CN211331993U - Raw material welding equipment for processing metal building materials - Google Patents

Raw material welding equipment for processing metal building materials Download PDF

Info

Publication number
CN211331993U
CN211331993U CN201922407674.4U CN201922407674U CN211331993U CN 211331993 U CN211331993 U CN 211331993U CN 201922407674 U CN201922407674 U CN 201922407674U CN 211331993 U CN211331993 U CN 211331993U
Authority
CN
China
Prior art keywords
electric telescopic
raw materials
welding
building material
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922407674.4U
Other languages
Chinese (zh)
Inventor
徐勇
陈文斌
方莹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Tianhong Building Materials Co ltd
Original Assignee
Henan Tianhong Building Materials Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Tianhong Building Materials Co ltd filed Critical Henan Tianhong Building Materials Co ltd
Priority to CN201922407674.4U priority Critical patent/CN211331993U/en
Application granted granted Critical
Publication of CN211331993U publication Critical patent/CN211331993U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a raw materials welding equipment for metal building material processing relates to welding equipment technical field. This a raw materials welding equipment for metal building material processing, including the bottom plate, the top of bottom plate is close to both sides edge and all welds and has square board, and square board is provided with two altogether, and the relative surface of two square boards is close to around both sides edge install first electric telescopic handle, first electric telescopic handle is provided with four altogether. This a raw materials welding equipment for metal building material processing, through launching of fourth electric telescopic handle, thereby make the junction between two processing raw materials of welder contact, be convenient for carry out welding treatment to two processing raw materials, through launching of third electric telescopic handle, thereby make the sliding bead move in the inside of the long spout of arc, make the fixed block drive welder and remove, in the use, the position of the butt welder of being convenient for is adjusted, in the use, be convenient for to processing raw materials welding treatment.

Description

Raw material welding equipment for processing metal building materials
Technical Field
The utility model relates to a welding equipment technical field specifically is a raw materials welding equipment for metal building material processing.
Background
When processing metal building material, often can use welding equipment to be used for carrying out welding treatment to metal material, but among the prior art, place metal processing raw materials when placing bench and carry out the welding, it is fixed to be difficult for carrying out stable centre gripping to metal processing raw materials's position, go on using, metal processing raw materials easily produces certain slip, thereby can greatly reduced metal processing raw materials's welding efficiency, simultaneously when carrying out the welding to metal processing raw materials, the position of difficult butt welding rifle is adjusted, in using, can greatly reduced welded effect.
SUMMERY OF THE UTILITY MODEL
The utility model provides a raw materials welding equipment for metal building material processing, in using, can be stable compress tightly fixedly to the metal processing raw materials, the position of butt welder that simultaneously can be better removes the regulation, is convenient for carry out welding treatment to the metal processing raw materials.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the raw material welding equipment for processing the metal building materials comprises a bottom plate, wherein square plates are welded at the top of the bottom plate close to the edges of the two sides, the number of the square plates is two, first electric telescopic rods are arranged on the opposite outer surfaces of the two square plates close to the edges of the front side and the rear side, the number of the first electric telescopic rods is four, the first electric telescopic rods are divided into two groups, a U-shaped plate is welded between one end of each group of two first electric telescopic rods, the number of the U-shaped plates is two, second electric telescopic rods are arranged on the inner top surfaces of the two U-shaped plates close to the edges of the front side and the rear side, the number of the second electric telescopic rods is four, the two groups of the second electric telescopic rods are divided into two groups, a pressing plate is welded between the bottom ends of the two, and the top of processing raw materials is attached to the bottom of the non-slip mat, two U-shaped rods are welded to the bottoms of the U-shaped plates, the outer surfaces of the U-shaped rods are provided with rollers in a sliding mode close to the edges of the front side and the rear side, and the bottoms of the rollers slide with the top of the bottom plate.
In order to install the position of fixed plate fixedly, as the utility model is used for the raw materials welding equipment of metal building material processing is preferred, the top of bottom plate is close to four corners and all welds there is the bracing piece, four the welding has the fixed plate between the top of bracing piece.
In order to install fixedly to third electric telescopic handle's position, as the utility model discloses a raw materials welding equipment is preferred for metal building material processing, the rear side welding of fixed plate has the mounting panel, third electric telescopic handle is installed along the horizontal direction to one side surface of mounting panel.
Install fixedly for the position of butt welder, conduct the utility model is used for the raw materials welding equipment of metal building material processing is preferred, the one end welding of third electric telescopic handle has the fixed block, fourth electric telescopic handle is installed to the bottom of fixed block, welder is installed to fourth electric telescopic handle's bottom.
In order to make the fixed block can carry out stable removal, conduct the utility model is used for the raw materials welding equipment of metal building material processing is preferred, the long spout of arc has been seted up to the bottom of fixed plate, the interior table wall slip of the long spout of arc inlays and is equipped with the smooth pearl, the bottom welding of smooth pearl has the stiffener, and the bottom of stiffener welds with the top of fixed block.
For the convenience remove the device, as the utility model is used for the raw materials welding equipment of metal building material processing is preferred, the universal wheel is all installed near four corners to the bottom of bottom plate.
The utility model provides a raw materials welding equipment for metal building material processing. The method has the following beneficial effects:
(1) this a raw materials welding equipment for metal building material processing, through placing the processing raw materials in the inside bottom surface of U template, start through second electric telescopic handle, thereby can make the clamp plate carry out stable the processing to the processing raw materials and compress tightly the processing, simultaneously through the slipmat, can increase the stability that compresses tightly the processing raw materials, be convenient for carry out stable welding treatment to the processing raw materials, through starting to first electric telescopic handle, thereby can make the U template remove, make the processing raw materials contact on two U templates, be convenient for carry out welding treatment to the junction between two processing raw materials.
(2) This a raw materials welding equipment for metal building material processing, through launching of fourth electric telescopic handle, thereby make the junction between two processing raw materials of welder contact, be convenient for carry out welding treatment to two processing raw materials, through launching of third electric telescopic handle, thereby make the sliding bead move in the inside of the long spout of arc, make the fixed block drive welder and remove, in the use, the position of the butt welder of being convenient for is adjusted, in the use, be convenient for to processing raw materials welding treatment.
Drawings
Fig. 1 is a front sectional view of the present invention;
fig. 2 is a left side view of the present invention;
fig. 3 is an enlarged view of a part of a section in fig. 1 according to the present invention.
In the figure: 1. a base plate; 2. a universal wheel; 3. a square plate; 4. a first electric telescopic rod; 5. a support bar; 6. a fixing plate; 7. a reinforcing bar; 8. mounting a plate; 9. a fixed block; 10. a fourth electric telescopic rod; 11. a welding gun; 12. a non-slip mat; 13. processing raw materials; 14. a roller; 15. a second electric telescopic rod; 16. pressing a plate; 17. a U-shaped plate; 18. a U-shaped rod; 19. a third electric telescopic rod; 20. an arc-shaped long chute; 21. and (4) sliding the beads.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are exemplary and intended to be used for explaining the present invention, and should not be construed as limiting the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: a raw material welding device for metal building material processing comprises a bottom plate 1, square plates 3 are welded on the top of the bottom plate 1 close to two side edges, the number of the square plates 3 is two, first electric telescopic rods 4 are installed on the opposite outer surfaces of the two square plates 3 close to the front side edge and the rear side edge, the number of the first electric telescopic rods 4 is four, the first electric telescopic rods are divided into two groups, a U-shaped plate 17 is welded between one end of each group of the two first electric telescopic rods 4, the number of the U-shaped plates 17 is two, second electric telescopic rods 15 are installed on the inner top surfaces of the two U-shaped plates 17 close to the front side edge and the rear side edge, the number of the second electric telescopic rods 15 is four, the two groups of the second electric telescopic rods are divided into two groups, a pressing plate 16 is welded between the bottom ends of the two second electric telescopic rods, and the top of processing raw materials 13 is attached to the bottom of the non-slip mat 12, U-shaped rods 18 are welded to the bottoms of the two U-shaped plates 17, rollers 14 are sleeved on the outer surfaces of the U-shaped rods 18 close to the front and rear edges of the two sides in a sliding mode, and the bottoms of the rollers 14 slide on the top of the bottom plate 1.
In this embodiment: the square plate 3 can be used for installing and fixing the position of the first electric telescopic rod 4, the first electric telescopic rod 4 can be used for installing and fixing the position of the U-shaped plate 17, when the first electric telescopic rod 4 is started, the U-shaped plate 17 can be moved to facilitate the welding treatment of the processing raw material 13, the U-shaped plate 17 can be used for installing and fixing the position of the second electric telescopic rod 15, the second electric telescopic rod 15 can be used for installing and fixing the position of the pressing plate 16, the stable pressing treatment can be carried out on the processing raw material 13 by the pressing plate 16 through the starting of the second electric telescopic rod 15, the stable pressing treatment can be carried out on the processing raw material 13 by the anti-skid pad 12, the U-shaped rod 18 can be used for installing and fixing the position of the roller 14, the roller 14 can stably roll, and the roller 14 can roll on the bottom plate 1 through the movement of the U-shaped plate 17, therefore, the U-shaped plate 17 is stably moved, the use is convenient, the first electric telescopic rod 4 adopts the model of NKLA8F, and the second electric telescopic rod 15 adopts the model of NKLA22 BL.
Specifically, the top of the bottom plate 1 is close to four corners and is welded with the support rods 5, and the fixing plate 6 is welded between the tops of the four support rods 5.
In this embodiment: the position of the fixing plate 6 can be fixed by four support rods 5.
Specifically, the rear side of the fixed plate 6 is welded with a mounting plate 8, and a third electric telescopic rod 19 is installed on the outer surface of one side of the mounting plate 8 along the horizontal direction.
In this embodiment: the fixed plate 6 can be installed fixedly to the position of mounting panel 8, can install fixedly through mounting panel 8 to the position of third electric telescopic handle 19, and the start of third electric telescopic handle 19 can make fixed block 9 drive welder 11 and remove, is convenient for carry out welding process to processing raw materials 13.
Specifically, a fixing block 9 is welded at one end of the third electric telescopic rod 19, a fourth electric telescopic rod 10 is installed at the bottom of the fixing block 9, and a welding gun 11 is installed at the bottom end of the fourth electric telescopic rod 10.
In this embodiment: the third electric telescopic handle 19 can be installed fixedly to the position of fixed block 9, the fixed block 9 can be installed fixedly to the position of fourth electric telescopic handle 10, the position of welding gun 11 can be installed fixedly to fourth electric telescopic handle 10, through the start of fourth electric telescopic handle 10, can make welding gun 11 contact the junction between two processing raw materials 13, be convenient for carry out welding treatment to two processing raw materials 13, third electric telescopic handle 19 adopts the model of TGA-30, fourth electric telescopic handle 10 adopts the model of TGA-500.
Specifically, the bottom of the fixed plate 6 is provided with an arc-shaped long sliding chute 20, the inner surface wall of the arc-shaped long sliding chute 20 is embedded with a sliding bead 21 in a sliding manner, the bottom of the sliding bead 21 is welded with the reinforcing rod 7, and the bottom end of the reinforcing rod 7 is welded with the top of the fixed block 9.
In this embodiment: when the fixed block 9 moves, the sliding ball 21 can slide in the arc-shaped long sliding groove 20, so that the fixed block 9 can stably move through the reinforcing rod 7, the welding gun 11 can stably move, and welding treatment on the machining raw material 13 is facilitated.
Specifically, universal wheels 2 are installed at the bottom of the bottom plate 1 close to four corners.
In this embodiment: through four universal wheels 2 of bottom plate 1 bottom, can remove convenient to use to the device.
When the device is used, the processing raw materials 13 are placed on the bottom surface inside the U-shaped plate 17, the processing raw materials 13 are stably pressed by the pressing plate 16 through the starting of the second electric telescopic rod 15, meanwhile, the stability of pressing the processing raw materials 13 can be increased through the anti-slip mat 12, the stable welding treatment of the processing raw materials 13 is facilitated, the U-shaped plate 17 can be moved through the starting of the first electric telescopic rod 4, the processing raw materials 13 on the two U-shaped plates 17 are contacted, the welding treatment of the joint between the two processing raw materials 13 is facilitated, the welding gun 11 is contacted with the joint between the two processing raw materials 13 through the starting of the fourth electric telescopic rod 10, the welding treatment of the two processing raw materials 13 is facilitated, the starting of the third electric telescopic rod 19 is facilitated, and the sliding ball 21 moves inside the arc-shaped long sliding chute 20, make fixed block 9 drive welder 11 and remove, in the use, be convenient for adjust the position of welder 11, in the use, be convenient for to raw materials for processing 13 welding process.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. A raw materials welding equipment for metal building material processing, including bottom plate (1), its characterized in that: the top of the bottom plate (1) is close to the edges of the two sides and is welded with square plates (3), the number of the square plates (3) is two, the relative outer surfaces of the two square plates (3) are close to the edges of the front side and the rear side and are provided with first electric telescopic rods (4), the number of the first electric telescopic rods (4) is four, the two electric telescopic rods are divided into two groups, a U-shaped plate (17) is welded between one end of each group of the two first electric telescopic rods (4), the number of the U-shaped plates (17) is two, the inner top surfaces of the two U-shaped plates (17) are close to the edges of the front side and the rear side and are provided with second electric telescopic rods (15), the number of the second electric telescopic rods (15) is four, the two electric telescopic rods are divided into two groups, a pressing plate (16) is welded between the bottoms, two processing raw materials (13) have all been placed to the inside bottom surface of U template (17), and the top of processing raw materials (13) and the bottom of slipmat (12) are attached, two U template (17)'s bottom has all welded U shaped rod (18), the equal slip cap of both sides edge is equipped with gyro wheel (14) around the surface of U shaped rod (18) is close to, and the bottom of gyro wheel (14) slides with the top of bottom plate (1).
2. The raw material welding apparatus for metallic building material processing according to claim 1, wherein: the top of bottom plate (1) is close to all welding of four corners and has bracing piece (5), four the welding has fixed plate (6) between the top of bracing piece (5).
3. The raw material welding apparatus for metallic building material processing according to claim 2, wherein: the rear side welding of fixed plate (6) has mounting panel (8), third electric telescopic handle (19) are installed along the horizontal direction to one side surface of mounting panel (8).
4. The raw material welding apparatus for metallic building material processing according to claim 3, wherein: the welding of the one end of third electric telescopic handle (19) has fixed block (9), fourth electric telescopic handle (10) are installed to the bottom of fixed block (9), welder (11) are installed to the bottom of fourth electric telescopic handle (10).
5. The raw material welding apparatus for metallic building material processing according to claim 2, wherein: arc long chute (20) have been seted up to the bottom of fixed plate (6), the interior table wall of arc long chute (20) slides and inlays and is equipped with smooth pearl (21), the bottom welding of smooth pearl (21) has stiffener (7), and the bottom of stiffener (7) and the top welding of fixed block (9).
6. The raw material welding apparatus for metallic building material processing according to claim 1, wherein: the bottom of bottom plate (1) is close to four corners and all installs universal wheel (2).
CN201922407674.4U 2019-12-27 2019-12-27 Raw material welding equipment for processing metal building materials Expired - Fee Related CN211331993U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922407674.4U CN211331993U (en) 2019-12-27 2019-12-27 Raw material welding equipment for processing metal building materials

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922407674.4U CN211331993U (en) 2019-12-27 2019-12-27 Raw material welding equipment for processing metal building materials

Publications (1)

Publication Number Publication Date
CN211331993U true CN211331993U (en) 2020-08-25

Family

ID=72108780

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922407674.4U Expired - Fee Related CN211331993U (en) 2019-12-27 2019-12-27 Raw material welding equipment for processing metal building materials

Country Status (1)

Country Link
CN (1) CN211331993U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112439832A (en) * 2020-10-30 2021-03-05 常德鑫睿新材料有限公司 Water logging formula aluminum alloy ingot apparatus for producing

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112439832A (en) * 2020-10-30 2021-03-05 常德鑫睿新材料有限公司 Water logging formula aluminum alloy ingot apparatus for producing

Similar Documents

Publication Publication Date Title
CN211331993U (en) Raw material welding equipment for processing metal building materials
CN216829873U (en) Be used for automobile parts processing turning device
CN211991253U (en) Cutting tool for cutting arc-shaped plate
CN210024423U (en) Special welding set of tubulation
CN212199009U (en) Cutting device for toughened glass
CN215092541U (en) Grinding device is used in tee bend pipe fitting processing
CN209737433U (en) Quick clamping device is used in panel processing
CN211332543U (en) Glass curtain wall's glass raw materials avris grinds paper-back edition and puts
CN211489150U (en) Steel plate bending machine
CN211054441U (en) Welding jig is used in automotive interior part production
CN207565645U (en) plank delivery system
CN211134391U (en) Spraying equipment with overturning function for processing iron-wood frame
CN214024339U (en) Turnover mechanism for welding steel structure
CN211277219U (en) Fixing support frame for pipeline welding
CN213323146U (en) Oil drum shallow for construction
CN210592041U (en) Auxiliary frame for assisting office furniture cabinet to move
CN212310658U (en) Part blank holder for hot stamping
CN210756015U (en) Simple cushion block device for spot welding of special-shaped workpiece
CN207239372U (en) A kind of running gear easy to clamping flame gun
CN210451575U (en) Positioning and clamping device for welding device
CN217775180U (en) Straightening mechanism for cold-rolled steel plate for machining
CN213917514U (en) Grinding device is used in electric tricycle processing convenient to remove
CN206068255U (en) A kind of mantle clamping push-pull mechanism
CN213998383U (en) Welding tool for wear-resisting plate
CN211218421U (en) Television frame bending device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200825

Termination date: 20201227