CN211499310U - Connection structure of reserved open-hole type partially-coated concrete combined shear wall - Google Patents

Connection structure of reserved open-hole type partially-coated concrete combined shear wall Download PDF

Info

Publication number
CN211499310U
CN211499310U CN201921687175.9U CN201921687175U CN211499310U CN 211499310 U CN211499310 U CN 211499310U CN 201921687175 U CN201921687175 U CN 201921687175U CN 211499310 U CN211499310 U CN 211499310U
Authority
CN
China
Prior art keywords
wing plates
bottom plate
plates
connecting beam
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921687175.9U
Other languages
Chinese (zh)
Inventor
潘庆华
蒋路
杨宇焜
回之正
邵琪琳
谢骁蒙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaoxing Seiko Green Building Integrated Systems Industrial Co ltd
Original Assignee
Shaoxing Seiko Green Building Integrated Systems Industrial Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaoxing Seiko Green Building Integrated Systems Industrial Co ltd filed Critical Shaoxing Seiko Green Building Integrated Systems Industrial Co ltd
Priority to CN201921687175.9U priority Critical patent/CN211499310U/en
Application granted granted Critical
Publication of CN211499310U publication Critical patent/CN211499310U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model relates to the field of buildings, in particular to a connection structure of a reserved open-hole type partially-coated concrete combined shear wall, which comprises a long wall limb, a short wall limb and a connecting beam, wherein the long wall limb and the short wall limb comprise a web plate and wing plates, the wing plates are vertically and fixedly arranged on two sides of the web plate to form an I shape, and cells formed by the wing plates and the web plate are filled by concrete pouring; the connecting beam comprises a bottom plate and side plates, the bottom plate and the side plates on the two sides form a U-shaped structure, connecting holes which correspond to each other are formed in the bottom plate of the connecting beam and the wing plates on the side edges of the long wall limbs, and the bottom plate of the connecting beam and the connecting holes in the wing plates on the side edges of the long wall limbs are connected through connecting pieces; one side plate of the connecting beam and the web plate of the short wall limb are vertically arranged and welded and fixed. After the scheme is adopted, the processing production and the field splicing are convenient, and the structural design performance requirements are met.

Description

Connection structure of reserved open-hole type partially-coated concrete combined shear wall
Technical Field
The utility model relates to a building field refers in particular to a reservation trompil formula partial cladding concrete composite shear wall's joint construction.
Background
China vigorously pushes the traditional building to be transformed into an industrialized building. In the traditional building, most of work needs to be finished on a construction site, and the problems of long construction period, serious environmental pollution, large stacking field, shortage of constructors and the like become barriers for inhibiting the progress of the building industry. The partially-coated concrete composite shear wall (PEC shear wall) is produced by an industrial production line, concrete is directly poured into a semi-open cavity defined by a steel flange and a steel web, no additional template is needed for pouring on a mold table, and the construction speed is high. The straight shear wall has weaker external stability, so that the shear walls adopted in practical engineering are mostly L-shaped and T-shaped, so that the wall limbs mutually provide external constraint to ensure the stability, and the PEC combined shear wall limb splicing part with the special shape can bring greater difficulty for pouring if an integral prefabrication process that all the wall limbs are welded firstly and then poured is adopted. In order to solve the processing difficulty of the special-shaped PEC composite shear wall and avoid the weak point of the external stability of the wall surface of the straight shear wall, so that the special-shaped PEC composite shear wall is convenient to process, produce and splice on site and meets the structural design performance requirements, the inventor of the invention further researches the special-shaped PEC composite shear wall and develops a connection structure of a reserved open-cell type partially-coated concrete composite shear wall and a construction method thereof.
SUMMERY OF THE UTILITY MODEL
In order to achieve the above purpose, the technical solution of the present invention is as follows:
a connection structure of a reserved open-hole type partially-coated concrete combined shear wall comprises a long wall limb, a short wall limb and a connection beam, wherein the long wall limb and the short wall limb comprise a web plate and wing plates, the wing plates are vertically and fixedly arranged on two sides of the web plate to form an I shape, and a cell formed by the wing plates and the web plate is filled by pouring concrete; the connecting beam comprises a bottom plate and side plates, the bottom plate and the side plates on the two sides form a U-shaped structure, connecting holes which correspond to each other are formed in the bottom plate of the connecting beam and the wing plates on the side edges of the long wall limbs, and the bottom plate of the connecting beam and the connecting holes in the wing plates on the side edges of the long wall limbs are connected through connecting pieces; one side plate of the connecting beam and the web plate of the short wall limb are vertically arranged and welded and fixed.
The long wall limb, the short wall limb and the connecting beam can be prefabricated in a factory, then the connecting holes between the wing plates of the long wall limb and the bottom plates of the connecting beams are aligned when the site construction is carried out, the through bolts are fastened, and finally the splicing part and the contact part are reinforced by spot welding.
Further, the connecting piece is a bolt.
Furthermore, the connecting holes on the wing plate of the long wall limb are uniformly distributed on two sides of the web plate.
Too close spacing between the attachment holes will reduce the strength of the panels themselves, while too few attachment holes will reduce the strength of the attachment between the panels.
After the scheme is adopted, compared with the prior art, the utility model, have following advantage:
the processing difficulty of the special-shaped combined shear wall is solved, the outer stability weakness of the wall surface of the straight shear wall is avoided, the processing production and the field splicing are facilitated, and the structural design performance requirement is met.
Drawings
Fig. 1 is a schematic diagram of an embodiment of the present invention;
FIG. 2 is an unstitched schematic view of FIG. 1;
description of the reference symbols
The wall comprises a long wall limb 1, a short wall limb 2, a connecting beam 3, a web plate 4, wing plates 5, a bottom plate 6, side plates 7 and connecting holes 8.
Detailed Description
The invention will be further described with reference to the accompanying drawings and specific embodiments.
As shown in the figure, the connection structure of the reserved open-hole type partially-coated concrete combined shear wall comprises a long wall limb 1, a short wall limb 2 and a connecting beam 3, wherein the long wall limb 1 and the short wall limb 2 both comprise a web plate 4 and wing plates 5, the wing plates 5 are vertically and fixedly arranged (or formed by welding or integral pouring and forging forming) to form I shapes on two sides of the web plate 4, the wing plates 5 and the web plate 4 form a plurality of cells, and the cells are filled with concrete through pouring.
The connecting beam 3 comprises a bottom plate 6 and side plates 7, the bottom plate 6 and the side plates 7 on two sides form a U-shaped structure, connecting holes 8 which correspond to each other are formed in the bottom plate 6 of the connecting beam 3 and the wing plates 5 on the side edge of the long wall limb 1, and the bottom plate 6 of the connecting beam 3 and the connecting holes 8 on the wing plates 5 on the side edge of the long wall limb 1 are connected through bolts; one side plate 7 of the connecting beam 3 and the web 4 of the short wall limb 2 are vertically arranged and welded, so that the long wall limb 1 and the short wall limb 2 form an L-shaped structure. The connecting holes 8 on the wing plates 5 of the long wall limbs 1 are uniformly distributed on two sides of the web plates 4, the strength of the plates is reduced when the connecting holes 8 are spaced too close, and the connecting strength between the plates is reduced when the connecting holes 8 are too few.
A construction method of a reserved open-hole type combined shear wall comprises the following steps:
weld web 4 and pterygoid lamina 5 in proper order and form long wall limb 1, the I-shaped steel skeleton of short wall limb 2, the steel skeleton is many cell structures, regard the channel-section steel as tie-beam 3, one of them curb plate 7 of tie-beam 3 and web 4 of short wall limb 2 set up perpendicularly and welded fastening, reserve the bolt hole on 1 side pterygoid lamina 5 of long wall limb and 3 bottom plates 6 of tie-beam, through calibration many times, after transporting to the job site, during on-the-spot hoist and mount concatenation, align the pterygoid lamina 5 of long wall limb 1 and connecting hole 8 between the bottom plate 6 of tie-beam 3, to wearing the bolt fastening, at last splice department and contact site spot welding reinforcement.
The special-shaped PEC combined shear wall solves the processing difficulty of the special-shaped PEC combined shear wall, avoids the weak point of external stability of the wall surface of the straight shear wall, is convenient to process, produce and splice on site, and meets the requirement of structural design performance.
The aforesaid is only the embodiment of the utility model discloses, all simultaneously the utility model discloses in related words such as "upper and lower, left and right, centre" only do the reference usefulness, not absolutely restricted, all utilize the utility model discloses carry out insubstantial change, all shall belong to the act of infringing the protection scope of the utility model.

Claims (3)

1. The utility model provides a reservation open cell formula partial cladding concrete composite shear wall's connection structure which characterized in that: the long wall limb and the short wall limb comprise webs and wing plates, the wing plates are vertically and fixedly arranged on two sides of the webs to form an I shape, and cells formed by the wing plates and the webs are filled by pouring concrete; the connecting beam comprises a bottom plate and side plates, the bottom plate and the side plates on the two sides form a U-shaped structure, connecting holes which correspond to each other are formed in the bottom plate of the connecting beam and the wing plates on the side edges of the long wall limbs, and the bottom plate of the connecting beam and the connecting holes in the wing plates on the side edges of the long wall limbs are connected through connecting pieces; one side plate of the connecting beam and the web plate of the short wall limb are vertically arranged and welded and fixed.
2. The connection structure of a pre-opened partially-coated concrete composite shear wall as claimed in claim 1, wherein: the connecting piece is a bolt.
3. The connection structure of a pre-opened partially-coated concrete composite shear wall as claimed in claim 1, wherein: the connecting holes on the wing plate of the long wall limb are uniformly distributed on two sides of the web plate.
CN201921687175.9U 2019-10-10 2019-10-10 Connection structure of reserved open-hole type partially-coated concrete combined shear wall Active CN211499310U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921687175.9U CN211499310U (en) 2019-10-10 2019-10-10 Connection structure of reserved open-hole type partially-coated concrete combined shear wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921687175.9U CN211499310U (en) 2019-10-10 2019-10-10 Connection structure of reserved open-hole type partially-coated concrete combined shear wall

Publications (1)

Publication Number Publication Date
CN211499310U true CN211499310U (en) 2020-09-15

Family

ID=72406363

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921687175.9U Active CN211499310U (en) 2019-10-10 2019-10-10 Connection structure of reserved open-hole type partially-coated concrete combined shear wall

Country Status (1)

Country Link
CN (1) CN211499310U (en)

Similar Documents

Publication Publication Date Title
CN108301545A (en) A kind of big module overlapping contignation of the assembled with space truss temporary support
CN212104574U (en) Floor board and shear wall corner steel construction for assembly type building
CN103397727A (en) Connection structure of building steel beam and composite floor slab
CN113152764A (en) Prefabricated composite floor slab adopting riveting C-shaped steel and steel plate and construction method thereof
CN112832415A (en) Partially-coated steel-concrete combined shear wall member
CN211499312U (en) Bolt type connection structure of partially-coated concrete combined shear wall
CN112443062A (en) Hidden beam type bolt connection full-prefabricated reinforced concrete slab structure
CN201176366Y (en) Hook structure for suspensing transportation device added in buildings
CN211114081U (en) Z-shaped double-splint node assembly type H-shaped steel beam square steel pipe column steel structure system
CN206090815U (en) Prefabricated assembled tube structure public building
CN210530024U (en) Vertical concatenation tempering node of partial cladding shaped steel concrete shear force wall
CN210827935U (en) Assembled modularization lightweight steel construction wall connection structure
CN211499310U (en) Connection structure of reserved open-hole type partially-coated concrete combined shear wall
CN211143440U (en) Assembled bidirectional steel bar truss floor
CN217679649U (en) Novel steel structure beam column rigid connection node adopting C-shaped connecting piece
CN214785031U (en) Partially-coated steel-concrete combined shear wall member
CN213539882U (en) Middle node of steel pipe concrete column H-shaped steel beam support pi-shaped connecting side column
CN214883834U (en) Novel combination beam and retaining wall connected node structure
CN110820993A (en) Connecting process of reserved open-hole type partially-coated concrete combined shear wall
CN211499311U (en) Connection structure of internal push bolt type coated concrete combined shear wall
CN111962953B (en) Concrete filled steel tube column-H-shaped steel beam-steel support-pi-shaped connecting piece combined side column middle node and manufacturing method
CN113802741A (en) Pin shear connection assembly type beam-slab combination system based on orthogonal corrugated steel plate bending-resistant tie-bar composite floor slab
CN211775070U (en) Floor support plate connected by its shaped folded plate
CN210395642U (en) Detachable assembly type steel structure building connecting node
CN210530025U (en) Connecting structure of multi-section beam type partially-coated concrete combined shear wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant