CN211340635U - Water conservancy building pipe laying fixing device - Google Patents

Water conservancy building pipe laying fixing device Download PDF

Info

Publication number
CN211340635U
CN211340635U CN201922283337.9U CN201922283337U CN211340635U CN 211340635 U CN211340635 U CN 211340635U CN 201922283337 U CN201922283337 U CN 201922283337U CN 211340635 U CN211340635 U CN 211340635U
Authority
CN
China
Prior art keywords
threaded rod
backup pad
water conservancy
fixing device
conservancy building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922283337.9U
Other languages
Chinese (zh)
Inventor
徐�明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201922283337.9U priority Critical patent/CN211340635U/en
Application granted granted Critical
Publication of CN211340635U publication Critical patent/CN211340635U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a fixing device is laid to water conservancy building pipeline, concretely relates to water conservancy building pipeline lays technical field, the camera includes a supporting plate, the one end fixed mounting of backup pad lower surface has the bracing piece, and the fixed regulating part that is provided with of the other end of backup pad lower surface, the below of bracing piece is provided with the bottom plate, the spout has been seted up to the upper surface of bottom plate, the fixed fastener that is provided with of central point department of putting of backup pad below, the through-hole has been seted up to the backup pad upper surface, the backup pad top is provided with the cover. The utility model discloses a set up the regulating part, held the sleeve and rotated, driven first threaded rod and second threaded rod antiport to the length of increasing the regulating part makes the bottom plate keep being a suitable inclination, has made things convenient for the staff to adjust, is convenient for install on the slope of difference, makes between whole and the ground agree with more, has guaranteed the steadiness behind the piping erection.

Description

Water conservancy building pipe laying fixing device
Technical Field
The utility model relates to a water conservancy building pipelaying technical field, more specifically say, the utility model relates to a water conservancy building pipelaying fixing device.
Background
Hydraulic engineering is an engineering built for controlling and allocating surface water and underground water in the nature to achieve the purposes of removing harmful substances and benefiting benefits, and is also called water engineering. Water is a valuable resource essential to human production and life, but the naturally existing state of the water does not completely meet the needs of human beings, and building pipelines in hydraulic engineering need to be laid when the hydraulic engineering is built.
But in actual use, the method still has more defects, such as poor stability after the pipeline is installed.
SUMMERY OF THE UTILITY MODEL
In order to overcome the above-mentioned defect of prior art, the embodiment of the utility model provides a fixing device is laid to water conservancy building pipeline, through having set up the regulating part, it is rotatory to hold the sleeve, drive first threaded rod and second threaded rod antiport, thereby increase the length of regulating part, make the bottom plate keep being a suitable inclination, made things convenient for the staff to adjust, be convenient for install on the slope of difference, make wholly agree with more between and the ground, the steadiness after the piping erection has been guaranteed.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a fixing device is laid to water conservancy building pipeline, includes the backup pad, the one end fixed mounting of backup pad lower surface has the bracing piece, and the fixed regulating part that is provided with of the other end of backup pad lower surface, the below of bracing piece is provided with the bottom plate, the spout has been seted up to the upper surface of bottom plate, the fixed fastener that is provided with of central point department of putting of backup pad below, the through-hole has been seted up to the backup pad upper surface, the backup pad top is provided with the cover plate, the arc card pad is installed on the inside top of cover plate, the.
In a preferred embodiment, the adjusting part comprises a first threaded rod fixedly connected with the lower surface of the supporting plate, a sleeve is sleeved below the first threaded rod, a second threaded rod is embedded below the sleeve, a sliding block is mounted at the bottom end of the second threaded rod, and the sliding block is connected with the sliding groove in a sliding manner.
In a preferred embodiment, the sleeve is rotatably connected with the first threaded rod and the second threaded rod in a threaded manner, and the threads of the first threaded rod and the second threaded rod are distributed in opposite directions.
In a preferred embodiment, a pin shaft penetrates through the joint of the second threaded rod and the sliding block, and the second threaded rod and the sliding block are rotatably connected through the pin shaft.
In a preferred embodiment, the fastener comprises a fixing frame fixedly connected with the lower surface of the supporting plate, two ends of the fixing frame are respectively provided with a positioning rod in a penetrating manner, one end of each positioning rod is fixedly provided with a movable block, a fastening spring is fixedly connected between the two groups of movable blocks, and the positioning rods are matched with the reserved holes.
In a preferred embodiment, the movable block and the movable block are connected with the fixed frame in a sliding manner.
In a preferred embodiment, the number of the positioning rods and the movable blocks is provided with two groups.
The utility model discloses a technological effect and advantage:
1. the utility model discloses in through having set up the regulating part, hold the sleeve and rotate, drive first threaded rod and second threaded rod counter-rotating, thereby increase the length of regulating part, make the bottom plate keep as an appropriate inclination, made things convenient for the staff to adjust, be convenient for install on different slopes, make between whole and the ground agree with more, guaranteed the steadiness after the pipeline installation;
2. the utility model discloses in through having set up the fastener, insert the through-hole with the both ends of cover plate in, pull locating lever extrusion fastening spring to the centre, utilize the elasticity characteristic of compressed fastening spring self, insert suitable preformed hole with the locating lever to the completion is fixed between cover plate and the backup pad, provides higher simple operation nature, is convenient for install the pipeline of equidimension model not fixed, has improved its practicality.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is an enlarged schematic structural view of a portion a in fig. 1 according to the present invention.
Fig. 3 is an enlarged schematic structural view of a portion B in fig. 1 according to the present invention.
The reference signs are: 1. a support plate; 2. a support bar; 3. an adjustment member; 31. a first threaded rod; 32. a sleeve; 33. a second threaded rod; 34. a slider; 4. a chute; 5. a base plate; 6. a fastener; 61. a fixed mount; 62. positioning a rod; 63. a movable block; 64. a fastening spring; 7. a cover plate; 8. an arc-shaped clamping pad; 9. a through hole; 10. holes are reserved.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As water conservancy building pipeline lays fixing device shown in attached figure 1 and attached figure 2, including backup pad 1, bracing piece 2, regulating part 3, spout 4, bottom plate 5, fastener 6, cover plate 7, arc card pad 8, through-hole 9 and preformed hole 10, the one end fixed mounting of 1 lower surface of backup pad has bracing piece 2, and the fixed regulating part 3 that is provided with of the other end of 1 lower surface of backup pad, the below of bracing piece 2 is provided with bottom plate 5, spout 4 has been seted up to the upper surface of bottom plate 5, the fixed fastener 6 that is provided with of central point department of putting of 1 below of backup pad, through-hole 9 has been seted up to 1 upper surface of backup pad, 1 top of backup pad is provided with cover plate 7, arc card pad 8 is installed on 7 inside tops of cover plate, multiunit preformed hole 10 has been seted up.
Regulating part 3 is including the first threaded rod 31 with 1 lower fixed surface of backup pad be connected, sleeve 32 has been overlapped to first threaded rod 31 below, sleeve 32 below embedding is provided with second threaded rod 33, sliding block 34 is installed to second threaded rod 33 bottom, be connected through the slip mode between sliding block 34 and the spout 4.
The sleeve 32 is rotatably connected with the first threaded rod 31 and the second threaded rod 33 in a threaded mode, and the threads of the first threaded rod 31 and the second threaded rod 33 are distributed in opposite directions.
And a pin shaft penetrates through the joint of the second threaded rod 33 and the sliding block 34, and the second threaded rod 33 and the sliding block 34 are rotatably connected through the pin shaft.
The implementation mode is specifically as follows: in implementation the utility model discloses the time, keep backup pad 1 as a horizontality, it is rotatory to hold sleeve 32, because sleeve 32 rotates through the screw thread mode between first threaded rod 31 and the second threaded rod 33 respectively and is connected, and the screw thread of first threaded rod 31 and second threaded rod 33 is the inverted distribution, will drive first threaded rod 31 and second threaded rod 33 inverted rotation, sliding block 34 on the second threaded rod 33 then slides in spout 4 on bottom plate 5, thereby increase the length of regulating part 3, the one end of bracing piece 2 is then rotating on bottom plate 5, make bottom plate 5 keep being a suitable inclination, be convenient for install on the slope of difference, make and agree with more between whole and the ground, the steadiness after the pipeline installation has been guaranteed.
Fixing device is laid to water conservancy building pipeline as shown in fig. 1 and fig. 3, still including fastener 6, wherein fastener 6 is including the mount 61 with 1 lower fixed surface of backup pad be connected, mount 61 both ends are run through respectively and are installed a locating lever 62, locating lever 62 one end fixed mounting has movable block 63, and is two sets of fixedly connected with fastening spring 64 between the movable block 63, locating lever 62 and preformed hole 10 looks adaptation.
The movable blocks 63 and 63 are connected with the fixed frame 61 in a sliding manner.
The number of the positioning rods 62 and the number of the movable blocks 63 are two.
The implementation mode is specifically as follows: when the utility model is implemented, the pipeline is flatly placed on the support plate 1, after the pipeline is placed, the cover plate 7 is clamped on the pipeline, two ends of the cover plate 7 are inserted into the through holes 9, in the process, two groups of positioning rods 62 need to be pulled towards the middle, the positioning rods 62 drive the movable blocks 63 to extrude the fastening springs 64, the fastening springs 64 are in a compressed state, the cover plate 7 is pressed downwards, the arc-shaped clamping pads 8 on the cover plate 7 are tightly attached to the pipeline, at the moment, the positioning rods 62 on the fixing frame 61 are loosened, the compressed fastening springs 64 recover due to the elastic characteristics of the positioning rods 62, the positioning rods 62 are pushed towards two sides, the positioning rods 62 are inserted into the proper reserved holes 10, the fixing between the cover plate 7 and the support plate 1 is completed, the high operation convenience is provided, and the pipelines with different sizes and models can be conveniently installed and fixed, the practicability is improved.
The utility model discloses the theory of operation:
referring to the attached drawings 1 and 2 of the specification, by arranging the adjusting part 3 and holding the sleeve 32 to rotate, the first threaded rod 31 and the second threaded rod 33 are driven to rotate reversely, so that the length of the adjusting part 3 is increased, the bottom plate 5 is kept at a proper inclination angle, the adjusting part is convenient for workers to adjust, installation on different slopes is facilitated, the whole body is more fit with the ground, and the stability of the pipeline after installation is ensured;
refer to description figure 1 and figure 3, through having set up fastener 6, insert the through-hole 9 with the both ends of cover plate 7 in, pull locating lever 62 extrusion fastening spring 64 to the centre, utilize the elasticity characteristic of compressed fastening spring 64 self, insert suitable preformed hole 10 with locating lever 62, thereby the completion is to the fixed between cover plate 7 and the backup pad 1, higher simple operation nature is provided, be convenient for install the pipeline of not equidimension model fixed, the practicality is improved.
The points to be finally explained are: first, in the description of the present application, it should be noted that, unless otherwise specified and limited, the terms "mounted," "connected," and "connected" should be understood broadly, and may be a mechanical connection or an electrical connection, or a communication between two elements, and may be a direct connection, and "upper," "lower," "left," and "right" are only used to indicate a relative positional relationship, and when the absolute position of the object to be described is changed, the relative positional relationship may be changed;
secondly, the method comprises the following steps: in the drawings of the disclosed embodiments of the present invention, only the structures related to the disclosed embodiments are referred to, and other structures can refer to the common design, and under the condition of no conflict, the same embodiment and different embodiments of the present invention can be combined with each other;
and finally: the above description is only for the preferred embodiment of the present invention and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (7)

1. The utility model provides a water conservancy building pipelaying fixing device, includes backup pad (1), its characterized in that: the one end fixed mounting of backup pad (1) lower surface has bracing piece (2), and the other end of backup pad (1) lower surface is fixed and is provided with regulating part (3), the below of bracing piece (2) is provided with bottom plate (5), spout (4) have been seted up to the upper surface of bottom plate (5), the fixed fastener (6) that are provided with of central point department of putting of backup pad (1) below, through-hole (9) have been seted up to backup pad (1) upper surface, backup pad (1) top is provided with cover plate (7), arc card pad (8) are installed on cover plate (7) inside top, multiunit preformed hole (10) have been seted up to cover plate (7) side surface.
2. The water conservancy building pipelaying fixing device of claim 1, characterized in that: regulating part (3) including with backup pad (1) lower fixed surface be connected first threaded rod (31), sleeve (32) have been overlapped to first threaded rod (31) below, sleeve (32) below embedding is provided with second threaded rod (33), sliding block (34) are installed to second threaded rod (33) bottom, be connected through the slip mode between sliding block (34) and spout (4).
3. The water conservancy building pipelaying fixing device of claim 2, characterized in that: the sleeve (32) is rotationally connected with the first threaded rod (31) and the second threaded rod (33) in a threaded mode, and threads of the first threaded rod (31) and the second threaded rod (33) are distributed in the opposite direction.
4. The water conservancy building pipelaying fixing device of claim 2, characterized in that: the junction of second threaded rod (33) and sliding block (34) runs through and is provided with the round pin axle, rotate through the round pin axle between second threaded rod (33) and the sliding block (34) and be connected.
5. The water conservancy building pipelaying fixing device of claim 1, characterized in that: fastener (6) including with backup pad (1) lower fixed surface be connected mount (61), mount (61) both ends are run through respectively and are installed a locating lever (62), locating lever (62) one end fixed mounting has movable block (63), and is two sets of fixedly connected with fastening spring (64) between movable block (63), locating lever (62) and preformed hole (10) looks adaptation.
6. The water conservancy building pipelaying fixing device of claim 5, characterized in that: the movable block (63) and the movable block (63) are connected with the fixed frame (61) in a sliding mode.
7. The water conservancy building pipelaying fixing device of claim 5, characterized in that: the number of the positioning rods (62) and the number of the movable blocks (63) are two.
CN201922283337.9U 2019-12-18 2019-12-18 Water conservancy building pipe laying fixing device Active CN211340635U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922283337.9U CN211340635U (en) 2019-12-18 2019-12-18 Water conservancy building pipe laying fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922283337.9U CN211340635U (en) 2019-12-18 2019-12-18 Water conservancy building pipe laying fixing device

Publications (1)

Publication Number Publication Date
CN211340635U true CN211340635U (en) 2020-08-25

Family

ID=72098286

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922283337.9U Active CN211340635U (en) 2019-12-18 2019-12-18 Water conservancy building pipe laying fixing device

Country Status (1)

Country Link
CN (1) CN211340635U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2589451A (en) * 2019-10-03 2021-06-02 Planet 42 Ltd Support apparatus

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2589451A (en) * 2019-10-03 2021-06-02 Planet 42 Ltd Support apparatus
GB2589451B (en) * 2019-10-03 2024-04-10 Planet 42 Ltd Support apparatus

Similar Documents

Publication Publication Date Title
CN211340635U (en) Water conservancy building pipe laying fixing device
CN202127205U (en) Rapidly-fixing clamp for cables
CN210440678U (en) Hydraulic engineering pipeline supports connection structure
CN209741761U (en) water conservancy bank protection component
CN212656230U (en) Film drum type vibrator for concrete curing
CN204315174U (en) The Sign Board bracing or strutting arrangement that a kind of power transformation engineering digital photograph is for shooting
CN207660562U (en) A kind of drilling well steel pipe clamping device
CN203800205U (en) Flat spiral grounding wire clamp with rotating clamping head
CN207021947U (en) A kind of new energy solar panels mounting bracket
CN205976126U (en) Glass curtain wall anchor clamps
CN215674219U (en) Pipeline strutting arrangement is used in civil engineering construction
CN109812118B (en) Power line pole ball cage fixing device
CN215170080U (en) Positioning clamp for embedding water stop
CN212584422U (en) Building engineering water and electricity installation mechanism
CN211116056U (en) Adjustable temporary support mechanism for tunnel construction
CN211449886U (en) Pipeline fixing device for water supply engineering
CN209909503U (en) Monitoring device for factory
CN209053601U (en) A kind of reservoir water auxiliary device facilitating clamping
CN207112090U (en) Device for pipe of cement installation
CN207888014U (en) A kind of convenient copper public affairs fixture of angular adjustment
CN221126372U (en) Cable interface protection structure for engineering construction
CN210739556U (en) Pipeline fixing device is used in construction of water conservancy water and electricity dam
CN213541517U (en) Fixing fastener for connecting water delivery pipe
CN219034076U (en) House construction bed course equipment of making level
CN217583448U (en) High-efficient convenient mounting structure of fire control feed pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant