CN211320780U - Construction electrical engineering passes through construction equipment - Google Patents

Construction electrical engineering passes through construction equipment Download PDF

Info

Publication number
CN211320780U
CN211320780U CN202020277108.6U CN202020277108U CN211320780U CN 211320780 U CN211320780 U CN 211320780U CN 202020277108 U CN202020277108 U CN 202020277108U CN 211320780 U CN211320780 U CN 211320780U
Authority
CN
China
Prior art keywords
fixing frame
hinged
cable
construction
bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020277108.6U
Other languages
Chinese (zh)
Inventor
赵文亮
陈翔
张永战
臧延峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020277108.6U priority Critical patent/CN211320780U/en
Application granted granted Critical
Publication of CN211320780U publication Critical patent/CN211320780U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model discloses a building electrical engineering passes through construction equipment mainly relates to the electrical engineering field. The device comprises at least one bracket mechanism, wherein the bracket mechanism comprises a first fixing frame and a second fixing frame which are arranged in a front-back manner, the circumferential side annular array of the first fixing frame is hinged with at least 2 first connecting rods, the circumferential side annular array of the second fixing frame is hinged with at least 2 second connecting rods, the tail end of each first connecting rod is hinged with the tail end of each second connecting rod, and a walking wheel is arranged at the hinged position; the first fixing frame is provided with a bracket extending outwards along the radial direction, and the distance between the first fixing frame and the second fixing frame is adjustable. The beneficial effects of the utility model reside in that: the cable dragging device is matched with the cable to pass through and drag, so that the dragging abrasion of the cable is reduced, the construction efficiency is improved, and the construction cost is reduced.

Description

Construction electrical engineering passes through construction equipment
Technical Field
The utility model relates to an electrical engineering field specifically is a building electrical engineering passes through construction equipment.
Background
With the rapid development of urban construction economy, the role proportion of the cable in each infrastructure is gradually increased. In infrastructure facilities such as subways and tunnels, special electrical equipment pipes and ventilation air ducts are generally required to be established obliquely above the tunnels, and cables are required to be laid and matched in the long and narrow tunnels so as to be used as required by supply points. For cable line laying in a long and narrow pipeline, when the existing construction process is used for laying in a long distance, the cable needs to be dragged, and the dragging of the cable is very heavy and difficult, and the cable is abraded, so that the construction efficiency is low, manpower and material resources are consumed, and inevitable damage is caused to the cable.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building electrical engineering passes through construction equipment, the passing through and the haulage of its cooperation cable for the cable is dragged and holds up it when moving, and the removal through this device replaces the cable subaerial wearing and tearing that pull, improves the efficiency of construction, reduces construction cost.
The utility model discloses a realize above-mentioned purpose, realize through following technical scheme:
a construction device for crossing of building electrical engineering comprises at least one bracket mechanism, wherein the bracket mechanism comprises a first fixing frame and a second fixing frame which are arranged in front and at back, at least 2 first connecting rods are hinged to the circumferential side annular array of the first fixing frame, at least 2 second connecting rods are hinged to the circumferential side annular array of the second fixing frame, the tail end of each first connecting rod is hinged to the tail end of each second connecting rod, and a walking wheel is installed at the hinged position;
the first fixing frame is provided with a bracket extending outwards along the radial direction, and the distance between the first fixing frame and the second fixing frame is adjustable.
The utility model discloses a portable electronic device, including first mount, second mount, inserted bar, the first mount is gone up the inserted bar that is equipped with along axial extension between two parties, be equipped with along axial extension's intubate on the second mount between two parties, the inserted bar is scalable pegged graft with the intubate, and the lockable.
One end of the insertion pipe adjacent to the insertion rod is provided with a large nut in running fit with the insertion pipe, and the insertion rod is provided with external threads.
One side of the second fixing frame, which is far away from the insertion tube, is provided with a fixing tube, and the fixing tubes of the two bracket mechanisms are fixedly connected.
Contrast prior art, the beneficial effects of the utility model reside in that:
during the application, put into the pipeline with the cable after, drag the dragging along with the cable is to the tunnel in, one section distance of every, put into the pipeline with this device, with the cable carrying on one's arm on the bracket when putting into, carry out the bearing through this device to the cable and hold up, make when the cable is by the pull-in pipeline, this device is along the pipeline walking forward along dragging of cable, replace the cable at the mode that pipeline internal surface friction moved ahead, avoid the wearing and tearing of cable, and because the roll moves ahead and replaces the friction to advance, the pulling force that needs also reduces greatly, manpower and materials are saved, also very high-efficient practical.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic structural diagram of the present invention.
Fig. 3 is a schematic structural diagram of the present invention.
Reference numerals shown in the drawings:
1. a first fixing frame; 2. a second fixing frame; 3. a first link; 4. a second link; 5. a traveling wheel; 6. a bracket; 7. inserting a rod; 8. inserting a tube; 9. and fixing the tube.
Detailed Description
The present invention will be further described with reference to the following specific examples. It should be understood that these examples are for illustrative purposes only and are not intended to limit the scope of the present invention. Furthermore, it should be understood that various changes or modifications of the present invention may be made by those skilled in the art after reading the teachings of the present invention, and these equivalents also fall within the scope defined in the present application.
Example (b): construction electrical engineering passes through construction equipment
This device includes that two front and back symmetries are fixed, and the same bracket 6 mechanism of structure, first mount 1 and second mount 2 that bracket 6 mechanism set up around including, the articulated three first connecting rod 3 that has of week side annular array of first mount 1, the articulated three second connecting rod 4 that has of week side annular array of second mount 2, the end of first connecting rod 3 is articulated through the connecting axle with the end of second connecting rod 4, and rotates on the connecting axle and install walking wheel 5.
The side of week of first mount 1 extends to both sides has bracket 6, bracket 6 is used for holding up the cable, supports the weight of cable for this device can follow dragging of cable and move ahead, avoids cable and ground friction contact.
The utility model discloses a pipe fitting, including first mount 1, be equipped with the inserted bar 7 that extends along the fore-and-aft direction on the first mount 1 between two parties, be equipped with the external screw thread on the inserted bar 7, be equipped with the intubate 8 that extends along the fore-and-aft direction on the second mount 2 between two parties, inserted bar 7 inserts in the intubate 8, intubate 8 is equipped with rather than normal running fit's big nut with the one end that inserted bar 7 is adjacent, can set up the relative degree of depth that inserted bar 7 inserted intubate 8 to the distance that 5 outside probes out of adjustment walking wheel adapts to different pipelines.
One side of the second fixing frame 2, which is far away from the insertion tube 8, is provided with a fixing tube 9, and the fixing tubes 9 of the two bracket 6 mechanisms are fixedly connected.
The above structure is further explained below in connection with specific uses:
during the application, put into the pipeline with the cable after, drag the dragging along with the cable is to the tunnel in, one section distance of every, put into the pipeline with this device, with the cable carrying on one's arm on bracket 6 when putting into, carry out the bearing through this device to the cable and hold up, make when the cable is by the pull-in pipeline, this device is along the pipeline walking forward along dragging of cable, replace the cable at the mode that pipeline internal surface friction moved ahead, avoid the wearing and tearing of cable, and because the roll moves ahead and replaces the friction to advance, the pulling power that needs also reduces greatly, manpower and materials are saved, also very high-efficient practical.

Claims (4)

1. The construction device for the building electrical engineering crossing is characterized by comprising at least one bracket mechanism, wherein the bracket mechanism comprises a first fixing frame and a second fixing frame which are arranged in front and back, at least 2 first connecting rods are hinged to the circumferential side annular array of the first fixing frame, at least 2 second connecting rods are hinged to the circumferential side annular array of the second fixing frame, the tail end of each first connecting rod is hinged to the tail end of each second connecting rod, and a walking wheel is installed at the hinged position;
the first fixing frame is provided with a bracket extending outwards along the radial direction, and the distance between the first fixing frame and the second fixing frame is adjustable.
2. The construction equipment according to claim 1, wherein the first fixing frame is provided with an inserting rod extending along the axial direction in the center, the second fixing frame is provided with an inserting tube extending along the axial direction in the center, and the inserting rod is telescopically inserted into the inserting tube and can be locked.
3. The construction equipment for building electrical engineering crossing according to claim 2, wherein one end of the insertion pipe adjacent to the insertion rod is provided with a large nut which is in running fit with the insertion pipe, and the insertion rod is provided with an external thread.
4. The construction equipment according to claim 1, wherein a fixing tube is disposed on a side of the second fixing frame away from the insertion tube, and the fixing tubes of the two bracket mechanisms are fixedly connected.
CN202020277108.6U 2020-03-06 2020-03-06 Construction electrical engineering passes through construction equipment Expired - Fee Related CN211320780U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020277108.6U CN211320780U (en) 2020-03-06 2020-03-06 Construction electrical engineering passes through construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020277108.6U CN211320780U (en) 2020-03-06 2020-03-06 Construction electrical engineering passes through construction equipment

Publications (1)

Publication Number Publication Date
CN211320780U true CN211320780U (en) 2020-08-21

Family

ID=72056126

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020277108.6U Expired - Fee Related CN211320780U (en) 2020-03-06 2020-03-06 Construction electrical engineering passes through construction equipment

Country Status (1)

Country Link
CN (1) CN211320780U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113427941A (en) * 2021-06-25 2021-09-24 东南大学 Self-adaptive protection device for weak part of special-shaped sculpture

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113427941A (en) * 2021-06-25 2021-09-24 东南大学 Self-adaptive protection device for weak part of special-shaped sculpture
CN113427941B (en) * 2021-06-25 2022-05-17 东南大学 Self-adaptive protection device for weak part of special-shaped sculpture

Similar Documents

Publication Publication Date Title
CN106451242B (en) The carrying method of underground cable conveying device
CN206135310U (en) Duct cable conveyor
CN211320780U (en) Construction electrical engineering passes through construction equipment
CN102620057B (en) Pipe arrangement method and pipe arrangement device for pipe gallery
CN105546214B (en) Pulling method for pipe for horizontal directional drilling and pulling force transmission device
CN103474917A (en) Guided trenchless laying power cable traction method
CN210531871U (en) Pipeline non-excavation inside lining restores draw gear
CN215635349U (en) Inner sleeve pipe jacking traction device
CN109038378B (en) Automatic propelling device for cable laying
CN106099771A (en) Cable guide device
CN206211415U (en) wedge-shaped cable laying ring
CN209844512U (en) Spool of buried cable
CN111711122B (en) Laying device for underground cable line
CN201656403U (en) Automatic cable arrangement device for mine construction machinery
CN202510839U (en) Pipe distributor
CN214412083U (en) Auxiliary traction equipment for cable laying
KR20010092917A (en) a highly dense and multi-ducted spacer
CN210286351U (en) Detachable water pipe reel
CN202190030U (en) Track for cable duct patrol trolley track
CN207039088U (en) A kind of water conservancy construction cable, which buries, puts support meanss
CN219106919U (en) Underground pipe gallery hoisting type cable laying auxiliary device
CN216598932U (en) Municipal works protection cable device that passes a way
CN204694893U (en) A kind of covered wire cable threading apparatus
CN209977561U (en) Guide device for repairing non-excavation pipeline by thermoplastic forming method
CN219498751U (en) Novel automatic cable laying device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200821

Termination date: 20210306