CN211257445U - Assembled steel construction light slat wall constructional column node - Google Patents
Assembled steel construction light slat wall constructional column node Download PDFInfo
- Publication number
- CN211257445U CN211257445U CN201922179025.3U CN201922179025U CN211257445U CN 211257445 U CN211257445 U CN 211257445U CN 201922179025 U CN201922179025 U CN 201922179025U CN 211257445 U CN211257445 U CN 211257445U
- Authority
- CN
- China
- Prior art keywords
- constructional column
- assembled steel
- column
- steel structure
- building wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
The utility model belongs to the technical field of the steel construction building technology and specifically relates to an assembled steel construction light slat wall constructional column node, including assembled steel construction building wall and constructional column, the node of constructional column includes the square steel pipe, outsourcing sheet metal and split bolt, the constructional column is connected with assembled steel construction building wall through split bolt, the outside of constructional column is equipped with the outsourcing sheet metal, assembled steel construction building wall is the light slat, and the tip of light slat is equipped with the grooving on the connected node position of constructional column on the assembled steel construction building wall, the constructional column is H shaped steel post, the component material of outsourcing sheet metal is the same with assembled steel construction building wall's material, be equipped with on the outsourcing sheet metal and make its self tapping screw of fixing on the square steel pipe, square steel pipe welds with H shaped steel post mutually. The H-shaped steel column is adopted to replace the traditional concrete constructional column, and vertical water and electricity pipelines are arranged on the outer side of the H-shaped steel column, so that the working procedures of slotting and pipeline burying of the light batten wall are reduced.
Description
Technical Field
The utility model relates to a steel construction building technical field especially relates to an assembled steel construction light slat wall constructional column node.
Background
When the steel structure building adopts the light slat wall, installation length overlength, the wall easily produces the fine crack, also influences the security performance of wall body, generally requires to take to add to the overlength partition wall and establishes treatment measures such as constructional column, and traditional constructional column is reinforced concrete cast-in-place generally, need set up the scaffold frame during on-the-spot construction, ties reinforcing bar formwork pouring concrete, can demolish the mould after waiting concrete curing to accomplish, and the time cycle is long, and the process is complicated, and the measure expense is high.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcomings of long construction period, complex process and high measure cost of the concrete constructional column when the steel structure building adopts the ultralong light batten wall in the prior art, and providing an assembled steel structure light batten wall constructional column node.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the design is a fabricated steel structure light slat wall constructional column node, including fabricated steel structure building wall and constructional column, the node of constructional column includes square steel pipe, outsourcing sheet metal and split bolt, the constructional column is connected with fabricated steel structure building wall through split bolt, the outside of constructional column is equipped with the outsourcing sheet metal.
Preferably, the assembly type steel structure building wall is a light batten, a cutting groove is formed in the end portion of the light batten at the connecting node position of the constructional column on the assembly type steel structure building wall, and the constructional column is an H-shaped steel column.
Preferably, the composition material of the outer-coated thin plate is the same as that of the assembled steel structure building wall, the outer-coated thin plate is provided with a self-tapping screw which enables the outer-coated thin plate to be fixed on a square steel pipe, and the square steel pipe is welded with the H-shaped steel column.
Preferably, a gap for filling mortar is arranged between the assembled steel structure building walls formed by the outer-wrapped thin plates and the light ribbon boards.
Preferably, the joint of the assembled steel structure building wall body consisting of the outer-coated thin plate and the light ribbon board is adhered with alkali-resistant glass fiber mesh cloth and is filled with putty.
Preferably, a gap for penetrating a vertical water and electricity pipeline is arranged between the constructional column and the outer packing thin plate.
The utility model provides a pair of assembled steel construction light slat wall constructional column node, beneficial effect lies in:
1. the H-shaped steel column is adopted to replace the traditional concrete constructional column, and vertical water and electricity pipelines are arranged on the outer side of the H-shaped steel column, so that the working procedures of slotting and pipeline burying of the light batten wall are reduced.
2. The H-shaped steel column is well hidden through the outer package of the outer package thin plate, the thin plate is consistent with the light batten wall material, mortar is filled in the gap, the alkali-resistant glass fiber grids are pasted at the splicing position, and putty is filled, so that cracks can be effectively prevented from being generated, dry connection of the nodes is realized, the construction speed is high, and the measure cost is low.
The utility model discloses simple structure, the simple operation, the shortcoming of establishing concrete constructional column construction cycle length, process complicacy, measure expense high when solution prior art steel construction building that can be fine adopts overlength light slat wall, the system connection is reliable, and construction speed is fast and measure expense is low, has stronger practicality.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic structural view of the joint between the middle constructional column and the slat wall and the thin plate of the present invention.
Fig. 3 is the utility model discloses well assembled steel construction building wall end of body's grooving structure sketch map.
Fig. 4 is a schematic structural view of the H-shaped steel column of the present invention.
Fig. 5 is a schematic structural view of the middle split bolt of the present invention.
Fig. 6 is a schematic structural view of the tapping screw of the present invention.
Fig. 7 is a schematic structural view of the square steel tube of the present invention.
Fig. 8 is a schematic structural view of the middle and outer wrapping sheet of the present invention.
In the figure: 1-assembled steel structure building wall, 11-grooving, 2-wrapping thin plates, 3-constructional columns, 4-split bolts, 5-square steel pipes, 6-self-tapping screws and 7-alkali-resistant glass fiber mesh cloth.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-8, an assembled steel structure lightweight slat wall constructional column node comprises an assembled steel structure building wall 1 and a constructional column 3, wherein the assembled steel structure building wall 1 is a lightweight slat, a slot is formed in the end portion of the lightweight slat at the position of a connection node of the constructional column 3 on the assembled steel structure building wall 1, the constructional column 3 is an H-shaped steel column, a gap for passing through a vertical water and electricity pipeline is formed between the constructional column 3 and an outer wrapping sheet 2, the H-shaped steel column is used for replacing a traditional concrete constructional column, the vertical water and electricity pipeline is arranged outside the H-shaped steel column, so that the process of slotting and pipeline burying of the lightweight slat wall is effectively reduced, meanwhile, the H-shaped steel column is well hidden through a sheet outer wrapping, the node of the constructional column 3 comprises a square steel pipe 5, an outer wrapping sheet 2 and a counter-pulling bolt 4, the constructional column 3 is connected with the assembled steel structure building wall 1 through the, the outer side of the constructional column 3 is provided with an outer-wrapping thin plate 2, a gap for filling mortar is arranged between the outer-wrapping thin plate 2 and an assembly type steel structure building wall body 1 consisting of light battens, the mortar is special mortar for filling the gap in the construction process, the splicing part of the assembly type steel structure building wall body 1 consisting of the outer-wrapping thin plate 2 and the light battens is pasted with alkali-resistant glass fiber gridding cloth 7 and is full of putty, the composition material of the outer-wrapping thin plate 2 is the same as that of the assembly type steel structure building wall body 1, thereby effectively achieving the effect of preventing the generation of the crack, the outer-wrapping thin plate 2 is provided with a self-tapping screw 6 which is fixed on a square steel pipe 5, the square steel pipe 5 is welded with an H-shaped steel column, the construction speed.
The working principle is as follows:
the method is characterized in that an H-shaped steel column, a square steel tube 5, an outer-wrapped thin plate 2 and split bolts 4 are arranged in the node construction of an assembly type steel structure building light batten wall constructional column 3, the constructional column 3 is the H-shaped steel column, the assembly type steel structure building wall body 1 formed by the constructional column 3 and the light batten is connected through the split bolts 4, the outer-wrapped thin plate 2 is wrapped on the outer side and fixed on the square steel tube 5 through self-tapping screws 6, the square steel tube 5 is welded with the H-shaped steel column, mortar is filled in the gap between the outer-wrapped thin plate 2 and the assembly type steel structure building wall body 1 formed by the light batten, and the spliced part of the assembly type steel structure building wall body 1 formed by the outer-wrapped thin plate 2 and the light batten is coated with alkali.
In the description of the present invention, it should be understood that the terms "upper", "end", "splice", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, which are merely for convenience of description and simplification of description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention.
In the present invention, unless otherwise explicitly specified or limited, the terms "provided with", "connected" and the like should be interpreted broadly, and unless otherwise explicitly limited, the specific meanings of the above terms in the present invention will be understood to those skilled in the art according to specific situations.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides an assembled steel construction light slat wall constructional column node which characterized in that: including assembled steel construction building wall and constructional column, the node of constructional column includes square steel pipe, outsourcing sheet metal and split bolt, the constructional column is connected with assembled steel construction building wall through split bolt, the outside of constructional column is equipped with the outsourcing sheet metal.
2. An assembled steel structure lightweight slat wall construction column node of claim 1, wherein: the assembled steel structure building wall is a light batten, a cutting groove is formed in the end portion of the light batten on the connecting node position of a constructional column on the assembled steel structure building wall, and the constructional column is an H-shaped steel column.
3. An assembled steel structure lightweight slat wall construction column node of claim 1, wherein: the outer-coated thin plate is made of the same material as the assembled steel structure building wall, self-tapping screws enabling the outer-coated thin plate to be fixed on the square steel tubes are arranged on the outer-coated thin plate, and the square steel tubes are welded with the H-shaped steel columns.
4. An assembled steel structure lightweight slat wall construction column node of claim 1, wherein: gaps for filling mortar are arranged between the assembled steel structure building walls formed by the outer-wrapped thin plates and the light battens.
5. An assembled steel structure lightweight slat wall construction column node of claim 1, wherein: and the joint of the assembled steel structure building wall body consisting of the outer wrapping thin plate and the light ribbon board is adhered with alkali-resistant glass fiber mesh cloth and is filled with putty.
6. An assembled steel structure lightweight slat wall construction column node of claim 1, wherein: and a gap for penetrating a vertical water and electricity pipeline is arranged between the constructional column and the outer-coated thin plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922179025.3U CN211257445U (en) | 2019-12-06 | 2019-12-06 | Assembled steel construction light slat wall constructional column node |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922179025.3U CN211257445U (en) | 2019-12-06 | 2019-12-06 | Assembled steel construction light slat wall constructional column node |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211257445U true CN211257445U (en) | 2020-08-14 |
Family
ID=71960146
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922179025.3U Active CN211257445U (en) | 2019-12-06 | 2019-12-06 | Assembled steel construction light slat wall constructional column node |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211257445U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112709356A (en) * | 2020-12-23 | 2021-04-27 | 中建科工集团有限公司 | Assembly type wall body structure and connecting method thereof |
-
2019
- 2019-12-06 CN CN201922179025.3U patent/CN211257445U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112709356A (en) * | 2020-12-23 | 2021-04-27 | 中建科工集团有限公司 | Assembly type wall body structure and connecting method thereof |
WO2022134844A1 (en) * | 2020-12-23 | 2022-06-30 | 中建科工集团有限公司 | Prefabricated wall structure and connecting method therefor |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101603336B (en) | Precast concrete short-pier shear wall with infilling wall panel and connecting method thereof | |
CN101603338B (en) | Assembly integrated precast concrete shear wall and construction method thereof | |
CN207122001U (en) | A kind of connecting node of square steel tube beam and the full bolt of steel pipe column | |
CN201217861Y (en) | Assembly integral precast concrete shear wall | |
CN214574908U (en) | Evaporate and press double-deck sandwich slat heat preservation outer wall erection joint structure of aerated concrete | |
CN214302256U (en) | Beam-column joint connection structure for assembled combined structure | |
CN211257445U (en) | Assembled steel construction light slat wall constructional column node | |
CN111305372A (en) | Fabricated steel reinforced concrete structure and construction method thereof | |
CN204551759U (en) | For the board plug type node that girder steel, bracing members are connected with Flat steel pipe concrete column | |
CN211472960U (en) | Assembled outer wall based on reinforced concrete frame structure | |
CN203514531U (en) | Square steel tube concrete column and steel beam node connecting structure with internal diaphragms | |
CN203462587U (en) | Penetration steel bar type joint of angle steel connection type rectangular concrete-filled steel tube column and steel beam | |
CN210530135U (en) | Vertical concatenation node structure of partial cladding shaped steel concrete column | |
CN210049443U (en) | T-shaped node of long-shaped steel and threaded sleeve combined type steel concrete combined pipe | |
CN211257446U (en) | Fabricated steel structure light batten internal partition wall constructional column joint | |
CN207122021U (en) | Assembled bolt connection concrete-filled steel tube shear wall | |
CN203034615U (en) | Novel outer sleeve tube type connecting node of cold-bending rectangular steel tube column and H-shaped steel girder | |
CN206769085U (en) | A kind of wall connecting point structure of assembled architecture | |
CN201972271U (en) | Novel precast reinforced concrete shear wall | |
CN114718217A (en) | Novel structure and construction method of horizontal node of prefabricated shear wall | |
CN212896873U (en) | Dry-type connected node device of prefabricated wallboard in L type node | |
CN212896859U (en) | Beam and wall connecting node of bolt-tube concrete structure | |
CN102900151A (en) | Steel structure building system | |
CN201437613U (en) | Steel beam integral feed-through type concrete-filled tubular column and steel beam connecting node | |
CN201738454U (en) | Unit type connecting piece for connecting beam slab and wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |