CN211377509U - Urban construction planning pipeline fixing structure - Google Patents
Urban construction planning pipeline fixing structure Download PDFInfo
- Publication number
- CN211377509U CN211377509U CN202020148306.2U CN202020148306U CN211377509U CN 211377509 U CN211377509 U CN 211377509U CN 202020148306 U CN202020148306 U CN 202020148306U CN 211377509 U CN211377509 U CN 211377509U
- Authority
- CN
- China
- Prior art keywords
- fixed
- frame
- pressing block
- groove
- block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims description 15
- 230000007246 mechanism Effects 0.000 claims abstract description 14
- 238000009434 installation Methods 0.000 claims description 4
- 210000002421 cell wall Anatomy 0.000 claims description 2
- 125000003003 spiro group Chemical group 0.000 claims 1
- 230000000694 effects Effects 0.000 abstract description 4
- 230000009471 action Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a city building planning pipeline fixed knot constructs, include the mount pad, set up at the shifting chute of a mount pad side and be used for accomodating the frame of accomodating of solidus mechanism, the spout has been seted up on the inside wall of shifting chute, accomodate the fixed block that is provided with in one side of frame, and the fixed slider that is provided with in both sides of fixed block, sliding fit installs between slider and the spout, accomodate a side of frame and seted up and accomodate the groove. The utility model discloses fixed being provided with the fixed block in one side of accomodating the frame, and the both sides of fixed block are still fixed and are provided with the slider, offer some spout slidable mounting on slider and the shifting chute inside wall, and screw-thread fit installs between screw rod and the fixed block, rotate the screw rod after, can adjust the height of fixed block, the fixed not co-altitude of better satisfied pipeline improves the functional effect.
Description
Technical Field
The utility model relates to a city construction planning field, in particular to city construction planning pipeline fixed knot constructs.
Background
Urban construction planning is a discipline for processing engineering construction, economy, society, land utilization layout and prediction of future development of cities and adjacent areas thereof. The method is mainly applied to the part of urban material forms, relates to the regional layout of industries in cities, the regional layout of buildings, the arrangement of roads and transportation facilities and the arrangement of urban engineering, and mainly contains contents such as space planning, road traffic planning, greening vegetation, water body planning and the like.
In urban construction planning process, can walk the line installation with the pipeline for the power supply work of equipment, so pipeline fixed knot constructs the use comparatively extensively, but, current pipeline fixed knot constructs the function lower, can only simple carry out the fixed action to the pipeline, can not adjust pipeline fixed knot according to the height of pipeline, and the practicality is lower.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides a city construction planning pipeline fixed knot constructs, can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a city construction planning pipeline fixed knot constructs, includes the mount pad, sets up at the shifting chute of mount pad side and is used for accomodating the frame of accomodating of solidus mechanism, the spout has been seted up on the inside wall of shifting chute, accomodate the fixed block that is provided with in one side of frame, and the fixed slider that is provided with in both sides of fixed block, sliding fit installs between slider and the spout, accomodate a side of frame and seted up and accomodate the groove, the bottom of accomodating the groove is provided with the commentaries on classics piece, and the commentaries on classics piece rotates the installation through the pivot between the cell wall of accomodating the groove, fixed mounting between the one end.
Furthermore, a screw is connected in a screw hole formed in the top of the mounting seat in a threaded manner, and one end of the screw is mounted with the fixing block in a threaded fit manner.
Furthermore, fixed edges are fixedly arranged on two sides of the mounting seat and fixedly mounted on the wall through bolts.
Furthermore, the wire fixing mechanism comprises a first pressing block, a second pressing block and a positioning block, the positioning block is fixedly arranged at the top of the second pressing block, and the positioning block is rotatably mounted between the rotating shaft and the first pressing block.
Further, a first convex edge is fixedly arranged at the top end of the first pressing block, a second convex edge is fixedly arranged at one end of the second pressing block, a first clamping groove is formed in the second pressing block, and a second clamping groove is formed in the first pressing block.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. the utility model discloses fixed block is fixed to be provided with in one side of accomodating the frame, and the both sides of fixed block are still fixed and are provided with the slider, and the spout slidable mounting that has seted up on slider and the shifting chute inside wall, and screw-thread fit installs between screw rod and the fixed block, after rotating the screw rod, can adjust the height of fixed block, the fixed different heights of pipeline that satisfies better, improve the functional effect;
2. the utility model discloses be provided with in accomodating the frame and accomodate the groove, accomodate the groove and can accomodate the effect with solidus mechanism, portable uses moreover also more convenient.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a schematic structural view of the storage frame of the present invention.
Fig. 3 is the structure diagram of the storage frame and the fixing block of the present invention.
In the figure: 1. a mounting seat; 101. fixing the edge; 102. a moving groove; 103. a chute; 2. a storage frame; 201. a receiving groove; 3. a wire fixing mechanism; 301. a first compact block; 302. a second compact block; 303. a first flange; 304. a first card slot; 305. positioning blocks; 306. a second card slot; 307. a second flange; 4. a screw; 5. a fixed block; 501. a slider; 6. and (6) turning the block.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
Referring to fig. 1-3, a fixing structure for urban construction planning pipelines comprises a mounting seat 1, a moving groove 102 formed in one side surface of the mounting seat 1, and a containing frame 2 for containing a line fixing mechanism 3, wherein a sliding groove 103 is formed in the inner side wall of the moving groove 102, a fixed block 5 is fixedly arranged on one side of the containing frame 2, sliding blocks 501 are fixedly arranged on two sides of the fixed block 5, the sliding blocks 501 and the sliding grooves 103 are installed in a sliding fit manner, a containing groove 201 is formed in one side surface of the containing frame 2, a rotating block 6 is arranged at the bottom end of the containing groove 201, the rotating block 6 is rotatably installed between the rotating shaft and the groove wall of the containing groove 201, and one end of the rotating block 6 is fixedly installed between the rotating shaft and the line fixing mechanism 3.
Specifically, as shown in fig. 1, a screw rod 4 is screwed in a screw hole formed in the top of the mounting base 1, and one end of the screw rod 4 is installed in threaded fit with the fixing block 5.
Through adopting above-mentioned scheme, rotate screw rod 4, can adjust the height of fixed block 5, can adjust the height of solidus mechanism 3.
Specifically, as shown in fig. 1, fixing edges 101 are fixedly arranged on two sides of the mounting base 1, and the fixing edges 101 are fixedly mounted on the wall through bolts.
Specifically, as shown in fig. 1, the wire fixing mechanism 3 includes a first pressing block 301, a second pressing block 302 and a positioning block 305, the positioning block 305 is fixedly disposed at the top of the second pressing block 302, and the positioning block 305 is rotatably mounted between the first pressing block 301 and the rotating shaft.
Specifically, as shown in fig. 1, a first convex edge 303 is fixedly arranged at the top end of the first pressing block 301, a second convex edge 307 is fixedly arranged at one end of the second pressing block 302, a first clamping groove 304 is formed in the second pressing block 302, and a second clamping groove 306 is formed in the first pressing block 301.
Through adopting above-mentioned scheme, the fixed first chimb 303 that is provided with in top of first compact heap 301, the fixed second chimb 307 that is provided with in one end of second compact heap 302, first draw-in groove 304 has been seted up on the second compact heap 302, has seted up second draw-in groove 306 on the first compact heap 301, compresses tightly fixedly to the pipeline.
It should be noted that, the utility model relates to a city building planning pipeline fixed knot constructs, when fixing the pipeline, fixed limit 101 that is provided with on the mount pad 1 passes through bolt fixed mounting on the wall, from accomodating in the frame 2 accomodate the groove 201 in through changeing 6 solid line mechanism 3 of roll-out, then according to the height of pipeline, rotate screw rod 4, make the height-adjustable of fixed block 5, can be to the highly regulating action that carries out of solid line mechanism 3, it is more convenient to operate, then place the pipeline in first draw-in groove 304, rotate first compact heap 301, make second draw-in groove 306 and the coincidence of first draw-in groove 304 on the first compact heap 301, compress tightly the fixed action to the pipeline, the improvement function effect.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.
Claims (5)
1. The utility model provides a city construction planning pipeline fixed knot constructs, includes mount pad (1), sets up removal groove (102) and the frame (2) of accomodating that are used for accomodating solidus mechanism (3) in mount pad (1) a side, its characterized in that: the utility model discloses a take in frame, including frame (2), movable groove (102), fixed frame (2) and fixed frame (2), the fixed frame (103) that is provided with in one side of movable groove (102), and the both sides of fixed block (5) are fixed and are provided with slider (501), sliding fit installs between slider (501) and spout (103), the side of taking in frame (2) has been seted up and has been accomodate groove (201), the bottom of accomodating groove (201) is provided with commentaries on classics piece (6), and changes piece (6) and rotate the installation between the cell wall of accomodating groove (201) through the pivot, fixed mounting between the one end of commentaries on classics piece (6) and solidus line mechanism (3).
2. The urban construction planning pipeline fixing structure according to claim 1, wherein: the screw hole that the top of mount pad (1) was seted up has spiro union screw rod (4), and the screw-thread fit installation between one end of screw rod (4) and fixed block (5).
3. The urban construction planning pipeline fixing structure according to claim 1, wherein: the two sides of the mounting seat (1) are fixedly provided with fixing edges (101), and the fixing edges (101) are fixedly mounted on the wall through bolts.
4. The urban construction planning pipeline fixing structure according to claim 1, wherein: the wire fixing mechanism (3) comprises a first pressing block (301), a second pressing block (302) and a positioning block (305), the positioning block (305) is fixedly arranged at the top of the second pressing block (302), and the positioning block (305) is rotatably mounted with the first pressing block (301) through a rotating shaft.
5. The urban construction planning pipeline fixing structure according to claim 4, wherein: the top end of the first pressing block (301) is fixedly provided with a first convex edge (303), one end of the second pressing block (302) is fixedly provided with a second convex edge (307), the second pressing block (302) is provided with a first clamping groove (304), and the first pressing block (301) is provided with a second clamping groove (306).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020148306.2U CN211377509U (en) | 2020-01-31 | 2020-01-31 | Urban construction planning pipeline fixing structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020148306.2U CN211377509U (en) | 2020-01-31 | 2020-01-31 | Urban construction planning pipeline fixing structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211377509U true CN211377509U (en) | 2020-08-28 |
Family
ID=72152844
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020148306.2U Expired - Fee Related CN211377509U (en) | 2020-01-31 | 2020-01-31 | Urban construction planning pipeline fixing structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211377509U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112627381A (en) * | 2020-12-09 | 2021-04-09 | 安徽艾米伦特建材科技有限公司 | Inorganic composite polyphenyl non-combustible heat preservation sandwich board assembled wall structure |
-
2020
- 2020-01-31 CN CN202020148306.2U patent/CN211377509U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112627381A (en) * | 2020-12-09 | 2021-04-09 | 安徽艾米伦特建材科技有限公司 | Inorganic composite polyphenyl non-combustible heat preservation sandwich board assembled wall structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211377509U (en) | Urban construction planning pipeline fixing structure | |
CN208996081U (en) | A kind of compact municipal administration synthesis pipe gallery | |
CN211344632U (en) | Building engineering cost analytical equipment | |
CN208455646U (en) | Municipal drainage pipeline pit slot supporting construction | |
CN203654150U (en) | High-precision hand-pushed type seam filling machine | |
CN212866275U (en) | Monitoring device for municipal drainage | |
CN215107926U (en) | Fender is enclosed in municipal works construction | |
CN213236772U (en) | Display screen for building site propaganda | |
CN212103732U (en) | Warning device is used in road and bridge construction | |
Zhen | Development and utilization of urban underground space | |
CN207958952U (en) | A kind of fluting apparatus for pavement rain penetration | |
CN210090638U (en) | Portable wind driven generator experimental device | |
CN214069853U (en) | Solar cell panel easy to assemble | |
CN219715419U (en) | Urban river and lake overflow pollution on-line monitoring device | |
CN211113051U (en) | Traffic engineering construction template device | |
CN221746024U (en) | Shore-based box for water ecology monitoring | |
CN205926941U (en) | Steel bar cutting machine | |
CN207146233U (en) | A kind of environment-friendly type automatically controls the LED street lamp of unlatching | |
CN218540306U (en) | Simple and easy supplementary kerbstone installation portable ware | |
CN217388125U (en) | Municipal works construction line support frame | |
CN216405198U (en) | Urban road and traffic engineering direction sign board | |
CN218375568U (en) | Bus stop booth for city planning | |
CN215105917U (en) | Drainage apron for municipal administration public works | |
CN210310391U (en) | Portable urban rail signal allotment device | |
CN204825765U (en) | Gardens are with shovel snow machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200828 |