CN211498864U - Sand quilt hanger frame for offshore wind power generation pile foundation construction - Google Patents

Sand quilt hanger frame for offshore wind power generation pile foundation construction Download PDF

Info

Publication number
CN211498864U
CN211498864U CN201922479048.6U CN201922479048U CN211498864U CN 211498864 U CN211498864 U CN 211498864U CN 201922479048 U CN201922479048 U CN 201922479048U CN 211498864 U CN211498864 U CN 211498864U
Authority
CN
China
Prior art keywords
lifting
pile foundation
power generation
lifting hook
wind power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922479048.6U
Other languages
Chinese (zh)
Inventor
王洋
梁晓
王军国
周胜杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Manyang Shipping Engineering Co ltd
Original Assignee
Zhejiang Manyang Shipping Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Manyang Shipping Engineering Co ltd filed Critical Zhejiang Manyang Shipping Engineering Co ltd
Priority to CN201922479048.6U priority Critical patent/CN211498864U/en
Application granted granted Critical
Publication of CN211498864U publication Critical patent/CN211498864U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a husky by gallows for offshore wind power generation pile foundation construction, including the gallows body, gallows body upper plane is equipped with the first hoisting point that a plurality of is connected with hoisting equipment, gallows body lower floor's surface is equipped with the second hoisting point that a plurality of is connected with husky, second hoisting point department is equipped with the lifting hook, the lifting hook passes through the rope and is connected with husky, be equipped with on the gallows body and be used for the unhook mechanism that breaks away from between lifting hook and the rope. The utility model discloses an earlier hoist and mount husky quilt on the gallows, rethread unhook mechanism will husky quilt sink into the specified area fast, can pave husky quilt fast to around the stake.

Description

Sand quilt hanger frame for offshore wind power generation pile foundation construction
Technical Field
The utility model relates to a husky by technical field, in particular to husky by gallows that is used for offshore wind power generation pile foundation construction.
Background
The foundation of the wading building is generally a pile structure, for example, a fan foundation constructed in a shallow sea and intertidal zone, a pile immersed in water can block water flow, and then the water flow can generate a vortex flow around the pile so as to increase local water flow shear stress, and simultaneously, under the action of tide and ocean current, soil around the pile can be washed, so that silt around the pile foundation can be taken away, and thus, a pit is formed by washing and sand-washing around the pile foundation, so that the bearing capacity of the pile foundation is reduced, and further, a serious consequence of inclination and even collapse is generated. Therefore, the anti-scouring treatment for treating the offshore wading pile is a problem which must be treated seriously. The traditional treatment method is generally to pile up sand bags or lay broken stones around the pile foundation, but the sand bags and broken stones can be displaced under the impact of seawater, and particularly the stability of the pile foundation in a deep water area is limited.
The application publication number is CN104480961A (application number is 201410661498.6) of the invention patent of China for an anti-scour construction method of an offshore wind power single-pile foundation, wherein the disclosed anti-scour construction method firstly carries out reinforced design on the structural strength of a seabed and then installs a single-pile on the seabed after the seabed strength is enough. The method has high construction cost and long construction period, and cannot be widely popularized.
Chinese patent (No. CN2049567358U) discloses a sand quilt, which is characterized in that sand quilt is laid around the pile structure to protect the pile, and then reinforcement belts are only arranged on the bag body along the length direction, so that the structural firmness is poor, and the sand quilt is not easy to be laid flat and the difficulty of laying the sand quilt is high.
Therefore, a sand quilt laying structure capable of quickly laying sand around the pile is urgently needed.
Disclosure of Invention
To prior art's not enough and defect, provide the husky quilt gallows that is used for offshore wind power generation pile foundation construction, through hoist and mount husky quilt on the gallows earlier, the specified region is sunk into with husky quilt fast to rethread unhook mechanism, can pave husky to around the stake fast.
In order to achieve the above object, the present invention provides the following technical solutions.
A husky by gallows for offshore wind power generation pile foundation construction, including the gallows body, gallows body upper plane is equipped with the first hoisting point that a plurality of and hoisting equipment are connected, gallows body lower floor surface is equipped with the second hoisting point that a plurality of and husky are connected, second hoisting point department is equipped with the lifting hook, the lifting hook passes through the rope and is connected with husky, be equipped with on the gallows body and be used for the unhook mechanism that breaks away from between lifting hook and the rope.
The utility model has the advantages that: the utility model discloses a husky by gallows, before using, pass through wire rope with hoisting equipment earlier first hoisting point and be connected, and be connected husky with the lifting hook through the rope, during the use, hoist husky by the gallows through hoisting equipment, make husky by the hoist and lift thereupon, remove husky assigned position by the gallows again, rethread unhook mechanism, make lifting hook and rope separation, make husky by sinking the assigned area, husky by can wholly sinking the assigned area, thereby can be fast with husky paved to around the stake.
As an improvement of the utility model, unhook mechanism includes mount pad and cylinder, the mount pad is fixed set up in second hanging point department, the lifting hook rotates and installs on the mount pad, the lifting hook is including linking hook portion and rotation portion as an organic whole, rotation portion with the one end that hook portion connects is for rotating the end, the other end of rotation portion is the free end, the rotation end of rotation portion rotates through the round pin axle and connects on the mount pad, the piston rod of cylinder with the free end of rotation portion is connected. Through the improvement, when the piston rod of the air cylinder moves, the lifting hook is enabled to rotate, and the lifting hook is separated from the sand quilt rope.
As an improvement of the utility model, the inner side surface of the claw tip of the claw part is a smooth plane. Through the improvement, the rope can be conveniently separated from the lifting hook.
As an improvement of the utility model, the unhooking mechanism still includes the locating part, the locating part is located claw point one side of claw portion, the lifting hook under the drive of cylinder with the locating part contacts each other and forms the closed loop or with the locating part separation. Through the improvement, the rope of the sand quilt can be prevented from being unhooked accidentally.
As an improvement of the utility model, the mount pad includes the curb plate of two relative settings, both sides board fixed set up in second hanging point department, cylinder, lifting hook and locating part all set up between the board of both sides. Through the improvement, the rotation of the lifting hook is convenient.
As an improvement of the present invention, the unhooking mechanism further includes a connecting rod, the connecting rod is connected to a plurality of rotating portions of the lifting hook located on the same straight line.
As an improvement of the utility model, the gallows body forms through a plurality of crossbeams and a plurality of longeron staggered connection. Through the improvement, the bearing capacity of the hanger body is high.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is another angle schematic diagram of the overall structure of the present invention.
Fig. 3 is a schematic view of the unhooking mechanism of the present invention.
Fig. 4 is another schematic view of the unhooking mechanism of the present invention.
Fig. 5 is a schematic view of the present invention showing a plurality of hooks engaged with the connecting rod.
Fig. 6 is a schematic view of the sand quilt of the present invention.
In the figure, 1, a hanger body; 2. a hook; 21. a claw portion; 22. a rotating part; 3. a mounting seat; 4. a cylinder; 5. a limiting member; 6. lifting lugs; 7. a connecting rod.
Detailed Description
The invention is further explained by combining the attached drawings.
Referring to fig. 1 to 6, the sand quilt hanger for offshore wind power generation pile foundation construction includes a hanger body 1, the hanger body 1 is formed by connecting a plurality of cross beams and a plurality of longitudinal beams in a staggered manner, so that the hanger body 1 has high strength and can bear the weight of the sand quilt, the sand quilt is provided with a dodging port which is matched with the periphery of a pile structure, so that the sand quilt can move to the periphery of the pile structure, the upper plane of the hanger body 1 is provided with a plurality of first hanging points connected with a hoisting device, in this embodiment, the number of the first hanging points is 8, the first hanging points are provided with lifting lugs 6, the lifting lugs 6 at the first hanging points are connected with the hoisting device through steel wire ropes, the lower surface of the hanger body 1 is provided with a plurality of second hanging points connected with the sand, in this embodiment, the number of the second hanging points is 292, each second hanging point is provided with a lifting hook 2, through setting up a plurality of second hoisting points for the load of husky quilt can disperse, lifting hook 2 passes through the rope and is connected with husky quilt, and on lifting hook 2 was located to rope pot head, the rope other end was connected with husky quilt, be equipped with on the gallows body 1 and be used for the unhook mechanism that breaks away from between lifting hook 2 and the rope.
The utility model discloses a husky by gallows, before the use, pass through wire rope with hoisting equipment earlier first hoisting point and be connected, and be connected husky with lifting hook 2 through the rope, during the use, will husky be hoisted by the gallows through hoisting equipment, make husky be hoisted thereupon, again will husky be moved the assigned position by the gallows, stake department promptly, rethread unhook mechanism, make lifting hook 2 and the rope separation of husky quilt, make husky be sunk into the assigned region, around the stake promptly, husky can wholly sink into the assigned region, thereby can pave fast to around the stake, and convenient for operation.
Specifically, the unhooking mechanism comprises a mounting base 3 and a cylinder 4, the mounting base 3 is fixedly arranged at the second hanging point, the lifting hook 2 is rotatably mounted on the mounting base 3, the lifting hook 2 comprises a hook part 21 and a rotating part 22 which are connected into a whole, the hook part 21 is in a hook shape, so that a rope of the sand quilt can be hung conveniently, one end of the rotating part 22, which is connected with the hook part 21, is a rotating end, the other end of the rotating part 22 is a free end, the rotating end of the rotating part 22 is rotatably connected onto the mounting base 3 through a pin shaft, a piston rod of the cylinder 4 is connected with the free end of the rotating part 22, the rope of the sand quilt is sleeved at the hook part 21, when the rope of the sand quilt needs to be unhooked, the cylinder 4 is started, so that the piston rod of the cylinder 4 retracts, the lifting hook 2 is driven to rotate around the pin shaft, and the opening of the hook part 21, lifting hook 2 and the rope separation of husky quilt, husky quilt sinks under the effect of gravity for sand can be wholly sunk around the stake, thereby can pave fast around the stake, convenient operation.
As an improvement of the utility model, mount pad 3 includes the curb plate of two relative settings, the both sides board fixed set up in second hanging point department, cylinder 4, lifting hook 2 and locating part 5 all set up between the board of both sides, and cylinder 4 and 5 fixed mounting of locating part are on one of them curb plate, and lifting hook 2 rotates through the round pin axle and installs between the board of both sides, and the lifting hook 2 of being convenient for can rotate smoothly, is difficult for producing the jamming phenomenon, connects stably moreover.
The inner side surface of the claw point of the claw part 21 is a smooth plane, so that a sand-covered rope is conveniently separated from the claw part 21 of the lifting hook 2, in addition, the unhooking mechanism further comprises a limiting piece 5, the limiting piece 5 is positioned on one side of the claw point of the claw part 21, the lifting hook 2 is driven by the cylinder 4 to be in mutual contact with the limiting piece 5 to form a closed ring or be separated from the limiting piece 5, when a piston rod of the cylinder 4 is not extended, the claw part 21 of the lifting hook 2 is in mutual contact with the limiting piece 5 to form a closed ring, so that the sand-covered rope is locked, the sand-covered rope is prevented from being separated from the claw part 21 of the lifting hook 2 in the moving process, when the piston rod of the cylinder 4 is extended, the claw part 21 of the lifting hook 2 is separated from the limiting piece 5, the sand-covered rope is separated from the claw part 21 of the lifting hook 2.
As an improvement of the utility model, unhook mechanism still includes connecting rod 7, connecting rod 7 is connected in a plurality of rotation portions 22 that are located lifting hook 2 on the collinear, and rotation portion 22 rotates through round pin axle and connecting rod 7 to be connected, connects a plurality of lifting hook 2 through connecting rod 7 for when cylinder 4 drives one of them lifting hook 2 and rotates, other lifting hook 2 also can be along with rotating through connecting, thereby the cylinder 4's that reduces quantity, the cost is reduced.
The above is only the preferred embodiment of the present invention, so all the equivalent changes or modifications made by the structure, features and principles in accordance with the claims of the present invention are included in the claims of the present invention.

Claims (7)

1. A husky by gallows for construction of offshore wind power generation pile foundation, including gallows body (1), its characterized in that: the lifting frame is characterized in that a plurality of first lifting points connected with lifting equipment are arranged on the upper plane of the lifting frame body (1), a plurality of second lifting points connected with sand are arranged on the lower surface of the lifting frame body (1), a lifting hook (2) is arranged at each second lifting point, the lifting hook (2) is connected with the sand through a rope, and a unhooking mechanism used for separating the lifting hook (2) from the rope is arranged on the lifting frame body (1).
2. The sand quilt hanger for offshore wind power generation pile foundation construction of claim 1, wherein: unhooking mechanism includes mount pad (3) and cylinder (4), mount pad (3) fixed set up in second hanging point department, lifting hook (2) rotate and install on mount pad (3), lifting hook (2) are including linking hook portion (21) and rotation portion (22) as an organic whole, rotation portion (22) with the one end that hook portion (21) are connected is for rotating the end, the other end that rotates portion (22) is the free end, the rotation end that rotates portion (22) rotates through the round pin axle and connects on mount pad (3), the piston rod of cylinder (4) with the free end that rotates portion (22) is connected.
3. The sand quilt hanger for offshore wind power generation pile foundation construction according to claim 2, wherein: the inner side surface of the claw tip of the claw part (21) is a smooth plane.
4. The sand quilt hanger for offshore wind power generation pile foundation construction according to claim 2, wherein: the unhooking mechanism further comprises a limiting part (5), the limiting part (5) is located on one side of the claw tip of the claw part (21), and the lifting hook (2) is driven by the cylinder (4) to be in contact with the limiting part (5) to form a closed ring or be separated from the limiting part (5).
5. The sand quilt hanger for offshore wind power generation pile foundation construction of claim 3, wherein: the mounting seat (3) comprises two oppositely arranged side plates, two side plates are fixedly arranged at the second hoisting point, and the cylinder (4), the lifting hook (2) and the limiting part (5) are arranged between the two side plates.
6. The sand quilt hanger for offshore wind power generation pile foundation construction according to claim 2, wherein: the unhooking mechanism further comprises a connecting rod (7), and the connecting rod (7) is connected to the rotating parts (22) of the lifting hooks which are located on the same straight line.
7. The sand quilt hanger for offshore wind power generation pile foundation construction of claim 1, wherein: the hanger body (1) is formed by connecting a plurality of cross beams and a plurality of longitudinal beams in a staggered mode.
CN201922479048.6U 2019-12-31 2019-12-31 Sand quilt hanger frame for offshore wind power generation pile foundation construction Active CN211498864U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922479048.6U CN211498864U (en) 2019-12-31 2019-12-31 Sand quilt hanger frame for offshore wind power generation pile foundation construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922479048.6U CN211498864U (en) 2019-12-31 2019-12-31 Sand quilt hanger frame for offshore wind power generation pile foundation construction

Publications (1)

Publication Number Publication Date
CN211498864U true CN211498864U (en) 2020-09-15

Family

ID=72397253

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922479048.6U Active CN211498864U (en) 2019-12-31 2019-12-31 Sand quilt hanger frame for offshore wind power generation pile foundation construction

Country Status (1)

Country Link
CN (1) CN211498864U (en)

Similar Documents

Publication Publication Date Title
CN102701083B (en) Method for replacing wind driven generator component by using special equipment
CN201971572U (en) Movable arm type tower crane with suspension arm possible of being folded for dismounting
CN203319499U (en) Shaft tube hoisting device
CN208235560U (en) A kind of offshore wind turbine single-pile foundation being internally provided with floating drum
CN103215956B (en) Multi-pile pile gripper and multi-pile guide pipe frame foundation construction method for shallow wind power farm
CN211498864U (en) Sand quilt hanger frame for offshore wind power generation pile foundation construction
CN101962946A (en) Method for arranging hoisting points and floating-supported conduit frame with skirt pile sleeves
CN107237722A (en) A kind of offshore wind farm construction technology
CN214989713U (en) Concrete pipe pile production is with going out stake hoist engine convenient to lift hoist and mount
CN207257907U (en) A kind of guide pile ship for over-water construction
CN106368199A (en) Self-walking type island foundation construction platform with drilling and hoisting device
CN207330215U (en) Hoisting machine on pouring machine
CN201546247U (en) Electric excavating machine convenient for teeth changing
CN206158586U (en) A bore and hang integrative rig for island reef foundation construction
CN107954308A (en) One kind is used to lift hollow hexahedral suspention apparatus
CN204529154U (en) Cement brick hoisting machine
CN209306848U (en) A kind of super high-rise building large scale equipment handling apparatus
CN209522491U (en) A kind of mucking machine for subway work
CN209163731U (en) The pore-forming equipment of a variety of diameters can be fast implemented in loess geology
CN208500169U (en) A kind of Multifunctional container haulage equipment
CN113006726A (en) Adjustable lifting device for rapidly grabbing and dragging reinforcement cage in slurry hole
CN206128038U (en) Self -propelled island reef basis construction platform of equipment that hangs is bored in area
CN108128695B (en) Lifting appliance and method for lifting transfer case of transmission
CN213622849U (en) Crane loading and unloading device
CN210150651U (en) Lifting device