CN110080211A - A kind of candidate formula slip casting solid piling method entirely - Google Patents

A kind of candidate formula slip casting solid piling method entirely Download PDF

Info

Publication number
CN110080211A
CN110080211A CN201910401821.9A CN201910401821A CN110080211A CN 110080211 A CN110080211 A CN 110080211A CN 201910401821 A CN201910401821 A CN 201910401821A CN 110080211 A CN110080211 A CN 110080211A
Authority
CN
China
Prior art keywords
vertical
grouting pipe
slip casting
groups
stirrup
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201910401821.9A
Other languages
Chinese (zh)
Inventor
王聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Hanlong Building Material Technology Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910401821.9A priority Critical patent/CN110080211A/en
Publication of CN110080211A publication Critical patent/CN110080211A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of candidate formula slip casting of construction engineering technical field solid piling methods entirely, comprise the following steps step: a. makes steel reinforcement cage, steel reinforcement cage includes the vertical reinforcing bar of multiple groups and multiple groups uniform intervals stirrup, the vertical reinforcing bar of stirrup by iron wire binding and fixing or is welded with the two groups of vertical Grouting Pipes in left and right by iron wire binding and fixing or welding, and on the inside of stirrup;B. two groups of vertical slip casting pipe outer walls are installed into annular Grouting Pipe by evenly spaced connector;C. the outer wall of 20 centimeters of vertical slip casting bottom of the tube and annular Grouting Pipe is bored into slurry outlet, 3 millimeters of pulp bore dia, slurry outlet and between the upper and lower away from 3~5 centimeters;D. steel reinforcement cage is placed into progress pile body in stake holes to pour, after the completion of pouring, after waiting pile concretes initial set, opens plug with high pressure water (8.0MPa);E. start slip casting after seven days, the pressure of grouting pump is controlled in 2~5MPa, and two groups of vertical Grouting Pipe intermittent cyclic mud jacking increase the bearing area at end, improve the bearing capacity of a surrounding soil.

Description

A kind of candidate formula slip casting solid piling method entirely
Technical field
The present invention relates to construction engineering technical field, specially a kind of candidate formula slip casting solid piling method entirely.
Background technique
As the height of urban skyscraper is higher and higher, just higher and higher, institute is required also to the bearing capacity of pile foundation Supplementary technology means must be used with existing pile foundation technology, a technical treatment is done to the unfavorable geology layer under earth's surface to meet into For the requirement of supporting course, it otherwise can not just meet a requirement for side bearing capacity and bearing capacity of pile tip simultaneously.For this purpose, it is proposed that one Plant candidate formula slip casting solid piling method entirely.
Summary of the invention
The purpose of the present invention is to provide a kind of candidate formula slip casting solid piling methods entirely, to solve to mention in above-mentioned background technique Out the problem of.
To achieve the above object, the invention provides the following technical scheme: a kind of candidate formula slip casting solid piling method entirely, including Following process step:
A. steel reinforcement cage is made, steel reinforcement cage includes the vertical reinforcing bar of multiple groups and multiple groups uniform intervals stirrup, and quantity is according to pile Size selection, stirrup and vertical reinforcing bar pass through iron wire binding and fixing or weldering by iron wire binding and fixing or welding on the inside of stirrup It is connected to the two groups of vertical Grouting Pipes in left and right;
B. two groups of vertical slip casting pipe outer walls are installed into annular Grouting Pipe, the vertical Grouting Pipe in left and right by evenly spaced connector The annular Grouting Pipe of outer wall is in staggered distribution up and down;
C. the outer wall of 20 centimeters of vertical slip casting bottom of the tube and annular Grouting Pipe is bored into slurry outlet, 3 millimeters of pulp bore dia, Slurry outlet and between the upper and lower away from 3~5 centimeters;
D. steel reinforcement cage is placed into progress pile body in stake holes to pour, after the completion of pouring, after waiting pile concretes initial set, with height Pressure water (8.0MPa) opens plug;
E. start slip casting after seven days, grouting cement uses ordinary portland cement, and the control of the slurries ratio of mud is infused 0.6 The pressure of stock pump is controlled in 2~5MPa, two groups of vertical Grouting Pipe intermittent cyclic mud jacking.
Further, the vertical Grouting Pipe uses diameter to make for the black pipe of 25mm, infuses vertically described in two adjacent groups Starch pipe connecting pin setting external screw thread simultaneously by inner screw sheath connection, the vertical slip casting length of tube has more 35 than length of reinforcing cage~ 55cm, the vertical Grouting Pipe extend steel reinforcement cage bottom 5cm in stake bottom, and it is mixed that the top of the vertical Grouting Pipe is higher by stake top Solidifying soil 30~50cm of face.
Further, the bottom of the vertical Grouting Pipe is provided with check valve.
Further, the slurry outlet outer layer covers elastic rubber layer, rubber layer be staggered pulp hole site open up it is logical Hole.
Further, the outside of stirrup is arranged in close to bottom bending for the vertical Grouting Pipe.
Compared with prior art, the beneficial effects of the present invention are: the technology will by vertical Grouting Pipe and annular Grouting Pipe Cement grout penetrates into loose stake end and stake side, forms the higher concrete of intensity, lasting cement grout perfusion, mud to It is permeated in bearing course at pile end, increases the bearing strength at end, when cement grout penetrates into the breach of fine mesh after plug is opened in a side In, the bearing capacity of a surrounding soil is improved, to improve bearing capacity of single pile, sedimentation is avoided to deviate.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention;
Fig. 2 is the vertical Grouting Pipe of the present invention and annular Grouting Pipe structural schematic diagram.
In figure: 1 vertical reinforcing bar, 2 stirrups, 3 vertical Grouting Pipes, 31 connectors, 4 annular Grouting Pipes, 5 slurry outlets, 6 check valves.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
The present invention provides a kind of technical solution referring to FIG. 1-2: a kind of candidate formula slip casting solid piling method entirely, including such as Lower process:
A. steel reinforcement cage is made, steel reinforcement cage includes the vertical reinforcing bar 1 of multiple groups and multiple groups uniform intervals stirrup 2, and quantity is according to stake Column dimension selection, stirrup 2 and vertical reinforcing bar 1 pass through iron wire binding and fixing by iron wire binding and fixing or welding on the inside of stirrup 2 Or it is welded with the two groups of vertical Grouting Pipes 3 in left and right;
B. two groups of vertical 3 outer walls of Grouting Pipe are installed into annular Grouting Pipe 4, the vertical note in left and right by evenly spaced connector 31 About the 4 annular Grouting Pipe of slurry 3 outer wall of pipe is in staggered distribution, and guarantees uniformity when slip casting;
C. the outer wall of 20 centimeters of vertical 3 bottom of Grouting Pipe and annular Grouting Pipe 4 is bored into slurry outlet 5,5 diameter 3 of slurry outlet Millimeter, slurry outlet 5 and between the upper and lower away from 3~5 centimeters carry out slip casting to stake side;
D. steel reinforcement cage is placed into progress pile body in stake holes to pour, after the completion of pouring, after waiting pile concretes initial set, with height Pressure water (8.0MPa) opens plug, with clear water to the slabbing action of soil layer around, at subtle netted, creates conditions for slip casting;
E. start slip casting after seven days, seven day time guaranteed the concrete setting poured, cement grout when can prevent slip casting Emerge from weak place is closed on, grouting cement uses ordinary portland cement, the control of the slurries ratio of mud 0.6, grouting pump Pressure is controlled in 2~5MPa, two groups of vertical 3 intermittent cyclic mud jacking of Grouting Pipe.
As shown in Figure 1, vertical Grouting Pipe 3 uses diameter to make for the black pipe of 25mm, the vertical Grouting Pipe 3 of two adjacent groups connects It connects end setting external screw thread and is connected by inner screw sheath, vertical 3 length of Grouting Pipe has more 35~55cm than length of reinforcing cage, vertically Grouting Pipe 3 extends steel reinforcement cage bottom 5cm in stake bottom, guarantees cement grout constantly to due to the stake soft by mud dipping Permeated in the supporting course of end, increase the bearing area at end, the top of vertical Grouting Pipe 3 be higher by stake top concrete surface 30~ 50cm facilitates connection cement grout delivery pipe;
As shown in Fig. 2, the bottom of vertical Grouting Pipe 3 is provided with check valve 6, guarantee that concrete grout will not when recycling slip casting By mud jacking blockage;
5 outer layer covers elastic rubber layer of slurry outlet is opening up through-hole in rubber layer 5 position of slurry outlet that is staggered, simply formed Unidirectional grout hole avoids cement grout refluence from resulting in blockage;
As shown in Figure 1, the outside of stirrup 2 is arranged in close to bottom bending for vertical Grouting Pipe 3, it is convenient to bottom stake end and stake The slip casting of side.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (5)

1. a kind of candidate formula slip casting solid piling method entirely, it is characterised in that: comprise the following steps step:
A. steel reinforcement cage is made, steel reinforcement cage includes the vertical reinforcing bar of multiple groups (1) and multiple groups uniform intervals stirrup (2), and quantity is according to stake Column dimension selection, stirrup (2) and vertical reinforcing bar (1) are tied up by iron wire binding and fixing or welding, and on the inside of stirrup (2) by iron wire It pricks and fixes or be welded with the two groups of vertical Grouting Pipes (3) in left and right;
B. two groups of vertical Grouting Pipe (3) outer walls are installed into annular Grouting Pipe (4) by evenly spaced connector (31), left and right is vertical The annular Grouting Pipe (4) of Grouting Pipe (3) outer wall is in staggered distribution up and down;
C. the outer wall of 20 centimeters of vertical Grouting Pipe (3) bottom and annular Grouting Pipe (4) is bored slurry outlet (5), slurry outlet (5) is straight 3 millimeters of diameter, slurry outlet (5) and between the upper and lower away from 3~5 centimeters;
D. steel reinforcement cage is placed into progress pile body in stake holes to pour, after the completion of pouring, after waiting pile concretes initial set, uses high pressure water (8.0MPa) opens plug;
E. start slip casting after seven days, grouting cement uses ordinary portland cement, and the control of the slurries ratio of mud is 0.6, grouting pump Pressure control in 2~5MPa, two groups of vertical Grouting Pipe (3) intermittent cyclic mud jacking.
2. a kind of candidate formula slip casting according to claim 1 solid piling method entirely, it is characterised in that: the vertical Grouting Pipe (3) diameter is used to make for the black pipe of 25mm, vertical Grouting Pipe (3) connecting pin setting external screw thread described in two adjacent groups simultaneously passes through Inner screw sheath connection, vertical Grouting Pipe (3) length have more 35~55cm, the vertical Grouting Pipe (3) than length of reinforcing cage Extend steel reinforcement cage bottom 5cm in stake bottom, the top of the vertical Grouting Pipe (3) is higher by 30~50cm of stake top concrete surface.
3. a kind of candidate formula slip casting according to claim 1 solid piling method entirely, it is characterised in that: the vertical Grouting Pipe (3) bottom is provided with check valve (6).
4. a kind of candidate formula slip casting according to claim 1 solid piling method entirely, it is characterised in that: the slurry outlet (5) Outer layer covers elastic rubber layer is opening up through-hole in rubber layer slurry outlet (5) position that is staggered.
5. a kind of candidate formula slip casting according to claim 1 solid piling method entirely, it is characterised in that: the vertical Grouting Pipe (3) close to bottom, bending is arranged in the outside of stirrup (2).
CN201910401821.9A 2019-05-15 2019-05-15 A kind of candidate formula slip casting solid piling method entirely Withdrawn CN110080211A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910401821.9A CN110080211A (en) 2019-05-15 2019-05-15 A kind of candidate formula slip casting solid piling method entirely

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910401821.9A CN110080211A (en) 2019-05-15 2019-05-15 A kind of candidate formula slip casting solid piling method entirely

Publications (1)

Publication Number Publication Date
CN110080211A true CN110080211A (en) 2019-08-02

Family

ID=67420220

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910401821.9A Withdrawn CN110080211A (en) 2019-05-15 2019-05-15 A kind of candidate formula slip casting solid piling method entirely

Country Status (1)

Country Link
CN (1) CN110080211A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111074882A (en) * 2019-12-16 2020-04-28 温州中领建设有限公司 Multiple three-dimensional cast-in-place pile structure and method for casting pile body

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111074882A (en) * 2019-12-16 2020-04-28 温州中领建设有限公司 Multiple three-dimensional cast-in-place pile structure and method for casting pile body

Similar Documents

Publication Publication Date Title
CN201722685U (en) No-adhesive prestress and pile side rear grouting punching pile structure
CN104746517B (en) A kind of suspension roof support system of total length below artesian head
CN101812843B (en) Centre grouted poured post-grouting pile construction methods, and grouter and grout injector used thereby
CN111119935A (en) Multi-layer grouting reinforcement method for surrounding rock of soft and broken roadway structure
JP2008150774A (en) Two step high/low concentration grout construction method
CN109024721B (en) Reinforced foundation and method for improving bending and shearing resistance of existing building rigid foundation
CN101289855A (en) Uplift pile construction method through grouting at sides of pile
CN109798140A (en) Km Deep Soft Rock fracture grouting support reinforcement method
CN108130903A (en) A kind of bored concrete pile grouting behind shaft or drift lining construction technology
CN109881668A (en) For soft layer, banket and the foundation construction method of sandy soils
CN112695809A (en) Structure and method for preventing downward-lying tunnel from floating upwards due to river channel excavation
CN105937221A (en) Manufacturing method for drilled grouting piles
CN209011137U (en) A kind of prestressing force miniature steel pipe pile constructing structure
CN110080211A (en) A kind of candidate formula slip casting solid piling method entirely
CN101793027A (en) Core-grouted static pressure anchor rod pile
CN113431046B (en) Post-grouting construction method for cast-in-place pile
CN105442593B (en) U-tube grouting behind shaft or drift lining strengthening construction apparatus and method in coring hole
CN108677891B (en) Spillway slide-resistant structure of rock-fill dam body
CN107503324B (en) Artificial dam anti-seepage reinforcing device and anti-seepage reinforcement method
CN110158589A (en) The Water sealing method and its seal water structure of the anchor cable hole of water rich strata diaphram wall
CN109183786A (en) A kind of post-tensioned prestressing resistance to plucking small diameter long screw pouring piles and its construction method
CN108221948A (en) A kind of method for processing foundation
CN206110124U (en) Bored concrete pile stake end post grouting device
CN110004938A (en) A kind of foundation pit side-wall structural strengthening suspension device
CN201635072U (en) Centrally grouted static-pressured anchor pile former

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190923

Address after: 221000 Building 1-1003, Office F, Green Business City, Yunlong District, Xuzhou City, Jiangsu Province

Applicant after: Jiangsu Hanlong Building Material Technology Co.,Ltd.

Address before: Room 1101, Building 1, Building 2, Taishan District Complex Building, Quanshan District, Xuzhou City, Jiangsu Province, 221000

Applicant before: Wang Cong

SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20190802