CN211313280U - Assembled operation platform - Google Patents
Assembled operation platform Download PDFInfo
- Publication number
- CN211313280U CN211313280U CN201921599438.0U CN201921599438U CN211313280U CN 211313280 U CN211313280 U CN 211313280U CN 201921599438 U CN201921599438 U CN 201921599438U CN 211313280 U CN211313280 U CN 211313280U
- Authority
- CN
- China
- Prior art keywords
- assembly
- platform
- construction
- platforms
- crossbeam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses an assembly type operation platform, including two assembly platform and a plurality of crossbeam, its characterized in that, two assembly platform parallel relative settings, and leave the clearance between two assembly platform, assembly platform edge all around is equipped with the rail, and the crossbeam is located between two assembly platform, and two assembly platform pass through the crossbeam and fix together, forms frame type staple bolt between crossbeam and two assembly platform, treats welded steel construction and is located the staple bolt, and the crossbeam passes through bolt fixed connection with assembly platform. The operating platform can greatly save the construction measure cost; by using the operating platform, a better operating environment can be created, the safety of construction operators is greatly ensured, the interference of severe environment can be eliminated to the maximum extent during construction, and the construction quality is ensured; because whole operation platform encircles around the construction component, more be favorable to construction operation personnel to operate, also greatly improved the efficiency of construction simultaneously.
Description
Technical Field
The utility model relates to a building technical field especially relates to assembled operation platform.
Background
In the construction process of a steel structure, the overhead assembly welding cannot be avoided, and in a conventional construction method, a crank arm vehicle is used as a welding platform; and an operation platform is also manufactured, and the operation platform is cut off again after use. The above conventional methods have many disadvantages. Firstly, a crank arm vehicle is used as an operation platform, the operation height is limited, and the requirements on a construction site are strict; secondly, the overhead butt joint of the steel column is high in shift cost, two mature welders respectively use one crank arm vehicle to perform overhead welding operation, two steel column wing plates with the thickness of 30mm are completed at most every day, preheating before welding, heat preservation after welding and welding line polishing are not considered, if the construction efficiency needs to be accelerated, machinery is inevitably added, and thus cost control is very unfavorable. If a fixed operating platform is adopted, construction is convenient during operation, but the workload of early installation and later dismantling is large.
Disclosure of Invention
The utility model discloses aim at solving prior art not enough, and provide assembled operation platform.
The utility model discloses a realize above-mentioned purpose, adopt following technical scheme: the assembly type operation platform comprises two assembly platforms and a plurality of cross beams, and is characterized in that the two assembly platforms are oppositely arranged in parallel, a gap is reserved between the two assembly platforms, the peripheral edges of the assembly platforms are provided with a fence, the cross beams are positioned between the two assembly platforms, the two assembly platforms are fixed together through the cross beams, a frame-shaped hoop is formed between the cross beams and the two assembly platforms, a steel structure to be welded is positioned in the hoop, and the cross beams are fixedly connected with the assembly platforms through bolts;
still include a plurality of wooden wedges, leave the clearance between staple bolt and the steel construction, wooden wedge is located the clearance between staple bolt and the steel construction.
Be equipped with a plurality of screw holes that are 100mm to the interval on the rail of two mounting platform opposite faces, be equipped with on the end plate at crossbeam both ends with the mounting platform on the bolt hole of screw hole crossbeam both ends end plate that the screw hole matches bolt hole align with the mounting platform on the bolt hole, and install the bolt in the bolt hole that aligns.
The assembly platform and the cross beam are connected to form an operation platform, and felt cloth is arranged on the periphery of the operation platform.
The height of the rails on the opposite sides of the two mounting platforms is lower than the height of the other three edges.
The utility model has the advantages that: the operating platform can greatly save the construction measure cost; by using the operating platform, a better operating environment can be created, the safety of construction operators is greatly ensured, the interference of severe environment can be eliminated to the maximum extent during construction, and the construction quality is ensured; because whole operation platform encircles around the construction component, more be favorable to construction operation personnel to operate, also greatly improved the efficiency of construction simultaneously.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural view of the mounting platform;
FIG. 3 is a schematic structural view of a cross beam;
FIG. 4 is a schematic structural view of a wood wedge;
in the figure: 1-assembling a platform; 2-a cross beam; 3-hoop holding; 4-wood wedge;
the following detailed description will be made in conjunction with embodiments of the present invention with reference to the accompanying drawings.
Detailed Description
The invention will be further explained with reference to the following figures and examples:
as shown in fig. 1 to 4, the assembly type operating platform comprises two assembly platforms 1 and a plurality of cross beams 2, and is characterized in that the two assembly platforms 1 are oppositely arranged in parallel, a gap is reserved between the two assembly platforms 1, the peripheral edges of the assembly platforms 1 are provided with fences, the cross beams 2 are positioned between the two assembly platforms 1, the two assembly platforms 1 are fixed together through the cross beams 2, a frame-shaped hoop 3 is formed between the cross beam 2 and the two assembly platforms 1, a steel structure to be welded is positioned in the hoop 3, and the cross beam 2 is fixedly connected with the assembly platforms 1 through bolts;
still include a plurality of wooden wedges 4, leave the clearance between staple bolt 3 and the steel construction, wooden wedge 4 is located the clearance between staple bolt 3 and the steel construction.
Be equipped with a plurality of screw holes that are 100mm to the interval on the rail of two assembly platform 1 opposite faces, be equipped with on the end plate at 2 both ends of crossbeam with assembly platform 1 on the bolt hole that screw hole matches, the bolt hole of 2 both ends of crossbeam end plates aligns with the screw hole on the assembly platform 1, and installs the bolt in the bolt hole that just aligns.
The assembling platform 1 and the cross beam 2 are connected to form an operating platform, and felt cloth is arranged on the periphery of the operating platform.
The height of the rails on opposite sides of two mounting platforms 1 is lower than the height of the other three edges.
The utility model discloses the during operation is placed two assembly platform 1 on treating the girder steel support of welded steel construction, treats that welded steel construction is located between two assembly platform 1, fixes a plurality of crossbeams 2 on assembly platform 1 again, forms staple bolt 3 between crossbeam 2 and two assembly platform 1, and wooden wedge 4 is located the clearance between staple bolt 3 and the steel construction, is used for the utility model discloses a fixed, if treat that welded steel construction does not have the girder steel support, then can set up the support under assembly platform 1 and fix. In addition, felt cloth is arranged around the operating platform, the operating platform is made into a heat preservation shed or a windproof shed, and welding is facilitated without being influenced by external factors.
The present invention has been described above with reference to the accompanying drawings, and it is obvious that the present invention is not limited by the above embodiments, and various improvements made by the method concept and technical solution of the present invention or directly applied to other occasions without improvement are all within the protection scope of the present invention.
Claims (4)
1. The assembly type operation platform comprises two assembly platforms (1) and a plurality of cross beams (2), and is characterized in that the two assembly platforms (1) are arranged in parallel and oppositely, a gap is reserved between the two assembly platforms (1), the peripheral edges of the assembly platforms (1) are provided with fences, the cross beams (2) are positioned between the two assembly platforms (1), the two assembly platforms (1) are fixed together through the cross beams (2), a frame-shaped hoop (3) is formed between the cross beams (2) and the two assembly platforms (1), a steel structure to be welded is positioned in the hoop (3), and the cross beams (2) are fixedly connected with the assembly platforms (1) through bolts;
still include a plurality of wooden wedges (4), leave the clearance between staple bolt (3) and the steel construction, wooden wedge (4) are located the clearance between staple bolt (3) and the steel construction.
2. The assembly type operating platform as claimed in claim 1, wherein the rails on the opposite sides of the two assembly platforms (1) are provided with a plurality of pairs of threaded holes with a distance of 100mm, the end plates at the two ends of the cross beam (2) are provided with bolt holes matched with the threaded holes on the assembly platforms (1), the bolt holes on the end plates at the two ends of the cross beam (2) are aligned with the threaded holes on the assembly platforms (1), and bolts are installed in the aligned bolt holes.
3. The assembly type operating platform according to claim 1, wherein the assembly platform (1) and the cross beam (2) are connected to form the operating platform, and felt cloth is arranged around the operating platform.
4. Fabricated work platform according to claim 1, characterized in that the fences of the opposite faces of two fabricated platforms (1) are each lower in height than the other three edges.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921599438.0U CN211313280U (en) | 2019-09-25 | 2019-09-25 | Assembled operation platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921599438.0U CN211313280U (en) | 2019-09-25 | 2019-09-25 | Assembled operation platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211313280U true CN211313280U (en) | 2020-08-21 |
Family
ID=72076230
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921599438.0U Expired - Fee Related CN211313280U (en) | 2019-09-25 | 2019-09-25 | Assembled operation platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211313280U (en) |
-
2019
- 2019-09-25 CN CN201921599438.0U patent/CN211313280U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107386462B (en) | Unilateral buckling restrained steel beam and column connecting node and steel structure building | |
CN110630015A (en) | Large-span steel bar truss floor support plate assembled support and construction method | |
CN202227701U (en) | Spliced type horizontal channel device | |
CN103774838B (en) | A kind of construction of lift well assembling safe operation platform and using method | |
CN211313280U (en) | Assembled operation platform | |
CN213804906U (en) | Positioning auxiliary device is assembled to steel case roof beam | |
CN205348415U (en) | Steel frame structure H type beam column node | |
CN213421059U (en) | Steel structure fastening support suitable for boiler | |
CN210134525U (en) | Connecting structure capable of quickly mounting steel beam | |
CN211172708U (en) | Column foot structure of channel steel column | |
CN210827835U (en) | Beam column rigid connection structure | |
CN210134340U (en) | Assembled landing stage guardrail | |
CN112267563A (en) | Steel beam column connection node for fine construction | |
CN221167413U (en) | Assembled trestle convenient to equipment | |
CN210850704U (en) | Vibrating table frame | |
CN214061952U (en) | Connecting plate fixing structure for welding large column beam | |
CN111074793A (en) | Cantilever construction steel beam segment butt welding temporary locking device and construction method | |
CN220036183U (en) | Clamp type code plate for steel beam installation | |
CN110005210A (en) | The mounting device and its construction method of steel truss | |
CN212656622U (en) | Steel construction industry factory building component | |
CN215167936U (en) | Assembled type packway structure | |
CN212359164U (en) | Trestle type assembling jig frame for steel beam subsection sliding | |
CN219753001U (en) | Support structure for transverse moving track of spliced wide bridge | |
CN219343546U (en) | Assembled steel structure connecting piece | |
CN215489654U (en) | Six-side lapping device for industrial boiler steel structure I-shaped steel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200821 |
|
CF01 | Termination of patent right due to non-payment of annual fee |