CN211446899U - Monitoring system for cement mixing pile work progress - Google Patents

Monitoring system for cement mixing pile work progress Download PDF

Info

Publication number
CN211446899U
CN211446899U CN201922281807.8U CN201922281807U CN211446899U CN 211446899 U CN211446899 U CN 211446899U CN 201922281807 U CN201922281807 U CN 201922281807U CN 211446899 U CN211446899 U CN 211446899U
Authority
CN
China
Prior art keywords
cement mixing
mixing pile
pile machine
monitoring system
flow meter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922281807.8U
Other languages
Chinese (zh)
Inventor
吴赵丰
郭诗华
郑智超
庄志贤
林志斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cccc Third Aviation Bureau Sixth Engineering Xiamen Co Ltd
CCCC Third Harbor Engineering Co Ltd
CCCC Third Harbor Engineering Co Ltd Xiamen Branch
Original Assignee
Cccc Sanya Xiamen Engineering Co ltd
CCCC Third Harbor Engineering Co Ltd
CCCC Third Harbor Engineering Co Ltd Xiamen Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cccc Sanya Xiamen Engineering Co ltd, CCCC Third Harbor Engineering Co Ltd, CCCC Third Harbor Engineering Co Ltd Xiamen Branch filed Critical Cccc Sanya Xiamen Engineering Co ltd
Priority to CN201922281807.8U priority Critical patent/CN211446899U/en
Application granted granted Critical
Publication of CN211446899U publication Critical patent/CN211446899U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a monitored control system of cement mixing stake work progress, including cement mixing stake machine, laser range finder, electromagnetic flow meter, straightness measuring apparatu and panel computer that hangs down. The laser range finder is arranged at the top of the vertical rod of the cement mixing pile machine; the electromagnetic flow meter is arranged at a grout inlet of the cement mixing pile machine; the verticality measuring instrument is arranged at a position 1.5-3 meters away from a vertical rod of the cement mixing pile machine; the panel computer is installed in a cab of the cement mixing pile machine, a monitoring system platform is installed on the panel computer, and the input end of the monitoring system platform is electrically connected with the output end of the laser range finder, the output end of the electromagnetic flow meter and the output end of the verticality measuring instrument respectively. The utility model discloses a monitored control system of cement mixing stake work progress can carry out effectual control to the work progress, has effectively guaranteed the stake quality of forming of cement mixing stake.

Description

Monitoring system for cement mixing pile work progress
Technical Field
The utility model relates to a monitored control system of cement mixing stake work progress.
Background
The cement mixing pile is an effective form of soft foundation treatment, and is characterized by that it uses cement as main agent of solidifying agent, and utilizes the mixing pile machine to spray cement into soil body and fully mix them so as to make cement and soil produce a series of physical and chemical reactions and make the soft soil be hardened and hardened so as to raise foundation strength. The method is to forcibly stir the soft soil and the cement (curing agent) by a special deep layer stirrer, and solidify the soil body by utilizing a series of physical and chemical reactions generated between the cement and the soft soil to form the cement soil pile with integrity, water stability and certain strength. The construction process of the cement mixing pile comprises the following steps: pile position lofting → drill rig in position → inspection, drill rig adjustment → forward circulation drilling to design depth → high pressure grouting pump opening → reverse circulation lifting and grouting cement slurry → below working datum plane 0.3m → repeated stirring and drilling to design depth → reverse circulation lifting and grouting cement slurry to ground surface → pile forming is finished → construction of next pile. At present, when soft foundation treatment is carried out, the problem of artificial engineering quality caused by complete manual experience or material loss due to work stealing of a construction party sometimes occurs. Therefore, each construction process of each pile needs to be monitored in real time in the construction process.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome prior art's defect and provide a monitored control system of cement stirring stake work progress, it can effectively monitor the work progress, has effectively guaranteed the stake quality of forming of cement stirring stake.
The purpose of the utility model is realized like this: a monitoring system for a cement mixing pile construction process comprises a cement mixing pile machine, a laser range finder, an electromagnetic flow meter, a verticality measuring instrument and a tablet personal computer; the laser range finder is arranged at the top of a vertical rod of the cement mixing pile machine; the electromagnetic flow meter is arranged at a grout inlet of the cement mixing pile machine; the verticality measuring instrument is arranged at a position 1.5-3 meters away from a vertical rod of the cement mixing pile machine; the panel computer is installed in the cab of the cement mixing pile machine, the monitoring system platform is installed on the panel computer, and the input end of the monitoring system platform is respectively connected with the output end of the laser range finder, the output end of the electromagnetic flow meter and the output end of the verticality measuring instrument through electric wires.
The monitoring system for the construction process of the cement mixing pile is characterized in that a milky white baffle plate used for reflecting of the laser range finder is installed above the power head on the vertical rod of the cement mixing pile machine.
The monitoring system for the construction process of the cement mixing pile is characterized in that the electromagnetic flow meter is installed at a position 1.5-3 meters away from a vertical rod of the cement mixing pile machine through a flange, and the diameter of the flange is matched with that of a grouting pipe of the cement mixing pile machine.
The utility model discloses a monitored control system of cement mixing stake work progress has following characteristics:
1) and monitoring parameters such as drilling depth, drill bit moving speed, verticality, slurry flow, flow velocity and the like of the cement mixing pile machine.
2) And monitoring the drilling and lifting processes of the cement mixing pile machine and the grouting amount and the mixing time of the corresponding processes.
3) The grouting amount of different depth sections is monitored in real time, the reasonable grouting stirring of the cement mixing pile machine operator is guided, and meanwhile, the work stealing and material reduction are avoided.
The utility model discloses a monitored control system of cement mixing stake work progress can effectively monitor the work progress, stops because the artificial engineering quality problem that the artifical experience is not enough and the construction side is stolen the worker and is subtracted the material and cause, has effectively guaranteed the stake quality of cement mixing stake.
Drawings
Fig. 1 is the structural schematic diagram of the monitoring system of the cement mixing pile construction process of the utility model.
Detailed Description
The present invention will be further explained with reference to the accompanying drawings.
Referring to fig. 1, the monitoring system for a cement mixing pile construction process of the present invention includes a cement mixing pile machine 1, a laser distance measuring instrument 2, an electromagnetic flow meter 3, a verticality measuring instrument 4 and a tablet computer 5; wherein the content of the first and second substances,
the laser range finder 2 is arranged at the top of the vertical rod of the cement mixing pile machine 1; a milky white baffle plate for reflection of the laser range finder 2 is also arranged above the power head on the upright rod of the cement mixing pile machine 1; the laser range finder 2 is perpendicular to the upright stanchion when being installed, so that laser can be guaranteed to be driven at a power head below, and the drilling depth of a drill rod of the cement mixing pile machine 1 can be conveniently judged;
the electromagnetic flow meter 3 is arranged at a grout inlet of the cement mixing pile machine 1; processing a flange plate with the same diameter according to the diameter of a grouting pipe of the cement mixing pile machine 1, and installing an electromagnetic flow meter 3 on a grout inlet on a vertical rod of the cement mixing pile machine 1 through the flange plate;
the perpendicularity measuring instrument 4 is installed at a position 1.5-3 meters away from a vertical rod of the cement mixing pile machine 1 in a welding mode; the installation needs to be vertical and horizontal;
the panel computer 5 is installed in a cab of the cement mixing pile machine 1, the panel computer 5 is provided with a monitoring system platform 6, and the input end of the monitoring system platform 6 is respectively and electrically connected with the output end of the laser range finder 2, the output end of the electromagnetic flow meter 3 and the output end of the verticality measuring instrument 4.
The utility model discloses a monitored control system of cement mixing stake work progress, when using, all install laser range finder 2, electromagnetic flow meter 3, straightness measuring apparatu 4 and panel computer 5 on cement mixing stake machine 1 earlier, again with laser range finder 2, electromagnetic flow meter 3, straightness measuring apparatu 4 and panel computer 5 electricity are connected, log in monitoring system platform 6 on panel computer 5, input parameter information to debug to normal operating, be under construction again. In the construction process, dynamic data such as drilling depth, drilling and lifting speeds, the perpendicularity of a drilled pile, grouting speed, grouting amount of sections with different depths, flow speed and the like of the cement mixing pile machine 1 are measured by the laser distance meter 2, the electromagnetic flow meter 3 and the perpendicularity measuring instrument 4 and transmitted to the monitoring system platform 6 on the tablet personal computer 5, the obtained data are processed by the monitoring system platform 6, and then the data such as the section grouting amount, the drilling and lifting depth, the speed, the perpendicularity, the inclination angle, the grouting amount, the flow speed and the like are displayed on the monitoring system platform 6 of the tablet personal computer 5, and an operator of the cement mixing pile machine 1 can adjust the drilling speed and the grouting amount of the cement mixing pile machine 1 in time according to the monitored dynamic data. The supervision unit, the owner unit and the like can know and supervise the construction situation of the site in real time through logging in the monitoring system platform 6.
The related modules involved in the system are all hardware system modules or functional modules combining computer software programs or protocols with hardware in the prior art, and the computer software programs or the protocols involved in the functional modules are all known in the technology of persons skilled in the art, and are not improvements of the system; the improvement of the system is the interaction relation or the connection relation among all the modules, namely the integral structure of the system is improved, so as to solve the corresponding technical problems to be solved by the system.
The above embodiments are provided only for the purpose of illustration, not for the limitation of the present invention, and those skilled in the relevant art can make various changes or modifications without departing from the spirit and scope of the present invention, therefore, all equivalent technical solutions should also belong to the scope of the present invention, and should be defined by the claims.

Claims (3)

1. A monitoring system for a cement mixing pile construction process comprises a cement mixing pile machine, a laser range finder, an electromagnetic flow meter, a verticality measuring instrument and a tablet personal computer; it is characterized in that the preparation method is characterized in that,
the laser range finder is arranged at the top of the vertical rod of the cement mixing pile machine;
the electromagnetic flow meter is arranged at a grout inlet of the cement mixing pile machine;
the verticality measuring instrument is arranged at a position 1.5-3 meters away from a vertical rod of the cement mixing pile machine;
the panel computer is installed in the cab of the cement mixing pile machine, the monitoring system platform is installed on the panel computer, and the input end of the monitoring system platform is respectively connected with the output end of the laser range finder, the output end of the electromagnetic flow meter and the output end of the verticality measuring instrument through electric wires.
2. The monitoring system for the construction process of the cement mixing pile as claimed in claim 1, wherein a milky white baffle plate for reflection of the laser range finder is installed above the power head on the vertical rod of the cement mixing pile machine.
3. The monitoring system for the cement mixing pile construction process according to claim 1, wherein the electromagnetic flow meter is installed at a position 1.5-3 meters away from a vertical rod of the cement mixing pile machine through a flange, and the diameter of the flange is matched with that of a grouting pipe of the cement mixing pile machine.
CN201922281807.8U 2019-12-18 2019-12-18 Monitoring system for cement mixing pile work progress Active CN211446899U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922281807.8U CN211446899U (en) 2019-12-18 2019-12-18 Monitoring system for cement mixing pile work progress

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922281807.8U CN211446899U (en) 2019-12-18 2019-12-18 Monitoring system for cement mixing pile work progress

Publications (1)

Publication Number Publication Date
CN211446899U true CN211446899U (en) 2020-09-08

Family

ID=72298922

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922281807.8U Active CN211446899U (en) 2019-12-18 2019-12-18 Monitoring system for cement mixing pile work progress

Country Status (1)

Country Link
CN (1) CN211446899U (en)

Similar Documents

Publication Publication Date Title
CN108265734A (en) A kind of sand and gravel stratum impervious wall construction method
CN204080817U (en) A kind of novel dual spindle soil-cement agitation pile device changing whitewashing up and down
CN110080237A (en) It cheats the shallow earthing subway tunnel pit earthwork in bottom and excavates anti-floating construction method and structure
CN110359467A (en) A kind of construction method that base pit engineering high-pressure rotary jet grouting pile is reinforced
CN110185844A (en) Shallow earthing pipe-jacking with large diameter construction method
CN104674798A (en) Construction method for non-replacement and up-and-down convertible spouting five-shaft cement mixing pile
CN103924585A (en) Novel method for constructing wind power rock-embedded pile
CN110331748B (en) Dynamic monitoring method for construction process of jet grouting pile
CN109750674A (en) It is a kind of for repairing the interlocking pile and its construction method of the pollution of sensitive boundary
CN102953374A (en) High pressure rotary jet grouting pile construction method for power transmission line iron tower pile foundation construction
CN204551447U (en) Mucky soil cement mixing pile drill bit of drilling machine
CN108842764A (en) A kind of Stirring formula anchor tube construction method
CN108265996A (en) A kind of masonry structure break wall punch it is pre- top restore construction
CN211446899U (en) Monitoring system for cement mixing pile work progress
CN102677630B (en) Construction method of concrete cut-off wall in sludge soil with high water content
CN110185029A (en) A kind of pile foundation intelligence construction equipment
CN103669377A (en) Waterproof curtain construction method
CN112252310A (en) Method for deep foundation pit waterproof curtain construction by adopting high-pressure jet grouting pile machine
CN103669339A (en) Wet jetting pile construction technology for strengthening soft soil foundation
CN103850261A (en) In-rock deep foundation pit rock-socketed water-stop curtain construction method
JP7304126B2 (en) Columnar structure verticality measurement method
CN112252302A (en) Method for realizing split hoisting of underground continuous wall special-shaped steel reinforcement cage into groove based on BIM
CN201981543U (en) Hasp-free steel pipe pile foundation pit bracing sealing-up cofferdam structure
CN210637029U (en) Electric-drive ultra-deep cement mixing pile machine
CN107675700A (en) The construction method of diaphram wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 200032 No. 139, Xuhui District, Shanghai, Pingjiang Road

Patentee after: CCCC THIRD HARBOR ENGINEERING Co.,Ltd.

Patentee after: CCCC Third Aviation Bureau Sixth Engineering (Xiamen) Co., Ltd.

Patentee after: XIAMEN BRANCH OF CCCC THIRD HARBOR ENGINEERING Co.,Ltd.

Address before: 200032 No. 139, Xuhui District, Shanghai, Pingjiang Road

Patentee before: CCCC THIRD HARBOR ENGINEERING Co.,Ltd.

Patentee before: CCCC Sanya (Xiamen) Engineering Co.,Ltd.

Patentee before: XIAMEN BRANCH OF CCCC THIRD HARBOR ENGINEERING Co.,Ltd.

CP01 Change in the name or title of a patent holder