Ecological permeable pavement structure
Technical Field
The utility model relates to a permeable pavement technical field, concretely relates to ecology permeable pavement structure.
Background
Along with the process of large-scale urban construction, a series of ecological environmental problems caused by urbanization are increasingly highlighted. The urbanization hydrological effect is one example. The change of the original natural ecological environment by urbanization influences the processes of rainfall, evaporation and rainwater runoff and confluence, and causes the problems of urban water resource shortage, urban non-point source pollution and the like, and the change and the confluence of the urban natural ecological environment and the urban natural ecological environment jointly form the urban hydrological effect. One important manifestation of the urbanized hydrological effect is the change of urban rainwater runoff and confluence characteristics. Due to the fact that impervious areas such as roofs and hard ground are greatly increased, rainwater runoff forming time is shortened, and rainwater flood peak flow is increased. On one hand, the problem of urban inland inundation can be caused (inland inundation caused by Beijing rainstorm in summer of 2012 is an example), and on the other hand, the problem of rainwater runoff pollution can be caused because the violent scouring action generated by rapidly formed runoff of the underlying surface brings roof pavement sediments, garbage generated by pedestrians and vehicles into urban water. More seriously, a large amount of oil stain substances on the urban motor vehicle lanes can cause the initial storm runoff to contain a large amount of carcinogenic substances, such as benzopyrene, benzanthracene and the like, and the carcinogenic substances can be enriched through a food chain after entering a water body, so that the health of human bodies is harmed.
The permeable pavement is a typical low-influence development measure for regulating and controlling urban rainwater runoff by increasing the urban permeable area. The urban rainwater runoff filter can meet the requirement of convenience of life of people, has good permeability, reduces the pollutant input of rainwater runoff on urban water, improves the urban water environment quality, and can relieve the negative influence brought by the urban process to a certain extent.
At present, the research on permeable pavement in developed countries is early and systematic, for example, a large amount of research is carried out in the aspects of permeable pavement runoff control, pollutant reduction and the like in the United states, Canada, Australia, British and the like, abundant experience is accumulated, and the developed countries are still in the starting stage in China. In recent years, under the promotion of construction of sponge cities and beautiful villages, permeable pavements are actively popularized and applied in many domestic areas, and large-area permeable pavements such as roads, parking lots and squares are constructed. However, due to the lack of long-term monitoring data and practical experience, some permeable pavements are unreasonable in design structure and only focus on the rainwater infiltration function, and the runoff regulation and control benefits are difficult to continuously and effectively exert due to incomplete removal of non-point pollutants and detailed design consideration.
Disclosure of Invention
1. Technical problem to be solved by the invention
Not enough to prior art, the utility model provides an ecology structure of mating formation that permeates water. The permeable base layer of the permeable pavement is formed by assembling the framework building block frameworks, the permeable pavement surface course can also be formed by assembling permeable bricks and broken stones, and the permeable base layer and the permeable pavement surface course of the permeable pavement are formed by adopting an assembling structure, so that the construction is convenient and fast, the construction period is short, the recycling is facilitated, and the laying cost is low; the permeable pavement has good permeable effect, meanwhile, the permeable pavement has good drainage effect, and the pressure of a city drainage system can be relieved; the permeable pavement can filter and purify suspended particles in the infiltration runoff, can effectively intercept and adsorb pollutants such as nitrogen and phosphorus, heavy metals and oil stains in the infiltration runoff, and avoids the pollutants from entering the underground.
2. Technical scheme
In order to achieve the above purpose, the utility model provides a technical scheme does:
the utility model discloses an ecology structure of mating formation that permeates water includes soil basic unit, bed course, infiltration filtration layer, basic unit, screed-coat and the road surface course that permeates water from bottom to top in proper order, bed course and infiltration filtration layer between, basic unit and the screed-coat that permeates water between all be equipped with the geotechnological cloth that permeates water, the infiltration filtration layer be equipped with the drain pipe, basic unit that permeates water have interlocking formula frame basic unit building block to assemble and form.
Preferably, the cushion layer adopts graded broken stones or gravels, and the grain size of the graded broken stones is 25-35 mm.
Preferably, the permeation filtration layer consists of coarse sand and a drain pipe, and the particle size of the coarse sand is 3-5 mm.
Further preferably, the upper surface of the drain pipe is flush with the lower surface of the permeable base layer, and the drain pipe is provided with water seepage holes for enabling water in the permeable base layer to permeate into the drain pipe and be discharged through the drain pipe.
Still further preferably, the outer wall of drain pipe be provided with the filter screen, the filter screen is the gauze, the gauze twines on the outer wall of drain pipe.
Further preferably, the drain pipes are arranged in the permeation filtering layer along the longitudinal direction, a plurality of drain pipes are arranged, and the drain pipes are uniformly distributed at intervals along the transverse length direction of the permeation filtering layer.
Still more preferably, the distance between two adjacent drain pipes is 3-5 m.
Preferably, the frame base block comprises a pair of transverse supports and a pair of longitudinal supports, the pair of transverse supports are parallel to each other, the pair of longitudinal supports are parallel to each other, the longitudinal supports and the transverse supports are perpendicular to each other and intersect, two ends of the transverse supports and two ends of the longitudinal supports are provided with a joint part, the part of the transverse support between the pair of longitudinal supports forms a transverse support section, and the part of the longitudinal support between the pair of transverse supports forms a longitudinal support section.
Further preferably, the joint comprises a first surface, a second surface and a third surface, the first surface is parallel to the second surface and protrudes from the second surface, and the third surface is connected with the first surface and the second surface and is a vertical surface.
Still further preferably, both ends of the lateral support are respectively provided with a left joint part and a right joint part, in the lateral direction, a first surface of the left joint part is aligned with a second surface of the right joint part, the second surface of the left joint part is aligned with the first surface of the right joint part, and a third surface of the left joint part is parallel to a third surface of the right joint part; the two ends of the longitudinal support are respectively provided with a front joint part and a rear joint part, in the longitudinal direction, a first surface of the front joint part is aligned with a second surface of the rear joint part, the second surface of the front joint part is aligned with the first surface of the rear joint part, and a third surface of the front joint part is parallel to a third surface of the rear joint part.
Further preferably, the transverse support and the longitudinal support form a Chinese character jing.
Preferably, the gaps of the permeable base layer are filled with a mixture, the mixture is composed of crushed stone and activated carbon according to the proportion of 5: 5-8: 2, and the particle size of the crushed stone and the activated carbon is 10-20 mm.
Preferably, the leveling layer consists of open graded broken stones, and the grain size of the open graded broken stones is 5-10 mm.
Preferably, the permeable road surface layer is composed of permeable bricks and gravels, the length, width and height of each permeable brick are 200mm multiplied by 100mm multiplied by 60mm, gaps of 2mm are reserved between adjacent permeable bricks and are solidified by cement, and the particle size of each gravel is 3-5 mm.
The utility model discloses beneficial effect does:
the utility model discloses an ecology structure of mating formation of permeating water is equipped with the perforation on the drain pipe of infiltration filter layer, and water in the infiltration filter layer can permeate the drain pipe through the perforation, and the water accessible drain pipe in the infiltration filter layer in time discharges when the water yield in the soil basic unit is more, can avoid making sewage spill over on the road surface because of the water yield in the soil basic unit is too much.
The utility model discloses an ecology structure of mating formation that permeates water, the basic unit that permeates water is formed by interlocking formula basic unit building block assembly, whole basic unit that permeates water is the assembled convenience, it is convenient to be under construction, construction period is short, and this kind of basic unit can recycle, direct each basic unit building block of the basic unit that will permeate water in the former when meetting the road transformation dismantles the packing and transports to other road position departments and assemble again can, it is very convenient to use, greatly reduced road laying's cost, and permeate water the space department of basic unit and adopt rubble and active carbon to fill, can hold back effectively and adsorb nitrogen phosphorus in the infiltration runoff, heavy metal, pollutants such as greasy dirt, avoid it to get into the underground and cause the pollution.
The utility model discloses an ecology structure of mating formation of permeating water, the road surface course that permeates water becomes by the brick and the rubble piece of permeating water makeup, and the road surface course that permeates water that the brick and the rubble piece of permeating water were assembled and are formed is water permeability good, and the brick and the rubble that permeate water such as rainwater, urban sewage permeate down fast, can avoid permeating water road surface course surface ponding, and it is convenient to assemble the same construction of the road surface course that permeates water that forms simultaneously, is favorable to cyclic utilization.
The utility model discloses an ecology structure of mating formation of permeating water, the efficient, long service life, the dirt-removing power that permeate water are strong, help the construction in ecological road and sponge city.
Drawings
The reference numerals in the schematic drawings illustrate:
fig. 1 is a schematic cross-sectional view of the overall structure of an ecological permeable pavement structure of the present invention;
fig. 2 is a schematic plan view of the permeable base skeleton of the present invention;
FIG. 3 is a schematic plan view of the permeable pavement of the present invention;
the reference numerals in the schematic drawings illustrate:
1. a soil base layer; 2. a cushion layer; 3. a permeation filtration layer; 4. a water permeable base layer; 5. leveling layer; 6. a permeable pavement facing; 7. water-permeable geotextile; 8. a drain pipe; 9. water permeable bricks; 10. and (4) crushing the stones.
Detailed Description
For a further understanding of the present invention, reference will be made to the following detailed description taken in conjunction with the accompanying drawings and examples.
Examples
As shown in fig. 1, the utility model discloses an ecology structure of mating formation that permeates water includes soil basic unit 1, bed course 2, permeation filtration layer 3, the basic unit 4 that permeates water, screed-coat 5 and the road surface course 6 that permeates water in proper order from bottom to top, between bed course 2 and the permeation filtration layer 3, all is equipped with the geotechnological cloth 7 that permeates water between basic unit 4 and the screed-coat 5, the permeation filtration layer is equipped with drain pipe 8, the basic unit that permeates water have interlocking formula frame basic unit building block to assemble and form.
Preferably, graded broken stones or gravels are adopted as the cushion layer 2, and the grain size of the graded broken stones is 25-35 mm.
Preferably, the infiltration filtering layer 3 consists of coarse sand and a drain pipe 8, and the particle size of the coarse sand is 3-5 mm.
Further preferably, the upper surface of the drain pipe 8 is flush with the lower surface of the permeable base layer 4, and the drain pipe 8 is provided with water seepage holes for water in the permeable base layer to seep into the drain pipe 8 and to be discharged through the drain pipe 8.
Still further preferably, the outer wall of the drain pipe 8 is provided with a filter screen, the filter screen is gauze, and the gauze is wound on the outer wall of the drain pipe.
Further preferably, the drain pipes 8 are longitudinally arranged in the permeable filtering layer, a plurality of drain pipes 8 are arranged, and the plurality of drain pipes 8 are uniformly distributed at intervals along the transverse length direction of the permeable filtering layer.
Further preferably, the distance between two adjacent drain pipes 8 is 3-5 m.
Preferably, the permeable base layer 4 block comprises a pair of transverse supports and a pair of longitudinal supports, the pair of transverse supports are parallel to each other, the pair of longitudinal supports are parallel to each other, the longitudinal supports and the transverse supports are perpendicular to each other and intersect, the two ends of the transverse supports and the two ends of the longitudinal supports are provided with a combination part, the part of the transverse support between the pair of longitudinal supports forms a transverse support section, and the part of the longitudinal support between the pair of transverse supports forms a longitudinal support section.
Further preferably, the joint comprises a first surface, a second surface and a third surface, the first surface is parallel to the second surface and protrudes from the second surface, and the third surface is connected with the first surface and the second surface and is a vertical surface.
Still further preferably, the two ends of the lateral support are respectively provided with a left joint part and a right joint part, in the lateral direction, the first surface of the left joint part is aligned with the second surface of the right joint part, the second surface of the left joint part is aligned with the first surface of the right joint part, and the third surface of the left joint part is parallel to the third surface of the right joint part. The two ends of the longitudinal support are respectively provided with a front joint part and a rear joint part, in the longitudinal direction, a first surface of the front joint part is aligned with a second surface of the rear joint part, the second surface of the front joint part is aligned with the first surface of the rear joint part, and a third surface of the front joint part is parallel to a third surface of the rear joint part.
Further preferably, the transverse support and the longitudinal support form a Chinese character jing.
Preferably, the gaps of the permeable base layer 4 are filled with a mixture, the mixture is composed of crushed stone and activated carbon according to the proportion of 5: 5-8: 2, and the particle size of the crushed stone and the activated carbon is 10-20 mm.
As a preferred embodiment, the mix consists of crushed stone and activated carbon in a ratio of 7: 3.
Preferably, the leveling layer 5 consists of open graded broken stones, and the grain size of the open graded broken stones is 5-10 mm.
More preferably, the permeable road surface layer 6 is composed of permeable bricks 9 and gravels 10, the length, width and height of the permeable bricks 9 are 200mm multiplied by 100mm multiplied by 60mm, gaps of 2mm are reserved between the adjacent permeable bricks 9 and are solidified by using cement, and the particle size of the gravels 10 is 3-5 mm.
As a preferred embodiment, the water permeable bricks 9 are ceramic water permeable bricks.
The present invention and its embodiments have been described above schematically, and the description is not intended to be limiting, and what is shown in the drawings is only one of the embodiments of the present invention, and the actual structure is not limited thereto. Therefore, if the person skilled in the art receives the teaching of the present invention, without creatively designing the similar structural modes and embodiments to the technical solutions, they should belong to the protection scope of the present invention.