CN211368413U - Road bridge is built and is repaired construction and support stake with road bed - Google Patents

Road bridge is built and is repaired construction and support stake with road bed Download PDF

Info

Publication number
CN211368413U
CN211368413U CN201921834930.1U CN201921834930U CN211368413U CN 211368413 U CN211368413 U CN 211368413U CN 201921834930 U CN201921834930 U CN 201921834930U CN 211368413 U CN211368413 U CN 211368413U
Authority
CN
China
Prior art keywords
pile
wall
road
adjusting block
pile body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921834930.1U
Other languages
Chinese (zh)
Inventor
么晖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinye Construction Co Ltd
Original Assignee
Jinye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinye Construction Co Ltd filed Critical Jinye Construction Co Ltd
Priority to CN201921834930.1U priority Critical patent/CN211368413U/en
Application granted granted Critical
Publication of CN211368413U publication Critical patent/CN211368413U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model relates to a roadbed supporting pile for road and bridge construction, which provides the following proposal that comprises a pile body, a top pile, an adjusting block and a pile rod; the top end of the pile body is provided with a thread groove, an adjusting block is connected inside the thread groove, a top pile is fixed at the top of the adjusting block, pile rods are fixed at the triangles at the bottom end of the pile body, and pile lifting blocks are fixed at the top ends of the left side and the right side of the pile body; the periphery of regulating block outer wall bottom is provided with the screw thread wall, and the top of regulating block outer wall is provided with the regulation scale, and the outer wall of fore-set runs through there is the pole hole. The utility model discloses an inside of this support stake is provided with rotation regulation mechanism to can highly finely tune the processing to supporting, when comparing traditional installation difference in height, just need not take out the support stake and trompil the pile again, convenience and work efficiency when improving the installation support stake greatly.

Description

Road bridge is built and is repaired construction and support stake with road bed
Technical Field
The utility model relates to a support the stake, especially relate to a road bridge is built and is repaiied construction and support stake with road bed.
Background
At present, in road and bridge construction, an integral supporting pile is generally adopted for construction, and the integral supporting pile in the prior art is generally constructed slowly and is inconvenient to construct.
After the construction of the supporting column is finished, the supporting column is inserted into the ground, after the construction is finished, the overall height of a common supporting pile is determined and cannot be changed, and the supporting pile needs to be drawn out to form a hole again for piling when the height is changed, so that the problems need to be solved;
the problem that the supporting height of the supporting pile cannot be adjusted is urgently needed to be solved, and in order to solve the problems, a roadbed supporting pile for road and bridge construction is provided.
SUMMERY OF THE UTILITY MODEL
The utility model provides a road bridge is built and is repaiied construction and is supported stake of road bed is provided with rotary adjusting mechanism through the inside of this support stake to can highly finely tune the processing of supporting, when comparing traditional installation and appearing the difference in height, just need not take out the support stake and trompil the pile again, convenience and work efficiency when improving the installation support stake greatly have solved the problem of proposing in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a roadbed supporting pile for road and bridge construction comprises a pile body, a top pile, an adjusting block and a pile rod;
the top end of the pile body is provided with a thread groove, an adjusting block is connected inside the thread groove, a top pile is fixed at the top of the adjusting block, pile rods are fixed at the triangles at the bottom end of the pile body, and pile lifting blocks are fixed at the top ends of the left side and the right side of the pile body;
the periphery of regulating block outer wall bottom is provided with the screw thread wall, and the top of regulating block outer wall is provided with the regulation scale, and the outer wall of fore-set runs through there is the pole hole.
Preferably, the bottom of the stake is pointed.
Preferably, the side wall of the bottom end of the pile block is inclined.
Preferably, the thread groove and the thread wall are connected through a bolt to form a rotating mechanism.
Preferably, the interior of the rod bore is externally inset with a metal rod.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses an inside of this support stake is provided with rotation regulation mechanism to can highly finely tune the processing to supporting, when comparing traditional installation difference in height, just need not take out the support stake and trompil the pile again, convenience and work efficiency when improving the installation support stake greatly.
2. The utility model discloses a regulating block outer wall is provided with the regulation scale, when carrying out altitude mixture control, can contrast the concrete distance of height-adjusting, makes clear and definite specific regulation size, reaches the effect of accurate regulation, because play pile block lateral wall for the slope form, reduce when doing benefit to into the soil and the ground between pressure, do benefit to the installation of pile body.
Drawings
Fig. 1 is a schematic view of the overall structure of a roadbed supporting pile for road and bridge construction;
fig. 2 is the utility model provides a road bridge is built and is repaired construction with road bed support pile's explosion chart.
In the figure: 1. a pile body; 2. a thread groove; 3. an adjusting block; 4. adjusting the scale; 5. pile jacking; 6. a rod hole; 7. a pile rod; 8. a threaded wall; 9. and (5) pile driving blocks.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-2, a roadbed supporting pile for road and bridge construction comprises a pile body 1, a top pile 5, an adjusting block 3 and a pile rod 7; the top end of the pile body 1 is provided with a thread groove 2, the inside of the thread groove 2 is connected with an adjusting block 3, the top of the adjusting block 3 is fixed with a top pile 5, the triangles at the bottom end of the pile body 1 are all fixed with pile rods 7, and the top ends of the left side and the right side of the pile body 7 are all fixed with pile lifting blocks 9; threaded wall 8 is provided with around the outer wall bottom of regulating block 3, and the top of the outer wall of regulating block 3 is provided with adjusting scale 4, and the outer wall of piling bar 5 runs through there is pole hole 6.
Wherein, the bottom of the pile rod 7 is in a pointed shape.
Wherein, the side wall of the bottom end of the pile-lifting block 9 is inclined.
Wherein, the thread groove 2 and the thread wall 8 are connected by bolts to form a rotating mechanism.
Wherein the inside of the rod hole 6 is externally inserted with a metal rod.
The utility model discloses during the use: when installing pile body 1, pile body 1 inserts ground by stake pole 7, when the bearing height of supporting pile is adjusted to needs, insert external metal pole in the pole hole 6 of seting up on the stake 5 of epiboly, metal pole through extrapolation drives the stake 5 of epiboly and rotates, be fixed on regulating block 3 by stake 5, regulating block 3 will be located 2 internal rotations of thread groove, the threaded wall 8 that regulating block 3 outer wall bottom set up will with thread groove 2 rotation regulation, carry out the adjustment of height, reach the effect of adjusting bearing height, need the inconvenience of repeated construction when saving the error, when rotatory height-adjusting simultaneously, the regulation scale 4 that sets up on regulating block 3 can be controlled the altitude distance of regulation, reach the effect of accurate regulation, when the pile body needs to be taken out, can take out pile body 1 for the point of application of force by pile block 9, the design answer, it is comparatively practical.
Above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the design of the present invention, equivalent replacement or change should be covered within the protection scope of the present invention.

Claims (5)

1. A roadbed supporting pile for road and bridge construction is characterized by comprising a pile body (1), a top pile (5), an adjusting block (3) and a pile rod (7);
the top end of the pile body (1) is provided with a thread groove (2), an adjusting block (3) is connected inside the thread groove (2), a top pile (5) is fixed at the top of the adjusting block (3), pile rods (7) are fixed at the triangles of the bottom end of the pile body (1), and pile lifting blocks (9) are fixed at the top ends of the left side and the right side of the pile body (1);
threaded walls (8) are arranged around the bottom end of the outer wall of the adjusting block (3), an adjusting scale (4) is arranged at the top of the outer wall of the adjusting block (3), and a rod hole (6) penetrates through the outer wall of the top pile (5).
2. The roadbed supporting pile for the road and bridge construction according to claim 1, wherein the bottom of the pile rod (7) is pointed.
3. The roadbed supporting pile for the road and bridge construction according to claim 1, wherein the side wall of the bottom end of the pile block (9) is inclined.
4. The roadbed supporting pile for the road and bridge construction according to claim 1, wherein the thread groove (2) and the thread wall (8) are connected by bolts to form a rotating mechanism.
5. The roadbed supporting pile for the road and bridge construction according to claim 1, wherein the inside of the rod hole (6) is externally inserted with a metal rod.
CN201921834930.1U 2019-10-29 2019-10-29 Road bridge is built and is repaired construction and support stake with road bed Active CN211368413U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921834930.1U CN211368413U (en) 2019-10-29 2019-10-29 Road bridge is built and is repaired construction and support stake with road bed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921834930.1U CN211368413U (en) 2019-10-29 2019-10-29 Road bridge is built and is repaired construction and support stake with road bed

Publications (1)

Publication Number Publication Date
CN211368413U true CN211368413U (en) 2020-08-28

Family

ID=72170230

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921834930.1U Active CN211368413U (en) 2019-10-29 2019-10-29 Road bridge is built and is repaired construction and support stake with road bed

Country Status (1)

Country Link
CN (1) CN211368413U (en)

Similar Documents

Publication Publication Date Title
CN207314884U (en) A kind of eyelid retractor for building easy to adjusting height
CN209585094U (en) A kind of bracket basis installation of embedded parts auxiliary mould
CN211368413U (en) Road bridge is built and is repaired construction and support stake with road bed
CN103114572A (en) Underground diaphragm wall guide wall movable mold frame
CN107882056A (en) A kind of foundation bolt positioning device and installation method
CN216664200U (en) Novel steel structure embedded column base
CN207277355U (en) A kind of pre-embedded bolt pours positioner
CN215803300U (en) Ground leveling auxiliary device for building construction
CN106013186A (en) Slope strengthening device for building municipal engineering
CN103075026A (en) Novel height-adjustable building bracket
CN209413871U (en) Long-spiral drilling machine regulating device
CN207197519U (en) Engineering survey spirit level support meanss
CN207960492U (en) A kind of portable manual is at well equipment
CN206084428U (en) A auxiliary stay for processing of gear room
CN219060019U (en) Ground screw miniature steel pipe pile
CN216341139U (en) Anchor rod fixing device for building connection
CN212154159U (en) Template fixing device for civil engineering
CN217352615U (en) Well lifting and well lid installation device
CN212835475U (en) Photovoltaic support pile foundation leveling structure
CN216920309U (en) Residential building foundation pile template reinforced structure
CN213014343U (en) Geotechnical engineering pile foundation anti-sinking device
CN217557631U (en) Adjustable overhanging scaffold base
CN215168189U (en) Auxiliary installation device for ground armor seam
CN221032664U (en) Tunnel steel arch supporting device
CN221077646U (en) Auxiliary mapping device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant