Prior art keywords
channel
channel steel
limiting plate
steel die
mould
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922416032.0U
Other languages
Chinese (zh)
Inventor
马建国
杨佳
解勇
崔轩
崔鹏博
马佳
李梅梅
赵超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Scegc No3 Construction Engineering Group Co ltd
Original Assignee
Scegc No3 Construction Engineering Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Scegc No3 Construction Engineering Group Co ltd filed Critical Scegc No3 Construction Engineering Group Co ltd
Priority to CN201922416032.0U priority Critical patent/CN211438791U/en
Application granted granted Critical
Publication of CN211438791U publication Critical patent/CN211438791U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a pipeline and groove box installing support mould, including horizontal channel-section steel mould, first channel-section steel mould and second channel-section steel mould, set up first waist shape hole in the horizontal channel-section steel mould, wear to be equipped with the connection lead screw in first channel-section steel mould and the second channel-section steel mould, be provided with first limiting plate on the horizontal channel-section steel mould, be provided with the second limiting plate on the first channel-section steel mould, be provided with the third limiting plate on the second channel-section steel mould. The utility model discloses can realize the processing of door type support, trapezoidal support and L type support to actual installation demand, reduce the influence that personnel's level difference caused in addition.

Description

Pipeline and groove box installing support mould
Technical Field
The utility model belongs to the technical field of pipeline and groove box installation, especially, relate to a pipeline and groove box installing support mould.
Background
Under the influence of global building system safety, various pipelines and tank boxes are widely applied to various public buildings and residential buildings, and supports for the pipelines and the tank boxes are also diversified. The processing of the installing support of traditional pipeline and groove box mainly carries out actual dimensions according to on-the-spot demand and measures, and the control of angle is accomplished according to the range estimation to most in the welding process, and the following defect often can appear in the installing support processing of traditional pipeline and groove box like this:
firstly, the mounting bracket structure is not uniform, and the overall impression quality is poor;
secondly, the difference of the levels of installation support processing personnel causes the difference of installation supports in the same style;
second, it is difficult to implement the conversion of various mounting brackets in a complex environment.
Consequently, now lack a pipeline and groove box installing support mould, the installing support structure who obtains through pipeline and groove box installing support mould is unified, improves the overall installation and sees the effect of feeling, reduces the influence that personnel's level difference caused in addition, secondly can realize the processing of door type support, trapezoidal support and L type support to actual installation demand.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that not enough among the above-mentioned prior art is directed at, provide a pipeline and groove box installing support mould, its reasonable in design and with low costs, the installing support structure who obtains through pipeline and groove box installing support mould is unified, improves the overall installation and sees the effect of feeling, reduces the influence that personnel's level difference caused in addition, secondly can realize the processing of door type support, trapezoidal support and L type support to actual installation demand.
In order to solve the technical problem, the utility model discloses a technical scheme is: the utility model provides a pipeline and groove box installing support mould which characterized in that: the steel mould comprises a horizontal channel steel mould, a first channel steel mould and a second channel steel mould, wherein a first waist-shaped hole is formed in the horizontal channel steel mould, a first lead screw and a second lead screw penetrate through the first waist-shaped hole, one end of the first lead screw, which extends out of the first waist-shaped hole, is welded with the end part of the first channel steel mould, one end of the second lead screw, which extends out of the first waist-shaped hole, is welded with the end part of the second channel steel mould, second waist-shaped holes are respectively formed in the first channel steel mould and the second channel steel mould, a connecting lead screw penetrates through the two second waist-shaped holes, a first limiting plate is arranged on the horizontal channel steel mould, the first limiting plate is arranged along the length direction of the horizontal channel steel mould, a second limiting plate is arranged on the first channel steel mould, the second limiting plate is arranged along the length direction of the first channel steel mould, and a third limiting plate is arranged on the second channel steel mould, and the third limiting plate is arranged along the length direction of the second channel steel mould.
Foretell pipeline and groove box installing support mould, its characterized in that: the quantity of connecting the lead screw is a plurality of, and is a plurality of connecting the lead screw and laying along the length direction in second waist shape hole, the cover is equipped with lock nut on the connecting the lead screw, lock nut is located the both sides in second waist shape hole.
Foretell pipeline and groove box installing support mould, its characterized in that: the first channel steel die is provided with a plurality of first restraint pieces, the first restraint pieces are arranged along the length direction of the first channel steel die, the second channel steel die is provided with a plurality of second restraint pieces, and the second restraint pieces are arranged along the length direction of the second channel steel die.
Foretell pipeline and groove box installing support mould, its characterized in that: first about piece and the about piece of second all include fixation nut and wear to establish the adjusting screw in fixation nut, fixation nut welds on first channel-section steel mould and second channel-section steel mould, adjusting screw in the first about piece can be close to or keep away from the second limiting plate and remove, adjusting screw in the about piece of second can be close to or keep away from the third limiting plate and remove.
Foretell pipeline and groove box installing support mould, its characterized in that: a gap is arranged between the first limiting plate and the second limiting plate and between the first limiting plate and the third limiting plate, the first limiting plate is located on the upper surface of the horizontal channel steel die, and the distance between the first limiting plate and the second limiting plate and the distance between the first limiting plate and the third limiting plate are larger than 1/2 of the width of the horizontal channel steel die.
Compared with the prior art, the utility model has the following advantage:
1. simple structure, reasonable in design and input cost are lower.
2. The adopted pipeline and trough box mounting support die comprises a horizontal channel steel die, a first channel steel die and a second channel steel die, and the angle between the first channel steel die and the horizontal channel steel die, the angle between the second channel steel die and the horizontal channel steel die can be adjusted, so that the processing of a door-shaped support, a trapezoidal support and an L-shaped support can be realized according to actual mounting requirements, the processing of the trapezoidal supports with different angles can be realized, and the flexible adjustment is convenient.
3. The first screw rod and the second screw rod penetrate through the first waist-shaped hole, the first channel steel die is connected through the first screw rod, the second channel steel die is connected through the second screw rod, and therefore the first channel steel die, the second channel steel die and the horizontal channel steel die are effectively fixedly connected in the angle change process between the first channel steel die, the second channel steel die and the horizontal channel steel die, and the stability of the integral die is improved.
4. Second waist shape hole has been seted up respectively in the first channel-section steel mould that adopts and the second channel-section steel mould in, be in order to facilitate two wear to be equipped with the connection lead screw in the second waist shape hole, slide along the connection lead screw through first channel-section steel mould and second channel-section steel mould like this, realize the interval between first channel-section steel mould and the second channel-section steel mould and adjust to realize the angle modulation between first channel-section steel mould and second channel-section steel mould and the horizontal groove steel mould, it is convenient to adjust.
5. The horizontal channel steel mould that adopts is provided with first limiting plate on, is provided with the second limiting plate on the first channel steel mould, is provided with the third limiting plate on the second channel steel mould for at pipeline and groove box installing support in-process, spacing to a support spare, improved the uniformity of installing support processing to improve the overall installation and look and feel the effect, reduce the influence that personnel's level difference caused in addition.
To sum up, the utility model relates to a rationally and with low costs, the installing support structure who obtains through pipeline and groove box installing support mould is unified, improves the integrally mounted impression effect, reduces the influence that personnel's level difference caused in addition, secondly can realize the processing of door type support, trapezoidal support and L type support to actual installation demand.
The technical solution of the present invention is further described in detail by the accompanying drawings and examples.
Drawings
Fig. 1 is a schematic structural view of the pipe and tank mounting bracket mold of the present invention.
Fig. 2 is a schematic view of the processing of the L-shaped bracket of the present invention.
Fig. 3 is a schematic view of the door-shaped bracket of the present invention.
Fig. 4 is a schematic view of the processing of the ladder support of the present invention.
Fig. 5 is a schematic view of the installation positions of the L-shaped bracket, the door-shaped bracket and the trapezoid bracket of the present invention.
Description of reference numerals:
1-horizontal channel steel mould; 1-a first horizontal angle steel; 1-2-first perpendicular angle steel;
2-a first waist-shaped hole; 2-1-second horizontal angle steel; 2-second perpendicular angle steel;
2-3-third perpendicular angle steel; 3-a first screw rod; 3-1-third horizontal angle steel;
3-2-first oblique angle steel; 3-second oblique angle steel;
4-a second screw rod; 5, a first channel steel die; 6, a second channel steel die;
7-second waist-shaped hole; 8, connecting a screw rod; 9-a second limiting plate;
10-a first limiting plate; 11-a third limiting plate; 12 — a first restraint;
12-1-adjusting screw; 12-2 — a fixing nut; 13 — a second restraint;
40-a structural wall; 50-structural beam; 60-structural top plate;
70-a first reinforcing steel plate; 80-third expansion screw; 90-a second reinforced steel plate;
100-L-shaped bracket; 110 — a first expansion screw; 120-second expansion screw;
130-a first pipe strap; 140 — a first conduit; 150-a cell box;
160-a second conduit; 170-second pipe strap; 180-a fourth expansion screw;
200-a portal frame; 300-trapezoidal support.
Detailed Description
As shown in fig. 1, the pipe and channel mounting bracket mold comprises a horizontal channel steel mold 1, a first channel steel mold 5 and a second channel steel mold 6, wherein a first waist-shaped hole 2 is formed in the horizontal channel steel mold 1, a first lead screw 3 and a second lead screw 4 are arranged in the first waist-shaped hole 2 in a penetrating manner, one end of the first lead screw 3 extending out of the first waist-shaped hole 2 is welded with the end of the first channel steel mold 5, one end of the second lead screw 4 extending out of the first waist-shaped hole 2 is welded with the end of the second channel steel mold 6, the first channel steel mold 5 and the second channel steel mold 6 are respectively provided with a second waist-shaped hole 7, a connecting lead screw 8 is arranged in the two second waist-shaped holes 7 in a penetrating manner, the horizontal channel steel mold 1 is provided with a first limiting plate 10, the first limiting plate 10 is arranged along the length direction of the horizontal channel steel mold 1, the first channel steel mold 5 is provided with a second limiting plate 9, the second limiting plate 9 is arranged along the length direction of the first channel steel die 5, a third limiting plate 11 is arranged on the second channel steel die 6, and the third limiting plate 11 is arranged along the length direction of the second channel steel die 6.
In this embodiment, the number of the connecting screw rods 8 is two, the two connecting screw rods 8 are arranged along the length direction of the second waist-shaped hole 7, and the connecting screw rods 8 are sleeved with locking nuts which are located on two sides of the second waist-shaped hole 7.
In this embodiment, the first channel steel mold 5 is provided with a plurality of first constraining members 12, the plurality of first constraining members 12 are arranged along the length direction of the first channel steel mold 5, the second channel steel mold 6 is provided with a plurality of second constraining members 13, and the plurality of second constraining members 13 are arranged along the length direction of the second channel steel mold 6.
In this embodiment, the first restraint piece 12 and the second restraint piece 13 each include a fixing nut 12-2 and an adjusting screw 12-1 inserted into the fixing nut 12-2, the fixing nut 12-2 is welded to the first channel steel mold 5 and the second channel steel mold 6, the adjusting screw 12-1 in the first restraint piece 12 can move close to or away from the second limiting plate 9, and the adjusting screw 12-1 in the second restraint piece 13 can move close to or away from the third limiting plate 11.
In this embodiment, a gap is provided between the first limiting plate 10 and the second limiting plate 9 and the third limiting plate 11, the first limiting plate 10 is located on the upper surface of the horizontal channel steel mold 1, and the distance between the first limiting plate 10 and the second limiting plate 9 and the third limiting plate 11 is greater than 1/2 of the width of the horizontal channel steel mold 1.
In this embodiment, further, the slot box refers to a cable slot box.
In this embodiment, connecting screw 8 can slide along second waist shape hole 7 to be convenient for first channel-section steel mould 5 and second channel-section steel mould 6 slide along connecting screw 8.
In this embodiment, set up horizontal channel-section steel mould 1, first channel-section steel mould 5 and second channel-section steel mould 6, and the angle adjustable between first channel-section steel mould 5 and second channel-section steel mould 6 and the horizontal channel-section steel mould 1 to can realize the processing of door type support, trapezoidal support and L type support to actual installation demand, and can realize the processing of the trapezoidal support of different angles, it is convenient to adjust in a flexible way.
In this embodiment, wear to be equipped with first lead screw 3 and second lead screw 4 in the first kidney-shaped hole 2, be in order to connect first channel-section steel mould 5 through first lead screw 3, connect second channel-section steel mould 6 through second lead screw 4 to at the angle change in-process between first channel-section steel mould 5 and second channel-section steel mould 6 and horizontal channel-section steel mould 1, effectively so that first channel-section steel mould 5 and second channel-section steel mould 6 and horizontal channel-section steel mould 1 fixed connection have improved the stability of whole mould.
In this embodiment, second waist shape hole 7 has been seted up respectively in first channel-section steel mould 5 and the second channel-section steel mould 6, is for the convenience of being in two wear to be equipped with in the second waist shape hole 7 and connect lead screw 8, first channel-section steel mould 5 and second channel-section steel mould 6 remove along connecting lead screw 8 like this, realize the interval between first channel-section steel mould 5 and the second channel-section steel mould 6 and adjust to realize the angle modulation between first channel-section steel mould 5 and second channel-section steel mould 6 and the horizontal groove steel mould 1, it is convenient to adjust.
In this embodiment, be provided with first limiting plate 10 on the horizontal channel steel mould 1, be provided with second limiting plate 9 on the first channel steel mould 5, be provided with third limiting plate 11 on the second channel steel mould 6, be for in pipeline and groove box installing support in-process, spacing to a support spare, improved the uniformity of support processing to improve the overall installation impression effect, reduce the influence that personnel's level difference caused in addition.
In this embodiment, first limiting plate 10, second limiting plate 9 and third limiting plate 11 are the L limiting plate that appears, the L limiting plate that appears includes horizontal part and vertical portion, the horizontal part laminating of L limiting plate is on horizontal channel-section steel mould 1, first channel-section steel mould 5 and second channel-section steel mould 6, the vertical portion and the horizontal channel-section steel mould 1, first channel-section steel mould 5 and the second channel-section steel mould 6 of L limiting plate that appears are laid perpendicularly.
As shown in fig. 2 to 5, the method for installing the pipe and the tank box according to the present invention comprises the following steps:
step one, processing an L-shaped bracket:
step 101, adjusting the first channel steel mould 5 or the second channel steel mould 6 to be vertically distributed with the horizontal channel steel mould 1 in the step 101;
102, placing a first horizontal angle steel 1-1 on a horizontal channel steel die 1, wherein the bottom surface of the first horizontal angle steel 1-1 is attached to the upper surface of the horizontal channel steel die 1;
103, when the first channel steel die 5 and the horizontal channel steel die 1 are vertically arranged, placing a first vertical angle steel 1-2 on the first channel steel die 5, attaching one end of the first vertical angle steel 1-2 to the first horizontal angle steel 1-1, and adjusting a first restraint piece 12 until the first vertical angle steel 1-2 is attached to a second limiting plate 9;
when the second channel steel die 6 and the horizontal channel steel die 1 are vertically arranged, a first vertical angle steel 1-2 is placed on the second channel steel die 6, one end of the first vertical angle steel 1-2 is attached to the first horizontal angle steel 1-1, and the second restraint piece 13 is adjusted until the first vertical angle steel 1-2 is attached to the third limiting plate 11;
103, welding one end of the first vertical angle steel 1-2 with the first horizontal angle steel 1-1 to obtain an L-shaped support 100;
102, repeating the step 102 for multiple times to finish the processing of the plurality of L-shaped brackets 100;
step two, processing the portal bracket:
step 201, adjusting a first channel steel die 5 and a second channel steel die 6 to be vertically arranged with a horizontal channel steel die 1;
202, placing a second horizontal angle steel 2-1 on the horizontal channel steel die 1, wherein the bottom surface of the second horizontal angle steel 2-1 is attached to the upper surface of the horizontal channel steel die 1;
step 203, placing a second vertical angle steel 2-2 on the first channel steel mould 5, adjusting the first restraint piece 12 until one end of the second vertical angle steel 2-2 is attached to a second horizontal angle steel 2-1, and attaching the second vertical angle steel 2-2 to a second limiting plate 9;
placing a third vertical angle steel 2-3 on the second channel steel mould 6, adjusting a second restraint piece 13 until one end of the third vertical angle steel 2-3 is attached to a second horizontal angle steel 2-1, and attaching the third vertical angle steel 2-3 to a third limiting plate 11;
step 204, welding one end of a second vertical angle steel 2-2 with a second horizontal angle steel 2-1 and one end of a third vertical angle steel 2-3 with a first horizontal angle steel 1-1 to obtain a door-shaped support 200;
step 205, repeating the steps 202 to 204 for multiple times to finish the processing of the plurality of door-shaped brackets 200;
step three, processing the trapezoid bracket:
301, adjusting a first channel steel die 5 and a second channel steel die 6 to enable the first channel steel die 5 and the second channel steel die 6 to be arranged in a trapezoid shape with a horizontal channel steel die 1, wherein the distance between the first channel steel die 5 and the second channel steel die 6 is gradually increased from the position close to the horizontal channel steel die 1 to the position far away from the horizontal channel steel die 1;
302, placing a third horizontal angle steel 3-1 on the horizontal channel steel mold 1, wherein the bottom surface of the third horizontal angle steel 3-1 is attached to the upper surface of the horizontal channel steel mold 1;
303, placing a first oblique angle steel 3-2 on the first channel steel mould 5, adjusting the first restraint piece 12 until one end of the first oblique angle steel 3-2 is attached to one end of a third horizontal angle steel 3-1, and attaching the first oblique angle steel 3-2 to the second limiting plate 9;
placing a second oblique angle steel 3-3 on the second channel steel die 6, adjusting a second restraint piece 13 until one end of the second oblique angle steel 3-3 is attached to the other end of the first horizontal angle steel 1-1, and attaching the second oblique angle steel 3-3 to a third limiting plate 11;
step 304, welding one end of the first oblique angle steel 3-2 with one end of the third horizontal angle steel 3-1 and welding one end of the second oblique angle steel 3-3 with the other end of the third horizontal angle steel 3-1 to obtain a trapezoidal bracket 300;
305, repeating the steps 302 to 304 for multiple times to finish the processing of the plurality of trapezoidal brackets 300;
step four, mounting the L-shaped support, the door-shaped support and the trapezoidal support:
when it is required to arrange a trough box or a pipeline below the structural ceiling 60 and close to the structural wall 40, a plurality of L-shaped brackets 100 are installed on the structural wall 40 along the length direction of the structural wall 40; wherein, the first vertical angle steel 1-2 in the L-shaped bracket 100 is fixedly arranged on the structural wall 40 through a first expansion screw 110, and the first horizontal angle steel 1-1 in the L-shaped bracket 100 is arranged in parallel with the structural top plate 60;
when a trough box or a pipeline needs to be arranged below the structural top plate 60 and close to the structural beam 50, a plurality of mounting L-shaped brackets 100 are mounted on the structural beam 50 along the length direction of the structural beam 50; wherein, the first vertical angle steel 1-2 in the L-shaped bracket 100 is fixedly arranged on the structural beam 50 through a second expansion screw 120, and the first horizontal angle steel 1-1 in the L-shaped bracket 100 is arranged in parallel with the structural top plate 60;
when a trough box and a plurality of pipelines need to be arranged below the structural top plate 60, a plurality of door-shaped brackets 200 are arranged on the structural top plate 60 along the length direction of the structural top plate 60; the end parts of the second vertical angle steel 2-2 and the third vertical angle steel 2-3 in the door-shaped support 200 are welded with a first reinforcing steel plate 70, the first reinforcing steel plate 70 is fixedly arranged on the structural top plate 60 through a third expansion screw 80, and the second horizontal angle steel 2-1 in the door-shaped support 200 is arranged in parallel with the structural top plate 60;
when a pipeline or a trough box needs to be arranged below the structural top plate 60 and at a horizontal distance of 10-20 m from the structural beam 50, a plurality of trapezoidal brackets 300 are arranged on the structural top plate 60 along the length direction of the structural top plate 60; the end parts of the first oblique angle steel 3-2 and the second oblique angle steel 3-3 in the trapezoid support 300 are welded with a second reinforcing steel plate 90, the second reinforcing steel plate 90 is fixedly arranged on the structure top plate 60 through a fourth expansion screw 180, and a third horizontal angle steel 3-1 in the trapezoid support 300 is arranged in parallel with the structure top plate 60;
step five, installing the pipeline and the groove box:
step 501, installing a first pipe clamp 130 on a plurality of L-shaped brackets 100 installed on the structural wall 40, a plurality of L-shaped brackets 100 installed on the structural beam 50 and a plurality of trapezoidal brackets 300 installed on the structural top plate 60, and installing a first pipeline 140 in the first pipe clamp 130; the first pipe clamp 130 is fixedly connected with a first horizontal angle steel 1-1 and a third horizontal angle steel 3-1, and the first pipeline 140 is arranged in parallel with the structural top plate 60;
step 502, mounting a second pipe clamp 170 and a tank box 150 on a plurality of door brackets 200 mounted on the structural top plate 60, and mounting a second pipe 160 in the second pipe clamp 170; the second pipe clamp 170 and the groove box 150 are fixedly connected with the second horizontal angle iron 2-1, and the second pipeline 160 and the groove box 150 are arranged in parallel with the structural top plate 60.
In this embodiment, when the first channel steel mold 5 or the second channel steel mold 6 is adjusted to be vertically arranged with the horizontal channel steel mold 1 in step 101, the following steps are specifically performed:
step A, loosening a locking nut sleeved on a connecting screw rod 8;
step B, the first channel steel die 5 and the second channel steel die 6 move along the connecting screw rod 8, so that the first channel steel die 5 or the second channel steel die 6 is vertically arranged with the horizontal channel steel die 1;
step C, screwing a locking nut sleeved on the connecting screw rod 8;
adjusting the first channel steel die 5 and the second channel steel die 6 in the step 301 to enable the first channel steel die 5 and the second channel steel die 6 to be in trapezoid arrangement with the horizontal channel steel die 1, and the method specifically comprises the following steps:
step A1, loosening the locking nut sleeved on the connecting screw rod 8;
step B1, moving the first channel steel mould 5 and the second channel steel mould 6 along the connecting screw rod 8, so that the first channel steel mould 5 or the second channel steel mould 6 and the horizontal channel steel mould 1 are distributed in a trapezoid shape;
and C1, screwing the locking nut sleeved on the connecting screw rod 8.
To sum up, the utility model relates to a rationally and with low costs, the installing support structure who obtains through pipeline and groove box installing support mould is unified, improves the integrally mounted impression effect, reduces the influence that personnel's level difference caused in addition, secondly can realize the processing of door type support, trapezoidal support and L type support to actual installation demand.
The above, only be the utility model discloses a preferred embodiment, it is not right the utility model discloses do any restriction, all according to the utility model discloses the technical entity all still belongs to any simple modification, change and the equivalent structure change of doing above embodiment the utility model discloses technical scheme's within the scope of protection.

Claims (5)

1. The utility model provides a pipeline and groove box installing support mould which characterized in that: the steel bar die comprises a horizontal channel steel die (1), a first channel steel die (5) and a second channel steel die (6), wherein a first waist-shaped hole (2) is formed in the horizontal channel steel die (1), a first lead screw (3) and a second lead screw (4) are arranged in the first waist-shaped hole (2) in a penetrating mode, one end, extending out of the first waist-shaped hole (2), of the first lead screw (3) is connected with the end portion of the first channel steel die (5) in a welding mode, one end, extending out of the first waist-shaped hole (2), of the second lead screw (4) is connected with the end portion of the second channel steel die (6) in a welding mode, second waist-shaped holes (7) are formed in the first channel steel die (5) and the second channel steel die (6) respectively, a connecting lead screw (8) is arranged in the second waist-shaped holes (7) in a penetrating mode, a first limiting plate (10) is arranged on the horizontal channel steel die (1), and the first limiting plate (10) is arranged along the length, the steel plate is characterized in that a second limiting plate (9) is arranged on the first channel steel die (5), the second limiting plate (9) is arranged along the length direction of the first channel steel die (5), a third limiting plate (11) is arranged on the second channel steel die (6), and the third limiting plate (11) is arranged along the length direction of the second channel steel die (6).
2. A duct and channel mounting bracket mould according to claim 1, characterised in that: the quantity of connecting screw rod (8) is a plurality of, and is a plurality of connecting screw rod (8) are laid along the length direction in second waist shape hole (7), the cover is equipped with lock nut on connecting screw rod (8), lock nut is located the both sides in second waist shape hole (7).
3. A duct and channel mounting bracket mould according to claim 1, characterised in that: the first channel steel die (5) is provided with a plurality of first restraint pieces (12), the first restraint pieces (12) are distributed along the length direction of the first channel steel die (5), the second channel steel die (6) is provided with a plurality of second restraint pieces (13), and the second restraint pieces (13) are distributed along the length direction of the second channel steel die (6).
4. A duct and channel mounting bracket mould according to claim 3, characterised in that: first restraint spare (12) and second restraint spare (13) all include fixation nut (12-2) and wear to establish adjusting screw (12-1) in fixation nut (12-2), fixation nut (12-2) welding is on first channel-section steel mould (5) and second channel-section steel mould (6), adjusting screw (12-1) in first restraint spare (12) can be close to or keep away from second limiting plate (9) and remove, adjusting screw (12-1) in the second restraint spare (13) can be close to or keep away from third limiting plate (11) and remove.
5. A duct and channel mounting bracket mould according to claim 1, characterised in that: a gap is arranged between the first limiting plate (10) and the second limiting plate (9) and between the first limiting plate (10) and the third limiting plate (11), the first limiting plate (10) is located on the upper surface of the horizontal channel steel die (1), and the distance between the first limiting plate (10) and the second limiting plate (9) and the third limiting plate (11) is larger than 1/2 of the width of the horizontal channel steel die (1).
CN201922416032.0U 2019-12-29 2019-12-29 Pipeline and groove box installing support mould Expired - Fee Related CN211438791U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922416032.0U CN211438791U (en) 2019-12-29 2019-12-29 Pipeline and groove box installing support mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922416032.0U CN211438791U (en) 2019-12-29 2019-12-29 Pipeline and groove box installing support mould

Publications (1)

Publication Number Publication Date
CN211438791U true CN211438791U (en) 2020-09-08

Family

ID=72309174

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922416032.0U Expired - Fee Related CN211438791U (en) 2019-12-29 2019-12-29 Pipeline and groove box installing support mould

Country Status (1)

Country Link
CN (1) CN211438791U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111015059A (en) * 2019-12-29 2020-04-17 陕西建工第三建设集团有限公司 Pipeline and groove box mounting bracket die and mounting method
CN111015059B (en) * 2019-12-29 2024-06-21 陕西建工第三建设集团有限公司 Pipeline and groove box mounting bracket die and mounting method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111015059A (en) * 2019-12-29 2020-04-17 陕西建工第三建设集团有限公司 Pipeline and groove box mounting bracket die and mounting method
CN111015059B (en) * 2019-12-29 2024-06-21 陕西建工第三建设集团有限公司 Pipeline and groove box mounting bracket die and mounting method

Similar Documents

Publication Publication Date Title
CN106989211B (en) Assembled architecture pipeline hanger system installation method based on BIM
CN108894372B (en) Modeling plate curtain wall assembly structure
CN205857458U (en) A kind of light partition wall of integrated routing
CN211438791U (en) Pipeline and groove box installing support mould
CN111015059A (en) Pipeline and groove box mounting bracket die and mounting method
CN111015059B (en) Pipeline and groove box mounting bracket die and mounting method
CN210218926U (en) Adjustable electromechanical pipeline installation's a gallows device of synthesizing
KR20190019549A (en) Assembly type panel supporting apparatus and panel structure by using of it
CN208733938U (en) The fixed device of reinforcement for the installation of alloy roofing
CN213682995U (en) Adjusting fixing support of UHPC hanging plate
CN215212311U (en) Free curved surface concrete formwork
CN208100677U (en) Concrete formation mold
CN210164106U (en) Steel joist unitized curtain wall bottom connecting device
CN111206712A (en) Slotted ceiling aluminum plate structure
CN209129235U (en) Ceiling structure and hanger system for ceiling structure
CN208100688U (en) Precast concrete wall panel production mould system
CN208100687U (en) Clamping screw and concrete formation mold with clamping screw
CN217951493U (en) Assembled pipeline strutting arrangement
CN208714202U (en) Concrete formation mold and wallboard mould system
CN204059749U (en) A kind of tubing rod member of space structures framework
CN111926966A (en) Support gravity component for curtain wall support and curtain wall support
CN105258112A (en) Corner flue of CFB boiler and assembly process thereof
CN214064039U (en) Pipeline support is synthesized to heavy construction
CN205224703U (en) Pit edge footboard
CN220889266U (en) Corrugated aluminum plate guy cable type installation system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200908

CF01 Termination of patent right due to non-payment of annual fee