CN211336809U - Pipeline spare arrangement frame for building engineering - Google Patents

Pipeline spare arrangement frame for building engineering Download PDF

Info

Publication number
CN211336809U
CN211336809U CN201921992163.7U CN201921992163U CN211336809U CN 211336809 U CN211336809 U CN 211336809U CN 201921992163 U CN201921992163 U CN 201921992163U CN 211336809 U CN211336809 U CN 211336809U
Authority
CN
China
Prior art keywords
fixedly connected
side wall
collecting
base
outer side
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921992163.7U
Other languages
Chinese (zh)
Inventor
顾海明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kuang Jianhua
Kuang Xiaoyong
Sichuan Xingxing Construction Group Co ltd
Original Assignee
Shen Yiyi
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shen Yiyi filed Critical Shen Yiyi
Priority to CN201921992163.7U priority Critical patent/CN211336809U/en
Application granted granted Critical
Publication of CN211336809U publication Critical patent/CN211336809U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a pipeline spare arrangement frame for building engineering, the on-line screen storage device comprises a base, the top fixedly connected with stand of base, the top fixedly connected with of stand is the collecting box that the opening set up, many support columns of top fixedly connected with of base, many the top fixedly connected with of support column is same to be and runs through the section of thick bamboo of placing of setting from top to bottom, the inside sliding connection who places a section of thick bamboo has a first filter screen, the bottom of first filter screen is passed through coupling mechanism and is connected with the top of base, place two inside wall fixedly connected with of a section of thick bamboo and place the board. The utility model discloses, when using, remaining pipeline spare is longer after the cutting, can insert the through hole of placing on the board, deposits to placing in the bucket, and the pipeline spare of medium or short length on the contrary can be put into first collecting vessel or second collecting vessel respectively in, need not many belt collection device again, has also effectively improved constructor's work efficiency when lightening constructor work burden.

Description

Pipeline spare arrangement frame for building engineering
Technical Field
The utility model relates to a building engineering technical field especially relates to a pipeline spare arrangement frame for building engineering.
Background
In building engineering's work progress, often can use various pipeline spares, constructor utilizes instruments such as cutting knife to cut the pipeline into required length according to job site's needs, and surplus length pipeline spare most can directly pile up on ground, therefore need utilize pipeline spare finishing device to collect the arrangement to this part's pipeline, makes things convenient for subsequent use.
Present pipeline spare arrangement frame, most are to not cutting or longer pipeline arrange in order yet, and the part after the cutting often is short therefore can't place on current arrangement frame, and constructor when arranging the pipeline, often need many other collection devices to collect the arrangement to shorter pipeline again, has increased constructor's burden, simultaneously greatly reduced constructor's work efficiency.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem existing in the prior art and providing a pipeline piece arrangement frame for building engineering.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a pipeline spare arrangement frame for building engineering, includes the base, the top fixedly connected with stand of base, the top fixedly connected with of stand is the collecting box that the opening set up, many support columns of top fixedly connected with of base the top fixedly connected with of support column is same to run through the section of thick bamboo of placing that sets up from top to bottom, the inside sliding connection who places a section of thick bamboo has first filter screen, coupling mechanism is passed through to the bottom of first filter screen and the top of base is connected, two inside wall fixedly connected with of placing a section of thick bamboo place the board, the top of placing the board is seted up a plurality of through holes that are align to grid, the inside wall fixedly connected with rubber pad of through hole, the lateral wall of stand is connected with collection.
Preferably, the top outer side wall of the collecting box is hinged with a box cover, and the outer side wall of the collecting box is fixedly connected with a push handle.
Preferably, coupling mechanism includes many first telescopic links with first filter screen bottom fixed connection, the lateral wall cover of first telescopic link is equipped with first spring, the both ends of first spring respectively with the bottom of first filter screen and the top fixed connection of base.
Preferably, the collection device includes the first surge drum with stand lateral wall fixed connection, the lateral wall sliding connection of stand has a plurality of second surge drums, the spout that corresponds with the second surge drum is seted up to the lateral wall of stand, the lateral wall of second surge drum passes through the inserted bar and is connected with the inside wall of spout, the bottom fixedly connected with of second surge drum is the picture peg of U type, the slot that corresponds with the picture peg is all seted up at the top of second surge drum and first surge drum.
Preferably, the through-hole has all been seted up to the bottom of first chimney and second chimney, the interior bottom fixedly connected with baffle of through-hole, the mounting groove has all been seted up to the inside wall about first chimney and second chimney, the inside wall fixedly connected with second telescopic link of mounting groove is located same horizontal position two the same second filter screen of top fixedly connected with of second telescopic link, the lateral wall cover of second telescopic link is equipped with the second spring, the both ends of second spring respectively with the bottom of second filter screen and the inside wall fixed connection of mounting groove.
Preferably, the bottom of the base is fixedly connected with four locking universal wheels.
The utility model has the advantages that:
1. when using, through placing mutually supporting between a section of thick bamboo, the first collecting vessel, the second collecting vessel, remaining pipeline spare is longer after the cutting, can insert the through-hole of placing on the board, deposit to placing in the bucket, in the pipeline spare of medium or short length partially, can put into first collecting vessel or second collecting vessel respectively, need not many more and takes collection device again, also effectively improved constructor's work efficiency when lightening constructor work burden.
2. Utilize first telescopic link, first spring, second telescopic link and second spring, can play good shock attenuation to collecting the pipeline spare in placing a section of thick bamboo, first collecting vessel and second collecting vessel and use most, prevent to cause the damage at base round trip movement's in-process to the pipeline spare.
Drawings
Fig. 1 is a schematic structural view of a pipe fitting tidying frame for construction engineering according to the present invention;
fig. 2 is a schematic view of an internal structure of a second collecting cylinder in the pipe fitting tidying frame for construction engineering provided by the utility model;
fig. 3 is a top view of a second collecting cylinder in the pipe fitting tidying frame for construction engineering according to the present invention;
fig. 4 is the utility model provides a structural schematic of place board in pipeline spare arrangement frame for building engineering.
In the figure: the automatic feeding device comprises a base 1, a stand column 2, a collecting box 3, a supporting column 4, a placing barrel 5, a first filter screen 6, a placing plate 7, a rubber pad 8, a box cover 9, a pushing handle 10, a first telescopic rod 11, a first spring 12, a first collecting barrel 13, a second collecting barrel 14, an inserting rod 15, an inserting plate 16, a slot 17, a second telescopic rod 18, a second filter screen 19, a second spring 20, a locking universal wheel 21, a locking universal wheel 22, a through hole 23 and a partition plate 23.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-4, a pipeline piece arranging frame for building engineering comprises a base 1, a vertical column 2 is fixedly connected to the top of the base 1, a collecting box 3 with an opening is fixedly connected to the top of the vertical column 2, a box cover 9 is hinged to the outer side wall of the top of the collecting box 3, a pushing handle 10 is fixedly connected to the outer side wall of the collecting box 3, a plurality of supporting columns 4 are fixedly connected to the top of the base 1, a placing cylinder 5 with an upper part and a lower part penetrating through is fixedly connected to the tops of the supporting columns 4, a first filter screen 6 is slidably connected to the inside of the placing cylinder 5, the bottom of the first filter screen 6 is connected to the top of the base 1 through a connecting mechanism, the connecting mechanism comprises a plurality of first telescopic rods 11 fixedly connected to the bottom of the first filter screen 6, a first spring 12 is sleeved on the outer side wall of the first telescopic rods 11, and two, the inner side wall of the placing cylinder 5 is fixedly connected with two placing plates 7, the top of each placing plate 7 is provided with a plurality of uniformly arranged through holes 22, and the inner side wall of each through hole 22 is fixedly connected with a rubber pad 8;
it should be noted that: the collecting box 3 is used for collecting small objects such as short pipeline pieces or unused pipeline connecting pieces in the construction process; first telescopic link 11 and the cooperation of first spring 12 can play good cushioning effect to the pipeline spare that is located on first filter screen 6, and rubber pad 8 prevents that base 1 from causing the damage to the pipeline spare with through hole 22 collision at the removal in-process pipeline spare.
Wherein, the outer side wall of the upright post 2 is connected with a collecting device, the collecting device comprises a first collecting cylinder 13 fixedly connected with the outer side wall of the upright post 2, the outer side wall of the upright post 2 is connected with a plurality of second collecting cylinders 14 in a sliding way, the outer side wall of the upright post 2 is provided with a sliding chute corresponding to the second collecting cylinder 14, the outer side wall of the second collecting cylinder 14 is connected with the inner side wall of the sliding chute through an inserting rod 15, the bottom of the second collecting cylinder 14 is fixedly connected with a U-shaped inserting plate 16, the top of the second collecting cylinder 14 and the top of the first collecting cylinder 13 are both provided with inserting grooves 17 corresponding to the inserting plate 16, the bottom of the first collecting cylinder 13 and the bottom of the second collecting cylinder 14 are both provided with through holes, the inner bottom of the through holes are fixedly connected with a clapboard 23, the left inner side wall and the right inner side wall of the first collecting cylinder 13 and the second collecting cylinder 14 are both provided with mounting grooves, the inner, a second spring 20 is sleeved on the outer side wall of the second telescopic rod 18, two ends of the second spring 20 are fixedly connected with the bottom of the second filter screen 19 and the inner side wall of the mounting groove respectively, and four locking universal wheels 21 are fixedly connected with the bottom of the base 1;
it should be noted that: the side walls of the second collecting cylinder 14 and the upright post 2 are respectively provided with a jack corresponding to the inserted rod 15, the inserted rod 15 penetrates through the two jacks, the inserted rod 15 is made of an iron material, the inner side wall of each jack is fixedly connected with a magnet (not shown in the figure), the magnet is utilized to strengthen the connection relation between the inserted rod 15 and the jack, so that the second collecting cylinder 14 is more tightly connected with the upright post 2, the first filter screen 6 and the second filter screen 19 are both arranged in a grid shape, and dust on a pipeline piece is prevented from being accumulated in the placing cylinder 5, the first collecting cylinder 13 and the second collecting cylinder 14; the insertion plate 16 prevents the pipeline pieces in the first collecting cylinder 13 and the second collecting cylinder 14 which are positioned at the lower part from falling off in the moving process of the base 1, and when attention needs to be paid, the insertion plate 16 is not arranged above the second collecting cylinder 14 which is positioned at the top part, so that the pipeline pieces are not easy to overfill when the pipeline pieces are loaded into the second collecting cylinder 14 at the top part, and the pipeline pieces are prevented from falling off; the locking universal wheel 21 is the prior art and will not be described in detail herein; the partition 23 is used for receiving dust in the first collecting cylinder 13 and the second collecting cylinder 14.
In the utility model, when the residual pipeline pieces after installation need to be collected and sorted, the pushing handle 10 is utilized to move the device to the position near the pipeline pieces, longer pipeline pieces in the device are sequentially inserted into the through holes 22 on the two placing plates 7, the longer pipeline is vertically placed, and the occupied area of the device is effectively reduced when the device is convenient to collect and sort;
and then manually distinguishing the lengths of the rest pipeline pieces, putting the pipeline pieces with similar lengths into the same first collecting cylinder 13 or second collecting cylinder 14, when a pipeline piece is loaded into a first collecting cylinder 13 or a second collecting cylinder 14 positioned below, an inserting rod 15 on the second collecting cylinder 14 positioned above is pulled out, the second collecting cylinder 14 is moved to the upper side and is fixed by the inserting rod 15 again, then the pipeline piece is loaded into the first collecting cylinder 13 or the second collecting cylinder 14 positioned below, after the pipeline piece is filled, the inserting rod 15 is pulled out again to enable the second collecting cylinder 14 positioned above to move downwards so that an inserting plate 16 is inserted into a slot 17 to prevent the loaded pipeline piece from falling, and a second telescopic rod 18 is matched with a second spring 20, the pipeline piece in the first collecting cylinder 13 or the second collecting cylinder 14 can be effectively and well damped, and the pipeline piece is prevented from being damaged in the moving process of the device.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The pipeline piece arranging frame for the building engineering comprises a base (1) and is characterized in that a stand column (2) is fixedly connected to the top of the base (1), a collecting box (3) with an opening is fixedly connected to the top of the stand column (2), a plurality of supporting columns (4) are fixedly connected to the top of the base (1), a same placing cylinder (5) which penetrates through the supporting columns from top to bottom is fixedly connected to the top of the supporting columns (4), a first filter screen (6) is connected to the inside of the placing cylinder (5) in a sliding mode, the bottom of the first filter screen (6) is connected to the top of the base (1) through a connecting mechanism, two placing plates (7) are fixedly connected to the inner side wall of the placing cylinder (5), a plurality of uniformly-arranged through holes (22) are formed in the top of the placing plates (7), and rubber pads (8) are fixedly connected to the inner side wall of the, the outer side wall of the upright post (2) is connected with a collecting device.
2. The pipe piece tidying frame for construction engineering according to claim 1, characterized in that the top outer side wall of the collecting box (3) is hinged with a box cover (9), and the outer side wall of the collecting box (3) is fixedly connected with a push handle (10).
3. The pipe fitting tidying frame for the building engineering according to claim 1, characterized in that the connecting mechanism comprises a plurality of first telescopic rods (11) fixedly connected with the bottom of the first filter screen (6), the outer side wall of the first telescopic rods (11) is sleeved with a first spring (12), and two ends of the first spring (12) are respectively fixedly connected with the bottom of the first filter screen (6) and the top of the base (1).
4. The pipe fitting tidying frame for the building engineering according to claim 1, characterized in that, the collecting device includes a first collecting barrel (13) fixedly connected with the outer side wall of the upright column (2), the outer side wall of the upright column (2) is slidably connected with a plurality of second collecting barrels (14), the outer side wall of the upright column (2) is provided with a chute corresponding to the second collecting barrel (14), the outer side wall of the second collecting barrel (14) is connected with the inner side wall of the chute through an inserting rod (15), the bottom of the second collecting barrel (14) is fixedly connected with a U-shaped inserting plate (16), and the tops of the second collecting barrel (14) and the first collecting barrel (13) are provided with inserting grooves (17) corresponding to the inserting plate (16).
5. The pipe fitting tidying frame for the building engineering according to claim 4, characterized in that through holes are opened at the bottoms of the first collecting cylinder (13) and the second collecting cylinder (14), a partition plate (23) is fixedly connected to the inner bottom of each through hole, mounting grooves are opened on the left and right inner side walls of the first collecting cylinder (13) and the second collecting cylinder (14), a second telescopic rod (18) is fixedly connected to the inner side wall of each mounting groove, two second telescopic rods (18) located on the same horizontal position are fixedly connected to the top of each second telescopic rod (18) through the same second filter screen (19), a second spring (20) is sleeved on the outer side wall of each second telescopic rod (18), and the two ends of each second spring (20) are respectively fixedly connected with the bottom of each second filter screen (19) and the inner side wall of each mounting groove.
6. The pipe fitting tidying frame for construction engineering according to claim 1, characterized in that four locking universal wheels (21) are fixedly connected to the bottom of the base (1).
CN201921992163.7U 2019-11-19 2019-11-19 Pipeline spare arrangement frame for building engineering Expired - Fee Related CN211336809U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921992163.7U CN211336809U (en) 2019-11-19 2019-11-19 Pipeline spare arrangement frame for building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921992163.7U CN211336809U (en) 2019-11-19 2019-11-19 Pipeline spare arrangement frame for building engineering

Publications (1)

Publication Number Publication Date
CN211336809U true CN211336809U (en) 2020-08-25

Family

ID=72136471

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921992163.7U Expired - Fee Related CN211336809U (en) 2019-11-19 2019-11-19 Pipeline spare arrangement frame for building engineering

Country Status (1)

Country Link
CN (1) CN211336809U (en)

Similar Documents

Publication Publication Date Title
CN211336809U (en) Pipeline spare arrangement frame for building engineering
CN208705076U (en) A kind of Portable soil sample storage device
CN210475302U (en) Aggregate device of bar shearing machine
CN213263288U (en) Agricultural apparatus rack
CN210122344U (en) Tool for moving in horizontal equipment frame
CN210364963U (en) Efficient aerated building block transfer equipment
CN210914655U (en) Braided bag production line pile up neatly mechanism
CN215087285U (en) Multifunctional appliance placing frame for geotechnical test
CN220466293U (en) Concrete test piece strorage device
CN220164589U (en) Flying probe tester base
CN213405316U (en) Forest resource information management platform
CN216229348U (en) Multifunctional tool car for carrying lawn
CN217299063U (en) Ground detects uses large-scale umbrella stand platform
CN213411493U (en) Part polishing operation table for mechanical manufacturing
CN212801418U (en) Water conservancy slope protection construction is with stone cage ware of drawing limit
CN220059177U (en) Fence convenient to fix
CN214551948U (en) Dust bag supporting device for environment-friendly dust removing equipment
CN209883634U (en) Pull type goods shelf convenient for goods storage and taking
CN218401565U (en) Access arrangement that electric power safety tool used
CN211902329U (en) Gearbox oil drain frock
CN210285454U (en) Garbage classification recycling bin
CN213565075U (en) Accounting bill binding means
CN209889787U (en) Device is put with a line section of thick bamboo to copper wire production
CN218199722U (en) Particle test measuring cylinder placing rack
CN217541180U (en) Get and put convenient refrigeration cabinet

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220221

Address after: 638600 No. 22, Jixiang street, Huaying City, Guang'an City, Sichuan Province

Patentee after: Kuang Jianhua

Patentee after: Kuang Xiaoyong

Address before: 313217 No.8, huangnitan, Xiashe village, Xin'an Town, Deqing County, Huzhou City, Zhejiang Province

Patentee before: Shen Yiyi

Effective date of registration: 20220221

Address after: 638699 No. 28 Qushui Road, Huaying City, Guang'an City, Sichuan Province

Patentee after: Sichuan Xingxing Construction Group Co.,Ltd.

Address before: 638600 No. 22, Jixiang street, Huaying City, Guang'an City, Sichuan Province

Patentee before: Kuang Jianhua

Patentee before: Kuang Xiaoyong

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200825