CN211286694U CN201922200988.7U CN201922200988U CN211286694U CN 211286694 U CN211286694 U CN 211286694U CN 201922200988 U CN201922200988 U CN 201922200988U CN 211286694 U CN211286694 U CN 211286694U
Authority
CN
China
Prior art keywords
fixed
sighting rod
base
grouting
thick liquid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922200988.7U
Other languages
Chinese (zh)
Inventor
孔秋艳
耿书丽
王孝慈
杨瑞红
吴瑞丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201922200988.7U priority Critical patent/CN211286694U/en
Application granted granted Critical
Publication of CN211286694U publication Critical patent/CN211286694U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses an elevation ware for grout for civil construction, base mechanism including sighting rod and supporting connection, the sighting rod is cylinder shell structure, the sighting rod outer wall evenly sets up the hourglass thick liquid hole that a plurality of dislocation distribute, base mechanism includes chassis and base, four screw holes have been seted up about angles such as its axis to the chassis upper surface, the bottom surface on chassis corresponds screw hole position department and is fixed with the base, chassis top surface central point department of putting is fixed with the ring that cup joints with the sighting rod outer wall, ring inside be fixed with two with the sighting rod bottom two plug-in blocks that leak thick liquid hole joint. The utility model discloses in, through setting up the sighting rod into cylinder shell structure, and the sighting rod outer wall evenly sets up the structure in a plurality of hourglass thick liquid holes, can make the concrete that grout came in can enter into the inside of sighting rod through leaking the thick liquid hole, can make the inside vacuum layer that does not have of concrete after the grout has passed like this, guaranteed the quality of engineering.

Description

Elevation device for grouting for civil construction
Technical Field
The utility model relates to a civil construction technical field, concretely relates to elevation ware for grout for civil construction.
Background
In concrete construction, since concrete is in a flowing state before being solidified, it is difficult to ensure the surface level of the poured concrete, and usually, an elevation gauge is used to mark the surface height of the poured concrete.
Its base of current elevation ware is flat structure, can expose its base after the concrete setting demolishs the template like this, influences whole aesthetic property to the concrete building that does not have the whitewash decoration, and current elevation ware poor stability, the sighting rod is hollow tube structure, buries underground at the inside intensity that influences the building of concrete, and current elevation ware all is connected with the template surface, to the concrete building that the layering was pour such as pier, is difficult to realize fixedly.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a: in order to solve the problems that the base of the existing elevation device is attractive after pouring and the stability is poor, the elevation device for grouting for civil construction is provided.
The purpose of the utility model can be realized by the following technical scheme:
elevation ware for grout for civil construction, base mechanism including sighting rod and supporting connection, the sighting rod is cylinder shell structure, the hourglass thick liquid hole that a plurality of dislocation distribute is evenly seted up to the sighting rod outer wall, base mechanism includes chassis and base, four screw holes have been seted up about angles such as its axis to the chassis upper surface, the bottom surface on chassis corresponds screw hole position department and is fixed with the base, chassis top surface central point department of putting is fixed with the ring that cup joints with the sighting rod outer wall, ring inside is fixed with two and two grafting pieces of leaking thick liquid hole joint in sighting rod bottom, the top surface embedding of sighting rod is fixed with the top cap.
Further, the method comprises the following steps: the supporting fixed establishment that is provided with of sighting rod, fixed establishment includes joint piece, screw rod and fixed plate, the joint piece is the U type, just the clamping face and the hourglass thick liquid hole of joint piece are joint cooperation component, screw rod one end closes with joint piece surface soon and is connected, the screw rod other end closes soon and is connected with the fixed plate, and the fixed establishment through supporting setting can directly carry out the ligature with the reinforcing bar when carrying out the elevation to the concrete structures that the layer was pour such as pier, and the convenience is fixed the sighting rod ware.
Further, the method comprises the following steps: the slurry leaking hole is a rectangular hole with the thickness of 1.5cm by 2cm, and the size is convenient for the concrete slurry to flow into the inside of the marker post to densely fill the marker post.
Further, the method comprises the following steps: and a warning flag is fixed at the center of the top surface of the top cover.
Further, the method comprises the following steps: the fixed plate is of an arc-shaped plate body structure, and the fixed plate is arranged to be of the arc-shaped plate body structure, so that the fixed plate can be conveniently attached to the outer wall of the steel bar.
Further, the method comprises the following steps: the length of the mark rod is 150 cm.
The utility model has the advantages that:
1. through being fixed with four bases about its centre of a circle array in the chassis bottom surface, wherein, go out through the screw with the base is fixed on the plank that needs the grout in the top surface on chassis corresponding four base position, the department is fixed with the ring of two inside fixed grafting pieces in chassis top surface central point, the structure of being connected at two grafting piece outer walls and sighting rod bottom inner wall block, can make the sighting rod firmly fix on the plank that needs the grout through base mechanism, through setting up the sighting rod into cylindrical shell structure, and the sighting rod outer wall evenly sets up the structure in a plurality of hourglass thick liquid holes, can make the concrete that the grout came in enter into can enter into the inside of sighting rod through leaking the thick liquid hole, can make the inside vacuum layer that does not have of concrete after the grout like this, the quality of engineering has been guaranteed.
2. Through being fixed with the joint piece in the inside embedding of leaking the grout hole, wherein, screw rod one end closes with joint piece surface soon and is connected, closes the structure that is connected with the fixed plate soon at the screw rod other end, can be so that when meetting pier or roof beam batch grout, can be fixed through binding fixed plate and reinforcing bar for whole device is more stable, and application range is wider.
Drawings
The present invention will be further described with reference to the accompanying drawings.
Fig. 1 is a schematic view of the overall structure of the middle height indicator of the present invention;
fig. 2 is an exploded view of the middle level indicator of the present invention;
FIG. 3 is a schematic structural view of the base mechanism of the present invention;
fig. 4 is a schematic view of the overall structure of the middle height indicator of the present invention;
fig. 5 is a schematic structural view of the middle fixing mechanism of the present invention.
In the figure: 1. a base mechanism; 11. a chassis; 12. a base; 13. a circular ring; 14. an insertion block; 2. a marker post; 21. a slurry leakage hole; 3. a top cover; 4. a fixing mechanism; 41. a clamping block; 42. a screw; 43. and (7) fixing the plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely below with reference to the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
Please refer to fig. 1-5, the level indicator for grouting for civil construction comprises a marker post 2 and a base mechanism 1 connected therewith, the marker post 2 is a cylindrical shell structure, the outer wall of the marker post 2 is uniformly provided with a plurality of slurry leaking holes 21 distributed in a staggered manner, the base mechanism 1 comprises a chassis 11 and a base 12, the upper surface of the chassis 11 is provided with four screw holes at equal angles with respect to the axis thereof, the base 12 is fixed at the position of the bottom surface of the chassis 11 corresponding to the screw holes, a circular ring 13 sleeved with the outer wall of the marker post 2 is fixed at the central position of the top surface of the chassis 11, two inserting blocks 14 clamped with the two slurry leaking holes 21 at the bottom of the marker post 2 are fixed inside the circular ring 13, and a top cover 3 is fixed on the top surface of the.
2 supporting fixed establishment 4 that are provided with of sighting rod, fixed establishment 4 includes joint piece 41, screw rod 42 and fixed plate 43, joint piece 41 is the U type, and the clamping face of joint piece 41 is joint cooperation component with leaking thick liquid hole 21, screw rod 42 one end closes with joint piece 41 surface soon and is connected, the screw rod 42 other end closes soon and is connected with fixed plate 43, fixed establishment 4 through supporting setting is when carrying out the elevation to concrete structures such as piers layering pouring, can directly carry out the ligature with the reinforcing bar, conveniently fix the sighting rod ware, it is 1.5cm 2 cm's rectangular hole to leak thick liquid hole 21, the inside that this size is convenient for concrete thick liquid stream income sighting rod 2 carries out closely knit packing to sighting rod 2, fixed plate 43 is arc plate body structure, be convenient for paste with the reinforcing bar outer wall and lean on.
The top surface center of the top cover 3 is fixed with a warning flag, and the length of the post 2 is 150 cm.
The working principle is as follows: when the grouting elevation device is used, a worker firstly selects a marker post 2 with a proper height, then marks the depth to be grouted on the marker post 2, then fixes the whole base mechanism 1 on a template through screws, and then inserts the selected marker post 2 into the circular ring 13, so that the elevation device is completely fixed on the template;
need carry out the ligature with the sighting rod ware and the reinforcing bar when fixed, bind fixed plate 43 and near reinforcing bar together, then fix fixed plate 43 and joint piece 41 together through screw rod 42, thereby make sighting rod 2 and steel reinforcement cage be in vertical fixed state, operating personnel is when concreting, the thick liquid of concrete can make the concrete get into from leaking thick liquid hole 21 through leaking thick liquid hole 21 on sighting rod 2, let the concrete to 2 inside packings of sighting rod, the quality of engineering has been guaranteed.
In the description herein, references to the description of "one embodiment," "an example," "a specific example," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The foregoing is illustrative and explanatory only, and various modifications, additions and substitutions as described for the specific embodiments described herein may be made by those skilled in the art without departing from the scope of the invention or exceeding the scope of the invention as defined in the claims.

Claims (6)

1. The grouting elevation device for civil construction is characterized by comprising a marker post (2) and a base mechanism (1) which is connected with the marker post in a matching way, the marker post (2) is of a cylindrical shell structure, the outer wall of the marker post (2) is uniformly provided with a plurality of slurry leaking holes (21) which are distributed in a staggered manner, the base mechanism (1) comprises a base plate (11) and a base (12), four screw holes are arranged on the upper surface of the base plate (11) at equal angles relative to the axis of the base plate, a base (12) is fixed on the bottom surface of the chassis (11) corresponding to the position of the screw hole, a circular ring (13) sleeved with the outer wall of the marker post (2) is fixed at the center of the top surface of the chassis (11), the utility model discloses a thick liquid hole (21) is leaked to ring (13) inside be fixed with two with sighting rod (2) bottom two plug-in blocks (14) of joint, the top surface embedding of sighting rod (2) is fixed with top cap (3).
2. The elevation device for grouting of civil construction according to claim 1, wherein the sighting rod (2) is provided with fixed establishment (4) in a matching manner, fixed establishment (4) includes joint piece (41), screw rod (42) and fixed plate (43), joint piece (41) is the U type, just the clamping face of joint piece (41) is joint cooperation component with hourglass thick liquid hole (21), screw rod (42) one end is connected with joint piece (41) surface soon, screw rod (42) other end closes soon and is connected with fixed plate (43).
3. The level gauge for grouting of civil engineering and construction according to claim 1, wherein the grout leaking hole (21) is a rectangular hole of 1.5cm by 2 cm.
4. The grouting level gauge for civil construction according to claim 1, wherein a warning flag is fixed to the center of the top surface of the top cover (3).
5. The grouting level gauge for civil construction according to claim 2, wherein the fixing plate (43) is an arc-shaped plate structure.
6. The grouting level gauge for civil construction according to claim 1, wherein the length of the post (2) is 150 cm.
CN201922200988.7U 2019-12-10 2019-12-10 Elevation device for grouting for civil construction Expired - Fee Related CN211286694U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922200988.7U CN211286694U (en) 2019-12-10 2019-12-10 Elevation device for grouting for civil construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922200988.7U CN211286694U (en) 2019-12-10 2019-12-10 Elevation device for grouting for civil construction

Publications (1)

Publication Number Publication Date
CN211286694U true CN211286694U (en) 2020-08-18

Family

ID=72017198

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922200988.7U Expired - Fee Related CN211286694U (en) 2019-12-10 2019-12-10 Elevation device for grouting for civil construction

Country Status (1)

Country Link
CN (1) CN211286694U (en)

Similar Documents

Publication Publication Date Title
CN105236839A (en) Fiber concrete for anticracking impervious superthin plate shell/tube member, and preparation method and application thereof
CN110439147A (en) A kind of assembled light internal partition wall assembly joint structure and construction method
CN211286694U (en) Elevation device for grouting for civil construction
SU933879A1 (en) Foundation
CN106480827A (en) A kind of construction technology of segmented casting concrete box beam
CN107299640A (en) A kind of variable cross-section well shaft type ground continuous wall base and its construction method
CN207891869U (en) Steel-pipe pile
CN209227516U (en) Cast-in-situ bored pile shield-tube embedment structure
CN100585096C (en) Prefabricated prestressing pipe pile composite supporting wall structure
CN103911991B (en) Quick pile-splicing construction method for prestressed concrete PS (poly styrene) pile fracture
CN211289237U (en) Mounting structure for construction machinery
CN209230632U (en) A kind of measurement and positioning and the fixed control stake of elevation
CN204676407U (en) A kind of three arch rib support tie-rod configuration
CN209353327U (en) The quick pile extension device of rotary digging stake in small space
CN208933975U (en) A kind of large diameter steel pipe friction pile and stake top association structure
CN207567600U (en) A kind of prefabricated pier, plate fast joint structure
CN214738225U (en) Composite pile structure for power transmission line iron tower
CN217871169U (en) Porous brick and corner wall reinforced structure
CN218203652U (en) Energy-storage slow-release cement-based colored porous plate structure
CN217210899U (en) Ground mark for surveying and mapping engineering
CN201187055Y (en) Composite support wall board
CN214143560U (en) Base face prevention of seepage stagnant water structure for hydraulic engineering
CN220820241U (en) Marking device for GNSS positioning
CN211645830U (en) Sponge city infiltration structure
CN217678884U (en) Ecological river bank protection

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200818

Termination date: 20211210