CN211357841U - A mud sewage deposits device for construction site - Google Patents

A mud sewage deposits device for construction site Download PDF

Info

Publication number
CN211357841U
CN211357841U CN201922171930.4U CN201922171930U CN211357841U CN 211357841 U CN211357841 U CN 211357841U CN 201922171930 U CN201922171930 U CN 201922171930U CN 211357841 U CN211357841 U CN 211357841U
Authority
CN
China
Prior art keywords
water
fixed cylinder
construction site
wall
lifting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922171930.4U
Other languages
Chinese (zh)
Inventor
焦志斌
张文强
刘刚业
薛飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Fuying Construction Group Co ltd
Original Assignee
Qingdao Fuying Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Fuying Construction Group Co ltd filed Critical Qingdao Fuying Construction Group Co ltd
Priority to CN201922171930.4U priority Critical patent/CN211357841U/en
Application granted granted Critical
Publication of CN211357841U publication Critical patent/CN211357841U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Treatment Of Sludge (AREA)

Abstract

The utility model belongs to building site sewage treatment field especially is a mud sewage sedimentation device for construction site, including holding mechanism, holding mechanism includes the fixed cylinder and the vibration section of thick bamboo of upper and lower symmetrical arrangement, the fixed cylinder with the vibration section of thick bamboo passes through sealing washer sealing connection, the material of sealing washer is rubber, the outer wall of fixed cylinder is close to the position sealing connection on top and is had inlet tube, inlet pipe; the lift plate can fall to the top surface of precipitate, isolate water and precipitate, precipitate accessible solenoid valve flows, the lift plate can upwards promote water, when the liquid level of water reachs the outlet position, water can get into the return water inslot via the outlet, carry to outside storage device in via the drain pipe again, can keep apart the water precipitable thing after deposiing, and simultaneously, under the condition that does not need the force (forcing) pump, can pressurize the discharge of precipitate, make its exhaust speed faster, it is cleaner to discharge.

Description

A mud sewage deposits device for construction site
Technical Field
The utility model relates to a building site sewage treatment field specifically is a mud sewage deposits device for construction site.
Background
The environment of construction place is comparatively complicated, and when the construction, can need a large amount of water, and often can store up a large amount of rainwater in the foundation ditch of construction place, and the rainwater mixes with earth, forms muddy water, directly extracts to it and discharges and can cause the pollution, unable make full use of.
The existing mud sewage sedimentation device for the construction site cannot well isolate mud and settled water, and when water is pumped, the mud settled at the bottom is easily pumped out together, so that the quality of the water is reduced. Accordingly, those skilled in the art have provided a sludge-sewage settling apparatus for a construction site to solve the problems set forth in the background art as described above.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a mud sewage deposits device for construction site to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
a mud sewage sedimentation device for a construction site comprises a containing mechanism, wherein the containing mechanism comprises a fixed cylinder and a vibrating cylinder which are symmetrically arranged from top to bottom, the fixed cylinder and the vibrating cylinder are connected through a sealing ring in a sealing manner, the sealing ring is made of rubber, the position, close to the top end, of the outer wall of the fixed cylinder is hermetically connected with a water inlet pipe and a water inlet pipe, the outer wall of the fixed cylinder is fixedly connected with a plurality of fixed support legs which are arranged at equal intervals, the bottom surface of the vibrating cylinder is fixedly connected with a plurality of buffering support legs, the top surface of the vibrating cylinder is hermetically connected with a gas inlet pipe, the containing mechanism is further provided with a lifting mechanism, the lifting mechanism comprises an electric hoist and a lifting plate, the electric hoist is electrically connected with an external power supply, the lifting plate slides on the inner wall of the fixed cylinder, a coiling rope is coiled on the electric hoist, and the other end of, the electric hoist is fixed the top surface of a solid fixed cylinder, set up four two bisymmetry arrangement's the groove of passing through on the lift plate, the top surface of lift plate articulate have with the rotor plate that corresponds through the groove, the outer wall sealing connection of a solid fixed cylinder has the wet return, the wet return is located the inlet tube top, sealing connection has the drain pipe on the wet return, the outer wall of a solid fixed cylinder seted up with the corresponding outlet in wet return, the bottom sealing connection of a vibration section of thick bamboo has the solenoid valve.
As a further aspect of the present invention: the area of the rotating plate is larger than that of the passing groove.
As a further aspect of the present invention: the middle position of the buffering support leg is fixedly connected with a buffering pad.
As a further aspect of the present invention: the outer wall fixedly connected with vibrating motor of vibration section of thick bamboo, vibrating motor and external power source electric connection.
As a further aspect of the present invention: the inner side wall of the through groove is fixedly connected with a gauze.
As a further aspect of the present invention: the outside cover of electric hoist is equipped with the buckler, the buckler with fixed section of thick bamboo fixed connection.
As a further aspect of the present invention: the mesh number of the gauze is 50 meshes.
Compared with the prior art, the beneficial effects of the utility model are that:
the lifting plate falls into the sediment water, when the lifting plate falls, the rotating plate rotates upwards to be opened under the action of the water flow rate, the lifting plate can fall to the top surface of the sediment to isolate the water from the sediment, when the lifting plate is static, the rotating plate is closed under the action of gravity to seal the passing groove, at the moment, the electromagnetic valve is opened, the sediment can flow out through the electromagnetic valve, meanwhile, the lifting plate moves downwards under the action of the water gravity to apply pressure to the sediment, after the sediment is discharged, the electric hoist winds the winding rope, the lifting plate can lift the water upwards, when the liquid level of the water reaches the position of the water outlet, the water can enter the water return groove through the water outlet and then is conveyed into an external storage device through the water outlet pipe, the sedimentable water sediment after the sediment can be isolated, meanwhile, under the condition that a pressure pump is not needed, the discharge of the sediment can be pressurized, the discharge speed is higher, and the discharge is cleaner.
Drawings
FIG. 1 is a schematic structural view of a slurry sewage settling device for a construction site;
FIG. 2 is a schematic view showing the internal structure of a slurry sewage sedimentation apparatus for a construction site;
FIG. 3 is an enlarged view of the point A in FIG. 2;
FIG. 4 is a schematic view of a lifting plate used in a slurry sewage settling device at a construction site;
fig. 5 is a schematic view of a gauze structure used in a mud sewage sedimentation device of a construction site.
In the figure: 1. a containing mechanism; 101. a water inlet pipe; 102. a feed pipe; 103. a water outlet; 11. a fixed cylinder; 12. a vibration cylinder; 13. a seal ring; 14. a fixed leg; 15. a buffer leg; 151. a cushion pad; 16. an air inlet pipe; 17. an electromagnetic valve; 2. a lifting mechanism; 21. an electric hoist; 211. winding the rope; 212. a screen; 213. a waterproof cover; 22. a lifting plate; 221. a rotating plate; 201. passing through the slot; 3. a water return tank; 31. a drain pipe; 4. a vibration motor.
Detailed Description
Referring to fig. 1 to 5, in the embodiment of the present invention, a slurry sewage sedimentation device for a construction site includes a holding mechanism 1, the holding mechanism 1 includes a fixed cylinder 11 and a vibration cylinder 12 which are arranged symmetrically up and down, the fixed cylinder 11 and the vibration cylinder 12 are connected by a sealing ring 13 in a sealing manner, the sealing ring 13 is made of rubber, a water inlet pipe 101 and a feed pipe 102 are connected to the outer wall of the fixed cylinder 11 at a position close to the top end in a sealing manner, a plurality of fixing support legs 14 are fixedly connected to the outer wall of the fixed cylinder 11 at equal intervals, a plurality of buffering support legs 15 are fixedly connected to the bottom surface of the vibration cylinder 12, an air inlet pipe 16 is connected to the top surface of the vibration cylinder 12 in a sealing manner, a lifting mechanism 2 is further disposed on the holding mechanism 1, the lifting mechanism 2 includes an electric hoist 21 and a lifting plate 22, the electric hoist 21 is electrically connected to an external power supply, the lifting plate, the other end and the lift plate 22 fixed connection of receipts serving as a reference 211, the top surface at solid fixed cylinder 11 is fixed to electric hoist 21, set up four two liang of symmetrical arrangement's the groove 201 that passes through on the lift plate 22, the top surface of lift plate 22 articulates has and passes through the rotor plate 221 that groove 201 corresponds, the outer wall sealing connection of solid fixed cylinder 11 has return flume 3, return flume 3 is located inlet tube 101 top, sealing connection has drain pipe 31 on the return flume 3, the outlet 103 corresponding with return flume 3 has been seted up to the outer wall of solid fixed cylinder 11, the bottom sealing connection of vibration section of thick bamboo 12 has solenoid valve 17.
In this embodiment: when in use, slurry sewage is conveyed to the inside of the fixed cylinder 11 and the vibrating cylinder 12 through the water inlet pipe 101, then a flocculating agent is sprayed to the inside through the feeding pipe 102, then the standing and the sedimentation are carried out, after the sedimentation is finished, the electric hoist 21 (model CD1-1T-9M) discharges the coiling rope 211, so that the lifting plate 22 falls to the sedimentation water, when the lifting plate 22 falls, under the action of the water flow rate, the rotating plate 221 rotates upwards to be opened, the lifting plate 22 can fall to the top surface of the sediment to isolate the water from the sediment, when the lifting plate 22 is static, the rotating plate 221 is closed under the action of gravity to seal the passing groove 201, at the moment, the electromagnetic valve 17 is opened, the sediment can flow out through the electromagnetic valve 17 (model DN250), meanwhile, the lifting plate 22 moves downwards under the action of the water gravity to apply pressure on the sediment, so that the sediment can be quickly discharged and is relatively cleanly discharged, after the precipitate discharges, electric hoist 21 winds winding rope 211, lifting plate 22 can upwards promote water, when the liquid level of water reaches outlet 103 position, water can get into return water tank 3 via outlet 103, carry to outside storage device in via drain pipe 31 again, can keep apart the water precipitable thing after depositing, and simultaneously, under the condition that does not need the force (forcing) pump, can pressurize the discharge of precipitate, make its exhaust speed faster, the discharge is cleaner, when the precipitate discharges, start vibrating motor 4, vibrating motor 4 vibrates vibration section of thick bamboo 12, the last precipitate whereabouts of adhesion at vibration section of thick bamboo 12 inner wall that can make, make its discharge cleaner.
In fig. 1-2: the device comprises a containing mechanism 1, the containing mechanism 1 comprises a fixed cylinder 11 and a vibrating cylinder 12 which are arranged in an up-down symmetrical manner, the fixed cylinder 11 and the vibrating cylinder 12 are connected in a sealing manner through a sealing ring 13, the sealing ring 13 is made of rubber, when the vibrating cylinder 12 vibrates, the sealing ring 13 can absorb vibration and prevent the vibration from being conducted to the fixed cylinder 11, a water inlet pipe 101 and a feed pipe 102 are connected in a sealing manner at a position, close to the top end, of the outer wall of the fixed cylinder 11, a plurality of fixing support legs 14 which are arranged at equal intervals are fixedly connected to the outer wall of the fixed cylinder 11, a plurality of buffering support legs 15 are fixedly connected to the bottom surface of the vibrating cylinder 12, an air inlet pipe 16 is connected to the top surface of the vibrating cylinder 12, a lifting mechanism 2 is further arranged on the containing mechanism 1, the lifting mechanism 2 comprises an electric hoist 21 and a lifting plate 22, the electric hoist 21 is, the other end of the coiling rope 211 is fixedly connected with the lifting plate 22, the electric hoist 21 is fixed on the top surface of the fixed cylinder 11, four passing grooves 201 which are symmetrically arranged in pairs are formed in the lifting plate 22, the top surface of the lifting plate 22 is hinged with a rotating plate 221 corresponding to the passing grooves 201, the outer wall of the fixed cylinder 11 is hermetically connected with a water return groove 3, the water return groove 3 is positioned above the water inlet pipe 101, a drain pipe 31 is hermetically connected on the water return groove 3, a water outlet 103 corresponding to the water return groove 3 is formed in the outer wall of the fixed cylinder 11, the bottom end of the vibration cylinder 12 is hermetically connected with an electromagnetic valve 17, when the electric hoist is used, slurry sewage is conveyed to the inside of the fixed cylinder 11 and the vibration cylinder 12 through the water inlet pipe 101, then a flocculating agent is sprayed to the inside through the inlet pipe 102, then standing and precipitating is carried out, after the precipitation is finished, the electric hoist, under the action of water flow rate, the rotating plate 221 rotates upwards to be opened, the lifting plate 22 can fall to the top surface of the sediment to isolate water and the sediment, when the lifting plate 22 is static, the rotating plate 221 is closed under the action of gravity to seal the passing groove 201, at the moment, the electromagnetic valve 17 is opened, the sediment can flow out through the electromagnetic valve 17, meanwhile, the lifting plate 22 moves downwards under the action of water gravity to apply pressure on the sediment, so that the sediment can be rapidly discharged and is cleanly discharged, after the sediment is completely discharged, the electric hoist 21 winds the winding rope 211, the lifting plate 22 can lift the water upwards, when the liquid level of the water reaches the position of the water outlet 103, the water can enter the water return groove 3 through the water outlet 103 and then is conveyed into an external storage device through the water outlet pipe 31, the water precipitable sediment after precipitation can be isolated, and meanwhile, under the condition that a pressure pump is not needed, can pressurize the discharge of precipitate, make its exhaust speed faster, the discharge is cleaner, the outer wall fixedly connected with vibrating motor 4 of vibration section of thick bamboo 12, vibrating motor 4 and external power source electric connection, when the precipitate is discharged, start vibrating motor 4, vibrating motor 4 vibrates vibration section of thick bamboo 12, the adhesion that can make falls at the last precipitate of vibration section of thick bamboo 12 inner wall, it is cleaner to make its discharge, fixedly connected with blotter 151 is located to the intermediate position department of buffering stabilizer blade 15, when vibration section of thick bamboo 12 vibrates, blotter 151 can absorb, the further conduction of prevention vibration is to ground, the outside cover of electric hoist 21 is equipped with buckler 213, buckler 213 and fixed section of thick bamboo 11 fixed connection, buckler 213 can protect electric hoist 21, prevent rain erosion.
In fig. 3: the outer wall sealing connection of fixed section of thick bamboo 11 has return flume 3, and return flume 3 is located inlet tube 101 top, and sealing connection has drain pipe 31 on the return flume 3, and the outlet 103 corresponding with return flume 3 is seted up to the outer wall of fixed section of thick bamboo 11, and lift plate 22 can upwards promote water, and when the liquid level of water reachd outlet 103 position, water can get into return flume 3 via outlet 103 in, carry to outside storage device via drain pipe 31 again.
In fig. 4 and-5: set up four two bisymmetry arrangements on the lifting plate 22 and pass through groove 201, the top surface of lifting plate 22 articulates there is the rotor plate 221 that corresponds with passing through groove 201, the area of rotor plate 221 is greater than the area through groove 201, when lifting plate 22 falls, under the effect of water velocity, rotor plate 221 upwards rotates and opens, lifting plate 22 can fall to the top surface of precipitate, it is isolated with water and precipitate, when lifting plate 22 is static, rotor plate 221 closes under the action of gravity, seal through groove 201, inside wall fixedly connected with gauze 212 through groove 201, the mesh of gauze 212 is 50 meshes, in the in-process of lifting plate 22 whereabouts, can keep apart floating impurity, further improve the quality of the water after the sediment.
The utility model discloses a theory of operation is: when the device is used, slurry sewage is conveyed to the inside of the fixed cylinder 11 and the vibrating cylinder 12 through the water inlet pipe 101, then a flocculating agent is sprayed to the inside through the feeding pipe 102, then standing and precipitating are carried out, after precipitation is finished, the electric hoist 21 discharges the winding rope 211, so that the lifting plate 22 falls into precipitating water, when the lifting plate 22 falls, under the action of the water flow rate, the rotating plate 221 rotates upwards to be opened, the lifting plate 22 can fall onto the top surface of precipitate to isolate the water and the precipitate, when the lifting plate 22 is static, the rotating plate 221 is closed under the action of gravity to seal the passing groove 201, at the moment, the electromagnetic valve 17 is opened, the precipitate can flow out through the electromagnetic valve 17, meanwhile, the lifting plate 22 moves downwards under the action of the water gravity to apply pressure to the precipitate, so that the precipitate can be discharged quickly and cleanly, after the precipitate is discharged, the electric hoist 21 winds the winding rope 211, the lifting plate 22 can lift water upwards, when the liquid level of water reaches the position of the water outlet 103, the water can enter the water return tank 3 through the water outlet 103, and then is conveyed to an external storage device through the water outlet pipe 31, the water after precipitation can be separated, meanwhile, under the condition that a pressure pump is not needed, the discharge of the precipitate can be pressurized, the discharging speed is higher, the discharge is cleaner, when the precipitate is discharged, the vibration motor 4 is started, the vibration motor 4 vibrates the vibration cylinder 12, the adhesion that can be made falls on the upper precipitate on the inner wall of the vibration cylinder 12, and the discharge is cleaner.
The above-mentioned, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (7)

1. The utility model provides a mud sewage deposits device for construction site, is including holding mechanism (1), its characterized in that, hold mechanism (1) including upper and lower symmetrical arrangement's solid fixed cylinder (11) and vibration section of thick bamboo (12), gu fixed cylinder (11) with vibration section of thick bamboo (12) are through sealing washer (13) sealing connection, the material of sealing washer (13) is rubber, the outer wall of gu fixed cylinder (11) is close to the position department sealing connection on top and has inlet tube (101), inlet pipe (102), the outer wall fixed connection of gu fixed cylinder (11) has a plurality of equidistance to arrange fixed stabilizer blade (14), the bottom surface fixed connection of vibration section of thick bamboo (12) has a plurality of buffering stabilizer blade (15), the top surface sealing connection of vibration section of thick bamboo (12) has intake pipe (16), it still is equipped with hoist mechanism (2) on mechanism (1) to hold;
the lifting mechanism (2) comprises an electric hoist (21) and a lifting plate (22), the electric hoist (21) is electrically connected with an external power supply, the lifting plate (22) slides on the inner wall of the fixed cylinder (11), a coiling rope (211) is coiled on the electric hoist (21), the other end of the coiling rope (211) is fixedly connected with the lifting plate (22), the electric hoist (21) is fixed on the top surface of the fixed cylinder (11), four passing grooves (201) which are symmetrically arranged in pairs are formed in the lifting plate (22), the top surface of the lifting plate (22) is hinged with a rotating plate (221) corresponding to the passing grooves (201), the outer wall of the fixed cylinder (11) is hermetically connected with a water return groove (3), the water return groove (3) is positioned above the water inlet pipe (101), and a drain pipe (31) is hermetically connected to the water return groove (3), the outer wall of the fixed cylinder (11) is provided with a water outlet (103) corresponding to the water return tank (3), and the bottom end of the vibrating cylinder (12) is hermetically connected with an electromagnetic valve (17).
2. The sludge sewage settling device for a construction site as claimed in claim 1, wherein the area of the rotating plate (221) is larger than the area of the passing groove (201).
3. The mud sewage settling device for a construction site as claimed in claim 1, wherein a buffering pad (151) is fixedly connected to the buffering leg (15) at a middle position thereof.
4. The mud sewage settling device for the construction site as claimed in claim 3, wherein a vibration motor (4) is fixedly connected to the outer wall of the vibration cylinder (12), and the vibration motor (4) is electrically connected with an external power supply.
5. The mud sewage settling device for a construction site as claimed in claim 1, wherein a gauze (212) is fixedly connected to the inner side wall of the passing groove (201).
6. The mud sewage settling device for the construction site as claimed in claim 1, wherein a waterproof cover (213) is covered on the outer side of the electric hoist (21), and the waterproof cover (213) is fixedly connected with the fixed cylinder (11).
7. The mud sewage settling device for a construction site of claim 5, wherein the mesh number of the gauze (212) is 50 meshes.
CN201922171930.4U 2019-12-06 2019-12-06 A mud sewage deposits device for construction site Expired - Fee Related CN211357841U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922171930.4U CN211357841U (en) 2019-12-06 2019-12-06 A mud sewage deposits device for construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922171930.4U CN211357841U (en) 2019-12-06 2019-12-06 A mud sewage deposits device for construction site

Publications (1)

Publication Number Publication Date
CN211357841U true CN211357841U (en) 2020-08-28

Family

ID=72162965

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922171930.4U Expired - Fee Related CN211357841U (en) 2019-12-06 2019-12-06 A mud sewage deposits device for construction site

Country Status (1)

Country Link
CN (1) CN211357841U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021083423A3 (en) * 2020-12-21 2021-10-14 苏州鱼得水电气科技有限公司 Industrial wastewater treatment apparatus
CN114684970A (en) * 2022-04-09 2022-07-01 西安旭旌再生资源有限公司 Comprehensive treatment system and treatment method for synthetic ammonia production discharged wastewater
CN116004316A (en) * 2023-02-20 2023-04-25 山东万棋能源科技有限公司 Lubricating oil recovery and filtration device and application method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021083423A3 (en) * 2020-12-21 2021-10-14 苏州鱼得水电气科技有限公司 Industrial wastewater treatment apparatus
CN114684970A (en) * 2022-04-09 2022-07-01 西安旭旌再生资源有限公司 Comprehensive treatment system and treatment method for synthetic ammonia production discharged wastewater
CN116004316A (en) * 2023-02-20 2023-04-25 山东万棋能源科技有限公司 Lubricating oil recovery and filtration device and application method thereof
CN116004316B (en) * 2023-02-20 2024-03-08 井贺春 Lubricating oil recovery and filtration device and application method thereof

Similar Documents

Publication Publication Date Title
CN211357841U (en) A mud sewage deposits device for construction site
CN105625555B (en) A kind of rainwater shunting of combined system, regulate and store and processing system
CN205475657U (en) Confluence system is rain regulation processing system just
CN106522345A (en) Automatic initial rainwater interception type rainwater inlet device
CN104746475B (en) A kind of utilization wind-force tidal power generation water-retention drain processes the device and method of river sewage
CN110670657A (en) Dredging equipment for narrow river channel
CN106930397B (en) A kind of biological delaying basin that initial rainwater can be persistently handled within the dry spell
CN112127464A (en) High-order cistern of water conservancy system gate-type rinse-system
CN105604176A (en) Combined-system first rain regulation and storage treatment system
CN109356228B (en) Tidal seawater taking device and method
CN106121004B (en) A kind of adjustable automatic flow abandoning type Rainwater collection system
CN204781292U (en) Flood regulation pond
CN211973623U (en) Environment-friendly dredging device
CN113005980A (en) Water conservancy project gate purifier
CN106902569B (en) A kind of collection pretreatment system of city overland runoff initial rainwater
CN211080520U (en) Anti-sedimentation-silting sewage pump station
CN112081227A (en) Construction rainfall drainage structures
CN109654036B (en) Anti-blocking sewage discharge self-sucking pump for outdoor use
CN207959470U (en) A kind of system including storage pond and online processing pond
CN111827458B (en) Municipal administration sewer sewage discharge processing system
CN110904985B (en) Full-automatic drainage recycling system for building foundation pit
CN209985017U (en) Drainage device for hydraulic engineering
CN109469028B (en) Sand discharging device for dam gate system
CN208202078U (en) Pipe gallery dmp filter blowdown is regulated and stored device
CN206916825U (en) A kind of integrated pump station having into emptying gate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200828