CN211440523U - Steel-pipe column concrete placement connects - Google Patents

Steel-pipe column concrete placement connects Download PDF

Info

Publication number
CN211440523U
CN211440523U CN202020054944.8U CN202020054944U CN211440523U CN 211440523 U CN211440523 U CN 211440523U CN 202020054944 U CN202020054944 U CN 202020054944U CN 211440523 U CN211440523 U CN 211440523U
Authority
CN
China
Prior art keywords
mounting
pipe column
fixed
movable rod
casing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020054944.8U
Other languages
Chinese (zh)
Inventor
谢旺军
刘振华
宾艳明
文韬
杨倩
陈建佳
王成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Vocational and Technical College of Communications
Original Assignee
Guangxi Vocational and Technical College of Communications
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Vocational and Technical College of Communications filed Critical Guangxi Vocational and Technical College of Communications
Priority to CN202020054944.8U priority Critical patent/CN211440523U/en
Application granted granted Critical
Publication of CN211440523U publication Critical patent/CN211440523U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a steel-pipe column concrete placement connects, which comprises a housin, the front end middle part of casing is fixed with the pouring tube, the rear end of casing is fixed with the second flange, the four corners department of casing front end all is provided with the mount pad, the front side of mount pad all is fixed with the gag lever post, the front side of gag lever post all is provided with the movable rod, position department between movable rod and the movable rod is provided with the collar, the front end of pouring tube is fixed with first flange, the mounting groove has been seted up to the upper end of casing, the standing groove has been seted up at the lower extreme middle part of mounting groove, the inside of standing groove is provided with the baffle. The utility model discloses a set up gag lever post, movable rod, collar, standing groove and baffle, solved and did not possess the function of spacing protection and did not possess the problem of the function that stops the pouring fast in the steel-pipe column concrete pouring connects.

Description

Steel-pipe column concrete placement connects
Technical Field
The utility model relates to a concrete processing equipment technical field specifically is a steel-pipe column concrete placement connects.
Background
The concrete-filled steel tube refers to a structural member which is formed by filling concrete in a steel tube and can bear the external load together with the core concrete of the steel tube, and can be divided into round concrete-filled steel tube, square concrete-filled steel tube, rectangular concrete-filled steel tube, polygonal concrete-filled steel tube and the like according to different cross-sectional forms.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
An object of the utility model is to provide a steel-pipe column concrete placement connects to solve the problem that proposes among the above-mentioned background art.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a steel-pipe column concrete placement connects, includes the casing, the front end middle part of casing is fixed with the pouring tube, the rear end of casing is fixed with the second flange, the four corners department of casing front end all is provided with the mount pad, the front side of mount pad all is fixed with the gag lever post, the front side of gag lever post all is provided with the movable rod, position department between movable rod and the movable rod is provided with the collar, the front end of pouring tube is fixed with first flange, the mounting groove has been seted up to the upper end of casing, the standing groove has been seted up at the lower extreme middle part of mounting groove, the inside of standing groove is provided with the baffle.
Preferably, the upper end of baffle is fixed with the mounting panel, the lower extreme setting of mounting panel is in the mounting groove, the installation pole has all been seted up to the side about the mounting groove.
Preferably, the mounting plate is provided with mounting holes at positions corresponding to the mounting rods, and the upper ends of the mounting rods are arranged in the corresponding mounting holes.
Preferably, first screw holes are formed in four corners of the shell, and bolts are arranged at positions, corresponding to the first screw holes, of the rear end of the shell.
Preferably, the rear side of the mounting seat is provided with a second screw hole, and the outer side of the limiting rod is provided with a through hole.
Preferably, the rear ends of the movable rods are respectively fixed with a movable plate, the rear sides of the movable plates are respectively arranged in the corresponding limiting rods, grooves are formed in the positions, corresponding to the mounting rings, on the side walls of the movable rods, and the side walls of the mounting rings are fixed on the grooves.
(III) advantageous effects
The utility model provides a steel-pipe column concrete placement connects possesses following beneficial effect:
(1) by arranging the limiting rod, the movable rod and the mounting ring, when the shell works, in order to improve the stability between the first flange and the steel pipe column, the movable rod moves in the limiting rod and is drawn out from the limiting rod, thereby enabling the movable plate to move outwards in the limiting rod and further enabling the mounting ring to move towards the direction of the steel pipe column, when the inner side of the mounting ring is contacted with the outer side of the steel pipe column, thereby improving the stability between the first flange and the steel pipe column, directly screwing out the bolt in the first screw hole when the limiting rod needs to be disassembled, the bolt can be screwed out from the second screw hole, the effect of separating the mounting seat and the shell can be achieved, thereby reach the effect of dismantling the gag lever post, solved the problem that does not possess spacing protection's function in the steel-pipe column concrete placement connects, possessed the benefit of the dismouting of being convenient for simultaneously.
(2) The utility model discloses a set up standing groove and baffle, when stopping the cast concrete, stop the work of outside elevator pump, place the baffle in the standing groove again, the while is the mounting panel that moves down, and then make the baffle block the casing is inside whole, make the mounting panel move to in the mounting groove simultaneously, and then make the installation pole inject in the mounting hole, thereby make the pouring pipe and the inside disconnection of casing, thereby reach the work that ends the cast concrete, the problem that does not possess the function that stops the pouring fast in the steel-pipe column concrete pouring joint has been solved, and the while has been possessed simple structure, the benefit of the operation of being convenient for.
Drawings
FIG. 1 is a block diagram of the present invention;
FIG. 2 is a front view of the housing of FIG. 1 in accordance with the present invention;
FIG. 3 is a rear view of the housing of FIG. 1 in accordance with the present invention;
FIG. 4 is a block diagram of the mounting plate of FIG. 1 according to the present invention;
FIG. 5 is a view showing a structure of the stop lever of FIG. 1 according to the present invention;
fig. 6 is a structural view of the movable rod of fig. 1 according to the present invention.
The reference numbers in the figures are: 1. a housing; 2. mounting a plate; 3. a limiting rod; 4. a movable rod; 5. a mounting ring; 6. a first flange; 7. a pouring tube; 8. mounting a rod; 9. a placement groove; 10. mounting grooves; 11. a first screw hole; 12. a bolt; 13. a second flange; 14. a baffle plate; 15. mounting holes; 16. a through hole; 17. a mounting seat; 18. a second screw hole; 19. a movable plate; 20. and (4) a groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-6, the present invention provides a technical solution: a steel pipe column concrete pouring joint comprises a shell 1, a pouring pipe 7 is fixed in the middle of the front end of the shell 1, a second flange 13 is fixed at the rear end of the shell 1, the shell is fixedly installed with an external lift pump through the second flange 13, installation seats 17 are arranged at four corners of the front end of the shell 1, limiting rods 3 are fixed on the front sides of the installation seats 17, movable rods 4 are arranged on the front sides of the limiting rods 3, installation rings 5 are arranged between the movable rods 4 and the movable rods 4, stability between the pouring pipe 7 and a steel pipe column is improved through the installation rings 5, a first flange 6 is fixed at the front end of the pouring pipe 7, the pouring pipe is fixedly installed with the steel pipe column through the first flange 6, an installation groove 10 is formed in the upper end of the shell 1, a placement groove 9 is formed in the middle of the lower end of the installation groove 10, and a baffle 14 is arranged inside the;
the mounting plate 2 is fixed at the upper end of the baffle plate 14, the lower end of the mounting plate 2 is arranged in the mounting groove 10, the mounting plate 2 is placed in the mounting groove 10, the baffle plate 14 is further placed in the placing groove 9, the pouring tube 7 is further disconnected from the shell 1, and the mounting rods 8 are arranged on the left side and the right side of the mounting groove 10;
mounting holes 15 are formed in the mounting plate 2 at positions corresponding to the mounting rods 8, after the mounting plate 2 is placed in the mounting groove 10, the mounting rods 8 are moved into the mounting holes 15, the positions of the mounting plate 2 are limited, and the upper ends of the mounting rods 8 are arranged in the corresponding mounting holes 15;
the four corners of the shell 1 are respectively provided with a first screw hole 11, bolts 12 are screwed into the first screw holes 11 and the second screw holes 18, so that the mounting seat 17 is fixedly mounted on the shell 1, and the rear end of the shell 1 is provided with the bolts 12 at positions corresponding to the first screw holes 11;
the rear side of the mounting seat 17 is provided with a second screw hole 18, the outer side of the limiting rod 3 is provided with a through hole 16, the inside of the limiting rod 3 is communicated with the outside air through the through hole 16, and the movable plate 19 cannot move when moving;
the rear end of movable rod 4 all is fixed with movable plate 19, the rear side of movable plate 19 all sets up in corresponding gag lever post 3, movable plate 19 can be in the inside removal of gag lever post 3, movable plate 19 is spacing to movable rod 4 simultaneously, prevent to break away from between movable rod 4 and the gag lever post 3, the position department that corresponds collar 5 on the lateral wall of movable rod 4 all seted up recess 20, install collar 5 in recess 20, and then make movable rod 4 when removing, can drive collar 5 and remove, the lateral wall of collar 5 is fixed on recess 20.
The working principle is as follows: when the utility model is used, the first flange 6 is arranged on the steel pipe column, the second flange 13 is communicated with the external lifting pump, concrete is pumped into the shell 1 through the work of the external lifting pump, and further the concrete pouring steel pipe column in the pouring pipe 7 is enabled, when the shell 1 works, in order to improve the stability between the first flange 6 and the steel pipe column, the movable rod 4 is outwards drawn out in the limiting rod 3 through the movement of the movable rod 4 in the limiting rod 3, and further the movable plate 19 is outwards moved in the limiting rod 3, and further the mounting ring 5 is moved towards the direction of the steel pipe column, when the inner side of the mounting ring 5 is contacted with the outer side of the steel pipe column, and further the stability between the first flange 6 and the steel pipe column is improved, when the concrete pouring is stopped, the work of the external lifting pump is stopped, and then the baffle 14 is placed in the placing groove 9, and simultaneously, the mounting plate 2 is moved downwards, so that the baffle plate 14 completely blocks the inside of the shell 1, and simultaneously, the mounting plate 2 is moved into the mounting groove 10, so that the mounting rod 8 is inserted into the mounting hole 15, so that the pouring pipe 7 is disconnected from the inside of the shell 1, and the concrete pouring is stopped.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a steel-pipe column concrete casting connects, includes casing (1), its characterized in that: the utility model discloses a pouring tube, including casing (1), front end, mount pad (4), spacer rod (6), mounting groove (9), standing groove (9), baffle (14), mounting groove (9), the inside of standing groove (9) is provided with baffle (14), the rear end of casing (1) is fixed with second flange (13), the four corners department of casing (1) front end all is provided with mount pad (17), the front side of mount pad (17) all is fixed with gag lever post (3), the front side of gag lever post (3) all is provided with movable rod (4), position department between movable rod (4) and movable rod (4) is provided with collar (5), the front end of pouring tube (7) is fixed with first flange (6), mounting groove (10) have been seted up to the upper end of casing (1), standing groove (9) have been seted up to the lower extreme middle part of mounting groove (10.
2. The steel pipe column concrete casting joint according to claim 1, wherein: the upper end of baffle (14) is fixed with mounting panel (2), the lower extreme setting of mounting panel (2) is in mounting groove (10), installation pole (8) have all been seted up to the side about mounting groove (10).
3. The steel pipe column concrete casting joint according to claim 2, wherein: mounting hole (15) have all been seted up in the position department of corresponding installation pole (8) on mounting panel (2), the upper end setting of installation pole (8) is in corresponding mounting hole (15).
4. The steel pipe column concrete casting joint according to claim 1, wherein: first screw holes (11) are formed in four corners of the shell (1), and bolts (12) are arranged at positions, corresponding to the first screw holes (11), of the rear end of the shell (1).
5. The steel pipe column concrete casting joint according to claim 1, wherein: second screw holes (18) are formed in the rear side of the mounting seat (17), and through holes (16) are formed in the outer side of the limiting rod (3).
6. The steel pipe column concrete casting joint according to claim 1, wherein: the rear end of movable rod (4) all is fixed with fly leaf (19), the rear side of fly leaf (19) all sets up in corresponding gag lever post (3), the position department of corresponding collar (5) all sets up fluted (20) on the lateral wall of movable rod (4), the lateral wall of collar (5) is fixed on recess (20).
CN202020054944.8U 2020-01-10 2020-01-10 Steel-pipe column concrete placement connects Expired - Fee Related CN211440523U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020054944.8U CN211440523U (en) 2020-01-10 2020-01-10 Steel-pipe column concrete placement connects

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020054944.8U CN211440523U (en) 2020-01-10 2020-01-10 Steel-pipe column concrete placement connects

Publications (1)

Publication Number Publication Date
CN211440523U true CN211440523U (en) 2020-09-08

Family

ID=72311286

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020054944.8U Expired - Fee Related CN211440523U (en) 2020-01-10 2020-01-10 Steel-pipe column concrete placement connects

Country Status (1)

Country Link
CN (1) CN211440523U (en)

Similar Documents

Publication Publication Date Title
CN210855035U (en) Electromechanical device's installation device
CN211440523U (en) Steel-pipe column concrete placement connects
CN206181531U (en) Accelerator convenient to overhaul
CN218478434U (en) Prefabricated shear wall lifting device for building convenient to dismantle installation
CN110821207A (en) Integral lifting method for small-sized existing structure
CN203077437U (en) Mould for concrete pouring of rectangular holes
CN108856657A (en) A kind of foundry sand case apparatus facilitating operation
CN210308361U (en) Self-contraction type inner formwork structure for caisson prefabrication
KR101436257B1 (en) Connection structure of the forms
CN218386323U (en) Distribution box and auxiliary mounting structure for same
CN216713848U (en) Crane convenient to building templates installation
CN220098281U (en) C-shaped hook for hoisting strip steel in steel mill
CN218520871U (en) American case becomes hoisting structure
CN216465248U (en) Assembled granary ring beam mould
CN219563553U (en) Anti-overflow structure of prefabricated plate side form
CN221020828U (en) Movable guide vane crank arm dismantling device
CN215589476U (en) Circular well forming device of concrete inspection well
CN219080863U (en) Structure for integrally pouring finished flue and main body structure
CN215150285U (en) Prefabricated staircase hoisting point rapid demoulding device
CN218116463U (en) Foundation pit hanging die installation reinforcing structure
CN217618726U (en) A simple and easy fixing device for lattice column processing
CN217129105U (en) Stereo garage safety hook convenient to dismouting
CN220642449U (en) Scissor fork type climbing vehicle balancing weight
CN216665079U (en) Shockproof framework for mounting shear wall
CN210547860U (en) Disappearance mould of fork truck box side by side casting usefulness

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200908

Termination date: 20220110

CF01 Termination of patent right due to non-payment of annual fee