CN211285599U - Soil body injection device is prevented to prestressing force tubular pile - Google Patents

Soil body injection device is prevented to prestressing force tubular pile Download PDF

Info

Publication number
CN211285599U
CN211285599U CN201921304983.2U CN201921304983U CN211285599U CN 211285599 U CN211285599 U CN 211285599U CN 201921304983 U CN201921304983 U CN 201921304983U CN 211285599 U CN211285599 U CN 211285599U
Authority
CN
China
Prior art keywords
pipe pile
pile
hollow pipe
plank sheathing
soil body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921304983.2U
Other languages
Chinese (zh)
Inventor
徐炜超
张明辉
蒋萦牧
张明明
陈志君
倪锋
池敏华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 7 Group Co Ltd
Original Assignee
Shanghai Construction No 7 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 7 Group Co Ltd filed Critical Shanghai Construction No 7 Group Co Ltd
Priority to CN201921304983.2U priority Critical patent/CN211285599U/en
Application granted granted Critical
Publication of CN211285599U publication Critical patent/CN211285599U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model relates to a prestressed pipe pile prevents soil body injection device relates to the content and includes hollow pipe pile, seals plank sheathing and pile follower. The top rigid coupling of hollow pipe pile has the plank sheathing, the plank sheathing covers hollow pipe pile's stake core completely. The shape of the wood template is consistent with that of the top of the hollow pipe pile. The wood template is bonded with the hollow pipe pile through structural adhesive. The hollow pipe pile is a square pipe pile. The utility model discloses utilize the plank sheathing to seal the processing with the hollow hole of pile body contact site to pile follower, can prevent that the soil body from in the hole of the last section of stake of injection after the pile follower is extracted, avoid need carrying out clear hole operation before irritating the core for pile foundation engineering work progress can reduce, has promoted the efficiency of construction, has reduced construction cost.

Description

Soil body injection device is prevented to prestressing force tubular pile
Technical Field
The utility model relates to a prestressed pipe pile prevents soil body injection device specifically indicates, for preventing that the soil body from injecting the device of stake core and installation after pile follower extracts, belongs to static pressure pile construction technical field.
Background
In recent years, the static pressure pile construction process is more and more widely applied to building engineering, and the static pressure pile has the advantages of small noise pollution in the construction process, high construction speed, simple construction process and the like compared with hammering pile sinking and drilling pile sinking. Two important points in the building construction process are safety and efficiency, and the target is embodied in each link of construction. And (3) performing core filling operation on the prestressed concrete hollow static pressure pile before structural construction after foundation engineering is completed. The miscellaneous soil in the pile core needs to be cleaned before core filling, a large amount of labor force and construction time of constructors need to be consumed, and the construction efficiency is influenced.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that a soil body injection device is prevented to prestressing force tubular pile can prevent that the soil body from injecting into the hole of last section of stake after pile follower extracts, avoids need clearing the hole operation before irritating the core.
In order to solve the above problem, the utility model discloses a technical scheme as follows:
the utility model provides a prestressed pipe pile prevents soil body injection device, includes hollow pipe pile, hollow pipe pile's top rigid coupling has the plank sheathing, the plank sheathing covers hollow pipe pile's stake core completely.
Further, the shape of the wood template is consistent with that of the top of the hollow pipe pile.
Further, the wood template is bonded with the hollow pipe pile through structural adhesive.
Further, the hollow pipe pile is a square pipe pile.
Furthermore, the side length of square tubular pile is 500mm, and the internal diameter is 300 mm.
Compared with the prior art, the beneficial effects of the utility model reside in that:
1. the utility model discloses utilize the plank sheathing to seal the processing to the pile core top of pile follower and pile body contact site, can prevent that the soil body from in the hole of the last section of stake of injection after the pile follower is extracted, avoid need carrying out clear hole operation before irritating the core for pile foundation engineering work progress can reduce, has promoted the efficiency of construction, has reduced construction cost.
2. The utility model discloses required plank sheathing material can be at on-the-spot processing, and the preparation is simple and convenient, strong adaptability.
3. The utility model discloses need not the cooperation of jack-up machinery, practice thrift manual work and mechanical cooperation expense.
Drawings
Fig. 1 is an elevation view of an operation surface of the present invention in a construction application.
Fig. 2 is a plan view of the operation surface of the present invention in construction application.
In the figure: and 3, a pile feeder.
Detailed Description
The present invention will be described in further detail with reference to the following drawings and specific embodiments. The objects, aspects and advantages of the present invention will become more apparent from the following description. It should be understood that the described embodiments are presently preferred, but not all embodiments of the invention.
Combine fig. 1 and fig. 2 to show, a soil body injection device is prevented to prestressing force tubular pile, including hollow tubular pile 1, the top of hollow tubular pile 1 has plank sheathing 2 through structural adhesive bonding, plank sheathing 2 covers hollow tubular pile's stake core 4 completely. Preferably, the wooden template 2 is consistent with the top of the hollow pipe pile 1 in shape.
As shown in the figure, the hollow pipe pile 1 is a square pipe pile. The side length of the square tubular pile is 500mm, and the inner diameter of the square tubular pile is 300 mm.
The utility model discloses when construction application, at first with 2 processing wooden templates into with 1 cross-section assorted shape of hollow tube stake earlier. And secondly, fixing the wood template 2 on the pile head by using structural adhesive before pile pressing, and finally pressing the pile to the designed elevation by operating personnel.
The above description is only for the purpose of illustration of the preferred embodiments of the present invention, and it is not intended to limit the scope of the present invention, and it is obvious that any person skilled in the art can easily conceive of alterations and modifications to obtain other embodiments based on the above embodiments, and these should be covered by the scope of the present invention.

Claims (5)

1. The utility model provides a prestressed pipe pile prevents soil body injection device, includes hollow pipe pile, its characterized in that:
the top rigid coupling of hollow pipe pile has the plank sheathing, the plank sheathing covers hollow pipe pile's stake core completely.
2. The prestressed pipe pile soil penetration preventing device according to claim 1, wherein:
the shape of the wood template is consistent with that of the top of the hollow pipe pile.
3. The prestressed pipe pile soil penetration preventing device according to claim 1 or 2, characterized in that:
the wood template is bonded with the hollow pipe pile through structural adhesive.
4. The prestressed pipe pile soil penetration preventing device according to claim 1, wherein:
the hollow pipe pile is a square pipe pile.
5. The prestressed pipe pile soil penetration preventing device according to claim 4, wherein:
the side length of the square tubular pile is 500mm, and the inner diameter of the square tubular pile is 300 mm.
CN201921304983.2U 2019-08-12 2019-08-12 Soil body injection device is prevented to prestressing force tubular pile Active CN211285599U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921304983.2U CN211285599U (en) 2019-08-12 2019-08-12 Soil body injection device is prevented to prestressing force tubular pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921304983.2U CN211285599U (en) 2019-08-12 2019-08-12 Soil body injection device is prevented to prestressing force tubular pile

Publications (1)

Publication Number Publication Date
CN211285599U true CN211285599U (en) 2020-08-18

Family

ID=72013436

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921304983.2U Active CN211285599U (en) 2019-08-12 2019-08-12 Soil body injection device is prevented to prestressing force tubular pile

Country Status (1)

Country Link
CN (1) CN211285599U (en)

Similar Documents

Publication Publication Date Title
CN112030964B (en) Positioning grouting anchor rod suitable for engineering seepage damage prevention and control and construction method thereof
CN105201530A (en) Repairing and strengthening method for large cracks on rock tunnel lining
CN201883435U (en) Preburied pipe pile grouting device
CN206396742U (en) A kind of prefabricated pile
CN111395300A (en) Method for reinforcing soft soil foundation structure by using original bamboo grouting piles
CN201581394U (en) Large pile toe grout-injection precast pile
CN211285599U (en) Soil body injection device is prevented to prestressing force tubular pile
CN201050062Y (en) Sand bed soil reinforcing piece
CN101575855A (en) Non soil taking hole guiding process for sinking prestressed pipe pile or prefabricated square pile
CN2370066Y (en) Channel slip casting steel bar concrete hollow prefabricated pile
CN206328747U (en) A kind of bolted precast square pile
CN206289627U (en) A kind of post jacking pile tube
CN201292528Y (en) Grouting machine
CN217270125U (en) Ultrahigh-pressure soil body jet cutting grouting device
CN203878590U (en) Post-reinforcement structure for cast-in-place piles
CN109972632A (en) Recoverable soil nail pin-connected panel flexible cladding wall construction method
CN206800379U (en) Grouting behind shaft or drift lining pre-stress hollow square pile
CN201520973U (en) Precast pile with grouting hole
CN201232181Y (en) Permeable structure of rigid drainage pile
CN204080797U (en) The composite pile of a kind of PHC stake and YTSC stake
CN205475211U (en) A mix soil extrusion solidification precast pile for soft base is handled
CN2153578Y (en) High efficiency ground pile
CN209538172U (en) A kind of composite structure of high-pressure rotary jet grouting pile and pile for prestressed pipe
CN112609685B (en) Concrete pipe pile system suitable for soft soil foundation and construction method thereof
CN111424647A (en) Concrete precast pile connecting device and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant