CN211499484U - Pre-grouting type full-grouting sleeve structure - Google Patents

Pre-grouting type full-grouting sleeve structure Download PDF

Info

Publication number
CN211499484U
CN211499484U CN201921674968.7U CN201921674968U CN211499484U CN 211499484 U CN211499484 U CN 211499484U CN 201921674968 U CN201921674968 U CN 201921674968U CN 211499484 U CN211499484 U CN 211499484U
Authority
CN
China
Prior art keywords
grout
grouting
sleeve
sleeve structure
barrel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921674968.7U
Other languages
Chinese (zh)
Inventor
龙莉波
马跃强
戚健文
王竹君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 2 Group Co Ltd
Original Assignee
Shanghai Construction No 2 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 2 Group Co Ltd filed Critical Shanghai Construction No 2 Group Co Ltd
Priority to CN201921674968.7U priority Critical patent/CN211499484U/en
Application granted granted Critical
Publication of CN211499484U publication Critical patent/CN211499484U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

In order to simplify the telescopic construction process of grout, improve grout telescopic efficiency of construction, the utility model provides a grout full grout sleeve structure of formula in advance. The pre-grouting type full grouting sleeve structure comprises a grout material barrel, wherein a grout overflow hole is formed in the barrel wall of the grout material barrel, barrel opening sealing sleeves are arranged at barrel opening parts at two ends of the grout material barrel respectively, a grout overflow opening sealing sleeve is arranged at a grout overflow opening part of the grout overflow hole, and grouting materials are filled in the grout material barrel. The utility model discloses a grout sleeve structure entirely of formula of grouting in advance, with grout material prefabrication in a thick liquids section of thick bamboo, when being under construction to grout sleeve structure entirely of formula in advance, only need will treat in the connecting reinforcement disect insertion thick liquids section of thick bamboo can. Compared with the traditional grouting sleeve construction process, the grouting operation is omitted, the grouting sleeve construction process is simplified, and the grouting sleeve construction efficiency is improved.

Description

Pre-grouting type full-grouting sleeve structure
Technical Field
The utility model belongs to the technical field of prefabricated assembly engineering, in particular to grout full grout sleeve structure of formula in advance.
Background
The grouting sleeve is one of the common reinforcing steel bar connection modes of the assembly type building in China at present. Wherein, the sleeve that full grout sleeve is that the both ends reinforcing bar all connects through the grout material, generally is used for the connection of precast beam owner muscle.
In the grouting sleeve, the grouting material is generally dry mixed material formed by mixing cement serving as a basic material, fine aggregate, an additive and other materials. The hardened grouting material is respectively bonded with the steel bar and the grouting sleeve to realize the continuous and reliable force transmission connection structure of the steel bar.
The grouting sleeve has wide application range, but needs complex grouting operation, and the quality of the grouting sleeve is difficult to ensure. Therefore, a new grouting sleeve structure with simple construction is needed.
SUMMERY OF THE UTILITY MODEL
In order to simplify the telescopic construction process of grout, improve grout telescopic efficiency of construction, the utility model provides a grout full grout sleeve structure of formula in advance.
The utility model discloses a grout full grout sleeve structure of formula in advance technical scheme as follows:
the pre-grouting type full grouting sleeve structure comprises a grout material barrel, wherein a grout overflow hole is formed in the barrel wall of the grout material barrel, barrel opening sealing sleeves are arranged at barrel opening parts at two ends of the grout material barrel respectively, a grout overflow opening sealing sleeve is arranged at a grout overflow opening part of the grout overflow hole, and grouting materials are filled in the grout material barrel.
The utility model discloses a grout sleeve structure entirely of formula of grouting in advance, with grout material prefabrication in a thick liquids section of thick bamboo, when being under construction to grout sleeve structure entirely of formula in advance, only need will treat in the connecting reinforcement disect insertion thick liquids section of thick bamboo can. Compared with the traditional grouting sleeve construction process, the grouting operation is omitted, the grouting sleeve construction process is simplified, and the grouting sleeve construction efficiency is improved.
Furthermore, among the full grout sleeve structure of grout in advance, still include the steel bar of treating the connection that the surface set up the catalyst layer. Before the steel bars to be connected are inserted into the slurry barrel, a catalyst can be coated on the surfaces of the steel bars to be connected. After the reinforcing bar to be connected is inserted into the grout material cylinder, the catalyst can accelerate the solidification of grouting material, improves the efficiency of construction.
Furthermore, in the pre-grouting type full grouting sleeve structure, the sleeve opening sealing sleeve is a one-way sealing sleeve. The unidirectional nozzle cuff can be opened from the exterior of the slurry barrel. The arrangement of the one-way sleeve can ensure that grouting materials cannot flow out of the slurry barrel before construction, and can facilitate the insertion of the steel bars to be connected during construction.
Furthermore, among the full grout sleeve structure of grout formula in advance, in order to facilitate the overflow of grout material, the grout outlet sets up in the middle part of thick liquid feed cylinder.
Drawings
Fig. 1 is a schematic view of a pre-grouting type full grouting sleeve structure of the present invention;
fig. 2 is a schematic diagram of a construction method of a pre-grouting type full grouting sleeve structure of the present invention.
Detailed Description
The present invention will be described in further detail with reference to the following drawings and specific embodiments. The advantages and features of the present invention will become more fully apparent from the following description and appended claims. It should be noted that the drawings are in simplified form and are not to precise scale, and are provided for convenience and clarity in order to facilitate the description of the embodiments of the present invention.
Example 1:
referring to fig. 1 to 2, the present embodiment provides a pre-grouting type full grouting sleeve structure, including a grout cylinder 1, a grout outlet 2 is formed on a cylinder wall of the grout cylinder 1, cylinder openings at two ends of the grout cylinder 1 are respectively provided with a cylinder opening sealing sleeve 4, a grout opening sealing sleeve 5 is arranged at a grout opening of the grout outlet 2, and a grouting material 8 is filled in the grout cylinder 1.
The full grout sleeve structure of grouting formula in advance of this embodiment, with grouting material 8 prefabricated in thick liquids section of thick bamboo 1, when being under construction to the full grout sleeve structure of grouting formula in advance, only need will treat that connecting reinforcement 7 disect insertion can in thick liquids section of thick bamboo 1. Compared with the traditional grouting sleeve construction process, the grouting operation is omitted, the grouting sleeve construction process is simplified, and the grouting sleeve construction efficiency is improved.
In a preferred embodiment, the pre-grouting type full grouting sleeve structure further comprises a steel bar 7 to be connected, wherein the surface of the steel bar is provided with a catalyst layer 6. Before inserting the reinforcing bar 7 to be connected into the grout barrel 1, a catalyst may be coated on the surface of the reinforcing bar 7 to be connected. After the reinforcing bar 7 of treating to connect inserts thick liquids feed cylinder 1, the catalyst can accelerate the solidification of grouting material 8, improves the efficiency of construction.
In a preferred embodiment, in the pre-grouting type full grouting sleeve structure, the nozzle jacket 4 is a one-way jacket. The one-way nozzle jacket 4 can be opened from the outside of the pulp cartridge 1. The arrangement of the one-way sleeve can ensure that the grouting material 8 cannot flow out of the slurry barrel 1 before construction, and can facilitate the insertion of the steel bar 7 to be connected during construction.
In a preferred embodiment, in the pre-grouting type full grouting sleeve structure, in order to facilitate the overflow of the grouting material 8, the grout outlet 2 is disposed in the middle of the grout barrel 1.
Example 2:
this embodiment provides a construction method of the pre-grouting type full grouting sleeve structure described in embodiment 1.
The construction method of the pre-grouting type full grouting sleeve structure of the embodiment has the technical characteristics that the construction method comprises the following steps:
firstly, filling grouting material 8 into a grouting material cylinder 1 of a pre-grouting type full grouting sleeve structure;
secondly, embedding a pre-grouting type full grouting sleeve structure into the prefabricated part in the manufacturing process of the prefabricated part;
thirdly, removing the slurry overflow port jacket 5;
fourthly, inserting the reinforcing steel bars 7 to be connected into the slurry barrel 1 from the barrel openings at the two ends of the slurry barrel 1 respectively, and arranging the slurry overflow opening sealing sleeves 5 at the slurry overflow openings of the slurry overflow holes 2 after the redundant grouting material 8 is discharged from the slurry overflow holes 2.
The construction method of the pre-grouting type full grouting sleeve structure of the embodiment is characterized in that the grouting material 8 is prefabricated in the grout barrel 1, and when the pre-grouting type full grouting sleeve structure is constructed, the steel bars 7 to be connected only need to be directly inserted into the grout barrel 1. Compared with the traditional grouting sleeve construction process, the grouting operation is omitted, the grouting sleeve construction process is simplified, and the grouting sleeve construction efficiency is improved.
In a preferred embodiment, in the construction method of the pre-grouting type full grouting sleeve structure, the third step further includes coating a catalyst on the surface of the steel bar 7 to be connected to form the catalyst layer 6. Before inserting the reinforcing bar 7 to be connected into the grout barrel 1, a catalyst may be coated on the surface of the reinforcing bar 7 to be connected. After the reinforcing bar 7 of treating to connect inserts thick liquids feed cylinder 1, the catalyst can accelerate the solidification of grouting material 8, improves the efficiency of construction.
The above description is only for the purpose of describing the preferred embodiments of the present invention, and is not intended to limit the scope of the present invention, and any variations and modifications made by those skilled in the art based on the above disclosure are within the scope of the appended claims.

Claims (4)

1. The pre-grouting type full grouting sleeve structure is characterized by comprising a grout cylinder (1), wherein a grout overflow hole (2) is formed in the cylinder wall of the grout cylinder (1), cylinder openings at two ends of the grout cylinder (1) are respectively provided with a cylinder opening sealing sleeve (4), a grout overflow opening sealing sleeve (5) is arranged at a grout overflow opening of the grout overflow hole (2), and grouting materials (8) are filled in the grout cylinder (1).
2. The pre-grouted full grout sleeve structure of claim 1, further comprising a reinforcing bar (7) to be connected, on the surface of which the catalyst layer (6) is disposed.
3. The pre-grouted fully grouted sleeve structure as claimed in claim 1, wherein the nozzle cuff (4) is a one-way cuff.
4. The pre-grouting type full grout sleeve structure according to claim 1, wherein the grout outlet (2) is provided at the middle of the grout cylinder (1).
CN201921674968.7U 2019-10-09 2019-10-09 Pre-grouting type full-grouting sleeve structure Active CN211499484U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921674968.7U CN211499484U (en) 2019-10-09 2019-10-09 Pre-grouting type full-grouting sleeve structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921674968.7U CN211499484U (en) 2019-10-09 2019-10-09 Pre-grouting type full-grouting sleeve structure

Publications (1)

Publication Number Publication Date
CN211499484U true CN211499484U (en) 2020-09-15

Family

ID=72406057

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921674968.7U Active CN211499484U (en) 2019-10-09 2019-10-09 Pre-grouting type full-grouting sleeve structure

Country Status (1)

Country Link
CN (1) CN211499484U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110656733A (en) * 2019-10-09 2020-01-07 上海建工二建集团有限公司 Pre-grouting type full-grouting sleeve structure and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110656733A (en) * 2019-10-09 2020-01-07 上海建工二建集团有限公司 Pre-grouting type full-grouting sleeve structure and construction method

Similar Documents

Publication Publication Date Title
CN110656733A (en) Pre-grouting type full-grouting sleeve structure and construction method
CN101319498B (en) Lattice type prefabricated prestressed underground continuous wall and its construction method
CN103075013B (en) Building construction steel bar connection structure and connection method
CN211499484U (en) Pre-grouting type full-grouting sleeve structure
CN110656734A (en) Pre-grouting type semi-grouting sleeve structure and construction method
CN110485552A (en) Sleeve, prefabricated components connector, prefabricated components and prefabricated components assembly
CN211499485U (en) Pre-grouting type semi-grouting sleeve structure
CN206928285U (en) Prefabricated high-strength core body and pressure type anchor rod
CN113293933B (en) Grouting device and grouting method for grouting sleeve
CN110644481A (en) Radial variable modulus composite pile and construction equipment and construction method thereof
CN208518216U (en) A kind of grout sleeve
CN206971379U (en) Precast beam and column connected node
CN205712760U (en) A kind of grout sleeve and prefabricated component
CN213890628U (en) High-wear-resistance gypsum mortar stirring device for building construction
CN107882020A (en) A kind of Trees with Small Diameters pile construction method and cleaning grouting device
CN211286302U (en) Inner cavity convex multi-point distributed grouting sleeve
CN104912069B (en) A kind of hydrophobic clad steel core glass fiber anti-float anchor rod and construction method thereof
CN209163028U (en) Sleeve, prefabricated components connector, prefabricated components
CN211691081U (en) Self-extrusion fixed grouting sleeve for double parallel ribs connection
CN113417465A (en) Assembled building grout sleeve grout system
CN205712764U (en) A kind of grout sleeve and prefabricated component
CN217480625U (en) A sealing thick liquid device for grout sleeve
CN113530093B (en) Spiral steel pipe type steel bar connecting sleeve and use method thereof
CN106939668B (en) A kind of molding grout sleeve of one-step casting
CN110080211A (en) A kind of candidate formula slip casting solid piling method entirely

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant