CN207660562U - A kind of drilling well steel pipe clamping device - Google Patents

A kind of drilling well steel pipe clamping device Download PDF

Info

Publication number
CN207660562U
CN207660562U CN201721313907.9U CN201721313907U CN207660562U CN 207660562 U CN207660562 U CN 207660562U CN 201721313907 U CN201721313907 U CN 201721313907U CN 207660562 U CN207660562 U CN 207660562U
Authority
CN
China
Prior art keywords
steel pipe
leading screw
drilling well
sliding slot
supporting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721313907.9U
Other languages
Chinese (zh)
Inventor
张菊金
夏春晖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Guangxin Machinery Manufacturing Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721313907.9U priority Critical patent/CN207660562U/en
Application granted granted Critical
Publication of CN207660562U publication Critical patent/CN207660562U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Drilling And Boring (AREA)

Abstract

The utility model discloses a kind of drilling well steel pipe clamping devices,Including pedestal,The base top is welded with geometrical clamp,It is connected with supporting rod on the left of the geometrical clamp,And the supporting rod is vertically connected on the base top,Sliding slot is equipped on the right side of the supporting rod,The sliding slot inner cavity is equipped with leading screw,The leading screw bottom end is connected with bearing,And the bearing is fixed on the sliding slot intracavity bottom,The leading screw screw top is connected with sliding sleeve,And the sliding sleeve sliding is in succession in the sliding slot inner cavity,It is welded with movable folder on the right side of the sliding sleeve,Activity folder top is equipped with rotating handle,And the rotating handle is connected to the leading screw top,Being glued with activity folder bottom at the top of the geometrical clamp has wearing layer,This kind of drilling well steel pipe clamping device,It is simple in structure,It is stable and firm,It is easily installed,It is easy to operate,Enhance fix tightly solidity,To reduce labor intensity when operation employee accesses steel pipe,Improve working efficiency,It is with a wide range of applications.

Description

A kind of drilling well steel pipe clamping device
Technical field
The utility model is related to drilling machinery equipment technical field, specially a kind of drilling well steel pipe clamping device.
Background technology
Drilling well refers to that stratum is drilled to using mechanical equipment or manpower from ground the work of eyelet, is often referred to explore or develop The engineering of the liquid such as oil, natural gas and gaseous state mineral products and Drilling wellbore and major diameter water supply well, drilling well is in the development of the national economy In application it is extremely wide, drilling well is a systematic engineering of business, be multi-specialized, multiplexing kind utilize plurality of devices, tool, material carry out Integration of operation, while it is that multiprogram is closely connected again, and too many levels is all linked with one another to work continuously, and the overall process of construction all has There is comparable complexity, the completion of every mouth well includes preliminary work for spudding, drilling engineering and completion practice three phases, each single item work The journey stage has a series of working procedure, master operation to generally comprise again:The location of well, road survey, foundation construction, installation well Frame, removal of home, installation equipment, once spud in, it is secondary spud in, creep into, pulling out of hole, bit change, lower brill, completion, electrical measurement, setting of casing, consolidate Well operations etc., in the operation that wellbore test scene is usually required for being linked into steel pipe in drilling, in the prior art drilling access It needs steel pipe being fixed on plummet when steel pipe, then steel pipe is accessed and is drilled, during steel pipe is fixed on plummet, need Drilling well steel pipe is carried out gripping work.
And existing drilling well steel pipe clamping device, steel pipe is manually first typically fixed, however, manually fixed steel pipe jail Solidity is poor, and steel pipe is often rolled when being connected and fixed with drilling well plummet, and fixed effect is bad, and artificial fixed steel pipe is time-consuming takes Power, reduces working efficiency, and some drilling well steel pipe clamping devices cannot fix the steel pipe of different size, fixed different steel pipe Different clamping devices, use scope is needed to be extremely limited, drilling well steel pipe clamping device also is adjusted not square enough Just, clamping steel pipe tension is easy so that steel pipe damage, deformation, clamping pine are easy to fall off, and has a security risk, so much without Method meets requirement of the current people to the product.
So how to design a kind of drilling well steel pipe clamping device, becoming us will currently solve the problems, such as.
Utility model content
The purpose of this utility model is to provide a kind of drilling well steel pipe clamping devices, to solve to propose in above-mentioned background technology The problem of.
To achieve the above object, the utility model provides the following technical solutions:A kind of drilling well steel pipe clamping device, including bottom Seat, the base top are welded with geometrical clamp, are connected with supporting rod on the left of the geometrical clamp, and the supporting rod is vertically connected on The base top, the supporting rod right side are equipped with sliding slot, and the sliding slot inner cavity is equipped with leading screw, and the leading screw bottom end is connected with axis It holds, and the bearing is fixed on the sliding slot intracavity bottom, the leading screw screw top is connected with sliding sleeve, and the sliding sleeve slides Movable folder is welded on the right side of the sliding slot inner cavity, the sliding sleeve in succession, activity folder top is equipped with rotating handle, and described Rotating handle is connected to the leading screw top, and being glued with activity folder bottom at the top of the geometrical clamp has wearing layer, described wear-resisting Steel pipe is equipped between layer, and the steel pipe is perpendicular to the pedestal and supporting rod, the supporting rod left vertical sets that there are two spiral shells Hole is connected with fixing bolt in the screw hole, and the fixing bolt is respectively positioned on above the geometrical clamp, and the pedestal both ends are equal Equipped with mounting hole, and the mounting hole extends vertically through the pedestal.
Further, the geometrical clamp is arc-shaped shape with activity folder inside, and the activity folder is located at the fixation Right over folder.
Further, the leading screw is vertically set on the sliding slot inner cavity, and the leading screw runs through the sliding sleeve.
Further,:The sliding sleeve is buckled in the sliding slot inner cavity, and the length of the sliding slot is equal to an activity folder left side The width at end.
Further, rotating handle shape in disk form, and the rotating handle center is connected to the leading screw top.
Further, the wear-resisting layer surface indention shape, and the wearing layer is made of synthetic rubber.
Further, the fixing bolt is on the left of the supporting rod, and the fixing bolt right end is movably connected in On the left of the sliding sleeve.
Compared with prior art, the utility model has the beneficial effects that:This kind of drilling well steel pipe clamping device, by device The many-sided of ontology improves, simple in structure, stable and firm, is easily installed, easy to operate, and steel pipe is accessed to reduce operation employee When labor intensity, improve working efficiency, enhance fix tightly solidity, by being provided with movable folder, activity folder and solid can be adjusted The distance of clamp increases accommodation, by being provided with wearing layer, can protect steel convenient for the steel pipe of clamping different size Injury-free, deformation is managed, prevents steel pipe from falling off, enhances crystallized ability, by being provided with leading screw and sliding sleeve, is convenient for flexible modulation, Manpower is saved, so this kind of drilling well steel pipe clamping device has wide application market.
Description of the drawings
Fig. 1 is the overall structure diagram of the utility model;
Fig. 2 is the overlooking structure diagram of the utility model;
Fig. 3 is the side structure schematic diagram of the utility model;
In figure:1- pedestals;2- geometrical clamps;3- supporting rods;4- sliding slots;5- leading screws;6- bearings;7- sliding sleeves;8- activities are pressed from both sides;9- Rotating handle;10- wearing layers;11- steel pipes;12- screw holes;13- fixing bolts;14- mounting holes.
Specific implementation mode
The utility model is further described With reference to embodiment, wherein being given for example only property of attached drawing Illustrate, expression is only schematic diagram rather than pictorial diagram, should not be understood as the limitation to this patent, in order to which this reality is better described With novel specific implementation mode, the certain components of attached drawing have omission, zoom in or out, and do not represent the size of actual product, It will be understood by those skilled in the art that the omitting of some known structures and their instructions in the attached drawings are understandable, it is based on this reality With the specific implementation mode in novel, institute obtained by those of ordinary skill in the art without making creative efforts There are other specific implementation modes, shall fall within the protection scope of the present invention.
- Fig. 3 is please referred to Fig.1, the utility model provides a kind of technical solution:A kind of drilling well steel pipe clamping device, including bottom Seat 1,1 top of the pedestal are welded with geometrical clamp 2, and 2 left side of the geometrical clamp is connected with supporting rod 3, and the supporting rod 3 is vertical It is connected to 1 top of the pedestal, 3 right side of the supporting rod is equipped with sliding slot 4, and 4 inner cavity of the sliding slot is equipped with leading screw 5, the leading screw 5 Bottom end is connected with bearing 6, and the bearing 6 is fixed on 4 intracavity bottom of the sliding slot, and 5 screw top of the leading screw is connected with cunning Set 7, and the sliding of the sliding sleeve 7, in succession in 4 inner cavity of the sliding slot, 7 right side of the sliding sleeve is welded with activity folder 8, the activity folder 8 Top is equipped with rotating handle 9, and the rotating handle 9 is connected to 5 top of the leading screw, 2 top of the geometrical clamp and activity folder 8 Bottom, which is glued, wearing layer 10, between the wearing layer 10 be equipped with steel pipe 11, and the steel pipe 11 perpendicular to the pedestal 1 with Supporting rod 3,3 left vertical of the supporting rod are set there are two screw hole 12, are connected with fixing bolt 13 in the screw hole 12, and described Fixing bolt 13 is respectively positioned on 2 top of the geometrical clamp, and 1 both ends of the pedestal are equipped with mounting hole 13, and the mounting hole 13 hangs down Directly run through the pedestal 1, the above constitutes the basic structure of the utility model.
More specifically, the geometrical clamp 2 is arc-shaped shape with 8 inside of movable folder, and the activity folder 8 is positioned at described Right over geometrical clamp 2, by being provided with the geometrical clamp 2 and activity folder 8, convenient for fixed steel pipe, the activity folder 8 can be adjusted At a distance from geometrical clamp 2, convenient for the steel pipe of clamping different size, accommodation is increased, the leading screw 5 is vertically set on described 4 inner cavity of sliding slot, and the leading screw 5 rotates the rotation hand through the sliding sleeve 7 by being provided with the leading screw 5 and sliding sleeve 7 Handle 9 so that leading screw 5 drives sliding sleeve 7 to move, and is convenient for flexible modulation, saves manpower, and the sliding sleeve 7 is buckled in the sliding slot 4 Chamber, and the length of the sliding slot 4 being capable of the company of fixation by being provided with the sliding sleeve 7 equal to the width of 8 left ends of the activity folder The activity folder 8 is connect, convenient for 8 movement of adjusting activity folder, 9 shape in disk form of the rotating handle, and 9 center of the rotating handle It is connected to 5 top of the leading screw, it is easy to operation by being provided with the rotating handle 9 so that clipping operation is easy and convenient, drop Low labor intensity, 10 surface indention shape of the wearing layer, and the wearing layer 10 is made of synthetic rubber, by being provided with The wearing layer 10, can protect steel pipe it is injury-free, deformation, prevent steel pipe from falling off, enhance crystallized ability, the fixing bolt 13 through 3 left side of the supporting rod, and 13 right end of the fixing bolt is movably connected in 7 left side of the sliding sleeve, by being provided with The fixing bolt 13 can be fixedly secured the sliding sleeve 7 so that clamping more firm stable.
Operation principle:This kind of drilling well steel pipe clamping device first disposes pedestal 1 in place when in use, and leads to It crosses mounting hole 14 to be fixed, then required steel pipe is placed on geometrical clamp 2, then by rotating rotating handle 9 so that silk Thick stick 5 drives sliding sleeve 7 to move so that and activity folder 8 closes up with geometrical clamp 2, and steel tube end part is fixed, after steel pipe is fixed, Then pass through the bolt 13 that is tightened, fixed activity folder 8 so that steel pipe fixation is more secured, by being provided with the resistance to of flexible material Layer 10 is ground, damage steel pipe can be prevented, enhance crystallized ability, by being provided with rotating handle 9 and leading screw 5, saving human resources, Improve working efficiency.
While there has been shown and described that specific embodiment of the present utility model, for those of ordinary skill in the art For, it is possible to understand that do not depart from the principles of the present invention and spirit in the case of, can to these specific implementation modes into The a variety of change, modification, replacement and modification of row, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (7)

1. a kind of drilling well steel pipe (11) clamping device, including pedestal (1), it is characterised in that:It is welded at the top of the pedestal (1) solid Clamp (2), geometrical clamp (2) left side is connected with supporting rod (3), and the supporting rod (3) is vertically connected on the pedestal (1) Top, supporting rod (3) right side are equipped with sliding slot (4), and sliding slot (4) inner cavity is equipped with leading screw (5), leading screw (5) bottom end It is connected with bearing (6), and the bearing (6) is fixed on the sliding slot (4) intracavity bottom, leading screw (5) the screw top connection There is sliding sleeve (7), and the sliding sleeve (7) sliding is welded with movable folder on the right side of the sliding slot (4) inner cavity, the sliding sleeve (7) in succession (8), it is equipped with rotating handle (9) above the activity folder (8), and the rotating handle (9) is connected to the leading screw (5) top, Being glued with activity folder (8) bottom at the top of the geometrical clamp (2) has wearing layer (10), and steel pipe is equipped between the wearing layer (10) (11), and the steel pipe (11) is perpendicular to the pedestal (1) and supporting rod (3), there are two supporting rod (3) left vertical is set Screw hole (12), the screw hole (12) is interior to be connected with fixing bolt (13), and the fixing bolt (13) is respectively positioned on the geometrical clamp (2) top, pedestal (1) both ends are equipped with mounting hole (14), and the mounting hole (14) extends vertically through the pedestal (1).
2. a kind of drilling well steel pipe (11) clamping device according to claim 1, it is characterised in that:The geometrical clamp (2) with Shape is arc-shaped on the inside of activity folder (8), and the activity folder (8) is located at right over the geometrical clamp (2).
3. a kind of drilling well steel pipe (11) clamping device according to claim 1, it is characterised in that:The leading screw (5) is vertical Setting is in the sliding slot (4) inner cavity, and the leading screw (5) runs through the sliding sleeve (7).
4. a kind of drilling well steel pipe (11) clamping device according to claim 1, it is characterised in that:Sliding sleeve (7) buckle In the sliding slot (4) inner cavity, and the length of the sliding slot (4) is equal to the width that (8) left end is pressed from both sides in the activity.
5. a kind of drilling well steel pipe (11) clamping device according to claim 1, it is characterised in that:The rotating handle (9) Shape in disk form, and the rotating handle (9) center is connected to the leading screw (5) top.
6. a kind of drilling well steel pipe (11) clamping device according to claim 1, it is characterised in that:Wearing layer (10) table Face indention shape, and the wearing layer (10) is made of synthetic rubber.
7. a kind of drilling well steel pipe (11) clamping device according to claim 1, it is characterised in that:The fixing bolt (13) On the left of the supporting rod (3), and the fixing bolt (13) right end is movably connected on the left of the sliding sleeve (7).
CN201721313907.9U 2017-10-12 2017-10-12 A kind of drilling well steel pipe clamping device Active CN207660562U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721313907.9U CN207660562U (en) 2017-10-12 2017-10-12 A kind of drilling well steel pipe clamping device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721313907.9U CN207660562U (en) 2017-10-12 2017-10-12 A kind of drilling well steel pipe clamping device

Publications (1)

Publication Number Publication Date
CN207660562U true CN207660562U (en) 2018-07-27

Family

ID=62937172

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721313907.9U Active CN207660562U (en) 2017-10-12 2017-10-12 A kind of drilling well steel pipe clamping device

Country Status (1)

Country Link
CN (1) CN207660562U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109095411A (en) * 2018-08-24 2018-12-28 杨喜兰 A kind of interior eminence erector's acting device
CN109606422A (en) * 2019-02-18 2019-04-12 中国铁路沈阳局集团有限公司科学技术研究所 A kind of passenger train water-feeding mechanical arm
CN112539039A (en) * 2020-11-27 2021-03-23 中石化石油机械股份有限公司研究院 Top drive lower casing sealing device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109095411A (en) * 2018-08-24 2018-12-28 杨喜兰 A kind of interior eminence erector's acting device
CN109606422A (en) * 2019-02-18 2019-04-12 中国铁路沈阳局集团有限公司科学技术研究所 A kind of passenger train water-feeding mechanical arm
CN112539039A (en) * 2020-11-27 2021-03-23 中石化石油机械股份有限公司研究院 Top drive lower casing sealing device

Similar Documents

Publication Publication Date Title
CN207660562U (en) A kind of drilling well steel pipe clamping device
CN207727589U (en) Internal support of foundation pit device
CN209083227U (en) A kind of geological mapping device that geotechnical engineering stability is high
CN205057654U (en) Recovery unit of bench drill drill chip
CN206112253U (en) Earth source heat pump ground pipe laying low tube device
CN209016567U (en) A kind of assembly type cable bearer
CN103046874B (en) Underground drill rig and supporting device thereof
CN209799916U (en) Oil field is fishing device in pit
CN207053150U (en) A kind of adjustable electric power support
CN207608901U (en) A kind of pricker for building lot visits device
CN215930909U (en) Novel measuring apparatu for civil engineering
CN109812118B (en) Power line pole ball cage fixing device
CN205165660U (en) Novel preparation of acting as go -between device
CN209727114U (en) A kind of embedding device for surveying convergence measuring point for tunnel
CN109540099B (en) Inclinometer
CN207743630U (en) For cable protection pipe downward putting device
CN219282596U (en) Petroleum pipeline supports fixed equipment in petroleum engineering field
CN220510455U (en) Novel lightning rod of drilling tower
CN219261342U (en) Corner overhanging structure
CN221119856U (en) Drilling device
CN214621814U (en) Deep soil body drilling device for geological engineering investigation
CN221142669U (en) Ecological slope protection supporting device for hydraulic engineering
CN204313824U (en) Horizontal double-deformation monitoring system
CN215761526U (en) Combined type drill frame structure applied to multiple environments
CN215820151U (en) Drawing device for civil engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200311

Address after: 045000 Huangshi board, No.1 mine, Yangquan mining area, Yangquan City, Shanxi Province

Patentee after: Shanxi Guangxin Machinery Manufacturing Co., Ltd

Address before: 318001 Taizhou District, Zhejiang, Jiaojiang District Road No. 306

Patentee before: Xu Huan