CN211338697U - Loading device for PE inspection well - Google Patents
Loading device for PE inspection well Download PDFInfo
- Publication number
- CN211338697U CN211338697U CN201921351528.8U CN201921351528U CN211338697U CN 211338697 U CN211338697 U CN 211338697U CN 201921351528 U CN201921351528 U CN 201921351528U CN 211338697 U CN211338697 U CN 211338697U
- Authority
- CN
- China
- Prior art keywords
- fixed mounting
- chain
- inspection shaft
- loading
- loading device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model discloses a loading device for PE inspection shaft, which comprises a supporting column, the equal fixed mounting in both sides of support column has spacing dish, the equal fixed mounting in the outside of support column has the mounting panel, the bottom fixed mounting of mounting panel has the connection rope, the equal fixed mounting in bottom both ends of connecting the rope has the connection chain, the equal fixed mounting in bottom of connecting the chain has the binding chain. This a loading device for PE inspection shaft, can be at PE inspection shaft loading in-process, cup joint the device of two the same model specifications on fork truck through the go-between, then encircle the both sides face relative with the inspection shaft of binding the chain of two devices and hug closely, can be according to the specification needs of actual inspection shaft, bind the chain through the snap ring and carry out the real-time regulation of mutual hook distance with two, make the device can carry out the loading work of the inspection shaft of different model specifications, the overall efficiency of loading has been improved, the use restriction nature of device has been reduced.
Description
Technical Field
The utility model relates to an inspection shaft auxiliary device technical field specifically is a loading device for PE inspection shaft.
Background
The inspection well is used for maintaining power supply, water supply, drainage, pollution discharge, communication, cable television, gas pipes, street lamp lines and the like of urban underground infrastructure, is convenient to install, is generally arranged at a pipeline intersection, a turning part, a pipe diameter or gradient changing part and a straight pipe section at a certain distance, is convenient for regularly inspecting auxiliary structures, is a PE inspection well which is widely applied, and needs to be loaded in a centralized manner in the installation and transportation process.
The existing PE inspection wells are loaded manually, and the height and the width of each inspection well exceed the height of a human body, so that the PE inspection wells are inconvenient to load and low in working efficiency.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a loading device for PE inspection shaft to solve the current PE inspection shaft that proposes in the above-mentioned background art and all come the loading by the manual work, because the height and the width of inspection shaft all exceed human height, all are very inconvenient in the loading, work efficiency is not high problem moreover yet.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a loading device for PE inspection shaft, includes the support column, the both sides of support column all fixed mounting have spacing dish, the outside all fixed mounting of support column has the mounting panel, the bottom fixed mounting of mounting panel has the connection rope, the bottom both ends all fixed mounting of connection rope has the connection chain, the bottom all fixed mounting of connection chain has the binding chain, the both ends all fixed mounting of binding chain has the snap ring, the top fixed mounting of spacing dish has the go-between, the top both sides all fixed mounting of go-between has the mounting plate.
Preferably, the surface of the fastening plate is provided with threaded holes, and the inner sides of the threaded holes are movably inserted with locking bolts.
Preferably, one end of the locking bolt is fixedly provided with a knob, and the surface of the knob is provided with anti-skid grains.
Preferably, the connecting ring and the clamping ring are formed by movably connecting a fixed semi-arc ring and a movable semi-arc ring through a rotating shaft.
Preferably, one end of the fixed semi-arc ring and one end of the movable semi-arc ring are provided with movable openings.
Preferably, the connecting rope is made of a steel wire rope with toughness.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses a go-between, the mounting plate, spacing dish, connect the rope, connect the chain, bind reasonable cooperation between chain and the snap ring and use, can be at PE inspection shaft loading in-process, cup joint the device of two the same model specifications on fork truck through the go-between, and it is fixed to lock through mounting plate and fitting pin, then encircle the relative both sides face of binding chain and inspection shaft with two devices and hug closely, can be according to the specification needs of actual inspection shaft, bind two chain through the snap ring and carry out the real-time regulation of mutual hook distance, make the device can carry out the loading work of the inspection shaft of different model specifications, it can to promote the loading through fork truck at last, the whole efficiency of loading has been improved, the use restriction of device has been reduced.
Drawings
Fig. 1 is a front perspective view of the present invention;
FIG. 2 is a schematic structural view of the connection ring portion of the present invention;
fig. 3 is a side view of the present invention;
fig. 4 is a schematic view of the structure of the connection rope portion of the present invention.
In the figure: 1. a locking bolt; 2. a threaded hole; 3. a movable semi-arc ring; 4. a rotating shaft; 5. a support pillar; 6. Binding a chain; 7. a snap ring; 8. connecting a chain; 9. connecting ropes; 10. a limiting disc; 11. a connecting ring; 12. a knob; 13. a fastening plate; 14. a movable opening; 15. mounting a plate; 16. and fixing the half-arc ring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a loading device for a PE inspection well comprises a support column 5, wherein both sides of the support column 5 are fixedly provided with a limiting disc 10, the outer side of the support column 5 is fixedly provided with a mounting plate 15, the bottom of the mounting plate 15 is fixedly provided with a connecting rope 9, both ends of the bottom of the connecting rope 9 are fixedly provided with connecting lock chains 8, the bottom ends of the connecting lock chains 8 are fixedly provided with binding lock chains 6, both ends of the binding lock chains 6 are fixedly provided with snap rings 7, the top of the limiting disc 10 is fixedly provided with a connecting ring 11, both sides of the top of the connecting ring 11 are fixedly provided with fastening plates 13, in the loading process of the PE inspection well, two devices with the same model and specification are sleeved on a forklift through the connecting ring 11 and are locked and fixed through the fastening plates 13 and the locking bolts 1, and then the binding lock chains 6 of the two devices are closely attached to two opposite side faces of the, can be according to the specification needs of actual inspection shaft, bind chain 6 through snap ring 7 and carry out the real-time regulation of mutual hook distance with two, make the device can carry out the loading work of the inspection shaft of different model specifications, promote the loading through fork truck at last can, improved the overall efficiency of loading, reduced the use restriction of device.
The utility model discloses in: threaded hole 2 has all been seted up on the surface of mounting plate 13, and the inboard of threaded hole 2 is all the activity pegs graft and is had the fitting pin 1, can make the device fix more firm with fork truck, prevents that the loading in-process from taking place to drop.
The utility model discloses in: one end fixed mounting of fitting bolt 1 has knob 12, and the surface of knob 12 is provided with anti-skidding line, can make the wrench movement in-process more laborsaving.
The utility model discloses in: the connecting ring 11 and the clamping ring 7 are formed by movably connecting the fixed half-arc ring 16 and the movable half-arc ring 3 through the rotating shaft 4, so that the connecting ring 11 and the clamping ring 7 can be opened and closed in real time to be connected with each other, and the inspection well is fixed.
The utility model discloses in: one end of the fixed semi-arc ring 16 and one end of the movable semi-arc ring 3 are provided with movable openings 14, which can facilitate the real-time opening and the mutual inserting and clamping of the chain.
The utility model discloses in: the connecting rope 9 is made of a steel wire rope with toughness, so that the device can hoist a plurality of inspection wells, and fracture caused by overlarge weight is avoided.
The working principle is as follows: need examine this inspection shaft before using this inspection shaft, whether each part of inspection is intact, the rear that finishes of the inspection can be used, when inspection shaft transportation loading work is carried out to needs, at first accessible go-between 11 cup joints the device of two the same model specifications on fork truck, and lock fixedly through mounting plate 13 and fitting pin 1, then encircle the relative both sides face of binding chain 6 and inspection shaft of two devices and hug closely, can be according to the specification needs of actual inspection shaft, bind chain 6 with two through snap ring 7 and carry out the real-time regulation of mutual hook distance, make the device can carry out the loading work of the inspection shaft of different model specifications, it can to promote the loading through fork truck at last, the bulk efficiency of loading has been improved, the use restriction of device has been reduced.
In summary, the following steps: the utility model discloses a go-between 11, the mounting plate 13, spacing dish 10, connect rope 9, connect the chain 8, bind the reasonable cooperation use between chain 6 and the snap ring 7, can be at PE inspection shaft loading in-process, cup joint the device of two the same model specifications on fork truck through go-between 11, and lock fixedly through mounting plate 13 and fitting pin 1, then encircle the relative both sides face of binding chain 6 and inspection shaft of two devices and hug closely, can be according to the specification needs of actual inspection shaft, bind chain 6 through snap ring 7 and carry out the real-time regulation of mutual hook distance, make the device can carry out the loading work of the inspection shaft of different model specifications, it can to promote the loading through fork truck at last, the whole efficiency of loading has been improved, the use restriction nature of device has been reduced.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a loading device for PE inspection shaft, includes support column (5), its characterized in that: the utility model discloses a spacing dish of fixing device, including support column (5), the both sides of support column (5) are all fixed mounting have spacing dish (10), the outside of support column (5) is all fixed mounting have mounting panel (15), the bottom fixed mounting of mounting panel (15) has connection rope (9), the bottom both ends of connecting rope (9) are all fixed mounting have connection chain (8), the bottom of connecting chain (8) is all fixed mounting have bindes chain (6), the both ends of binding chain (6) are all fixed mounting have snap ring (7), the top fixed mounting of spacing dish (10) has go-between (11), the top both sides of go-between (11) are all fixed mounting have mounting plate (13).
2. The loading device for the PE inspection well, as recited in claim 1, is characterized in that: the surface of the fastening plate (13) is provided with threaded holes (2), and the inner sides of the threaded holes (2) are movably inserted with locking bolts (1).
3. The loading device for the PE inspection well, as recited in claim 2, is characterized in that: one end fixed mounting of locking bolt (1) has knob (12), and the surface of knob (12) is provided with anti-skidding line.
4. The loading device for the PE inspection well, as recited in claim 1, is characterized in that: the connecting ring (11) and the clamping ring (7) are formed by movably connecting a fixed semi-arc ring (16) and a movable semi-arc ring (3) through a rotating shaft (4).
5. The loading device for the PE inspection well, as claimed in claim 4, wherein: one ends of the fixed semi-arc ring (16) and the movable semi-arc ring (3) are provided with movable openings (14).
6. The loading device for the PE inspection well, as recited in claim 1, is characterized in that: the connecting rope (9) is made of a steel wire rope with toughness.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921351528.8U CN211338697U (en) | 2019-08-20 | 2019-08-20 | Loading device for PE inspection well |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921351528.8U CN211338697U (en) | 2019-08-20 | 2019-08-20 | Loading device for PE inspection well |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211338697U true CN211338697U (en) | 2020-08-25 |
Family
ID=72135798
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921351528.8U Active CN211338697U (en) | 2019-08-20 | 2019-08-20 | Loading device for PE inspection well |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211338697U (en) |
-
2019
- 2019-08-20 CN CN201921351528.8U patent/CN211338697U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109987546B (en) | Self-propelled pipeline transportation installation vehicle in corridor and construction method thereof | |
CN211338697U (en) | Loading device for PE inspection well | |
CN201793312U (en) | Auxiliary device for overturning large articles with end flanges | |
CN213027206U (en) | Electric overhead ground wire lifting device | |
CN211735679U (en) | Urban sewage pipeline treatment device | |
CN211521328U (en) | Fixing device for ash sliding pipe of deep shaft | |
CN210127045U (en) | Movable hanging bracket for offshore platform | |
CN204609267U (en) | A kind of suspension bracket for tank inside construction | |
JP2514314Y2 (en) | Suspension equipment for mountain retaining materials | |
CN220864018U (en) | Hanging belt storage vehicle for power station | |
CN218708534U (en) | Pipeline moving mechanism | |
CN111891941A (en) | Municipal works construction carrier that lifts by crane | |
CN214530777U (en) | Utility tunnel suitable for longitudinal slope | |
CN109626204B (en) | Tail sliding lifting appliance of tower drum | |
CN213534772U (en) | High-strength double-wall corrugated pipe allocation and transportation device | |
CN219078836U (en) | Porous type round pipe culvert high-efficiency safe hoisting device | |
CN220904985U (en) | Curbstone transfer device | |
CN212151391U (en) | Curb transports hoist and mount integrated device | |
CN209758217U (en) | Material lifting device | |
CN210103355U (en) | Hoisting device | |
CN219585700U (en) | Water conservancy pipeline promotes transportation equipment | |
CN214028789U (en) | Pipe transportation equipment for building construction | |
CN109552985A (en) | A kind of Combined fixture and application method for being transported in narrow space | |
RU159479U1 (en) | DOMESTIC COVERAGE | |
CN212289938U (en) | Building material transfer device that building engineering used |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220218 Address after: 750101 Room 201, office building of Ningxia saile Building System Co., Ltd., Hongqi Road, Wangyuan Industrial Park, Yongning County, Yinchuan City, Ningxia Hui Autonomous Region Patentee after: Ningxia Luchuan Technology Co.,Ltd. Address before: 750101 1249km away from 109 National Road, Wangyuan Industrial Park, Yongning County, Yinchuan City, Ningxia Hui Autonomous Region Patentee before: YINCHUAN CHUANYU WATER-SAVING IRRIGATION CO.,LTD. |
|
TR01 | Transfer of patent right |