CN211422669U - Traffic tunnel prevents drain bar and lays structure - Google Patents

Traffic tunnel prevents drain bar and lays structure Download PDF

Info

Publication number
CN211422669U
CN211422669U CN201922050807.7U CN201922050807U CN211422669U CN 211422669 U CN211422669 U CN 211422669U CN 201922050807 U CN201922050807 U CN 201922050807U CN 211422669 U CN211422669 U CN 211422669U
Authority
CN
China
Prior art keywords
waterproof
prevention
brick
tunnel
basic unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922050807.7U
Other languages
Chinese (zh)
Inventor
黄玲霜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wang Yu
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201922050807.7U priority Critical patent/CN211422669U/en
Application granted granted Critical
Publication of CN211422669U publication Critical patent/CN211422669U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model provides a traffic tunnel prevents drain bar and lays structure belongs to tunnel technical field, including tunnel country rock, basic unit and watering the layer of building, first prevention of seepage membrane, waterproof board and second prevention of seepage membrane are laid in proper order from inside to outside on the surface of basic unit, and the outside of second prevention of seepage membrane is fixed lays waterproof heap brick, and waterproof heap brick's bottom gomphosis is connected with waterproof bottom, and the gomphosis rigidity on waterproof bottom surface sets up and seals the arch. The utility model discloses a first prevention of seepage membrane, waterproof board and second prevention of seepage membrane, the waterproof nature of this tunnel waterproof construction of effectual increase, form double-deck protection from the top layer structure, reach waterproof effect, through waterproof pile brick and waterproof bottom, arc gomphosis position between waterproof pile brick and the waterproof bottom, effectual dispersion treatment to external force, avoid the position of combining to appear splitting, cooperate outside filler to reach good closed effect simultaneously, reduce the safe risk of structure, thereby reach waterproof effect and stability.

Description

Traffic tunnel prevents drain bar and lays structure
Technical Field
The utility model relates to a tunnel technical field, more specifically relates to a traffic tunnel prevents drain bar and lays structure.
Background
The tunnel, especially the railway tunnel with complex geological conditions, is constructed according to the principle of 'prevention, drainage, interception and blockage combination, according to local conditions and comprehensive treatment'. On one hand, in order to meet the waterproof requirement of the use function of the tunnel, waterproof boards are paved between the primary support and the secondary lining of the tunnel; simultaneously for the groundwater behind the discharge secondary lining, avoid or reduce the adverse effect of water pressure to the lining structure, lay the drain bar between tunnel preliminary bracing and secondary lining generally, the main problem that current drain bar structure exists in the use is:
firstly, when the drainage plate is pulled, the right-angle joint of the convex shell and the plastic substrate is easy to generate the problem of stress concentration, and further the joint is broken;
secondly, the right angle joint is unfavorable for the flow of concrete at concrete placement in-process, and the uncompacted problem of concrete filling in the convex shell easily appears, and the convex shell receives the primary support extrusion yielding for drainage channel's section size reduces, and then influences the drainage ability of drain bar and increases the water pressure behind the secondary lining, increases the safe risk of structure.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem in the background to a traffic tunnel prevents drain bar laying structure is provided.
In order to achieve the above object, the utility model provides a following technical scheme: including the tunnel country rock, the basic unit and the layer of building of watering, basic unit and tunnel country rock constitute tunnel wall structure, water the outside that the layer is located the basic unit, the surface of basic unit is laid first prevention of seepage membrane, waterproof board and second prevention of seepage membrane from inside to outside in proper order, the fixed waterproof heap brick of laying in the outside of second prevention of seepage membrane, the bottom gomphosis of waterproof heap brick is connected with waterproof bottom, the gomphosis position on waterproof bottom surface is fixed to be set up and is sealed protruding, the surface embedding of waterproof heap brick sets up fixing bolt.
Preferably, the first impermeable membrane and the second impermeable membrane are arranged in a surrounding manner on the waterproof board, and both the first impermeable membrane and the second impermeable membrane are HDPE impermeable membranes.
Preferably, the waterproof stacking bricks are arranged on the outer side surface of the base layer, and the surfaces of the waterproof stacking bricks can be provided with vertically arranged drainage channels.
Preferably, the two ends of the waterproof stacking brick are provided with a clamping groove and a clamping block in a matched mode and are spliced mutually.
Preferably, the contact positions of the waterproof bottom layer and the waterproof stacking bricks are in arc-shaped embedded arrangement, and the embedded positions are arranged at intervals.
Preferably, the sealing bulge is arranged in an arc shape and is positioned between the waterproof bottom layer and the embedded position of the waterproof stacking brick.
Preferably, the sealing bulges are continuously arranged at each group of embedded positions between the waterproof bottom layer and the waterproof stacking bricks and are wavy.
The utility model provides a traffic tunnel prevents drain bar laying structure has following beneficial effect:
1. this kind of traffic tunnel prevents drain bar and lays structure prevents osmosis membrane through first prevention of seepage membrane, waterproof board and second, is in the effectual waterproof nature that increases this tunnel waterproof construction of prevention of seepage membrane that both sides set up, forms double-deck protection from surface layer structure, reaches waterproof effect.
2. This kind of drain bar laying structure is prevented in traffic tunnel through waterproof heap brick and waterproof bottom, when doing the waterproof setting in surface to the basic unit, the arc gomphosis position between waterproof heap brick and the waterproof bottom, effectually carries out dispersion treatment to external force, avoids the hookup location fracture to appear, cooperates outside filler material to reach good closed effect simultaneously, non-deformable reduces the safe risk of structure to reach waterproof effect and stability.
3. This kind of drain bar structure of laying is prevented in traffic tunnel through sealing the arch, when laying, cooperates the outside filler to reach effectual sealed effect, strengthens the connection between the layer body to reach waterproof effect.
Drawings
Fig. 1 is a side view of the overall structure of the present invention.
Fig. 2 is the utility model discloses a waterproof brick connection structure plan.
Figure 3 is the utility model discloses a waterproof brick structure section view of piling.
In FIGS. 1-3: the method comprises the following steps of 1-tunnel surrounding rock, 2-base layer, 3-pouring layer, 4-first impermeable film, 5-waterproof plate, 6-second impermeable film, 7-waterproof stacking brick, 8-fixing bolt, 9-waterproof bottom layer and 10-sealing bulge.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Please refer to fig. 1 to 3, in the embodiment of the present invention, a traffic tunnel drainage plate laying structure, including tunnel country rock 1, basic unit 2 and the layer of watering 3, basic unit 2 and tunnel country rock 1 constitute the tunnel wall structure, the layer of watering 3 is located the outside of basic unit 2, first prevention of seepage membrane 4 is laid from inside to outside in proper order on the surface of basic unit 2, waterproof board 5 and second prevention of seepage membrane 6, the fixed waterproof heap brick 7 of laying in the outside of second prevention of seepage membrane 6, the bottom gomphosis of waterproof heap brick 7 is connected with waterproof bottom 9, the gomphosis position on waterproof bottom 9 surface is fixed and is set up sealed arch 10, the surface embedding of waterproof heap brick 7 sets up fixing bolt 8.
In this embodiment, first prevention of seepage membrane 4 and second prevention of seepage membrane 6 are to surround the setting to waterproof board 5, and both HDPE prevention of seepage membranes, through first prevention of seepage membrane 4, waterproof board 5 and second prevention of seepage membrane 6, the effectual waterproof nature that increases this tunnel waterproof construction of prevention of seepage membrane that is in both sides setting forms double-deck protection from top layer structure, reaches waterproof effect.
In this embodiment, waterproof stacking brick 7 is located on the outer surface of base layer 2, and the surface of waterproof stacking brick 7 can be provided with a vertically arranged drainage channel.
In this embodiment, waterproof heap brick 7 both ends are supporting to be set up draw-in groove and fixture block, splice each other.
In this embodiment, the contact position of waterproof bottom 9 and waterproof heap brick 7 is the arc gomphosis setting, the gomphosis position is two liang of intervals and sets up, through waterproof heap brick 7 and waterproof bottom 9, when being surperficial waterproof setting to basic unit 2, arc gomphosis position between waterproof heap brick 7 and the waterproof bottom 9, effectual dispersion treatment to external force, avoid the position of combining to appear the fracture, cooperate outside filling material to reach good closed effect simultaneously, non-deformable, reduce the safe risk of structure, thereby reach waterproof effect and stability.
In this embodiment, the sealing protrusion 10 is disposed in an arc shape and is located between the waterproof bottom layer 9 and the embedded position of the waterproof stacking brick 7.
In this embodiment, seal every group gomphosis position of arch 10 between waterproof bottom 9 and waterproof heap brick 7 and set up in succession, be wavy, through sealing arch 10, when laying, the cooperation outside filler reaches effectual sealed effect, strengthens the connection between the layer body to reach waterproof effect.
Use the utility model relates to a traffic tunnel prevents drain bar laying structure, at first, the user carries out laying of first prevention of seepage membrane 4 earlier, carry out laying of waterproof board 5 and second prevention of seepage membrane 6 in proper order, later when going on laying waterproof heap brick 7, at first cooperate outside filler to fill between waterproof bottom 9 and the waterproof heap brick 7, connect the brick body and waterproof bottom 9, fix both through fixing bolt 8 simultaneously, the layer body structure of using outside adhesive and basic unit 2 again connects, later user of service carries out the stack concatenation each other with waterproof heap brick 7 of polylith, after laying and finishing, waterproof heap brick 7 forms the plane wall body of mutual stack.
The above is only the preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, without departing from the concept of the present invention, several modifications and improvements can be made, which should also be regarded as the protection scope of the present invention, and these will not affect the effect of the implementation of the present invention and the practicability of the patent.

Claims (7)

1. The utility model provides a traffic tunnel prevents drain bar and lays structure, includes tunnel country rock (1), basic unit (2) and waters built layer (3), and basic unit (2) and tunnel country rock (1) constitute tunnel wall structure, waters the outside that built layer (3) are located basic unit (2), its characterized in that: the surface of basic unit (2) is laid first prevention of seepage membrane (4), waterproof board (5) and second prevention of seepage membrane (6) from inside to outside in proper order, and the outside of second prevention of seepage membrane (6) is fixed lays waterproof heap brick (7), and the bottom gomphosis of waterproof heap brick (7) is connected with waterproof bottom (9), and the gomphosis rigidity on waterproof bottom (9) surface sets up seals arch (10), and the surface embedding of waterproof heap brick (7) sets up fixing bolt (8).
2. The traffic tunnel drainage-preventing plate laying structure according to claim 1, wherein: the first impermeable membrane (4) and the second impermeable membrane (6) are arranged to surround the waterproof plate (5), and are HDPE impermeable membranes.
3. The traffic tunnel drainage-preventing plate laying structure according to claim 1, wherein: waterproof heap brick (7) are in the outside surface of basic unit (2), and the drainage tank of vertical setting can be opened on waterproof heap brick (7) surface.
4. The traffic tunnel water drain prevention plate laying structure according to any one of claims 1 and 3, wherein: the two ends of the waterproof stacking brick (7) are provided with clamping grooves and clamping blocks in a matched mode and are spliced mutually.
5. The traffic tunnel drainage-preventing plate laying structure according to claim 1, wherein: the contact positions of the waterproof bottom layer (9) and the waterproof stacking bricks (7) are in arc-shaped embedded arrangement, and the embedded positions are arranged at intervals.
6. The traffic tunnel drainage-preventing plate laying structure according to claim 1, wherein: the sealing bulge (10) is arranged in an arc shape and is positioned between the embedded positions of the waterproof bottom layer (9) and the waterproof stacking brick (7).
7. The traffic tunnel drainage preventing and laying structure according to any one of claims 1 and 6, wherein: the sealing bulges (10) are continuously arranged at the embedding positions of each group between the waterproof bottom layer (9) and the waterproof stacking bricks (7) and are wavy.
CN201922050807.7U 2019-11-25 2019-11-25 Traffic tunnel prevents drain bar and lays structure Expired - Fee Related CN211422669U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922050807.7U CN211422669U (en) 2019-11-25 2019-11-25 Traffic tunnel prevents drain bar and lays structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922050807.7U CN211422669U (en) 2019-11-25 2019-11-25 Traffic tunnel prevents drain bar and lays structure

Publications (1)

Publication Number Publication Date
CN211422669U true CN211422669U (en) 2020-09-04

Family

ID=72244836

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922050807.7U Expired - Fee Related CN211422669U (en) 2019-11-25 2019-11-25 Traffic tunnel prevents drain bar and lays structure

Country Status (1)

Country Link
CN (1) CN211422669U (en)

Similar Documents

Publication Publication Date Title
CN202124865U (en) Quick plugging device for dewatering wellhead of sand-free cement pipe deep well
CN110878700A (en) Tunnel waterproof structure and construction method thereof
CN211422669U (en) Traffic tunnel prevents drain bar and lays structure
CN203559411U (en) H-shaped support pile connecting structure
CN207437099U (en) A kind of elasticity grouting back-pressure sealing structure at expansion joint
CN214115074U (en) Anti-seepage constructed wetland system
CN211006775U (en) Water stop structure for post-cast strip of underground chamber bottom plate
CN210562126U (en) Low stress area strenghthened type bentonite antifouling division wall
CN103924694B (en) A kind of mending-leakage processing method of water proofing property concrete extension joint
CN210216326U (en) Dam panel is PVC membrane fixed knot structure for prevention of seepage
CN211446944U (en) Lining structure of deep foundation pit underground structure
CN210395458U (en) Connection structure of cut-off wall and hydraulic structure
CN205530136U (en) Modular water conservancy ditch rapid prototyping device
CN217974508U (en) Building basement outer wall expansion joint waterproof construction
CN217629727U (en) Water conservancy project is with indirect seam sealing device of aqueduct
CN114991222B (en) Shock absorption disposal method for subway station structure
CN215563949U (en) Waterproof connection structure that optimizes of mouth of a river falls in parapet bottom
CN215211597U (en) Multiple waterproof and diversion structure of movement joint
CN211736016U (en) Pre-buried brick is used in installation of building engineering water electricity heating, shear force wall
CN210766831U (en) Be used for bed face wood wedge leaking stoppage waterproof construction
CN218233841U (en) Civil engineering prevention of seepage passes through structure
CN215484167U (en) Waterproof connection structure of mouth of a river falls in parapet bottom
CN213450415U (en) Novel water intercepting system for deformation joint of subway tunnel
CN220927705U (en) Filling type water channel slope protection structure
CN217204303U (en) Underground waterproof structure of wall back embedded grouting pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20211223

Address after: 271000 No. 3, Lingshan street, Taishan District, Tai'an City, Shandong Province

Patentee after: Wang Yu

Address before: No. 139, Renmin West Road, Jinhua, Zhejiang 321000

Patentee before: Huang Lingshuang

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200904