CN202510839U - Pipe distributor - Google Patents
Pipe distributor Download PDFInfo
- Publication number
- CN202510839U CN202510839U CN2012201591787U CN201220159178U CN202510839U CN 202510839 U CN202510839 U CN 202510839U CN 2012201591787 U CN2012201591787 U CN 2012201591787U CN 201220159178 U CN201220159178 U CN 201220159178U CN 202510839 U CN202510839 U CN 202510839U
- Authority
- CN
- China
- Prior art keywords
- base
- pipeline
- piping lane
- triangle
- stringing device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model discloses a pipe distributor. The pipe distributor comprises a base, wherein two triangular carrier roller seats which are oppositely arranged are arranged on the base; two bearing pedestals are arranged on the bottom and the top of an inclined surface of each triangular carrier roller seat respectively; a carrier roller is arranged on the two bearing pedestals through a bearing; and the carrier rollers on the two triangular carrier roller seats form a V shape. The pipe distributor has a simple structure, is convenient to disassemble and assemble, can be simply operated, can greatly improve the installation efficiency of pipelines, and can avoid the damage of the pipelines and ensure the using quality of the pipelines.
Description
Technical field
The utility model belongs to petrochemical pipe and lays technical field, particularly a kind of stringing device.
Background technique
In petroleum chemical engineering, each device all connects with piping lane, on piping lane, also is provided with various pipelines to accomplish the conveying of various media simultaneously.Therefore, piping lane length is very long, particularly Utilities or outer tube, and its length reaches hundreds of rice.Usually; The pipeline of installing on the piping lane is to give system on the ground mostly; Be about to 2-3 pipeline group to being welded into certain-length, its length can be between 16-24mm, necessary detection and the after welding treatment of process on ground; Be installed on the piping lane after sling with crane in the tubulation road qualified giving again, and then assembly welding becomes the length of design.
At present; Arrange that on piping lane pipe laying has two kinds of methods: one, directly haul method; Pipeline is placed on the machine supporting beams of piping lane and drags to the other end from an end; This method can produce serious scratch to pipeline external surface because the machine supporting beams of pipeline and piping lane directly produces slide relative, has a strong impact on the service property (quality) of pipeline; Two, crane lifting method is utilized crane that pipeline is sling and is installed, and this method only is applicable to the installation of top layer pipeline on the piping lane; Top layer then can't be accomplished through the crane lifting method with the installation of Outer Tube; And still need under piping lane, to move horizontally pipeline, cause installation efficiency low, installation cost is high.
The model utility content
The utility model provides a kind of simple in structure, simple to operate, the stringing method and stringing device on the piping lane that be used for that can improve installation efficiency greatly, avoid pipe damage, guarantee the pipeline service property (quality).
For realizing above-mentioned purpose; The technological scheme of the utility model is: a kind of stringing device; Comprise base, base is provided with two triangle roller seats that are oppositely arranged, and the bottom, plane of inclination and the top of triangle roller seat are provided with bearing support; Be provided with carrying roller through bearing on the bearing support, the carrying roller on two triangle roller seats constitutes the V font.
Said base is provided with regulating tank, and the triangle roller seat is installed on the base through the clamping bolt in the regulating tank.
The bottom of said base both sides is provided with fixed block, is equipped with on fixed block and the base and installs bolt.
Compared with prior art, the utility model has the advantages that:
1, the utility model comprises base, and base is provided with two triangle roller seats that are oppositely arranged, and the bottom, plane of inclination and the top of triangle roller seat are provided with bearing support; Be provided with carrying roller through bearing on the bearing support, the carrying roller on two triangle roller seats constitutes the V font, and it is simple in structure; Be convenient to dismounting; Simple to operate, can improve piping erection efficient greatly, and can avoid pipe damage and guarantee the pipeline service property (quality).
2, base is provided with regulating tank, and the triangle roller seat is installed on the base through the clamping bolt in the regulating tank, through regulating two distances between the triangle roller seat, can satisfy the transport requirement of different-diameter pipeline, and Applicable scope is wide.
3, the carrying roller in the utility model constitutes the V font, can satisfy pipeline and on carrying roller, move horizontally, and can prevent that again pipeline from sidewindering to one on carrying roller, and is safe and reliable.
4, the utility model is applicable to the laying installation of different-diameter pipeline in the petrochemical industry piping lane; Be particularly suitable for length apart from the piping erection on the piping lane, directly do not contact in the pipe conveying procedure, can effectively avoid the frictionally damage of pipe surface with the machine supporting beams of piping lane; Reduce the conveying pulling force of pipeline; Can improve the installation rate of pipeline greatly, can reduce the use machine-team quantity of crane in the piping erection process again, save installation cost.
Description of drawings
Fig. 1 is the schematic representation that is connected of stringing device and piping lane machine supporting beams in the utility model;
Fig. 2 is the scheme of installation of stringing device on piping lane in the utility model.
Embodiment
Stringing device as depicted in figs. 1 and 2; It comprises base 11, on base 11, is provided with two triangle roller seats 12 that are oppositely arranged, and the bottom, plane of inclination and the top of triangle roller seat 12 are provided with bearing support 13; Be provided with carrying roller 14 through bearing 15 on the bearing support 13; Carrying roller 14 on two triangle roller seats 12 constitutes the V fonts, can satisfy pipeline and on carrying roller 14, move horizontally, and can prevent that again pipeline from sidewindering to one on carrying roller 14.On base 11, be provided with regulating tank 16, triangle roller seat 12 is installed on the base 11 through the clamping bolt 17 in the regulating tank 16, through regulating two distances between the triangle roller seat 12, to satisfy the transport requirement of different-diameter pipeline.
Bottom in base 11 both sides is provided with fixed block 19, is equipped with on fixed block 19 and the base 11 and installs bolt 18.When the utility model stringing device uses, through fixed block 19 with install bolt 18 and be fixedly mounted on the machine supporting beams 3 of piping lane.
Clamping bolt 17 is a T shape clamping bolt, installs bolt 18 and is L shaped clamping bolt.
The using process of the utility model is following:
⑴, stringing device 1 is fixedly mounted on the machine supporting beams 3 of piping lane 2, then according to treating that the diameter of conveyance conduit adjusts the spacing of two carrying rollers 14;
⑵, the pipeline that adopts 2 binding methods will give making are sling from piping lane 2 one ends and are sent into;, the pipeline front end just is placed on the carrying roller 14 of stringing device 1 after getting into piping lane 2; Level pulling pipeline in piping lane 2; Pipeline inwardly is moved horizontally to when duct length surpasses in half entering piping lane 2 removes hoist lifting hook, support pipeline by the carrying roller 14 of stringing device 1 on the piping lane 2 this moment fully;
, at piping lane 2 outer installment winchs, the rope of winch is bundled on the pipeline, utilize the draw of winch to make the pipeline reach of on carrying roller 14, rolling;
⑷ after, line transportation put in place, the winch antiport came off rope on the pipeline and gets back to initial position, for the traction of carrying out next root pipeline is prepared;
⑸, pipeline is shifted out between the carrying roller 14 of stringing device 1, and be installed on the piping lane 2, assembly welding connects the front end and back end of each pipeline then;
⑹, repeat above-mentioned steps ⑴~⑸, carry out the layout of next root pipeline, reach the length of design until pipeline.
Claims (3)
1. a stringing device is characterized in that, comprises base; Base is provided with two triangle roller seats that are oppositely arranged; Bottom, the plane of inclination of triangle roller seat is provided with bearing support with the top, is provided with carrying roller through bearing on the bearing support, the carrying roller formation V font on two triangle roller seats.
2. stringing device as claimed in claim 1 is characterized in that said base is provided with regulating tank, and the triangle roller seat is installed on the base through the clamping bolt in the regulating tank.
3. according to claim 1 or claim 2 stringing device is characterized in that the bottom of said base both sides is provided with fixed block, is equipped with on fixed block and the base and installs bolt.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012201591787U CN202510839U (en) | 2012-04-16 | 2012-04-16 | Pipe distributor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012201591787U CN202510839U (en) | 2012-04-16 | 2012-04-16 | Pipe distributor |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202510839U true CN202510839U (en) | 2012-10-31 |
Family
ID=47063326
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012201591787U Expired - Fee Related CN202510839U (en) | 2012-04-16 | 2012-04-16 | Pipe distributor |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202510839U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102620057A (en) * | 2012-04-16 | 2012-08-01 | 中国化学工程第十一建设有限公司 | Pipe arrangement method and pipe arrangement device for pipe gallery |
CN106122592A (en) * | 2016-08-31 | 2016-11-16 | 中船黄埔文冲船舶有限公司 | A kind of sea conduit saddle roller unit |
CN112324988A (en) * | 2020-11-13 | 2021-02-05 | 吴江港华燃气有限公司 | Non-excavation pipe moving method for gas pipeline |
-
2012
- 2012-04-16 CN CN2012201591787U patent/CN202510839U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102620057A (en) * | 2012-04-16 | 2012-08-01 | 中国化学工程第十一建设有限公司 | Pipe arrangement method and pipe arrangement device for pipe gallery |
CN106122592A (en) * | 2016-08-31 | 2016-11-16 | 中船黄埔文冲船舶有限公司 | A kind of sea conduit saddle roller unit |
CN112324988A (en) * | 2020-11-13 | 2021-02-05 | 吴江港华燃气有限公司 | Non-excavation pipe moving method for gas pipeline |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102620057B (en) | Pipe arrangement method and pipe arrangement device for pipe gallery | |
CN202510839U (en) | Pipe distributor | |
CN102820744A (en) | Method and device for mounting rotor of large-sized synchronous motor | |
CN105775991A (en) | Large-diameter tube bundle hoisting assembly tooling and using method thereof | |
CN108343783B (en) | The installation method and hanging apparatus of high-altitude large-diameter pipeline under complex environment | |
CN201898296U (en) | Cable traction conveyor | |
CN203903767U (en) | Single-rail walking sling for installing power plant boiler equipment | |
CN202608816U (en) | Special tool car for pipeline transportation | |
CN204739326U (en) | Steel truss or piping lane gallows poling auxiliary device | |
CN202542770U (en) | Tube joint turning over device of pressure steel tube in hole chamber | |
CN201195668Y (en) | Movable cable saddle | |
CN106838464A (en) | A kind of long-distance transmission pipeline and π type compensator floating on water surface installation methods | |
CN204156403U (en) | One-tenth dish electrical line releasing reel | |
CN103486330B (en) | Either inside high-altitude pipeline mounting construction method | |
CN204243626U (en) | Cable unwinding device | |
CN103726537A (en) | Movable combination type water intake pumping station | |
CN203359822U (en) | Indoor GIS (geographic information system) transport in-place device | |
CN203147158U (en) | Split type hoop device for long-distance pipeline | |
CN103231993A (en) | Indoor GIS (Gas Insulated Switchgear) transporting and locating device and use method | |
CN209781857U (en) | Pipeline installation car in piping lane | |
CN203649773U (en) | Opening alignment device for welding of water supply and sewerage steel pipe | |
CN202268651U (en) | Fixing device of transmission wire lifter | |
CN203348724U (en) | Adjustable device capable of enabling pipeline to penetrate through pipe gallery | |
CN104234494B (en) | A kind of detachable pylon and using method thereof | |
CN102079308B (en) | Curve transporting ropeway system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121031 Termination date: 20180416 |
|