CN211473212U - Waterproof chassis mounting structure of assembled bathroom - Google Patents

Waterproof chassis mounting structure of assembled bathroom Download PDF

Info

Publication number
CN211473212U
CN211473212U CN201922228240.8U CN201922228240U CN211473212U CN 211473212 U CN211473212 U CN 211473212U CN 201922228240 U CN201922228240 U CN 201922228240U CN 211473212 U CN211473212 U CN 211473212U
Authority
CN
China
Prior art keywords
chassis body
chassis
decorative layer
mounting structure
drainage tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922228240.8U
Other languages
Chinese (zh)
Inventor
尹飞云
墙林
高洁
余利海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Tuo Da Construction Group Co ltd
Original Assignee
Chongqing Tuo Da Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Tuo Da Construction Group Co ltd filed Critical Chongqing Tuo Da Construction Group Co ltd
Priority to CN201922228240.8U priority Critical patent/CN211473212U/en
Application granted granted Critical
Publication of CN211473212U publication Critical patent/CN211473212U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Residential Or Office Buildings (AREA)

Abstract

The utility model relates to a waterproof chassis mounting structure of assembled bathroom, it includes the chassis body, set gradually supporting framework and decorative layer on the chassis body, be equipped with the curb plate around the chassis body, water drainage tank has been seted up on the chassis body, set up the mouth that leaks that is located directly over the water drainage tank on the decorative layer, the one end curb plate setting of chassis body is being pasted to the water drainage tank, the surface that the chassis body deviates from supporting framework is the level setting, the thickness of chassis body reduces to the one end that is close to water drainage tank gradually from the one end of keeping away from water drainage tank, supporting framework and decorative layer all are the slope setting along the chassis body. The surface of the chassis body facing the decorative layer is an inclined plane, water leakage penetrating into the chassis body from a gap between the decorative layer and the side plate flows to one side of the water inlet hole along the inclined plane of the chassis body, water is drained quickly, accumulated water is not easy to generate on the chassis body, the decorative layer is arranged in an inclined mode along the chassis body, and the water drainage speed on the surface of the decorative layer can be accelerated.

Description

Waterproof chassis mounting structure of assembled bathroom
Technical Field
The utility model belongs to the technical field of the technique of assembled fitment and specifically relates to a waterproof chassis mounting structure in assembled bathroom is related to.
Background
In traditional bathroom fitment, need do screed-coat, waterproof layer, look for slope layer, protective layer, cement mortar anchor coat, ceramic tile decorative layer etc. at the scene to pre-buried pipeline, the process is complicated, and is consuming time long, and the noise is big, influences peripheral crowd's normal life, and in addition, final fitment effect relies on operation workman's technical merit, in case make mistakes, prosthetic cost is huge, and the quality does not guarantee.
Therefore, there is a growing interest in the construction of prefabricated buildings, which are fabricated directly at a construction site after being manufactured in a factory from prefabricated parts. The fabricated building has the advantages of high construction speed, low construction cost and low dependence on the technical level of operators.
At present, chinese patent with publication number CN208502333U discloses an integrally assembled toilet, which includes a side wall plate, a drainage chassis disposed in a sealed manner and abutted against the side wall plate is disposed in a space formed at the bottom of the side wall plate, the drainage chassis includes a chassis body with side plates disposed at the periphery, a support table is disposed at the periphery of the chassis body, a slope adjusting block is disposed at one side of the chassis body, one end of a grate is disposed on the slope adjusting block, and the other end of the grate is abutted against the support table; an integrated plate is laid on the grate; the grate is provided with a plurality of support bars which are arranged in parallel; the chassis body is provided with a plurality of secondary gradient adjusting blocks which are arranged in parallel with the gradient adjusting blocks, and each secondary gradient adjusting block is abutted with the grate.
In the patent, one end of the grate is higher and the other end of the grate is lower through the gradient adjusting block, so that the integrated plate on the grate is also obliquely arranged, and water in a toilet conveniently flows into the water outlet along the integrated plate. But be not sealing connection between integrated board and the brace table, the water of bathroom can be through the gap seepage to the chassis body between integrated board and the brace table on, and the bottom of chassis body is steady, accumulates the percolating water easily, in case ponding time overlength will produce the foul smell, influences the bathroom internal environment.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, one of the purposes of the utility model is to provide a waterproof chassis mounting structure in assembled bathroom, its advantage that has the rapid drainage percolating water.
The above utility model discloses an above-mentioned utility model purpose can realize through following technical scheme: the utility model provides an assembly type bathroom waterproof chassis mounting structure, includes the chassis body, sets gradually braced frame and decorative layer on the chassis body, be equipped with the curb plate around the chassis body, water drainage tank has been seted up on the chassis body, set up the mouth that leaks that is located directly over the water drainage tank on the decorative layer, the one end curb plate setting of chassis body is being pasted to the water drainage tank, the surface that the chassis body deviates from braced frame is the level setting, the thickness of chassis body reduces to the one end that is close to the water drainage tank gradually from the one end of keeping away from the water drainage tank, braced frame and decorative layer all are the slope setting along the chassis body.
Through adopting above-mentioned technical scheme, the surface of chassis body orientation decorative layer is the inclined plane, and the percolating water that permeates the chassis body from the clearance between decorative layer and the curb plate flows to inlet opening one side along chassis body inclined plane, and quick drainage makes and is difficult for producing ponding on the chassis body, and the decorative layer is the slope setting along the chassis body, also can accelerate the drainage rate on decorative layer surface.
The present invention may be further configured in a preferred embodiment as: the surface of the chassis body facing the decoration layer is provided with two grooves arranged along the length direction of the chassis body, and the two grooves are respectively attached to the side plates on the two sides of the chassis body.
Through adopting above-mentioned technical scheme, the lateral wall of decorative layer is the biggest with the curb plate area of contact on the chassis body side, also takes place the seepage the easiest, consequently sets up corresponding recess, can directly enter into the recess when most percolating water flows into the chassis body on to by the recess guide to the chassis body be close to the one end of water drainage tank, reduce the area that percolating water flowed through on the chassis body, make the surface of chassis body most keep dry.
The present invention may be further configured in a preferred embodiment as: the decorative layer is formed by splicing a plurality of panels.
Through adopting above-mentioned technical scheme, convenient transport to make things convenient for the panel to install one by one on the support fossil fragments, also can change pertinence when damage appears in arbitrary panel, reduce the replacement cost.
The present invention may be further configured in a preferred embodiment as: the chassis body has a slope from the middle portion to the edge portion in the width direction.
By adopting the technical scheme, the leakage water leaking from the gap between the adjacent panels to the chassis body can quickly flow into the grooves on the similar sides, the flow of the leakage water on the surface of the chassis body is reduced, and the chassis body is kept dry as far as possible.
The present invention may be further configured in a preferred embodiment as: a diversion trench is arranged between the end part of the groove close to the drainage trench and inclines to one side of the drainage trench.
Through adopting above-mentioned technical scheme, the guiding gutter can pour the percolating water in the recess into water drainage tank to the utmost, prevents that percolating water from accumulating in the tip that the recess is close to water drainage tank, further improves chassis body's drainage ability.
The present invention may be further configured in a preferred embodiment as: the supporting framework is fixed on the chassis body in an adhesive or welding mode.
Through adopting above-mentioned technical scheme, in the use, the removal is difficult to take place for the support chassis, makes the support effect of support chassis to the decorative layer stable.
The present invention may be further configured in a preferred embodiment as: the supporting framework divides the chassis body into a plurality of independent blocks, a plurality of circulation holes which communicate the independent blocks in the width direction of the chassis body together are formed in the supporting framework, and the circulation holes are located on one side, close to the drainage groove, of the corresponding independent block.
By adopting the technical scheme, the water leakage can not be circulated between the adjacent independent blocks in the length direction of the chassis body, and the water leakage can be circulated between the adjacent independent blocks in the length direction of the chassis body through the circulation holes, so that the water leakage can smoothly enter the grooves on the similar sides.
The present invention may be further configured in a preferred embodiment as: the chassis body is provided with a sleeve which vertically penetrates through the chassis body.
Through adopting above-mentioned technical scheme, the sleeve pipe provides the route for passing through of circuit, and the sleeve pipe is produced with the chassis body together, and the sealing performance between sleeve pipe lateral wall and the chassis body is good.
To sum up, the utility model discloses a following at least one useful technological effect:
1. by arranging the chassis bodies with different thicknesses, leakage water leaked to the chassis bodies can flow into the drainage grooves along the surfaces of the chassis bodies more quickly, and the possibility of water accumulation on the chassis bodies is reduced;
2. through set up the opening on supporting framework, reduce supporting framework to the hindrance of the circulation of percolating water on the chassis body.
Drawings
FIG. 1 is a schematic view of the overall structure of the embodiment;
FIG. 2 is a top view of the chassis body in an embodiment;
FIG. 3 is a sectional view of a first perspective in the embodiment, which is used for showing the structure of the chassis body in the length direction;
fig. 4 is a sectional view of a second perspective in the embodiment, which shows the structure of the chassis body in the width direction.
In the figure, 1, a chassis body; 11. an independent block; 2. a support framework; 21. a flow-through hole; 3. a panel; 4. a side plate; 5. a water discharge tank; 6. a water leakage port; 7. a groove; 8. a diversion trench; 9. a sleeve.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1, for the utility model discloses a waterproof chassis mounting structure in assembled bathroom, including chassis body 1, set gradually supporting framework 2 and the decorative layer on chassis body 1, chassis body 1 circumference lateral wall is to supporting framework side buckling and forming curb plate 4, sealing connection between the adjacent curb plate 4. The side plate 4 and the chassis body 1 enclose a placing groove for mounting the supporting framework 2 and the decorative plate, the chassis body 1 is provided with a sleeve 9 vertically penetrating through the chassis body 1, and the sleeve 9 is connected with the chassis body 1 in a seamless mode. The supporting framework 2 is fixed on the chassis body 1 by gluing or welding. The decorative plate is arranged on the supporting framework 2.
Referring to fig. 1 and 2, a drainage channel 5 is formed in the chassis body 1, the drainage channel 5 is arranged to be attached to a side plate 4 at one end of the chassis body 1, and the center of the bottom of the drainage channel 5 is communicated with an external drainage pipeline. The surface of the chassis body 1 facing the decoration layer is provided with two grooves 7 arranged along the length direction of the chassis body 1, and the two grooves 7 are respectively attached to the side plates 4 at the two sides of the chassis body 1. A diversion trench 8 is arranged between the end part of the groove 7 close to the drainage trench 5 and the drainage trench 5, and the diversion trench 8 inclines towards one side of the drainage trench 5.
Referring to fig. 3 and 4, the surface of the chassis body 1 departing from the supporting framework 2 is horizontally arranged, and the thickness of the chassis body 1 gradually decreases from the end far away from the drainage channel 5 to the end close to the drainage channel 5. When the chassis body 1 is placed on the ground, the maximum included angle between the surface of the chassis body 1 facing the support framework 2 and the ground in the length direction of the chassis body 1 is between 1 ° and 5 °, and the included angle is set to 5 ° in this embodiment. The chassis body 1 has a slope from the middle portion to the edge portion in the width direction.
Referring to fig. 1 and 2, the surface of the supporting framework 2 contacting the chassis body 1 is matched with the surface of the chassis body 1 facing the supporting framework 2, and the surface of the supporting framework 2 far away from the chassis body 1 is a plane. The supporting framework 2 divides the chassis body 1 into a plurality of independent blocks 11, a plurality of circulation holes 21 which communicate the independent blocks 11 in the width direction of the chassis body 1 together are formed in the supporting framework 2, and the circulation holes 21 are located on one side, close to the drainage groove 5, of the corresponding independent blocks 11.
Referring to fig. 1 and 3, the decorative plate is composed of a plurality of panels 3, wherein one panel 3 is provided with a water leakage port 6 positioned right above a water drainage groove 5. A plurality of panels 3 are placed on the supporting framework 2 in sequence along the length direction of the chassis body 1, and the adjacent panels 3 are abutted. When the decorative plate is completely put into the supporting framework 2, the panel 3 is lower than the top of the side plate 4, and the panel 3 abuts against the side wall of the side plate 4 which is contacted with the side plate.
The implementation principle of the embodiment is as follows: when the toilet is decorated, the ground of the toilet is trimmed, and after the chassis body 1 is placed on the ground of the toilet, the height from the top surface of the side plate 4 to the ground is kept consistent. Then the supporting framework 2 is fixed on the chassis body 1, and the length direction of the circulating holes 21 of the supporting framework 2 is perpendicular to the length direction of the grooves 7. And finally, sequentially placing the panel 3 on the supporting framework 2 along the length direction of the chassis body 1.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (8)

1. The utility model provides a waterproof chassis mounting structure of assembled bathroom, includes chassis body (1), sets gradually supporting framework (2) and decorative layer on chassis body (1), be equipped with curb plate (4) around chassis body (1), water drainage tank (5) have been seted up on chassis body (1), set up mouth of leaking (6) that are located directly over water drainage tank (5) on the decorative layer, its characterized in that: drainage tank (5) are setting up attaching one end curb plate (4) of chassis body (1), the surface that deviates from support chassis (2) in chassis body (1) is the level setting, the thickness of chassis body (1) reduces to the one end that is close to drainage tank (5) gradually from the one end of keeping away from drainage tank (5), support chassis (2) and decorative layer all are the slope setting along chassis body (1).
2. The waterproof chassis mounting structure of assembled bathroom of claim 1, characterized in that: the surface of the chassis body (1) facing the decorative layer is provided with two grooves (7) arranged along the length direction of the chassis body (1), and the two grooves (7) are respectively attached to the side plates (4) on the two sides of the chassis body (1).
3. The waterproof chassis mounting structure of assembled bathroom of claim 2, characterized in that: a diversion trench (8) is arranged between the end part of the groove (7) close to the drainage trench (5) and the drainage trench (5), and the diversion trench (8) inclines towards one side of the drainage trench (5).
4. The waterproof chassis mounting structure of assembled bathroom of claim 2, characterized in that: the decorative layer is formed by splicing a plurality of panels (3).
5. The waterproof chassis mounting structure of assembled bathroom of claim 4, characterized in that: the chassis body (1) has a gradient from the middle part to the edge part in the width direction.
6. The waterproof chassis mounting structure of assembled bathroom of claim 5, characterized in that: the supporting framework (2) is fixed on the chassis body (1) in an adhesive or welding mode.
7. The waterproof chassis mounting structure of assembled bathroom of claim 6, characterized in that: the chassis body (1) is divided into a plurality of independent blocks (11) by the supporting framework (2), a plurality of circulation holes (21) which communicate the independent blocks (11) in the width direction of the chassis body (1) together are formed in the supporting framework (2), and the circulation holes (21) are located on one side, close to the drainage groove (5), of the corresponding independent blocks (11).
8. The waterproof chassis mounting structure of assembled bathroom of claim 1, characterized in that: the chassis body (1) is provided with a sleeve (9) which vertically penetrates through the chassis body (1).
CN201922228240.8U 2019-12-11 2019-12-11 Waterproof chassis mounting structure of assembled bathroom Expired - Fee Related CN211473212U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922228240.8U CN211473212U (en) 2019-12-11 2019-12-11 Waterproof chassis mounting structure of assembled bathroom

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922228240.8U CN211473212U (en) 2019-12-11 2019-12-11 Waterproof chassis mounting structure of assembled bathroom

Publications (1)

Publication Number Publication Date
CN211473212U true CN211473212U (en) 2020-09-11

Family

ID=72377498

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922228240.8U Expired - Fee Related CN211473212U (en) 2019-12-11 2019-12-11 Waterproof chassis mounting structure of assembled bathroom

Country Status (1)

Country Link
CN (1) CN211473212U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112282277A (en) * 2020-10-22 2021-01-29 北京宇航建筑工程有限公司 Assembled toilet floor structure and processing method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112282277A (en) * 2020-10-22 2021-01-29 北京宇航建筑工程有限公司 Assembled toilet floor structure and processing method

Similar Documents

Publication Publication Date Title
CN211473212U (en) Waterproof chassis mounting structure of assembled bathroom
CN203487558U (en) Structural joint surface seepage water guiding and drainage structure
CN208631204U (en) A kind of water supply and sewerage pipeline piling apparatus
CN211849708U (en) Water film waterscape
CN215565997U (en) Prefabricated assembled arch wall structure of railway tunnel
CN215714326U (en) Mortise and tenon type assembled pavement structure
CN112127489B (en) Construction method for pre-embedding water stop of reverse ridge of toilet
CN211446883U (en) Underground continuous wall antiseep connection structure
CN210406705U (en) Culture pond and drain outlet sealing structure thereof
CN210034758U (en) Non-excavation winding shaping pipeline that can cross bend
CN215976699U (en) Plastic course with quick drainage function
CN112237394A (en) Embedded bathtub for assembled toilet and installation method thereof
KR100258297B1 (en) Expansion joint matter using concrete slab
CN205369513U (en) Non - infiltration detention pond structure of concatenation formula
CN218323519U (en) Water leakage-proof roof
CN215926057U (en) Two cloth three scribble assembled waterproof construction
CN220129186U (en) Auxiliary water isolation device for continuous water opening of side wall of water inlet tank
CN219450808U (en) Assembled retaining wall structure for municipal road slope protection
CN220285043U (en) Outer wall board mounting node structure
CN212958034U (en) Movable field runoff plot suitable for navel orange garden in southern hilly terrace
CN214530096U (en) Concrete cracking prevention device for concrete pavement maintenance
CN221030809U (en) Concrete outer wall antiseep structure
CN210887918U (en) Waterproof cooling floor for building construction
CN117230902B (en) Basement outer wall seepage prevention structure
CN211312433U (en) Structure is assembled to water conservancy channel prefab

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200911

CF01 Termination of patent right due to non-payment of annual fee