CN211344632U - Building engineering cost analytical equipment - Google Patents

Building engineering cost analytical equipment Download PDF

Info

Publication number
CN211344632U
CN211344632U CN202020026854.8U CN202020026854U CN211344632U CN 211344632 U CN211344632 U CN 211344632U CN 202020026854 U CN202020026854 U CN 202020026854U CN 211344632 U CN211344632 U CN 211344632U
Authority
CN
China
Prior art keywords
fixedly connected
fixed
threaded
fixed station
case
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020026854.8U
Other languages
Chinese (zh)
Inventor
刘国荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020026854.8U priority Critical patent/CN211344632U/en
Application granted granted Critical
Publication of CN211344632U publication Critical patent/CN211344632U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Instructional Devices (AREA)

Abstract

The utility model belongs to the technical field of building engineering, in particular to a building engineering cost analysis device, which comprises a base, wherein a fixed rod is fixedly connected with the surface of the base, a supporting tube is arranged at the upper end of the fixed rod, a first bearing is arranged on the surface of the supporting tube, a first rotating shaft is arranged in the first bearing in a penetrating way, one end of the first rotating shaft is fixedly connected with a rotating disc, the other end of the first rotating shaft is fixedly connected with a first threaded column, and the surface of the first threaded column is in threaded connection with a threaded pipe; the utility model discloses, through setting up electric putter, when people need adjust the angle of placing the case, people at first extend through control switch control electric putter, under the combined action of third fixed station and connecting rod to the angle of placing the case can be adjusted, and under electric putter's effect, people are carrying out the in-process of adjusting to placing the case angle more swiftly, thereby have improved people's work efficiency.

Description

Building engineering cost analytical equipment
Technical Field
The utility model belongs to the technical field of building engineering, concretely relates to building engineering cost analytical equipment.
Background
The construction cost directly means the construction price of a project, and broadly covers the construction cost (civil engineering and installation major), the road construction cost, the water transportation construction cost, the railway construction cost, the water conservancy construction cost, the electric power construction cost, the communication construction cost, the aerospace construction cost and the like, the construction cost refers to all the costs spent on certain construction, the core contents of the construction cost are investment estimation, design approximate calculation, correction approximate calculation, construction drawing budget, construction settlement, completion settlement and the like, the drawing is usually required to be analyzed when the construction drawing budget is carried out, the current construction cost has a simple structure, and the angle cannot be adjusted.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides a building engineering cost analytical equipment has the characteristics of being convenient for adjust.
In order to achieve the above object, the utility model provides a following technical scheme: a construction engineering cost analysis device comprises a base, wherein a fixed rod is fixedly connected to the surface of the base, a supporting tube is arranged at the upper end of the fixed rod, a first bearing is arranged on the surface of the supporting tube in a penetrating mode, a first rotating shaft is arranged in the first bearing in a penetrating mode, a rotating disc is fixedly connected to one end of the first rotating shaft, a first threaded column is fixedly connected to the other end of the first rotating shaft, a threaded tube is in threaded connection with the surface of the first threaded column, the other end of the threaded tube is fixedly connected to the surface of the fixed rod, a first sliding groove is formed in the inner wall of the supporting tube, a first sliding block is slidably connected to the first sliding groove, the other end of the first sliding block is fixedly connected to the surface of the threaded tube, the number of the first sliding blocks is two, the first sliding blocks are symmetrically connected to, the other end of the first fixing table is movably connected with the electric push rod through a pin shaft, the other end of the electric push rod is provided with a second fixing table, the other end of the electric push rod is movably connected with the second fixing table through a pin shaft, and the other end of the second fixing table is fixedly connected with a placing box.
Preferably, the supporting tube surface is fixedly connected with a third fixing table, the other end of the third fixing table is provided with a connecting rod, the other end of the third fixing table is movably connected with the connecting rod through a pin shaft, the other end of the connecting rod is fixedly connected to the surface of the placing box, and the inner wall of the placing box is fixedly connected with a double-shaft motor.
Preferably, the output shaft of the double-shaft motor is fixedly connected with a second threaded column, the other end of the second threaded column is fixedly connected with a second rotating shaft, the inner wall of the placing box is fixedly connected with a second bearing, the other end of the second rotating shaft penetrates through the second bearing, a threaded cap is in threaded connection with the surface of the second threaded column, and the other end of the threaded cap is fixedly connected with a fixing plate.
Preferably, place the incasement wall and seted up the second spout, sliding connection has the second slider in the second spout, second slider other end fixed connection is on the screw cap surface, total two of second screw thread post, and symmetric connection is in the biax motor both sides, it has seted up the through-hole to place the case surface, total two of through-hole, and symmetric connection are placing the case surface.
Preferably, an energy storage bin is arranged in the base, a storage battery is fixedly connected in the energy storage bin, and a control switch is fixedly connected to the surface of the fixing rod.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses, through setting up electric putter, when people need adjust the angle of placing the case, people at first through control switch control electric putter extension, under the combined action of third fixed station and connecting rod, thereby place the angle of case and can adjust, under electric putter's effect, people are more swift in the process of adjusting placing the case angle, thereby improve people's work efficiency, when people need to shift out the fixed plate placing the case, people at first through control switch control biax motor operation, drive the rotation of second screw post simultaneously, under the interact of second screw post and screw cap, the fixed plate can shift out of placing the incasement, thereby people are more swift in the process that the fixed plate shifts out, when people need to adjust placing the height of case, people drive first screw post to rotate through rotating the carousel, under the interact of first screw thread post and screwed pipe, people can adjust the height of placing the case to people are more swift to the process of placing the altitude mixture control of case.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic structural view of a front view section of the present invention;
FIG. 2 is a schematic side view of the present invention;
FIG. 3 is a front view of the present invention;
in the figure: 1. a base; 2. fixing the rod; 3. supporting a tube; 4. a first bearing; 5. a first rotating shaft; 6. a turntable; 7. a first threaded post; 8. a threaded pipe; 9. a first chute; 10. a first slider; 11. a first fixed table; 12. an electric push rod; 13. a second stationary stage; 14. placing a box; 15. a third stationary stage; 16. a connecting rod; 17. a second rotating shaft; 18. a second bearing; 19. a threaded cap; 20. a second chute; 21. a second slider; 22. a fixing plate; 23. a through hole; 24. an energy storage bin; 25. a storage battery; 26. a control switch; 27. a double-shaft motor; 28. a second threaded post.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-3, the present invention provides the following technical solutions: a building engineering cost analysis device comprises a base 1, wherein a fixed rod 2 is fixedly connected to the surface of the base 1, a supporting tube 3 is arranged at the upper end of the fixed rod 2, a first bearing 4 penetrates through the surface of the supporting tube 3, a first rotating shaft 5 penetrates through the first bearing 4, one end of the first rotating shaft 5 is fixedly connected with a rotary table 6, the other end of the first rotating shaft 5 is fixedly connected with a first threaded column 7, a threaded tube 8 is in threaded connection with the surface of the first threaded column 7, the other end of the threaded tube 8 is fixedly connected to the surface of the fixed rod 2, a first sliding groove 9 is formed in the inner wall of the supporting tube 3, a first sliding block 10 is in sliding connection with the first sliding groove 9, the other end of the first sliding block 10 is fixedly connected to the surface of the threaded tube 8, when people need to adjust the height of a placing box 14, people drive, under the interaction of the first threaded column 7 and the threaded pipe 8, people can adjust the height of the placing box 14, so that the height adjusting process of the placing box 14 is more rapid, the number of the first sliding blocks 10 is two, the first sliding blocks are symmetrically connected to the surface of the threaded pipe 8, the surface of the supporting pipe 3 is fixedly connected with a first fixing table 11, the other end of the first fixing table 11 is provided with an electric push rod 12, the other end of the first fixing table 11 is movably connected with the electric push rod 12 through a pin shaft, the other end of the electric push rod 12 is provided with a second fixing table 13, the other end of the electric push rod 12 is movably connected with the second fixing table 13 through a pin shaft, the other end of the second fixing table 13 is fixedly connected with the placing box 14, through the electric push rod 12, when people need to adjust the angle of the placing box 14, people firstly control the electric push rod 12 to extend through the control switch 26, under the combined action of third fixed station 15 and connecting rod 16 to the angle of placing case 14 can be adjusted, under electric putter 12's effect, people are being more swift to the in-process of placing case 14 angle and adjusting, thereby has improved people's work efficiency.
Specifically, the surface of the support tube 3 is fixedly connected with a third fixing table 15, the other end of the third fixing table 15 is provided with a connecting rod 16, the other end of the third fixing table 15 is movably connected with the connecting rod 16 through a pin shaft, the other end of the connecting rod 16 is fixedly connected to the surface of the placing box 14, and the inner wall of the placing box 14 is fixedly connected with a double-shaft motor 27.
Specifically, the output shaft of the double-shaft motor 27 is fixedly connected with the second threaded column 28, when people need to move the fixing plate 22 out of the placing box 14, people firstly control the double-shaft motor 27 to operate through the control switch 26, meanwhile, the second threaded column 28 is driven to rotate, the fixing plate 22 can be moved out of the placing box 14 under the interaction of the second threaded column 28 and the threaded cap 19, so that people can move out of the fixing plate 22 more quickly, the other end of the second threaded column 28 is fixedly connected with the second rotating shaft 17, the inner wall of the placing box 14 is fixedly connected with the second bearing 18, the other end of the second rotating shaft 17 penetrates through the second bearing 18, the threaded cap 19 is connected to the surface of the second threaded column 28 through threads, and the other end of the threaded cap 19 is fixedly connected with the fixing plate 22.
Specifically, place case 14 inner wall and seted up second spout 20, sliding connection has second slider 21 in second spout 20, second slider 21 other end fixed connection is on the screw cap 19 surface, second screw thread post 28 is total two, and symmetric connection is in biax motor 27 both sides, place case 14 surface and seted up through-hole 23, through-hole 23 is total two, and symmetric connection is on placing case 14 surface.
Specifically, an energy storage bin 24 is arranged in the base 1, a storage battery 25 is fixedly connected in the energy storage bin 24, and a control switch 26 is fixedly connected to the surface of the fixing rod 2.
The utility model discloses a theory of operation and use flow: when the utility model is used, firstly, the device is placed at a proper position, when people need to move the fixed plate 22 out of the box body, people only need to control the operation of the double-shaft motor 27 through the control switch 26, and simultaneously, the second threaded post 28 can be driven to rotate, under the interaction of the second threaded post 28 and the threaded cap 19, the fixed plate 22 can be driven to move out of the box body, when people need to adjust the angle of the placing box 14, people firstly control the electric push rod 12 to extend through the control switch 26, under the interaction of the third fixed platform 15 and the connecting rod 16, the angle of the placing box 14 can be adjusted, when people need to adjust the height of the placing box 14, people firstly twist the turntable 6 to drive the first threaded post 7 to rotate, under the interaction of the first threaded post 7 and the threaded pipe 8, so as to drive the placing box 14 to move, thereby adjusting the angle of the placing box 14.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (5)

1. A building engineering cost analytical equipment, includes base (1), its characterized in that: the surface of the base (1) is fixedly connected with a fixed rod (2), a supporting tube (3) is arranged at the upper end of the fixed rod (2), a first bearing (4) is arranged on the surface of the supporting tube (3) in a penetrating manner, a first rotating shaft (5) is arranged in the first bearing (4) in a penetrating manner, one end of the first rotating shaft (5) is fixedly connected with a turntable (6), the other end of the first rotating shaft (5) is fixedly connected with a first threaded column (7), the surface of the first threaded column (7) is in threaded connection with a threaded tube (8), the other end of the threaded tube (8) is fixedly connected on the surface of the fixed rod (2), a first sliding groove (9) is formed in the inner wall of the supporting tube (3), a first sliding block (10) is connected in the first sliding groove (9) in a sliding manner, the other end of the first sliding block (10) is fixedly, and the symmetric connection is on screwed pipe (8) surface, stay tube (3) fixed surface is connected with first fixed station (11), first fixed station (11) other end is provided with electric putter (12), first fixed station (11) other end is through round pin axle and electric putter (12) swing joint, the electric putter (12) other end is provided with second fixed station (13), electric putter (12) other end is through round pin axle and second fixed station (13) swing joint, case (14) are placed to second fixed station (13) other end fixedly connected with.
2. A construction cost analysis apparatus according to claim 1, wherein: stay tube (3) fixed surface is connected with third fixed station (15), third fixed station (15) other end is provided with connecting rod (16), third fixed station (15) other end is through round pin axle and connecting rod (16) swing joint, connecting rod (16) other end fixed connection is on placing case (14) surface, place case (14) inner wall fixedly connected with biax motor (27).
3. A construction cost analysis apparatus according to claim 2, wherein: the output shaft of biax motor (27) fixedly connected with second screw thread post (28), second screw thread post (28) other end fixedly connected with second pivot (17), place case (14) inner wall fixedly connected with second bearing (18), second pivot (17) other end is worn to establish in second bearing (18), second screw thread post (28) surface threaded connection has screw cap (19), screw cap (19) other end fixedly connected with fixed plate (22).
4. A construction cost analysis apparatus according to claim 3, wherein: place case (14) inner wall and seted up second spout (20), sliding connection has second slider (21) in second spout (20), second slider (21) other end fixed connection is on screw cap (19) surface, total two of second screw thread post (28), and symmetric connection is in biax motor (27) both sides, place case (14) surface and seted up through-hole (23), total two of through-hole (23), and symmetric connection is on placing case (14) surface.
5. A construction cost analysis apparatus according to claim 4, wherein: an energy storage bin (24) is arranged in the base (1), a storage battery (25) is fixedly connected in the energy storage bin (24), and a control switch (26) is fixedly connected to the surface of the fixing rod (2).
CN202020026854.8U 2020-01-07 2020-01-07 Building engineering cost analytical equipment Expired - Fee Related CN211344632U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020026854.8U CN211344632U (en) 2020-01-07 2020-01-07 Building engineering cost analytical equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020026854.8U CN211344632U (en) 2020-01-07 2020-01-07 Building engineering cost analytical equipment

Publications (1)

Publication Number Publication Date
CN211344632U true CN211344632U (en) 2020-08-25

Family

ID=72129537

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020026854.8U Expired - Fee Related CN211344632U (en) 2020-01-07 2020-01-07 Building engineering cost analytical equipment

Country Status (1)

Country Link
CN (1) CN211344632U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112116850A (en) * 2020-10-30 2020-12-22 朱娟 Literacy auxiliary device for Chinese teaching
CN112209284A (en) * 2020-10-29 2021-01-12 刘伟 Material hoisting device for building

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112209284A (en) * 2020-10-29 2021-01-12 刘伟 Material hoisting device for building
CN112116850A (en) * 2020-10-30 2020-12-22 朱娟 Literacy auxiliary device for Chinese teaching

Similar Documents

Publication Publication Date Title
CN211344632U (en) Building engineering cost analytical equipment
CN211398794U (en) A water conservancy pipeline supports connection structure for hydraulic engineering
CN206241570U (en) A kind of different size steel pipe rotary device
CN209591936U (en) A kind of fixation kit of pole-mounted circuit breaker
CN202428286U (en) Moving type welding tong electrode cap trimming device
CN208696382U (en) Drilling equipment is used in a kind of detection of building template
CN212986475U (en) On-spot mapping device of municipal works cost
CN211615251U (en) Deburring roller mechanism
CN212982039U (en) Portable pay-off of rural power grids fortune dimension
CN215115300U (en) Underground water sampling device
CN209830136U (en) Reinforcing bar processingequipment for construction
CN211396534U (en) Civil engineering construction support
CN210702650U (en) Fixing device for steel structure machined part
CN110126079B (en) Cement pier pouring device for bridge building
CN210119930U (en) Warning sign is used in environmental protection with adjustable
CN218715216U (en) Concrete placement construction prevents discrete device
CN216789438U (en) Pipeline fixing device on construction frame
CN213046143U (en) Architectural design outward appearance effect display device
CN217949927U (en) Pole setting interval adjusting device of power transmission and transformation framework post
CN218647350U (en) Photovoltaic power generation device
CN215518479U (en) Municipal works road warning device
CN213898268U (en) Supporting structure for assembly type building construction
CN215749870U (en) Base structure for concrete curing
CN215483426U (en) Fixing device is used in construction of rain sewage pipe network
CN220456471U (en) Cylindrical polymer lithium battery two-sealing clamp

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200825

Termination date: 20210107

CF01 Termination of patent right due to non-payment of annual fee