CN211498932U - Pre-buried pipe device of equipment foundation - Google Patents

Pre-buried pipe device of equipment foundation Download PDF

Info

Publication number
CN211498932U
CN211498932U CN201922058809.0U CN201922058809U CN211498932U CN 211498932 U CN211498932 U CN 211498932U CN 201922058809 U CN201922058809 U CN 201922058809U CN 211498932 U CN211498932 U CN 211498932U
Authority
CN
China
Prior art keywords
embedded pipe
embedded
equipment foundation
steel sheet
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922058809.0U
Other languages
Chinese (zh)
Inventor
郭凯
李强
孙玉强
孙磊
王发涛
郑付强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SEPCO1 Electric Power Construction Co Ltd
Original Assignee
SEPCO1 Electric Power Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SEPCO1 Electric Power Construction Co Ltd filed Critical SEPCO1 Electric Power Construction Co Ltd
Priority to CN201922058809.0U priority Critical patent/CN211498932U/en
Application granted granted Critical
Publication of CN211498932U publication Critical patent/CN211498932U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model relates to an engineering construction technology specifically is a pre-buried tub of device of equipment foundation, set up the template that is used for supporting the pre-buried pipe of several including last horizontal pole, sheer pole, several vertical pole and level, after the vertical pole one-to-one passed pre-buried pipe and template, both ends ligature respectively on last horizontal pole and sheer pole. Still be equipped with at least a circular shape steel sheet in the embedded pipe, the center of steel sheet is passed by the vertical pole, the external diameter of steel sheet equals the internal diameter of embedded pipe, the thickness of steel sheet is no longer than 4 mm. The longitudinal and transverse rod pieces are combined into a scaffold structure to simultaneously position a plurality of embedded pipes to the mounting positions, so that the working procedures are reduced, and a large number of construction periods are saved. Meanwhile, after the pouring is finished, the exposed longitudinal and transverse rod pieces and the steel plates can be detached for recycling, so that the material cost is greatly saved.

Description

Pre-buried pipe device of equipment foundation
Technical Field
The utility model relates to an engineering construction technology specifically is a pre-buried pipe device of equipment foundation.
Background
During construction of building engineering, a large number of sleeves need to be embedded. During casing fixed construction, the tradition mode is fixed for the model frame mode, pours in the concrete for the model frame that channel-section steel or angle bar welding combination formed promptly, and this just leads to the unable used repeatedly once more of model frame, and the material is extravagant comparatively serious.
Disclosure of Invention
In order to solve the problem, the utility model provides an equipment foundation's pre-buried pipe device plays environmental protection construction, cost reduction and efficiency's effect. The utility model adopts the technical scheme as follows:
the utility model provides an equipment foundation's buried pipe device in advance, includes that horizontal pole, sheer pole, several vertical pole and level set up the template that is used for supporting the several pipe in advance, after the vertical pole one-to-one passed pipe in advance and template, both ends were ligatured respectively on sheer pole and sheer pole.
The embedded pipe device of the equipment foundation is characterized in that at least one round steel plate is further arranged in the embedded pipe, the center of the steel plate is penetrated through by a longitudinal rod, the outer diameter of the steel plate is equal to the inner diameter of the embedded pipe, and the thickness of the steel plate is not more than 4 mm.
The embedded pipe device of the equipment foundation is characterized in that the number of the steel plates is two, one steel plate is arranged at a position 30-50 mm away from the lower port of the embedded pipe, and the other steel plate is arranged at a position 30-50 mm away from the upper port of the embedded pipe.
The pre-buried pipe device of above-mentioned equipment foundation, be equipped with 2~4 groups strengthening rib groups on the lateral wall of pre-buried pipe, every group strengthening rib group includes 3~6 anchor bars along pre-buried pipe radial welding.
The embedded pipe device of the equipment foundation is characterized in that the anchor bars are steel bars with the diameter of 16mm, and the distance between every two adjacent anchor bars is not less than 300 mm.
The pre-buried tub of device on above-mentioned equipment foundation, it all adopts the steel pipe that the diameter is 48mm to go up horizontal pole, sheer pole and vertical pole, template thickness is 15 mm.
The utility model has the advantages that: the longitudinal and transverse rod pieces are combined into a scaffold structure to simultaneously position a plurality of embedded pipes to the mounting positions, so that the working procedures are reduced, and a large number of construction periods are saved. Meanwhile, after the pouring is finished, the exposed longitudinal and transverse rod pieces and the steel plates can be detached for recycling, so that the material cost is greatly saved.
Drawings
Fig. 1 is a schematic structural diagram of an embodiment of the present invention.
In the figure: 1 is a pre-buried pipe, 2 is an upper cross rod, 3 is a longitudinal rod, 4 is a lower cross rod, 5 is a template, 6 is a steel plate, and 7 is an anchor bar.
Detailed Description
The present invention will be further explained with reference to the accompanying drawings.
The utility model provides an equipment foundation's buried pipe device in advance, includes that horizontal pole 2, sheer pole 4, several vertical pole 3 and level set up and be used for supporting the template 5 of several embedded pipe 1, 3 one-to-one of vertical pole pass behind embedded pipe 1 and the template 5, both ends ligature respectively on horizontal pole 2 and sheer pole 4. The template 5 and the longitudinal rod 3 limit the transverse and longitudinal movement of the embedded pipe 1 and position the embedded pipe 1.
According to the embedded pipe device of the equipment foundation, at least one circular steel plate 6 is further arranged in the embedded pipe 1, the center of the steel plate 6 is penetrated by the longitudinal rod 3, the outer diameter of the steel plate 6 is equal to the inner diameter of the embedded pipe 1, and the thickness of the steel plate 6 is not more than 4 mm.
According to the embedded pipe device of the equipment foundation, the steel plates 6 are arranged in two numbers, one steel plate 6 is arranged at a position 30-50 mm away from the lower port of the embedded pipe 1, and the other steel plate 6 is arranged at a position 30-50 mm away from the upper port of the embedded pipe 1. The concrete is poured into in the embedded pipe 1 when the steel sheet 6 can avoid pouring, and simultaneously, the steel sheet 6 can also further fix a position embedded pipe 1's position, dislocation when avoiding pouring.
The embedded pipe device of the equipment foundation is characterized in that 2-4 groups of reinforcing rib groups are arranged on the outer side wall of the embedded pipe 1, and each group of reinforcing rib group comprises 3-6 anchor bars 7 which are welded along the radial direction of the embedded pipe 1. In this embodiment, the four directions of the outer side wall of the embedded pipe 1 are respectively provided with reinforcing rib groups, and each reinforcing rib group comprises 4 anchor bars
According to the embedded pipe device of the equipment foundation, the anchor bars 7 are steel bars with the diameter of 16mm, and the distance between every two adjacent anchor bars 7 is not smaller than 300 mm.
The pre-buried tub of device on above-mentioned equipment foundation, it is 48 mm's steel pipe that the diameter all adopts to go up horizontal pole 2, bottom end rail 4 and vertical pole 3, 5 thickness of template are 15 mm.

Claims (6)

1. The utility model provides an equipment foundation's pre-buried tub of device which characterized in that: the embedded pipe type embedded pipe fixing device is characterized by comprising an upper transverse rod (2), a lower transverse rod (4), a plurality of longitudinal rods (3) and a template (5) which is horizontally arranged and used for supporting a plurality of embedded pipes (1), wherein the longitudinal rods (3) penetrate through the embedded pipes (1) and the template (5) in a one-to-one correspondence mode and are bound to the upper transverse rod (2) and the lower transverse rod (4) respectively at two ends.
2. The embedded pipe device of the equipment foundation of claim 1, wherein: still be equipped with at least one circular shape steel sheet (6) in the embedded pipe (1), the center of steel sheet (6) is passed by vertical pole (3), the external diameter of steel sheet (6) equals the internal diameter of embedded pipe (1), the thickness of steel sheet (6) is no longer than 4 mm.
3. The embedded pipe device of the equipment foundation of claim 2, wherein: the steel plate (6) is provided with two steel plates, wherein one steel plate (6) is arranged at a position 30-50 mm away from the lower port of the embedded pipe (1), and the other steel plate (6) is arranged at a position 30-50 mm away from the upper port of the embedded pipe (1).
4. The embedded pipe device of the equipment foundation of claim 1, wherein: the outer side wall of the embedded pipe (1) is provided with 2-4 groups of reinforcing rib groups, and each group of reinforcing rib group comprises 3-6 anchor bars (7) which are welded along the radial direction of the embedded pipe (1).
5. The embedded pipe device of the equipment foundation of claim 4, wherein: the anchor bars (7) are steel bars with the diameter of 16mm, and the distance between every two adjacent anchor bars (7) is not less than 300 mm.
6. The embedded pipe device of the equipment foundation of claim 1, wherein: the upper cross rod (2), the lower cross rod (4) and the longitudinal rod (3) are all steel pipes with the diameter of 48mm, and the thickness of the template (5) is 15 mm.
CN201922058809.0U 2019-11-26 2019-11-26 Pre-buried pipe device of equipment foundation Active CN211498932U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922058809.0U CN211498932U (en) 2019-11-26 2019-11-26 Pre-buried pipe device of equipment foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922058809.0U CN211498932U (en) 2019-11-26 2019-11-26 Pre-buried pipe device of equipment foundation

Publications (1)

Publication Number Publication Date
CN211498932U true CN211498932U (en) 2020-09-15

Family

ID=72411339

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922058809.0U Active CN211498932U (en) 2019-11-26 2019-11-26 Pre-buried pipe device of equipment foundation

Country Status (1)

Country Link
CN (1) CN211498932U (en)

Similar Documents

Publication Publication Date Title
CN210659276U (en) Template positioning device for thickness of shear wall and concrete protective layer
CN111676993A (en) Special construction method for constructing basement foundation by inserting steel structure
CN105625187A (en) Method for constructing concrete for large-section inclined column
CN207878789U (en) A kind of assembled architecture reinforcing steel bar connecting device
CN211498932U (en) Pre-buried pipe device of equipment foundation
CN210918296U (en) Square steel pipe sleeve fixing device
CN202787242U (en) Concrete-grouting and model-overhanging device of pile head of cut-off prestressed concrete pipe pile
CN209742389U (en) Alignment positioning machine tool for casting ribs of prefabricated column
CN207419854U (en) A kind of steel reinforcement cage positioner
CN108086523B (en) Light steel concrete block composite wall and construction method thereof
CN211368733U (en) Prefabricated assembled concrete pipe props structure
CN210597742U (en) Shear wall
CN209941733U (en) Retaining wall
CN110306443B (en) Aquatic tie beam bracket device and corresponding construction method
CN207331958U (en) A kind of prefabricated concrete structure
CN202273345U (en) Positioning and anti-floating device for BDF thin-walled cement hollow pipes
CN215371261U (en) Embedded sleeve positioning and fixing device
CN219508549U (en) Centering installation device for pile foundation reinforcement cage
CN221052564U (en) Full pile casing engaged pile reinforcing cage
CN217630684U (en) Isolation device for concrete high-low grade serial number wall
CN215202549U (en) Assembled side template
CN203514311U (en) Steel strand anchor mounting device and anchor seat thereof
CN221939882U (en) U-shaped steel reinforcement cage lifting device
CN203546729U (en) Connecting component of steel strand anchorage device mounting device
CN217580830U (en) GFRP restraint shaped steel reinforcing bar recycled concrete post

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant