water inlet pipe (3) is communicated with the inside of the water tank (2), a connecting pipe (5) is fixedly arranged on the front surface of the other side of the water tank (2), a water pump (4) is fixedly arranged between the connecting pipe (5) and the water tank (2), an L-shaped pipe (6) is fixedly arranged on the front end of the connecting pipe (5), the L-shaped pipe (6) is made of soft material, the L-shaped pipe (6) and the water tank (2) are both communicated with the inside of the connecting pipe (5), risers (7) are fixedly arranged on the front side and the rear side of the middle part of the top surface of the cart (1), supporting rods (8) are fixedly arranged on the inner side above the risers (7), a transverse water pipe (9) is arranged between, the upper end of an L-shaped pipe (6) is fixedly connected with one end of a water pipe (9) and communicated with the inside of the water pipe (9), the other end of the water pipe (9) is fixedly provided with a spray head (10), the spray head (10) is communicated with the inside of the water pipe (9), one end of the water pipe (9) is fixedly connected with the top surface of a trolley (1) through an air cylinder (11), the front side and the rear side of the water pipe (9) are respectively provided with a branch pipe (12), the two ends of each branch pipe (12) are closed ends, one end of each branch pipe (12) is fixedly connected with a vertical plate (7) through a universal shaft (13), the middle part of each branch pipe (12) is fixedly connected with the water pipe (9) through a telescopic hose (14), each branch pipe (12) and each water pipe (9) are communicated with the inside of the hose (14), the inner side of each branch pipe (12) and the front side and rear side of the water pipe (9) are respectively hinged with, the end part of the screw rod (16) is positioned in the corresponding screw sleeve (15) and can rotate in the screw sleeve (15), the outer wall of the branch pipe (12) is provided with a plurality of screw holes (17), the screw holes (17) are communicated with the inside of the branch pipe (12), the outer wall of the branch pipe (12) is provided with a plurality of downward nozzles (18) with threads at the tops, the tops of the nozzles (18) are matched with the screw holes (17) through threads, and the nozzles (18) are communicated with the inside of the screw holes (17).
2. The high-efficiency energy-saving building construction dust settling device according to claim 1, characterized in that: one side of the nozzle (18) is provided with a plug which is hinged on the outer wall of the branch pipe (12), and the plug can be plugged into the screw hole (17) and matched with the screw hole (17).
3. The high-efficiency energy-saving building construction dust settling device according to claim 1, characterized in that: the supporting legs of the cart (1) are fixedly connected with the bottom surface of the water tank (2) through inclined struts.
4. The high-efficiency energy-saving building construction dust settling device according to claim 1, characterized in that: the front side and the rear side of the top surface of the cart (1) are fixedly provided with top surface opening type water receiving tanks, the water receiving tanks are positioned on the right sides of the vertical plates (7), and the water receiving tanks correspond to the nozzles (18).
CN201921093929.8U 2019-07-13 2019-07-13 Energy-efficient building construction dust device Active CN211523060U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921093929.8U CN211523060U (en) 2019-07-13 2019-07-13 Energy-efficient building construction dust device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921093929.8U CN211523060U (en) 2019-07-13 2019-07-13 Energy-efficient building construction dust device

Publications (1)

Publication Number Publication Date
CN211523060U true CN211523060U (en) 2020-09-18

Family

ID=72439213

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921093929.8U Active CN211523060U (en) 2019-07-13 2019-07-13 Energy-efficient building construction dust device

Country Status (1)

Country Link
CN (1) CN211523060U (en)

Similar Documents

Publication Publication Date Title
CN107524338A (en) A kind of construction isolated wall plate
CN211523060U (en) Energy-efficient building construction dust device
CN205921273U (en) High pressure overhauls work platform
CN203685265U (en) Dry wide amplitude tunnel dust falling vehicle with water recycling function
CN211659571U (en) Environmental protection dust collecting equipment of building engineering construction
CN206670478U (en) A kind of explosion dust suppression water pot
CN207211044U (en) A kind of urban environmental protection operation sprinkling truck
CN215782491U (en) Energy-efficient dust device for hydraulic engineering construction
CN214035748U (en) Underground coal mining dust spraying device
CN205422804U (en) Portable atomizer
CN211987721U (en) Building site is with environment-friendly processing apparatus for dustproof
CN210660082U (en) Coal-winning machine spraying dust device
CN207434466U (en) A kind of mine rubber band conveyer automatic dustproof spraying device
CN220434808U (en) Colliery is spraying dust device in pit
CN208649968U (en) A kind of construction dust guard
CN218166390U (en) Dust device for construction
CN207025929U (en) Multi-functional construction equipment clears up care device
CN220378323U (en) Movable tunnel construction spraying dust device
CN204571226U (en) A kind of project under construction indoor moving device for reducing dust
CN211562291U (en) A adjustable atomizer for construction raise dust
CN216170913U (en) Dust collector is used in highway construction
CN220609663U (en) Dust collecting equipment for construction
CN220160756U (en) Ash removal mechanism for refractory bricks
CN211851900U (en) Tunnel dust collector for coal mining
CN214554663U (en) Outer wall paint spraying apparatus for pipeline production

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant