CN211260067U - 5G system installation equipment - Google Patents
5G system installation equipment Download PDFInfo
- Publication number
- CN211260067U CN211260067U CN201921793259.0U CN201921793259U CN211260067U CN 211260067 U CN211260067 U CN 211260067U CN 201921793259 U CN201921793259 U CN 201921793259U CN 211260067 U CN211260067 U CN 211260067U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- pipe
- bottom plate
- cooling
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009434 installation Methods 0.000 title claims abstract description 39
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 46
- 238000001816 cooling Methods 0.000 claims abstract description 37
- 239000007788 liquid Substances 0.000 claims description 5
- 230000003014 reinforcing effect Effects 0.000 claims description 5
- 238000010586 diagram Methods 0.000 description 2
- 238000010295 mobile communication Methods 0.000 description 2
- 239000003351 stiffener Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 239000002826 coolant Substances 0.000 description 1
- 239000000110 cooling liquid Substances 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
Images
Landscapes
- Cooling Or The Like Of Electrical Apparatus (AREA)
Abstract
The utility model relates to the technical field of installation equipment, and discloses 5G system installation equipment, which comprises a bottom plate, wherein the upper surface of the bottom plate is fixedly connected with a supporting rod, the outer wall of the supporting rod is fixedly connected with a plurality of evenly distributed annular cooling pipes, the upper surface of the bottom plate is fixedly connected with a cooling mechanism, the front side and the rear side of the annular cooling pipes are fixedly connected with an installation frame together, and a clamping mechanism is fixedly connected in the installation frame; the cooling mechanism comprises a water storage tank and a cooling tank which are fixedly connected with the upper surface of the base plate, the left side and the right side of the annular cooling pipes are respectively and fixedly communicated with a first shunt pipe and a second shunt pipe, a pump is fixedly connected in the water storage tank, and a first water delivery pipe is fixedly connected at the output end of the pump. The utility model discloses can conveniently cool off a plurality of 5G network hardware equipment fast, improve 5G network hardware equipment's life, can conveniently install 5G network hardware equipment simultaneously, improve the installation effectiveness.
Description
Technical Field
The utility model relates to a erection equipment technical field especially relates to a 5G system installation equipment.
Background
The 5G is a fifth generation mobile communication technology and also an extension behind the 4G, and the peak theoretical transmission speed of the 5G network as a fifth generation mobile communication network can reach tens of Gb per second, which is hundreds of times faster than that of the 4G network, and the main objective of the 5G network is to keep the end user in a networked state all the time.
The existing 5G network hardware equipment has the following defects when being installed:
firstly, when the installation equipment installs a plurality of 5G network hardware equipment, the heat emitted by the plurality of 5G network hardware equipment is large, and the service life of the 5G network hardware equipment is influenced;
when the second and 5G network hardware devices are installed, most of the devices are connected through bolts, so that the installation is inconvenient, and the devices are not easy to disassemble and assemble.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving among the prior art because of the erection equipment when installing a plurality of 5G network hardware equipment, the heat that a plurality of 5G network hardware equipment gived off is great, can cause the influence to the life of 5G network hardware equipment, and 5G network hardware equipment when installing, connect through using the bolt mostly, the installation is inconvenient, and is difficult for carrying out the problem of dismouting to it, and the 5G system installation equipment that proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the 5G system installation equipment comprises a bottom plate, wherein a supporting rod is fixedly connected to the upper surface of the bottom plate, a plurality of uniformly distributed annular cooling pipes are fixedly connected to the outer wall of the supporting rod, a cooling mechanism is fixedly connected to the upper surface of the bottom plate, an installation frame is fixedly connected to the front side and the rear side of each annular cooling pipe together, and a clamping mechanism is fixedly connected to the inside of the installation frame;
the cooling mechanism comprises a water storage tank and a cooling tank which are fixedly connected with the upper surface of the bottom plate, the left side and the right side of the annular cooling pipe are respectively and fixedly communicated with a first shunt pipe and a second shunt pipe, a pump is fixedly connected in the water storage tank, the output end of the pump is fixedly connected with a first water pipe, one end, away from the pump, of the first water pipe is fixedly communicated with the side wall of the first shunt pipe, the outer wall of the first water pipe is fixedly connected with an electromagnetic valve, the right side of the second shunt pipe is fixedly communicated with a second water pipe, and one end, away from the second shunt pipe, of the second water pipe penetrates through the side wall of the cooling tank and is fixedly communicated with the side wall of the water storage tank.
Preferably, the liquid inlet has all been seted up to the lateral wall of storage water tank and cooler bin, and the liquid inlet internal plug has the rubber buffer.
Preferably, the left and right sides of the supporting rod are fixedly connected with reinforcing rods which are obliquely arranged, and one ends of the reinforcing rods, far away from the supporting rod, are fixedly connected with the upper surface of the bottom plate.
Preferably, chucking mechanism include with installing frame top sliding connection's T type pole, the first U type splint of bottom fixedly connected with of T type pole, the top fixedly connected with spring of first U type splint, the one end that first U type splint were kept away from to the spring is connected with the top inner wall fixed connection of installing frame, threaded hole is seted up on the surface of installing frame, and threaded hole female connection has the corresponding bolt of T type pole, the bottom inner wall fixedly connected with of installing frame and the corresponding second U type splint of first U type splint.
Preferably, the rubber pads are fixedly connected to the opposite sides of the first U-shaped clamping plate and the second U-shaped clamping plate.
Compared with the prior art, the utility model provides a 5G system installation equipment possesses following beneficial effect:
1. this 5G system installation equipment through being provided with cooling body, can conveniently cool off a plurality of 5G network hardware equipment fast, has improved 5G network hardware equipment's life.
2. This 5G system installation equipment through being provided with chucking mechanism, can conveniently install 5G network hardware equipment, has improved the installation effectiveness.
The device does not relate to the part and all is the same with prior art or can adopt prior art to realize, the utility model discloses can conveniently cool off a plurality of 5G network hardware equipment fast, improve 5G network hardware equipment's life, can conveniently install 5G network hardware equipment simultaneously, improve the installation effectiveness.
Drawings
Fig. 1 is a schematic structural diagram of a 5G system installation apparatus provided by the present invention;
fig. 2 is a schematic structural diagram of a part a of the 5G system installation device provided by the present invention.
In the figure: the device comprises a base plate 1, a support rod 2, an annular cooling pipe 3, a cooling mechanism 4, a water storage tank 41, a cooling box 42, a first flow dividing pipe 43, a second flow dividing pipe 44, a pump 45, a first water conveying pipe 46, an electromagnetic valve 47, a second water conveying pipe 48, an installation frame 5, a clamping mechanism 6, a T-shaped rod 61, a first U-shaped clamping plate 62, a spring 63, a bolt 64, a second U-shaped clamping plate 65, a rubber plug 7 and a reinforcing rod 8.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-2, a 5G system installation device comprises a bottom plate 1, wherein a support rod 2 is fixedly connected to the upper surface of the bottom plate 1, a plurality of uniformly distributed annular cooling pipes 3 are fixedly connected to the outer wall of the support rod 2, a cooling mechanism 4 is fixedly connected to the upper surface of the bottom plate 1, an installation frame 5 is fixedly connected to the front side and the rear side of each of the plurality of annular cooling pipes 3, and a clamping mechanism 6 is fixedly connected to the inside of the installation frame 5;
The inlet has all been seted up to the lateral wall of storage water tank 41 and cooler bin 42, and the inlet is filled in to have rubber buffer 7, can conveniently add into storage water tank 41 and cooler bin 42 with water and coolant liquid.
The equal fixedly connected with slope of the left and right sides of bracing piece 2 sets up stiffener 8, and the one end that bracing piece 2 was kept away from to stiffener 8 is connected with the last fixed surface of bottom plate 1, can conveniently improve the stability of bracing piece 2.
The equal fixedly connected with rubber pad in the relative one side of first U type splint 62 and second U type splint 65 can increase first U type splint 62 and second U type splint 65's frictional force, makes its centre gripping more stable.
The pump 45 and the solenoid valve 47 are electrically connected to an external power source through a control switch, so as to ensure that the power supply is supported during operation.
In the utility model, when a plurality of 5G network hardware devices are required to be cooled rapidly, the pump 45 is started, the pump 45 takes water from the water storage tank 41 and conveys the water into the first water pipe 46, the electromagnetic valve 47 on the first water pipe 46 is opened, the water in the first water pipe 46 is conveyed into the first shunt pipe 43 and enters the plurality of annular cooling pipes 3 through the first shunt pipe 43, the adopted installation structure is a frame body, so that the 5G network hardware devices can be attached to the annular cooling pipe 4, when cold water in the annular cooling pipe 4 passes through the 5G network hardware devices, a part of heat on the 5G network hardware devices is taken away through the heat exchange principle and enters the second shunt pipe 44 and then enters the second water pipe 48 through the second shunt pipe 44, when the water in the second water pipe 48 passes through the cooling box 42, the cooling liquid in the cooling box 42 cools the water in the second water pipe 48, the water in the second water pipe 48 is conveyed into the water storage tank 41 again, and the process is repeated for cooling the 5G network hardware equipment for a plurality of times, so that the 5G network hardware equipment can be conveniently and rapidly cooled, the service life of the 5G network hardware equipment is prolonged, when 5G network hardware equipment needs to be installed, the bolt 64 is rotated to loosen the bolt 64, and pulls the T-shaped rod 61, the T-shaped rod 61 pulls the first U-shaped clamping plate 62, the first U-shaped clamping plate 62 presses the spring 63, the spring 63 is contracted inwards, the 5G network hardware equipment is clamped in the second U-shaped clamping plate 65, and the T-shaped rod 61 is released, the spring 63 pushes the first U-shaped clamping plate 62, the first U-shaped clamping plate 62 clamps the 5G network hardware equipment, and the T-shaped rod 61 is locked by using the bolt 64, so that 5G network hardware equipment can be conveniently installed, and the installation efficiency is improved.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (5)
1. The 5G system installation equipment comprises a bottom plate (1), and is characterized in that a support rod (2) is fixedly connected to the upper surface of the bottom plate (1), a plurality of uniformly distributed annular cooling pipes (3) are fixedly connected to the outer wall of the support rod (2), a cooling mechanism (4) is fixedly connected to the upper surface of the bottom plate (1), an installation frame (5) is fixedly connected to the front side and the rear side of each annular cooling pipe (3) together, and a clamping mechanism (6) is fixedly connected to the inside of the installation frame (5);
the cooling mechanism (4) comprises a water storage tank (41) and a cooling tank (42) which are fixedly connected with the upper surface of the bottom plate (1), the left side and the right side of the plurality of annular cooling pipes (3) are respectively and fixedly communicated with a first shunt pipe (43) and a second shunt pipe (44), a pump (45) is fixedly connected in the water storage tank (41), the output end of the pump (45) is fixedly connected with a first water delivery pipe (46), one end of the first water pipe (46) far away from the pump (45) is fixedly communicated with the side wall of the first shunt pipe (43), the outer wall of the first water pipe (46) is fixedly connected with an electromagnetic valve (47), the right sides of the two second shunt pipes (44) are jointly and fixedly communicated with a second water pipe (48), one end of the second water pipe (48) far away from the second shunt pipe (44) penetrates through the side wall of the cooling box (42) and is fixedly communicated with the side wall of the water storage box (41).
2. The 5G system installation equipment according to claim 1, wherein liquid inlets are formed in the side walls of the water storage tank (41) and the cooling tank (42), and rubber stoppers (7) are plugged in the liquid inlets.
3. The 5G system installation equipment according to claim 1, wherein obliquely arranged reinforcing rods (8) are fixedly connected to the left side and the right side of the supporting rod (2), and one ends of the reinforcing rods (8) far away from the supporting rod (2) are fixedly connected with the upper surface of the bottom plate (1).
4. The 5G system installation device as claimed in claim 1, wherein the clamping mechanism (6) comprises a T-shaped rod (61) which is slidably connected with the top of the installation frame (5), a first U-shaped clamping plate (62) is fixedly connected to the bottom of the T-shaped rod (61), a spring (63) is fixedly connected to the top of the first U-shaped clamping plate (62), one end, far away from the first U-shaped clamping plate (62), of the spring (63) is fixedly connected with the inner wall of the top of the installation frame (5), a threaded hole is formed in the surface of the installation frame (5), a bolt (64) corresponding to the T-shaped rod (61) is connected in the threaded hole in a threaded manner, and a second U-shaped clamping plate (65) corresponding to the first U-shaped clamping plate (62) is fixedly connected to the inner wall of the bottom of the installation frame (5).
5. A5G system mounting device according to claim 4, characterised in that a rubber pad is fixedly attached to each of the opposite sides of the first (62) and second (65) U-shaped clamping plates.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921793259.0U CN211260067U (en) | 2019-10-24 | 2019-10-24 | 5G system installation equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921793259.0U CN211260067U (en) | 2019-10-24 | 2019-10-24 | 5G system installation equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211260067U true CN211260067U (en) | 2020-08-14 |
Family
ID=71957874
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921793259.0U Expired - Fee Related CN211260067U (en) | 2019-10-24 | 2019-10-24 | 5G system installation equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211260067U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112351616A (en) * | 2020-11-06 | 2021-02-09 | 天津全和诚科技有限责任公司 | Microwave generator |
-
2019
- 2019-10-24 CN CN201921793259.0U patent/CN211260067U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112351616A (en) * | 2020-11-06 | 2021-02-09 | 天津全和诚科技有限责任公司 | Microwave generator |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211260067U (en) | 5G system installation equipment | |
CN209926662U (en) | New energy automobile water-cooled condenser | |
CN216274392U (en) | Proton exchange membrane hydrogen production module with high heat exchange efficiency | |
CN208450214U (en) | A kind of ingot gripper | |
CN214720499U (en) | Novel tilting casting machine water cooling device | |
CN112751268A (en) | Be applied to electrical equipment's high-efficient heat dissipation cabinet | |
CN215508670U (en) | Solar energy blank pipe reducing equipment | |
CN213904950U (en) | Marine reactor waste heat discharge system | |
CN209861407U (en) | Small system movement module | |
CN211855029U (en) | Novel plate heat exchanger's cooling base | |
CN211177549U (en) | Vacuum cooling device | |
CN210161099U (en) | Condenser core binding equipment | |
CN210807333U (en) | Heat dissipation device for switch | |
CN216592431U (en) | External water-cooling frame | |
CN215421369U (en) | Static phase advancer cooling device | |
CN216058021U (en) | External water-cooling frame heat radiation structure | |
CN214175032U (en) | Be applied to high-pressure-resistant high-efficient ditch water-cooling plate of digging of 5G server | |
CN214125800U (en) | 5G communication equipment with integrated configuration | |
CN218955513U (en) | Efficient cooling tower convenient to maintain | |
CN219938762U (en) | Network safety device with detachable heat dissipation base | |
CN221508286U (en) | Energy storage power station with battery heat radiation structure | |
CN212435156U (en) | Water-cooled dynamic reactive power compensation device | |
CN220897059U (en) | Mining explosion-proof frequency converter with explosion-proof core | |
CN219677905U (en) | A electric power cabinet for energy-efficient | |
CN212555206U (en) | Compounding agent granulator cooling system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20211222 Address after: 518021 Room 202, building C, Hongcheng business center, No. 3063, Buxin Dongxiao Road, Dongxiao street, Luohu District, Shenzhen, Guangdong Province Patentee after: Shenzhen Liyu Culture Communication Co.,Ltd. Address before: 362000 Xiaban 36, Wupu Mountain Village, Shishan Town, Nanan City, Quanzhou City, Fujian Province Patentee before: NANAN HAOYUNLAI RAIN GEAR Co.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200814 |