CN211498945U - Leading-out structure of rigid pipeline of comprehensive pipe rack - Google Patents

Leading-out structure of rigid pipeline of comprehensive pipe rack Download PDF

Info

Publication number
CN211498945U
CN211498945U CN201921846854.6U CN201921846854U CN211498945U CN 211498945 U CN211498945 U CN 211498945U CN 201921846854 U CN201921846854 U CN 201921846854U CN 211498945 U CN211498945 U CN 211498945U
Authority
CN
China
Prior art keywords
calandria
pipe
corridor
rigid
reservation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921846854.6U
Other languages
Chinese (zh)
Inventor
陈哲明
强健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority to CN201921846854.6U priority Critical patent/CN211498945U/en
Application granted granted Critical
Publication of CN211498945U publication Critical patent/CN211498945U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model relates to a structure of drawing forth of utility tunnel rigid conduit, including the reservation calandria that passes the corridor wall, pre-buried wall bushing in its characterized in that corridor wall, reservation calandria wear to establish in the wall bushing, reservation calandria tip sets up detachable blind flange in the corridor, reservation calandria below sets up the bracket outside the corridor. The utility model discloses draw forth rigid pipe way (heat supply, feedwater, gas etc.) pipe diameter and draw forth the position at utility tunnel long-term under the unable complete definite condition of construction phase, can overcome traditional utility tunnel rigid pipe way and draw forth that the reservation mouth can't draw forth different pipe diameter pipelines in a flexible way and can't overcome the inhomogeneous settlement of ground and cause the cracked problem of kneck very well.

Description

Leading-out structure of rigid pipeline of comprehensive pipe rack
Technical Field
The utility model belongs to the technical field of the technique of utility tunnel and specifically relates to when considering that the different positions of different pipe diameters of all kinds of rigid pipeline (heat supply, feedwater, gas etc.) draw forth in the utility tunnel, the structure way of drawing forth of a utility tunnel rigid pipeline that can adopt.
Background
The utility tunnel is a structure and accessory facilities which are built under the city and used for accommodating two or more types of city engineering pipelines. A municipal public tunnel is built under an urban road, various municipal pipelines such as electric power, communication, water supply, fuel gas and the like are integrated into a whole structure, and a special overhaul port, a lifting port and a monitoring system are arranged to implement unified planning, design, construction and management.
The comprehensive pipe gallery is built, so that the phenomenon of 'link pulling' in a city is eliminated, the smooth traffic is guaranteed, and the economic development is promoted; the requirement of developing and utilizing the urban underground space is met; the method is required for ensuring the safe operation of urban underground pipelines and improving the urban disaster prevention capability; is a need for improving urban environment construction. Therefore, the science and technology department, the construction department and the financial department have made intensive research and popularization on the comprehensive arrangement of the municipal pipelines as a new technology for the construction of new cities and the comprehensive transformation of old cities. Under the big background, in recent years, a large number of municipal comprehensive pipe galleries are planned or built in city construction all over the country, the development is towards networking, systematization and multistage, and the functions of the pipe gallery service land parcel are exerted to the maximum extent by utilizing the advantages of multistage.
Because utility tunnel design live time is long, the demand of drawing forth of all kinds of municipal pipeline in the corridor can be along with the development of utility tunnel institute service landmass constantly changes, especially rigid pipe, and its pipe diameter and route often change greatly, and meanwhile, the excavation of future road is avoided to an important a bit of utility tunnel construction, consequently just sets up the structure that can satisfy rigid pipe in the piping lane and draw forth the demand in the future and becomes the problem of awaiting the need to be solved promptly in the construction period.
Generally, the leading-out construction method of the rigid pipeline in the comprehensive pipe rack adopts the following two measures: (1) leading out a branch gallery; (2) and planning the pre-buried pipelines according to each municipal pipeline. Measure (1) can satisfy the demand of drawing forth of different pipe diameters of each municipal pipeline long-term and different positions, but the setting up of a corridor can increase utility tunnel's construction cost on the one hand, and on the other hand can occupy a large amount of latent layer spaces under the road, leads to the passing through of other not corridor pipelines to occupy the space beyond the red line of road. Measure (2) can satisfy the final requirement of plot development in the planning, but pipeline pipe diameter and position are along with the constantly changeable of plot actual development situation, if the pipe diameter and the position of original buried pipeline can't satisfy the demand, need lay direct buried pipeline to plot in addition.
Therefore, under the condition that the rigid pipeline can not completely determine the leading-out pipe diameter and the leading-out position in the construction period, leading-out of pipelines with different pipe diameters and different leading-out positions in a long period is guaranteed, one-time construction is achieved, the pipeline is permanently used, and the pipeline is economical and reasonable, and is a problem to be solved urgently in the construction of a comprehensive pipe gallery.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a structure of drawing forth of utility tunnel rigid conduit draws forth rigid conduit (heat supply, feedwater, gas etc.) pipe diameter and draw forth the position at utility tunnel long-term under the unable condition of confirming completely in the construction phase, can overcome traditional utility tunnel rigid conduit and draw forth that the reservation mouth can't draw forth different pipe diameter pipelines in a flexible way and can't overcome the inhomogeneous settlement of ground and cause the cracked problem of kneck very well.
In order to realize the purpose, the technical scheme of the utility model is that: the utility model provides a structure of drawing forth of utility tunnel rigid conduit, includes the reservation calandria that passes the corridor wall, pre-buried wall bushing in its characterized in that corridor wall, it wears to establish in the wall bushing to reserve the calandria, and it sets up detachable blind flange lid to reserve the calandria tip in the corridor to reserve the calandria, sets up the bracket outside the corridor.
Furthermore, a flange plate is arranged at the end part of a reserved discharge pipe in the gallery, when the pipe is not penetrated, a blind flange cover can be disassembled to be connected with the flange plate through bolts, and asphalt hemp thread plugs are arranged in the reserved discharge pipe; when the pipe is penetrated, the detachable blind flange cover is detached, the rigid leading-out pipeline penetrates through the reserved pipe, and the gap between the rigid leading-out pipeline and the reserved pipe is sealed by asphalt hemp threads.
Further, the inner section of the reserved pipe rack is provided with a concrete package.
The utility model discloses a reserve the calandria and jointly set up with waterproof sleeve pipe to reserve the calandria tip in the corridor and set up detachable blind flange lid, reserve the mode that the calandria below set up the bracket outside the corridor, provide a structure of drawing forth of utility tunnel rigid conduit. The advantages are that: the bracket can reduce the possibility of breakage at the intersection of the discharge pipe and the reserved opening caused by uneven settlement of the foundation; the flange closing plate can solve the waterproof problem during the period of no pipe penetration on one hand, and can be repeatedly opened when the pipe penetration is needed on the other hand; the waterproof sleeve and the reserved pipes are combined, so that pipelines with different pipe diameters can be led out in a long period; the leading-out construction method can meet the requirement that the pipe rack passing through the road is constructed together with the road in the construction period, and can simultaneously lead out rigid pipelines with different pipe diameters in different land blocks in a long term, thereby achieving one-time construction, permanent use and economy and reasonableness.
Drawings
Fig. 1 is a schematic view of a conventional calandria extraction configuration.
Fig. 2 is a schematic drawing of a rigid duct exit plan.
Fig. 3 is a schematic drawing of the rigid conduit in an outgoing section.
Fig. 4 is a schematic view of a rigid pipe run-out configuration (unpenetrated state).
Fig. 5 is a schematic view of a rigid pipe leading-out configuration (a pipe threading state).
The figure includes: 1. the device comprises a reserved pipe, 2, a wall-penetrating waterproof sleeve, 3, a blind flange cover, 4, a bracket, 5, a flange plate, 6, asphalt hemp threads, 7, concrete encapsulation, 8, a pre-buried wall-penetrating waterproof wall pipe, 9, bolts, 10, a rigid leading-out pipeline, 11, a heat supply pipeline leading-out end, 12, a reserved reclaimed water pipeline pipe, 13 and a water supply pipeline leading-out end.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and specific embodiments.
The urban underground comprehensive pipe gallery can meet the requirements of leading out different pipe diameters and positions of long-term rigid pipelines.
Fig. 1 is a schematic view of a conventional calandria extraction configuration. The traditional calandria is drawn forth the structure and is included pre-buried wall waterproof wall pipe 8, and pre-buried wall waterproof wall pipe 8 corridor outer end is connected and is reserved calandria 1, and pre-buried wall waterproof wall pipe 8 is interior to be blocked with pitch hemp 6.
Fig. 4 is a schematic diagram of the rigid pipeline leading-out structure of the present invention. The utility model provides a structure of drawing forth of utility tunnel rigid conduit, includes the reservation calandria 1 that passes the corridor wall, pre-buried wall bushing 2 in its characterized in that corridor wall, reservation calandria 1 wears to establish in wall bushing 2, reservation calandria 1 reserves the calandria tip in the corridor and sets up ring flange 5, sets up detachable blind flange 3 on ring flange 5, reserves 2 below settings brackets 4 of calandria outside the corridor.
It can be seen from comparing fig. 1 and 4 that two kinds of structures all possess the function that the rigid pipeline was drawn forth, but traditional structure does not set up and reserves wall waterproof bushing 2, blind flange lid 3 and bracket 4, reserves calandria 1 and pre-buried wall waterproof wall pipe 8 rigid connection, takes place to destroy easily, and the unable adjustment of pipe diameter is drawn forth to the long-term.
The utility model discloses a waterproof sleeve pipe combines the setting with the reservation calandria, can realize drawing forth of different pipe diameter pipelines in the long-term.
Reserve the calandria tip in the corridor and be provided with detachable blind flange 3, waterproof problem during can solving not poling on the one hand, on the other hand can be opened repeatedly when needs poling or change pipeline. The bracket 4 is arranged below the reserved discharge pipe outside the gallery, so that the possibility of breakage at the intersection of the discharge pipe and the reserved opening caused by uneven settlement of the foundation can be reduced.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, a plurality of modifications and replacements can be made without departing from the technical principle of the present invention, and these modifications and replacements should also be regarded as the protection scope of the present invention.

Claims (3)

1. The utility model provides a structure of drawing forth of utility tunnel rigid conduit, includes the reservation calandria that passes the corridor wall, pre-buried wall bushing in its characterized in that corridor wall, it wears to establish in the wall bushing to reserve the calandria, and it sets up detachable blind flange lid to reserve the calandria tip in the corridor to reserve the calandria, sets up the bracket outside the corridor.
2. The extraction structure of the utility tunnel rigid pipeline of claim 1, characterized in that: the end part of a reserved discharge pipe in the gallery is provided with a flange plate, when the pipe is not penetrated, a blind flange cover can be disassembled to be connected with the flange plate through a bolt, and an asphalt hemp thread plug is arranged in the reserved discharge pipe; when the pipe is penetrated, the detachable blind flange cover is detached, the rigid leading-out pipeline penetrates through the reserved pipe, and the gap between the rigid leading-out pipeline and the reserved pipe is sealed by asphalt hemp threads.
3. The extraction structure of the utility tunnel rigid pipeline of claim 1, characterized in that: the inner section of the reserved pipe rack is provided with a concrete envelope.
CN201921846854.6U 2019-10-30 2019-10-30 Leading-out structure of rigid pipeline of comprehensive pipe rack Active CN211498945U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921846854.6U CN211498945U (en) 2019-10-30 2019-10-30 Leading-out structure of rigid pipeline of comprehensive pipe rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921846854.6U CN211498945U (en) 2019-10-30 2019-10-30 Leading-out structure of rigid pipeline of comprehensive pipe rack

Publications (1)

Publication Number Publication Date
CN211498945U true CN211498945U (en) 2020-09-15

Family

ID=72407855

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921846854.6U Active CN211498945U (en) 2019-10-30 2019-10-30 Leading-out structure of rigid pipeline of comprehensive pipe rack

Country Status (1)

Country Link
CN (1) CN211498945U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112779928A (en) * 2021-01-26 2021-05-11 中冶京诚工程技术有限公司 Comprehensive pipe rack branch mouth structure of dodging barrier

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112779928A (en) * 2021-01-26 2021-05-11 中冶京诚工程技术有限公司 Comprehensive pipe rack branch mouth structure of dodging barrier

Similar Documents

Publication Publication Date Title
CN204898721U (en) Steel construction city utility tunnel
CN107131001A (en) A kind of and water delivery and the Railway Tunnel of communication function
CN107542106A (en) The pipe gallery built using the pavement underground space
CN105064400A (en) Urban comprehensive pipe rack of steel corrugated plate structure
CN211498945U (en) Leading-out structure of rigid pipeline of comprehensive pipe rack
CN207053151U (en) A kind of pipe gallery cable line outlet arrangement
CN107542153A (en) A kind of method and pipe gallery for solving urban waterlogging
WO2021063295A1 (en) Fire-fighting water supply system for super-long tunnel
CN206346222U (en) The pipe gallery built using the pavement underground space
CN205617425U (en) Prefabricated structure of assembling of utility tunnel
CN205296347U (en) Arrangement structure that utility tunnel internal drain pipe said
CN205894103U (en) Prefabricated parabola type utility tunnel
CN201162227Y (en) Underground pipe canal
CN208136954U (en) Precast splice type Pipe rack
CN110847228A (en) Leading-out structure of rigid pipeline of comprehensive pipe rack
CN206903689U (en) A kind of and water delivery and the Railway Tunnel of communication function
CN102691312A (en) Precast assembled pipeline combined shaft
CN210766884U (en) Underground cover plate ditch suitable for pipeline collection
CN205530342U (en) Outer hanging utility tunnel
CN207760873U (en) Assembled steel pipe gallery sewage conduct maintenance structure
CN209587393U (en) A kind of pipeline mismatch no-dig technique liner steel collar prosthetic device
CN111733882A (en) Assembled underground utility tunnel cross connected node
CN212716751U (en) High-pressure water-rich tunnel drainage system
CN210369045U (en) Underground comprehensive pipe gallery structure
CN203521114U (en) Special isolation transformer box mounting structure for airport

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant