CN211396557U - Construction is with outer basket of hanging of preventing falling - Google Patents
Construction is with outer basket of hanging of preventing falling Download PDFInfo
- Publication number
- CN211396557U CN211396557U CN201921891003.3U CN201921891003U CN211396557U CN 211396557 U CN211396557 U CN 211396557U CN 201921891003 U CN201921891003 U CN 201921891003U CN 211396557 U CN211396557 U CN 211396557U
- Authority
- CN
- China
- Prior art keywords
- support
- cross beam
- construction
- hanging
- hanging basket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model relates to an anti-falling external hanging basket for construction, which effectively solves the problems of inconvenient and unsafe installation and construction of an overhanging mechanism; the technical scheme for solving the problem is that the hanging basket hanging device comprises a hanging mechanism consisting of a support rod, a cross beam and a safety rope, wherein a hanging basket is hung at the left end of the cross beam, two vertical pull rods are hinged at the right end of the cross beam, the two pull rods are arranged side by side from left to right, the bottoms of the two pull rods are fixedly connected with a transverse first support beam, a plurality of second support beams arranged in the front-back direction are fixedly connected to the first support beam, and the plurality of second support beams are arranged in sequence from left to right; each second supporting beam is fixed with a plurality of vertical fixing rods; each fixed rod is inserted with a balancing weight; be connected with a plurality of wire rope between crossbeam and the first supporting beam, the utility model provides high speed and the quality of installation have guaranteed operating personnel's safety.
Description
Technical Field
The utility model relates to a construction engineering field, especially a construction is with outer basket of hanging of preventing falling.
Background
The hanging basket is a construction machine for high-altitude operation in construction engineering, and is used for curtain wall installation and outer wall cleaning. The suspension mechanism is erected on a building or a structure, the suspension platform is driven by the lifting mechanism, and the construction facility which runs up and down along the vertical surface of the building or the structure through the steel wire rope is also an operation platform for operators.
The existing cantilever mechanism generally adopts a lever principle, a plurality of cement blocks with larger size are placed at the other end of the cantilever mechanism, and in order to ensure safety, five layers of cement blocks are often stacked to play a role in protection; however, since the cement block is heavy, a plurality of persons are often required to lift the cement block when the cement block is placed or removed; meanwhile, after the cement blocks are stacked, the steel bars penetrating and fixing the cement blocks need to be lengthened, and the cement blocks are not very flat, so that the steel bars can incline and are bent in a fatigue manner, and accidents occur. There is therefore a need to address this problem.
SUMMERY OF THE UTILITY MODEL
To the above situation, for solving the problem that exists among the prior art, the utility model aims at providing a construction is with preventing outer basket of hanging that falls, can effectively solve the mechanism installation construction of encorbelmenting inconvenient, unsafe problem.
The technical scheme for solving the problem is that the hanging basket hanging device comprises a hanging mechanism consisting of a support rod, a cross beam and a safety rope, wherein a hanging basket is hung at the left end of the cross beam, two vertical pull rods are hinged at the right end of the cross beam, the two pull rods are arranged side by side from left to right, the bottoms of the two pull rods are fixedly connected with a transverse first support beam, a plurality of second support beams arranged in the front-back direction are fixedly connected to the first support beam, and the plurality of second support beams are arranged in sequence from left to right; each second supporting beam is fixed with a plurality of vertical fixing rods; each fixed rod is inserted with a balancing weight; a plurality of steel wire ropes are connected between the cross beam and the first supporting beam.
The utility model discloses convenient operation, the structure is ingenious, low cost, and it is convenient to make, and is safe effective, has improved the portability and the security of the systematic installation of encorbelmenting greatly, has improved the speed and the quality of installation, has guaranteed operating personnel's safety.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a schematic view of the counterweight part of the present invention.
FIG. 3 is a cross-sectional view of the pull rod, the sleeve, the positioning hole and the positioning pin.
Detailed Description
The following detailed description of the embodiments of the present invention will be made with reference to the accompanying drawings.
As shown in fig. 1 to 3, the utility model comprises a cantilever mechanism composed of a support rod 1, a beam 2 and a safety rope 3, wherein a hanging basket 4 is hung at the left end of the beam 2, two vertical pull rods 5 are hinged at the right end of the beam 2, the two pull rods 5 are arranged side by side left and right, the bottoms of the two pull rods 5 are fixedly connected with a transverse first support beam 6, a plurality of second support beams 7 arranged in the front-back direction are fixedly connected to the first support beam 6, and the plurality of second support beams 7 are arranged in sequence left and right; a plurality of vertical fixing rods 8 are fixed on each second supporting beam 7; each fixed rod 8 is inserted with a balancing weight 9; a plurality of steel wire ropes 10 are connected between the cross beam 2 and the first supporting beam 6.
In order to better realize the angle adjustment, the lower end of each pull rod 5 is sleeved with a vertical sleeve 11, the pull rod 5 is provided with a plurality of positioning holes 12 which are sequentially arranged up and down, and the sleeve 11 is inserted with a positioning pin 13; the bottom of the sleeve 11 is fixedly connected to the first support beam 6.
In order to make the counterweight block 9 convenient to install, the counterweight block 9 is formed by cement condensation, the outer edge surface of the counterweight block 9 is wrapped by a steel plate, and a through hole corresponding to the fixing rod 8 is formed in the counterweight block 9.
For better stability, the height of the fixing rod 8 exceeds the height 10CM of the counterweight 9.
The utility model discloses during the use, at first need install the mechanism of encorbelmenting, after installation and the bracing piece 1 and the crossbeam 2 of fixing the structure of encorbelmenting, alright in order to carry out the installation of counter weight to the right-hand member of the structure of encorbelmenting.
When the balance weight is installed, firstly, the upper end of the pull rod 5 is hinged with the right end of the cross beam 2, and then the positioning pin 13 and the positioning hole 12 are adjusted, so that the inclination angle of the cross beam 2 is adjusted by adjusting the extending length of the pull rod 5; and simultaneously fixing the steel wire rope 10 between the cross beam 2 and the first supporting beam 6.
Then, the balancing weight 9 can be arranged on the fixing rod 8; the number of the second supporting beams 7 is multiple, and the second supporting beams are arranged at the left side and the right side at the same time; each second supporting beam 7 is provided with a plurality of vertical fixing rods 8, so that the number of the fixing rods 8 is large; therefore, the weight of each balancing weight 9 does not need to be too heavy, and the balancing weight can be easily taken up by one person; each weight 9 can then be inserted onto each fixing rod 8.
Through the mode, the traditional large clump weight 9 which is vertically stacked is divided into a plurality of small clumps, so that the clump weight is convenient to take up and remove, and can be operated by one person; on the other hand, as the counterweight blocks 9 do not need to be stacked, the height of each fixed rod 8 is lower, the strength of the fixed rods 8 is greatly increased, and the fixed rods 8 cannot be bent; meanwhile, the counterweight 9 does not need to be too high to be taken up, and the operation safety is improved.
Through setting up first supporting beam 6 and second supporting beam 7 in this device, expand the pull rod 5 bottom and fix, make fixed area increase, afterwards alright place one deck alright reach fixed purpose with balancing weight 9.
In the device, a plurality of steel wire ropes 10 are designed between the cross beam 2 and the first supporting beam 6, so that the stress of the hinged position of the pull rod 5 and the cross beam 2 can be effectively reduced, and the effect of protecting the connecting part of the cross beam 2 and the first supporting beam 6 is achieved.
The device supports the area of the whole tray to be large, and shortens the reinforcing steel bar penetrating through the balancing weight; therefore, the effects of two aspects are realized, one is that the strength of the vertical steel bar is increased, the strength of the short steel bar is higher, and the bending is avoided; secondly, the preventable counterweight blocks are large in number, and each counterweight block is small in size and small in volume, so that enough counterweight data can be provided. By reducing the volume of a single balancing weight, the manufacturing, the transportation, the installation and the disassembly of the configuration block are convenient, and the advantages of the aspect are incomparable.
The utility model discloses convenient operation, the structure is ingenious, low cost, and it is convenient to make, and is safe effective, has improved the portability and the security of the systematic installation of encorbelmenting greatly, has improved the speed and the quality of installation, has guaranteed operating personnel's safety.
Claims (4)
1. An anti-falling outer hanging basket for construction comprises an overhanging mechanism consisting of a support rod (1), a cross beam (2) and a safety rope (3), and is characterized in that a hanging basket (4) is hung at the left end of the cross beam (2), two vertical pull rods (5) are hinged to the right end of the cross beam (2), the two pull rods (5) are arranged side by side from left to right, the bottoms of the two pull rods (5) are fixedly connected with a transverse first support beam (6), a plurality of second support beams (7) arranged in the front-back direction are fixedly connected to the first support beam (6), and the plurality of second support beams (7) are sequentially arranged from left to right; a plurality of vertical fixing rods (8) are fixed on each second supporting beam (7); each fixed rod (8) is inserted with a balancing weight (9); a plurality of steel wire ropes (10) are connected between the cross beam (2) and the first supporting beam (6).
2. The anti-falling hanging basket for construction according to claim 1, wherein a vertical sleeve (11) is sleeved at the lower end of each pull rod (5), a plurality of positioning holes (12) are formed in each pull rod (5) and are sequentially arranged up and down, and positioning pins (13) are inserted into the sleeves (11); the bottom of the sleeve (11) is fixedly connected with the first supporting beam (6).
3. The anti-falling hanging basket for construction as claimed in claim 1, wherein the weight block (9) is formed by cement coagulation, the outer edge surface of the weight block (9) is wrapped with a steel plate, and the weight block (9) is provided with a through hole corresponding to the fixing rod (8).
4. The fall-preventing hanging-out basket for construction according to claim 1, wherein the height of the fixing rod (8) exceeds the height of the counterweight (9) by 10 CM.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921891003.3U CN211396557U (en) | 2019-11-05 | 2019-11-05 | Construction is with outer basket of hanging of preventing falling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921891003.3U CN211396557U (en) | 2019-11-05 | 2019-11-05 | Construction is with outer basket of hanging of preventing falling |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211396557U true CN211396557U (en) | 2020-09-01 |
Family
ID=72210257
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921891003.3U Expired - Fee Related CN211396557U (en) | 2019-11-05 | 2019-11-05 | Construction is with outer basket of hanging of preventing falling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211396557U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112411974A (en) * | 2020-11-20 | 2021-02-26 | 苏州龙骐自动化科技有限公司 | Automatic auxiliary device is used in building engineering installation |
-
2019
- 2019-11-05 CN CN201921891003.3U patent/CN211396557U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112411974A (en) * | 2020-11-20 | 2021-02-26 | 苏州龙骐自动化科技有限公司 | Automatic auxiliary device is used in building engineering installation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9410329B2 (en) | Lift unit for ascending and descending a scaffold | |
US9890019B2 (en) | Arrangement and a method for parallel transport and installation of elevator components | |
CN105384035A (en) | Guide rail installation arrangement and method for installing guide rails | |
US20100122872A1 (en) | Scaffold elevator | |
CN105129602A (en) | Sling capable of integrally lifting long and large-diameter vertical steel bars | |
CN107119921B (en) | A kind of skyscraper Bailey beam Demolition Construction method | |
CN211396557U (en) | Construction is with outer basket of hanging of preventing falling | |
AU2009222526A1 (en) | Lifting apparatus for a building under construction | |
CN206233600U (en) | Overlength super large beams of concrete installs the apparatus capable of fluctuating of reinforcing bar | |
CN109667416B (en) | Elevator shaft integral lifting operation platform and lifting method thereof | |
CN214167097U (en) | Lifting appliance for integral steel reinforcement framework of railway box girder | |
CN202324574U (en) | Lifting scaffold with simple and convenient operations | |
KR20190008918A (en) | Surround Safety Screen Assembly | |
KR102554166B1 (en) | Coner type gondola | |
CN209975993U (en) | Suspension cage | |
CN209702166U (en) | A kind of sound barrier plate simply installs equipment | |
JP7241154B2 (en) | MOVEMENT SYSTEMS, METHODS FOR MOVEMENT OF ARTICLES, AND RELATED COMPONENTS | |
CN206494694U (en) | A kind of Multi-layer electric hanging basket | |
JP6818201B2 (en) | Installation structure of stretcher for raising and lowering scaffolding materials | |
CN213951973U (en) | Adjustable construction platform | |
CN105060124B (en) | Intra-frame portal crane system and hoisting use method thereof | |
JP3977400B2 (en) | Concrete structure construction method | |
CN211664545U (en) | Light box cage for hoisting building blocks | |
CN207812982U (en) | A kind of inner wall of oil tank construction hanging basket | |
JP5948828B2 (en) | Lifting device used for assembling cargo lift for building demolition work, cargo lift for building demolition work, and assembling method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200901 Termination date: 20211105 |
|
CF01 | Termination of patent right due to non-payment of annual fee |