CN211414199U - Building steel pipe welding set convenient to carry - Google Patents

Building steel pipe welding set convenient to carry Download PDF

Info

Publication number
CN211414199U
CN211414199U CN201921630598.7U CN201921630598U CN211414199U CN 211414199 U CN211414199 U CN 211414199U CN 201921630598 U CN201921630598 U CN 201921630598U CN 211414199 U CN211414199 U CN 211414199U
Authority
CN
China
Prior art keywords
mounting
steel pipe
limiting holes
pipe welding
fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921630598.7U
Other languages
Chinese (zh)
Inventor
陈有熙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Rongqing Jiehua Environmental Engineering Co ltd
Original Assignee
Sichuan Rongqing Jiehua Environmental Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Rongqing Jiehua Environmental Engineering Co ltd filed Critical Sichuan Rongqing Jiehua Environmental Engineering Co ltd
Priority to CN201921630598.7U priority Critical patent/CN211414199U/en
Application granted granted Critical
Publication of CN211414199U publication Critical patent/CN211414199U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The utility model relates to a building material processing technology field specifically is a building steel pipe welding set convenient to carry, including first mounting and second mounting, and handle two links of fixing are connected to the both sides face of first mounting and second mounting, the middle part of first mounting, second mounting and two links forms a welding chamber, a plurality of first spacing holes have been seted up to the inside of first mounting, and are a plurality of the quantity in first spacing hole is six, six the cross-sectional area in first spacing hole increases gradually. The utility model has the advantages that: through opening the spacing hole of establishing different models in two mountings, can fix the steel pipe of different models inside it welds, realized the effectual purpose of welding, use through the cooperation of spirit level, screw hole B and regulation post, guarantee that the device is in the horizontality, guaranteed the welding effect of steel pipe, through the setting of universal wheel, make the device be convenient for remove.

Description

Building steel pipe welding set convenient to carry
Technical Field
The utility model relates to a building material processing technology field, especially a building steel pipe welding set convenient to carry.
Background
At present, steel pipes are part of building materials, and can play a role in stabilizing buildings, ensuring the beauty of the buildings and guiding fluid. However, for the convenience of transportation, the length and shape of the steel pipe often cannot meet the requirements of buildings, so the steel pipe needs to be welded on a building site, the right-angle welding is relatively easy, a right-angle object is found, and two steel pipes can be welded by adhering to two right-angle edges of the object.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome prior art's shortcoming, provide a building steel pipe welding set convenient to carry.
The purpose of the utility model is realized through the following technical scheme: the utility model provides a building steel pipe welding set convenient to carry, includes first mounting and second mounting, and the both sides face of first mounting and second mounting is connected two fixed links, the middle part of first mounting, second mounting and two links forms a welding chamber, a plurality of first spacing holes have been seted up to the inside of first mounting, and is a plurality of the quantity in first spacing hole is six, six the cross-sectional area in first spacing hole increases gradually, the spacing hole of a plurality of seconds has been seted up to the inside of second mounting, and is a plurality of the quantity in the spacing hole of second is six, six the cross-sectional area in the spacing hole of second increases gradually, and six groups are corresponding the cross-sectional area and the shape homogeneous phase in the spacing hole of first spacing hole and second are the same.
Preferably, the top of the first fixing part is fixedly connected with six first threaded pipes, the inner cavities of the six first threaded pipes are respectively communicated with the inner cavities of the six first limiting holes, and the inner parts of the six first threaded pipes are all in threaded connection with one first fixing bolt.
Preferably, the top of the second fixing part is fixedly connected with six second threaded pipes, inner cavities of the six second threaded pipes are respectively communicated with inner cavities of the six second limiting holes, and the inner parts of the six second threaded pipes are all in threaded connection with a second fixing bolt.
Preferably, the link includes two connecting rods, two stopper fixed connection, two are passed through at the corresponding both ends of connecting rod the screw hole A has all been seted up, two in the inside of stopper limiting plate of the equal fixedly connected with in side of connecting rod.
Preferably, the first limiting grooves matched with the limiting blocks are formed in the two sides of the first fixing piece, and the second limiting grooves matched with the limiting blocks are formed in the two sides of the second fixing piece.
Preferably, the top of the first fixing piece and the top of the second fixing piece are both fixedly connected with two gradienters.
Preferably, two screw holes B, four have all been seted up to the bottom of first mounting and second mounting the equal threaded connection in inside of screw hole B has one to adjust the post, four adjust the equal fixedly connected with backup pad of one end that screw hole B was kept away from to the post.
Preferably, the side surfaces of the first fixing piece and the second fixing piece are fixedly connected with a universal wheel, and the two universal wheels are located on the same side.
The utility model has the advantages of it is following:
1. through setting up two mountings, and set up corresponding spacing hole in the inside of two mountings, can put into corresponding spacing hole respectively two steel pipes that need the welded, and twist and move two kinds of fixing bolt and fix two steel pipes, because the both sides of two mountings are fixed through the link, so counterpoint that two steel pipes can be accurate, and form a welding chamber between two mounts and two links, so can carry out accuracy and efficient welding in the inside in welding chamber, the spacing hole of equidimension not has been seted up to the inside of two mountings, so can be according to the rotatory different spacing hole of diameter of steel pipe, select suitable spacing hole to use, can prevent rocking of steel pipe in when fixed with welding process, the purpose of being convenient for to use has been realized.
2. Through setting up the spirit level, can judge whether two mountings are in the horizontality through the spirit level to use through the cooperation of screw hole B and regulation post, guarantee that two mountings are in the horizontality, guarantee to be in the horizontality among the steel pipe welding process, guaranteed steel pipe welding's effect.
3. Through setting up two universal wheels with one side at two mountings, can make the device be convenient for remove through the removal of universal wheel when not using, realized portable purpose.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic front view of the structure of the present invention;
fig. 3 is a schematic structural view of a second fixing member of the present invention;
fig. 4 is a schematic structural view of the first fixing member of the present invention;
FIG. 5 is a schematic structural view of the connecting frame of the present invention;
fig. 6 is a schematic structural view of a first fixing bolt of the present invention;
fig. 7 is a schematic structural view of a second fixing bolt of the present invention;
fig. 8 is a schematic structural view of the adjusting post and the supporting plate of the present invention.
In the figure: 1-a first fixing part, 2-a second fixing part, 3-a connecting frame, 31-a connecting rod, 32-a limiting block, 33-a screw hole A, 34-a limiting plate, 4-a welding cavity, 5-a first limiting hole, 6-a second limiting hole, 7-a first threaded pipe, 8-a first fixing bolt, 9-a second threaded pipe, 10-a second fixing bolt, 11-a first limiting groove, 12-a second limiting groove, 13-a level gauge, 14-a screw hole B, 15-an adjusting column, 16-a supporting plate and 17-a universal wheel.
Detailed Description
The invention will be further described with reference to the accompanying drawings, but the scope of the invention is not limited to the following description.
As shown in fig. 1, a portable construction steel pipe welding device comprises a first fixing member 1, a second fixing member 2, and two connecting frames 3 for connecting and fixing two side surfaces of the first fixing member 1 and the second fixing member 2, wherein a welding cavity 4 is formed in the middle of the first fixing member 1, the second fixing member 2, and the two connecting frames 3, a plurality of first limiting holes 5 are formed in the first fixing member 1, the number of the first limiting holes 5 is six, the cross-sectional areas of the six first limiting holes 5 are gradually increased, a plurality of second limiting holes 6 are formed in the second fixing member 2, the number of the second limiting holes 6 is six, the cross-sectional areas of the six second limiting holes 6 are gradually increased, the cross-sectional areas and the shapes of the six corresponding first limiting holes 5 and the second limiting holes 6 are the same, by arranging the two fixing members, and arranging the corresponding limiting holes in the two fixing members, can put into corresponding spacing hole respectively two steel pipes that need the welded, and twist two kinds of fixing bolt and fix two steel pipes, because the both sides of two mountings are fixed through link 3, so counterpoint that two steel pipes can be accurate, and form a welding chamber 4 between two mountings and two link 3, so can carry out accuracy and efficient welding in welding chamber 4's inside, the spacing hole of equidimension not has been seted up to the inside of two mountings, so can be according to the rotatory different spacing hole of diameter of steel pipe, select suitable spacing hole to use, can prevent rocking of steel pipe in fixed time and the welding process, the purpose of convenient to use has been realized, what need to explain very much, the material of first mounting 1 and second mounting 2 is rigid plastic, and form for the integrated into one piece preparation of moulding plastics.
As an optimal technical solution of the utility model: the top of the first fixing piece 1 is fixedly connected with six first threaded pipes 7, inner cavities of the six first threaded pipes 7 are respectively communicated with inner cavities of the six first limiting holes 5, and the six first threaded pipes 7 are all in threaded connection with a first fixing bolt 8.
As an optimal technical solution of the utility model: the top of the second fixing part 2 is fixedly connected with six second threaded pipes 9, inner cavities of the six second threaded pipes 9 are respectively communicated with inner cavities of the six second limiting holes 6, and the inner parts of the six second threaded pipes 9 are all in threaded connection with a second fixing bolt 10.
As an optimal technical solution of the utility model: the link 3 includes two connecting rods 31, and stopper 32 fixed connection is passed through at the both ends that two connecting rods 31 are corresponding, and screw hole A33 has all been seted up to the inside of two stoppers 32, limiting plate 34 of the equal fixedly connected with in side of two connecting rods 31.
As an optimal technical solution of the utility model: first spacing groove 11 with stopper 32 looks adaptation is all seted up to the both sides of first mounting 1, and second spacing groove 12 with stopper 32 looks adaptation is all seted up to the both sides of second mounting 2.
As an optimal technical solution of the utility model: the top of first mounting 1 and second mounting 2 all fixedly connected with two spirit levels 13.
As an optimal technical solution of the utility model: two screw holes B14 have all been seted up to the bottom of first mounting 1 and second mounting 2, four equal threaded connection in inside of screw hole B14 has one to adjust post 15, through setting up spirit level 13, can judge whether two mountings are in the horizontality through spirit level 13, and use through screw hole B14 and the cooperation of adjusting post 15, guarantee that two mountings are in the horizontality, guarantee to be in the horizontality among the steel pipe welding process, steel pipe welding's effect has been guaranteed, four equal fixedly connected with backup pads 16 of one end that adjust post 15 and keep away from screw hole B14, backup pad 16 can increase the area of contact with ground, increase the device's stability.
As an optimal technical solution of the utility model: the side of first mounting 1 and second mounting 2 all fixedly connected with a universal wheel 17, and two universal wheels 17 are located same side, through establishing two universal wheels 17 with same side at two mountings, can pass through the removal of universal wheel 17 when not using, make the device be convenient for remove, have realized portable purpose.
The working process of the utility model is as follows: place two mountings side by side, and correspond the setting to the spacing hole of equidimension in the two, then in the spacing groove of stopper 32 joint in two mountings in to two links, and it is fixed through connecting bolt, then select the spacing hole of equidimension not according to the diameter of steel pipe, insert the steel pipe back in the spacing hole of looks adaptation, twist fixing bolt, make fixing bolt push down, and then fix the steel pipe in the spacing hole, judge whether the device is horizontal through spirit level 13, and adjust with adjusting post 15.
In conclusion, by arranging the two fixing pieces and arranging the corresponding limiting holes in the two fixing pieces, two steel pipes to be welded can be respectively placed in the corresponding limiting holes, and the two fixing bolts are screwed to fix the two steel pipes, because the two sides of the two fixing pieces are fixed through the connecting frames 3, the two steel pipes can be accurately aligned, and a welding cavity 4 is formed between the two fixing frames and the two connecting frames 3, the welding can be accurately and efficiently carried out in the welding cavity 4, the limiting holes with different sizes are formed in the two fixing pieces, so that different limiting holes can be rotated according to the diameters of the steel pipes, and a proper limiting hole can be selected for use, thereby preventing the steel pipes from shaking during fixing and welding, and achieving the purpose of convenient use; by arranging the level meter 13, whether the two fixing pieces are in a horizontal state or not can be judged through the level meter 13, and the two fixing pieces are ensured to be in the horizontal state through the matched use of the screw hole B14 and the adjusting column 15, so that the steel pipe welding process is ensured to be in the horizontal state, and the steel pipe welding effect is ensured; by arranging the two universal wheels 17 on the same side of the two fixing parts, the device can be moved conveniently through the movement of the universal wheels 17 when not in use, and the purpose of portability is achieved.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1. The utility model provides a building steel pipe welding set convenient to carry which characterized in that: comprises a first fixing piece (1), a second fixing piece (2) and two connecting frames (3) for connecting and fixing two side surfaces of the first fixing piece (1) and the second fixing piece (2), the middle parts of the first fixing piece (1), the second fixing piece (2) and the two connecting frames (3) form a welding cavity (4), a plurality of first limiting holes (5) are formed in the first fixing piece (1), the number of the first limiting holes (5) is six, the cross-sectional areas of the six first limiting holes (5) are gradually increased, a plurality of second limiting holes (6) are formed in the second fixing piece (2), the number of the second limiting holes (6) is six, the cross-sectional areas of the six second limiting holes (6) are gradually increased, and the cross sectional areas and the shapes of the six groups of corresponding first limiting holes (5) and second limiting holes (6) are the same.
2. The portable construction steel pipe welding device according to claim 1, wherein: the top fixedly connected with of first mounting (1) six first screwed pipe (7), six the inner chamber of first screwed pipe (7) respectively with six the inner chamber of first spacing hole (5) is linked together, six the equal threaded connection in inside of first screwed pipe (7) has a first fixing bolt (8).
3. The portable construction steel pipe welding device according to claim 1, wherein: the top of the second fixing part (2) is fixedly connected with six second threaded pipes (9), the inner cavities of the six second threaded pipes (9) are communicated with the inner cavities of the six second limiting holes (6), and the inner parts of the six second threaded pipes (9) are all in threaded connection with a second fixing bolt (10).
4. The portable construction steel pipe welding device according to claim 1, wherein: link (3) include two connecting rods (31), two stopper (32) fixed connection, two are passed through at the corresponding both ends of connecting rod (31) the screw hole A (33), two have all been seted up to the inside of stopper (32) limiting plate (34) of the equal fixedly connected with in side of connecting rod (31).
5. The portable construction steel pipe welding device according to claim 1, wherein: first spacing groove (11) with stopper (32) looks adaptation is all seted up to the both sides of first mounting (1), second spacing groove (12) with stopper (32) looks adaptation is all seted up to the both sides of second mounting (2).
6. The portable construction steel pipe welding device according to claim 1, wherein: the top of first mounting (1) and second mounting (2) all fixedly connected with two spirit levels (13).
7. The portable construction steel pipe welding device according to claim 1, wherein: two screw holes B (14), four have all been seted up to the bottom of first mounting (1) and second mounting (2) the equal threaded connection in inside of screw hole B (14) has one to adjust post (15), four adjust the equal fixedly connected with backup pad (16) of one end that screw hole B (14) was kept away from in post (15).
8. The portable construction steel pipe welding device according to claim 1, wherein: the side of first mounting (1) and second mounting (2) all fixedly connected with a universal wheel (17), two universal wheel (17) lie in same one side.
CN201921630598.7U 2019-09-27 2019-09-27 Building steel pipe welding set convenient to carry Active CN211414199U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921630598.7U CN211414199U (en) 2019-09-27 2019-09-27 Building steel pipe welding set convenient to carry

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921630598.7U CN211414199U (en) 2019-09-27 2019-09-27 Building steel pipe welding set convenient to carry

Publications (1)

Publication Number Publication Date
CN211414199U true CN211414199U (en) 2020-09-04

Family

ID=72283461

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921630598.7U Active CN211414199U (en) 2019-09-27 2019-09-27 Building steel pipe welding set convenient to carry

Country Status (1)

Country Link
CN (1) CN211414199U (en)

Similar Documents

Publication Publication Date Title
CN211414199U (en) Building steel pipe welding set convenient to carry
CN210282032U (en) Pressure pipeline component clamping device
KR101383355B1 (en) Clamp for supporter of form-shore
CN211312917U (en) Prefabricated damping component for assembly type building
CN209538682U (en) A kind of anti-bank structure one-shot forming apparatus of sealing
CN209891822U (en) Water horse encloses fender bearing diagonal
CN203769327U (en) Tower concrete pump pipe fixing device
CN105666187B (en) The clamping device processed based on machining center to engaging lug internal face on weld yoke
CN212026673U (en) Building antidetonation reinforced structure
CN211083084U (en) Dismantle convenient locking gallows
CN211228151U (en) Novel template support frame is used in public road bridge roof beam construction
CN208457345U (en) A kind of mud tube damping gantry that cooperation steel trestle uses
CN203784472U (en) Petroleum pipeline fixed bracket
CN208764584U (en) A kind of pedestal that non-negative pressure water-supply device is easily installed
CN107097200B (en) Water conservancy construction pipe laying pay-off
CN206476173U (en) Pad pasting rotating jig
CN105638291A (en) Detachable flower planting shelf
CN209897280U (en) Fixing device is used in stereo set production
CN203227958U (en) Fixing device for welding connecting pipe assemblies of vibrating screens
CN215137101U (en) Movable chromatographic column
CN215298784U (en) Portable engineering cost statistics display device
CN215562037U (en) Culvert is with crab-bolt embedded steel bar location auxiliary device that takes precautions against earthquakes
CN213921916U (en) Placement rack for civil engineering pipe fittings
CN212975039U (en) Multifunctional fluidized bed pelleting and coating machine
CN216520009U (en) Anti-vibration pipe support for pipeline

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant