Pre-grouting type full-grouting sleeve structure Download PDFInfo
- Publication number
- CN211499484U CN211499484U CN201921674968.7U CN201921674968U CN211499484U CN 211499484 U CN211499484 U CN 211499484U CN 201921674968 U CN201921674968 U CN 201921674968U CN 211499484 U CN211499484 U CN 211499484U
- Authority
- CN
- China
- Prior art keywords
- grout
- grouting
- sleeve
- sleeve structure
- barrel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Reinforcement Elements For Buildings (AREA)
Abstract
In order to simplify the telescopic construction process of grout, improve grout telescopic efficiency of construction, the utility model provides a grout full grout sleeve structure of formula in advance. The pre-grouting type full grouting sleeve structure comprises a grout material barrel, wherein a grout overflow hole is formed in the barrel wall of the grout material barrel, barrel opening sealing sleeves are arranged at barrel opening parts at two ends of the grout material barrel respectively, a grout overflow opening sealing sleeve is arranged at a grout overflow opening part of the grout overflow hole, and grouting materials are filled in the grout material barrel. The utility model discloses a grout sleeve structure entirely of formula of grouting in advance, with grout material prefabrication in a thick liquids section of thick bamboo, when being under construction to grout sleeve structure entirely of formula in advance, only need will treat in the connecting reinforcement disect insertion thick liquids section of thick bamboo can. Compared with the traditional grouting sleeve construction process, the grouting operation is omitted, the grouting sleeve construction process is simplified, and the grouting sleeve construction efficiency is improved.
Description
Technical Field
The utility model belongs to the technical field of prefabricated assembly engineering, in particular to grout full grout sleeve structure of formula in advance.
Background
The grouting sleeve is one of the common reinforcing steel bar connection modes of the assembly type building in China at present. Wherein, the sleeve that full grout sleeve is that the both ends reinforcing bar all connects through the grout material, generally is used for the connection of precast beam owner muscle.
In the grouting sleeve, the grouting material is generally dry mixed material formed by mixing cement serving as a basic material, fine aggregate, an additive and other materials. The hardened grouting material is respectively bonded with the steel bar and the grouting sleeve to realize the continuous and reliable force transmission connection structure of the steel bar.
The grouting sleeve has wide application range, but needs complex grouting operation, and the quality of the grouting sleeve is difficult to ensure. Therefore, a new grouting sleeve structure with simple construction is needed.
SUMMERY OF THE UTILITY MODEL
In order to simplify the telescopic construction process of grout, improve grout telescopic efficiency of construction, the utility model provides a grout full grout sleeve structure of formula in advance.
The utility model discloses a grout full grout sleeve structure of formula in advance technical scheme as follows:
the pre-grouting type full grouting sleeve structure comprises a grout material barrel, wherein a grout overflow hole is formed in the barrel wall of the grout material barrel, barrel opening sealing sleeves are arranged at barrel opening parts at two ends of the grout material barrel respectively, a grout overflow opening sealing sleeve is arranged at a grout overflow opening part of the grout overflow hole, and grouting materials are filled in the grout material barrel.
The utility model discloses a grout sleeve structure entirely of formula of grouting in advance, with grout material prefabrication in a thick liquids section of thick bamboo, when being under construction to grout sleeve structure entirely of formula in advance, only need will treat in the connecting reinforcement disect insertion thick liquids section of thick bamboo can. Compared with the traditional grouting sleeve construction process, the grouting operation is omitted, the grouting sleeve construction process is simplified, and the grouting sleeve construction efficiency is improved.
Furthermore, among the full grout sleeve structure of grout in advance, still include the steel bar of treating the connection that the surface set up the catalyst layer. Before the steel bars to be connected are inserted into the slurry barrel, a catalyst can be coated on the surfaces of the steel bars to be connected. After the reinforcing bar to be connected is inserted into the grout material cylinder, the catalyst can accelerate the solidification of grouting material, improves the efficiency of construction.
Furthermore, in the pre-grouting type full grouting sleeve structure, the sleeve opening sealing sleeve is a one-way sealing sleeve. The unidirectional nozzle cuff can be opened from the exterior of the slurry barrel. The arrangement of the one-way sleeve can ensure that grouting materials cannot flow out of the slurry barrel before construction, and can facilitate the insertion of the steel bars to be connected during construction.
Furthermore, among the full grout sleeve structure of grout formula in advance, in order to facilitate the overflow of grout material, the grout outlet sets up in the middle part of thick liquid feed cylinder.
Drawings
Fig. 1 is a schematic view of a pre-grouting type full grouting sleeve structure of the present invention;
fig. 2 is a schematic diagram of a construction method of a pre-grouting type full grouting sleeve structure of the present invention.
Detailed Description
The present invention will be described in further detail with reference to the following drawings and specific embodiments. The advantages and features of the present invention will become more fully apparent from the following description and appended claims. It should be noted that the drawings are in simplified form and are not to precise scale, and are provided for convenience and clarity in order to facilitate the description of the embodiments of the present invention.
Example 1:
referring to fig. 1 to 2, the present embodiment provides a pre-grouting type full grouting sleeve structure, including a grout cylinder 1, a grout outlet 2 is formed on a cylinder wall of the grout cylinder 1, cylinder openings at two ends of the grout cylinder 1 are respectively provided with a cylinder opening sealing sleeve 4, a grout opening sealing sleeve 5 is arranged at a grout opening of the grout outlet 2, and a grouting material 8 is filled in the grout cylinder 1.
The full grout sleeve structure of grouting formula in advance of this embodiment, with grouting material 8 prefabricated in thick liquids section of thick bamboo 1, when being under construction to the full grout sleeve structure of grouting formula in advance, only need will treat that connecting reinforcement 7 disect insertion can in thick liquids section of thick bamboo 1. Compared with the traditional grouting sleeve construction process, the grouting operation is omitted, the grouting sleeve construction process is simplified, and the grouting sleeve construction efficiency is improved.
In a preferred embodiment, the pre-grouting type full grouting sleeve structure further comprises a steel bar 7 to be connected, wherein the surface of the steel bar is provided with a catalyst layer 6. Before inserting the reinforcing bar 7 to be connected into the grout barrel 1, a catalyst may be coated on the surface of the reinforcing bar 7 to be connected. After the reinforcing bar 7 of treating to connect inserts thick liquids feed cylinder 1, the catalyst can accelerate the solidification of grouting material 8, improves the efficiency of construction.
In a preferred embodiment, in the pre-grouting type full grouting sleeve structure, the nozzle jacket 4 is a one-way jacket. The one-way nozzle jacket 4 can be opened from the outside of the pulp cartridge 1. The arrangement of the one-way sleeve can ensure that the grouting material 8 cannot flow out of the slurry barrel 1 before construction, and can facilitate the insertion of the steel bar 7 to be connected during construction.
In a preferred embodiment, in the pre-grouting type full grouting sleeve structure, in order to facilitate the overflow of the grouting material 8, the grout outlet 2 is disposed in the middle of the grout barrel 1.
Example 2:
this embodiment provides a construction method of the pre-grouting type full grouting sleeve structure described in embodiment 1.
The construction method of the pre-grouting type full grouting sleeve structure of the embodiment has the technical characteristics that the construction method comprises the following steps:
firstly, filling grouting material 8 into a grouting material cylinder 1 of a pre-grouting type full grouting sleeve structure;
secondly, embedding a pre-grouting type full grouting sleeve structure into the prefabricated part in the manufacturing process of the prefabricated part;
thirdly, removing the slurry overflow port jacket 5;
fourthly, inserting the reinforcing steel bars 7 to be connected into the slurry barrel 1 from the barrel openings at the two ends of the slurry barrel 1 respectively, and arranging the slurry overflow opening sealing sleeves 5 at the slurry overflow openings of the slurry overflow holes 2 after the redundant grouting material 8 is discharged from the slurry overflow holes 2.
The construction method of the pre-grouting type full grouting sleeve structure of the embodiment is characterized in that the grouting material 8 is prefabricated in the grout barrel 1, and when the pre-grouting type full grouting sleeve structure is constructed, the steel bars 7 to be connected only need to be directly inserted into the grout barrel 1. Compared with the traditional grouting sleeve construction process, the grouting operation is omitted, the grouting sleeve construction process is simplified, and the grouting sleeve construction efficiency is improved.
In a preferred embodiment, in the construction method of the pre-grouting type full grouting sleeve structure, the third step further includes coating a catalyst on the surface of the steel bar 7 to be connected to form the catalyst layer 6. Before inserting the reinforcing bar 7 to be connected into the grout barrel 1, a catalyst may be coated on the surface of the reinforcing bar 7 to be connected. After the reinforcing bar 7 of treating to connect inserts thick liquids feed cylinder 1, the catalyst can accelerate the solidification of grouting material 8, improves the efficiency of construction.
The above description is only for the purpose of describing the preferred embodiments of the present invention, and is not intended to limit the scope of the present invention, and any variations and modifications made by those skilled in the art based on the above disclosure are within the scope of the appended claims.
Claims (4)
1. The pre-grouting type full grouting sleeve structure is characterized by comprising a grout cylinder (1), wherein a grout overflow hole (2) is formed in the cylinder wall of the grout cylinder (1), cylinder openings at two ends of the grout cylinder (1) are respectively provided with a cylinder opening sealing sleeve (4), a grout overflow opening sealing sleeve (5) is arranged at a grout overflow opening of the grout overflow hole (2), and grouting materials (8) are filled in the grout cylinder (1).
2. The pre-grouted full grout sleeve structure of claim 1, further comprising a reinforcing bar (7) to be connected, on the surface of which the catalyst layer (6) is disposed.
3. The pre-grouted fully grouted sleeve structure as claimed in claim 1, wherein the nozzle cuff (4) is a one-way cuff.
4. The pre-grouting type full grout sleeve structure according to claim 1, wherein the grout outlet (2) is provided at the middle of the grout cylinder (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921674968.7U CN211499484U (en) | 2019-10-09 | 2019-10-09 | Pre-grouting type full-grouting sleeve structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921674968.7U CN211499484U (en) | 2019-10-09 | 2019-10-09 | Pre-grouting type full-grouting sleeve structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211499484U true CN211499484U (en) | 2020-09-15 |
Family
ID=72406057
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921674968.7U Active CN211499484U (en) | 2019-10-09 | 2019-10-09 | Pre-grouting type full-grouting sleeve structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211499484U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110656733A (en) * | 2019-10-09 | 2020-01-07 | 上海建工二建集团有限公司 | Pre-grouting type full-grouting sleeve structure and construction method |
-
2019
- 2019-10-09 CN CN201921674968.7U patent/CN211499484U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110656733A (en) * | 2019-10-09 | 2020-01-07 | 上海建工二建集团有限公司 | Pre-grouting type full-grouting sleeve structure and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110656733A (en) | Pre-grouting type full-grouting sleeve structure and construction method | |
CN101319498B (en) | Lattice type prefabricated prestressed underground continuous wall and its construction method | |
CN103075013B (en) | Building construction steel bar connection structure and connection method | |
CN211499484U (en) | Pre-grouting type full-grouting sleeve structure | |
CN110656734A (en) | Pre-grouting type semi-grouting sleeve structure and construction method | |
CN110485552A (en) | Sleeve, prefabricated components connector, prefabricated components and prefabricated components assembly | |
CN211499485U (en) | Pre-grouting type semi-grouting sleeve structure | |
CN206928285U (en) | Prefabricated high-strength core body and pressure type anchor rod | |
CN113293933B (en) | Grouting device and grouting method for grouting sleeve | |
CN110644481A (en) | Radial variable modulus composite pile and construction equipment and construction method thereof | |
CN208518216U (en) | A kind of grout sleeve | |
CN206971379U (en) | Precast beam and column connected node | |
CN205712760U (en) | A kind of grout sleeve and prefabricated component | |
CN213890628U (en) | High-wear-resistance gypsum mortar stirring device for building construction | |
CN107882020A (en) | A kind of Trees with Small Diameters pile construction method and cleaning grouting device | |
CN211286302U (en) | Inner cavity convex multi-point distributed grouting sleeve | |
CN104912069B (en) | A kind of hydrophobic clad steel core glass fiber anti-float anchor rod and construction method thereof | |
CN209163028U (en) | Sleeve, prefabricated components connector, prefabricated components | |
CN211691081U (en) | Self-extrusion fixed grouting sleeve for double parallel ribs connection | |
CN113417465A (en) | Assembled building grout sleeve grout system | |
CN205712764U (en) | A kind of grout sleeve and prefabricated component | |
CN217480625U (en) | A sealing thick liquid device for grout sleeve | |
CN113530093B (en) | Spiral steel pipe type steel bar connecting sleeve and use method thereof | |
CN106939668B (en) | A kind of molding grout sleeve of one-step casting | |
CN110080211A (en) | A kind of candidate formula slip casting solid piling method entirely |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |