CN211257141U - Geotechnical engineering vertical component mounting and pre-connecting process hole - Google Patents

Geotechnical engineering vertical component mounting and pre-connecting process hole Download PDF

Info

Publication number
CN211257141U
CN211257141U CN201922157579.3U CN201922157579U CN211257141U CN 211257141 U CN211257141 U CN 211257141U CN 201922157579 U CN201922157579 U CN 201922157579U CN 211257141 U CN211257141 U CN 211257141U
Authority
CN
China
Prior art keywords
fabrication hole
chassis
geotechnical engineering
hole structure
connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922157579.3U
Other languages
Chinese (zh)
Inventor
齐常亮
周丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Shengtai Geotechnical Engineering Co ltd
Original Assignee
Liaoning Shengtai Geotechnical Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoning Shengtai Geotechnical Engineering Co ltd filed Critical Liaoning Shengtai Geotechnical Engineering Co ltd
Priority to CN201922157579.3U priority Critical patent/CN211257141U/en
Application granted granted Critical
Publication of CN211257141U publication Critical patent/CN211257141U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model discloses a geotechnical engineering vertical component installation and pre-connection fabrication hole, including the chassis, the chassis is provided with first fabrication hole structure, and is provided with the filling member that is used for the buffering between chassis and the first fabrication hole structure, first fabrication hole structure sets up on the chassis through the filling member, and fixed mounting has a stationary mast on the chassis, be provided with on the stationary mast and be used for assisting vertical component to install the second fabrication hole structure of pre-connection. A geotechnical engineering vertical member installation and connect fabrication hole in advance, through the first fabrication hole structure that sets up, the cooperation is using the packing, can guarantee the vertical member installation accurate degree of connecting in advance, improves the installation stability, adopts second fabrication hole structure, has further improved the result of use of whole fabrication hole, combines the rubber sleeve to use, can effectually protect closing the structure earlier, improves life, reinforcing practicality.

Description

Geotechnical engineering vertical component mounting and pre-connecting process hole
Technical Field
The utility model relates to a fabrication hole field, in particular to geotechnical engineering vertical component installation and connect fabrication hole in advance.
Background
Civil engineering refers to the general names of various projects above ground, underground and in water. The civil engineering relates to rock, soil, underground and underwater part called geotechnical engineering, and the geotechnical engineering is a research object of solving rock and soil engineering problems including foundation and foundation, side slope, underground engineering and the like. The geotechnical engineering is a branch of civil engineering and is a science for solving engineering technical problems about rocks and soil in various engineering by applying engineering geology, soil mechanics and rock mechanics. According to the engineering construction stage division, the work content can be divided into: geotechnical engineering investigation, geotechnical engineering design, geotechnical engineering treatment, geotechnical engineering monitoring and geotechnical engineering detection. In geotechnical engineering, a vertical component is required to be used for supporting, collecting and other work, and a fabrication hole is usually required to be formed for better mounting a pre-connected vertical component; in current geotechnical engineering, the fabrication hole is simple for a square or circular shape hole, has certain limitation during the use, and the result of use is general to current fabrication hole simple structure, the result of use is relatively poor, leads to whole fabrication hole structure's practicality to be low.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides a geotechnical engineering vertical member installation and connect fabrication hole in advance, can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a geotechnical engineering vertical member installation and pre-connection fabrication hole, includes the chassis, the chassis is provided with first fabrication hole structure, and is provided with the filling member that is used for the buffering between chassis and the first fabrication hole structure, first fabrication hole structure sets up on the chassis through the filling member, and fixed mounting has the stationary mast on the chassis, be provided with on the stationary mast and be used for supplementary vertical member to install the second fabrication hole structure of pre-connection.
Preferably, the first fabrication hole structure comprises a fixing pad, a buffer pad, a placing frame and a pipe sleeve, wherein the fixing pad is arranged on the underframe, the buffer pad used for buffering is arranged on the upper surface of the fixing pad, the placing frame is placed on the buffer pad, and the pipe sleeve is fixedly arranged on the placing frame.
Preferably, the connection mode between the fixed bolster and the chassis is the welding, and passes through glue fixed connection between fixed bolster and the blotter, the connection mode between rack and the pipe box is the welding.
Preferably, the filling member includes an outer shell, an inner shell, a cover plate and a filler, the outer shell and the inner shell are fixedly assembled together, a cavity is formed between the outer shell and the inner shell, the filler is arranged in the cavity, and the cover plate is fixedly mounted at the upper ends of the outer shell and the inner shell.
Preferably, the second fabrication hole structure comprises a connecting sleeve, a fastening screw, a rubber sleeve and a through hole, the connecting sleeve is fixed on the fixed upright post through the fastening screw, the rubber sleeve is arranged on the inner side of the connecting sleeve, and the through hole is formed in the rubber sleeve.
Preferably, the fixed upright post is provided with a threaded hole, the connecting sleeve is provided with a round hole, one end of the fastening screw penetrates through the round hole to be in threaded connection with the threaded hole, and a gasket is arranged between the fastening screw and the connecting sleeve.
Compared with the prior art, the utility model discloses following beneficial effect has: this geotechnical engineering vertical member installation and pre-connection fabrication hole through the first fabrication hole structure that sets up, is coordinating the filler and is using, can guarantee the vertical member installation accuracy degree of pre-connection, improves installation stability, adopts second fabrication hole structure, has further improved the result of use of whole fabrication hole, combines the rubber sleeve to use, can effectually protect closing the structure earlier, improves life, reinforcing practicality.
Drawings
Fig. 1 is a schematic view of the overall structure of the geotechnical engineering vertical member installation and pre-connection process hole of the utility model;
FIG. 2 is an enlarged view of the installation and pre-connection process hole A of the geotechnical engineering vertical member of the utility model;
FIG. 3 is a schematic view of the internal structure of the geotechnical engineering vertical member installation and pre-connection process hole filling member of the present invention;
fig. 4 is the utility model discloses a mounting of geotechnical engineering vertical component and enlarged view of pre-connection fabrication hole B department.
In the figure: 1. a chassis; 2. a first fabrication aperture structure; 201. a fixing pad; 202. a cushion pad; 203. placing a rack; 204. pipe sleeve; 3. a filling member; 301. a housing; 302. an inner shell; 303. a cover plate; 304. a filler; 4. fixing the upright post; 5. a second fabrication aperture structure; 6. connecting sleeves; 7. fastening screws; 8. a rubber sleeve; 9. and a through hole.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
As shown in fig. 1-4, a geotechnical engineering vertical member installation and pre-connection process hole comprises an underframe 1, wherein the underframe 1 is provided with a first process hole structure 2, a filling piece 3 for buffering is arranged between the underframe 1 and the first process hole structure 2, the first process hole structure 2 is arranged on the underframe 1 through the filling piece 3, a fixed upright post 4 is fixedly installed on the underframe 1, and a second process hole structure 5 for assisting vertical members in installation and pre-connection is arranged on the fixed upright post 4;
the first fabrication hole structure 2 comprises a fixing pad 201, a buffer pad 202, a placing frame 203 and a pipe sleeve 204, wherein the fixing pad 201 is arranged on the underframe 1, the buffer pad 202 for buffering is arranged on the upper surface of the fixing pad 201, the placing frame 203 is arranged on the buffer pad 202, and the pipe sleeve 204 is fixedly arranged on the placing frame 203; the fixing pad 201 and the underframe 1 are connected by welding, the fixing pad 201 and the cushion pad 202 are fixedly connected by glue, and the placing frame 203 and the pipe sleeve 204 are connected by welding; the filling piece 3 comprises an outer shell 301, an inner shell 302, a cover plate 303 and a filler 304, wherein the outer shell 301 and the inner shell 302 are fixedly assembled together, a cavity is formed between the outer shell 301 and the inner shell 302, the filler 304 is arranged in the cavity, and the cover plate 303 is fixedly installed at the upper ends of the outer shell 301 and the inner shell 302; the second fabrication hole structure 5 comprises a connecting sleeve 6, a fastening screw 7, a rubber sleeve 8 and a through hole 9, the connecting sleeve 6 is fixed on the fixed upright post 4 through the fastening screw 7, the rubber sleeve 8 is arranged on the inner side of the connecting sleeve 6, and the through hole 9 is formed in the rubber sleeve 8; the fixed upright post 4 is provided with a threaded hole, the connecting sleeve 6 is provided with a round hole, one end of the fastening screw 7 penetrates through the round hole to be in threaded connection with the threaded hole, and a gasket is arranged between the fastening screw 7 and the connecting sleeve 6.
It should be noted that, the utility model relates to a geotechnical engineering vertical component installation and pre-connection fabrication hole, when using, at first fix chassis 1 to the position department that needs to use vertical component in geotechnical engineering, guarantee chassis 1 stable installation, corresponding position department is seted up flutedly on chassis 1 afterwards, add filler 304 to the cavity that shell 301 and inner shell 302 formed, after filler 304 fills up, fix apron 303 to the upper end of shell 301, inner shell 302, then put whole filler 3 into the recess on chassis 1, guarantee that the opening in filler 3 is up, the staff will have fixing pad 201 of blotter 202 to install the upper opening part of chassis 1 afterwards, and put pipe box 204 into filler 3 through rack 203, thereby set up first fabrication hole structure 2, after the relevant structure setting is accomplished, the staff will fix the stand 4 and install on chassis 1, guarantee the stability after the stationary mast 4 installation, suitable position department sets up the round hole on stationary mast 4, utilize fastening screw 7 to install adapter sleeve 6 in the second fabrication hole structure 5 on stationary mast 4 afterwards, go into adapter sleeve 6 with rubber sleeve 8 card, thereby form second fabrication hole structure 5, after fabrication hole mechanism sets up the completion, the staff carries out erection joint to vertical member, during erection joint, first fabrication hole structure 2 is cooperating second fabrication hole structure 5 to use, can guarantee erection joint's accurate degree, convenient row material simultaneously, guarantee the normal clear of erection joint, and the use effect is improved, when carrying out the erection pre-connection, rubber sleeve 8 and filler 3 can form effectual buffering, and then protect relevant structure, and the high practicality.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a geotechnical engineering vertical member installation and connect fabrication hole in advance which characterized in that: including chassis (1), chassis (1) is provided with first fabrication hole structure (2), and is provided with between chassis (1) and first fabrication hole structure (2) and is used for the packing (3) of buffering, first fabrication hole structure (2) set up on chassis (1) through packing (3), and fixed mounting has fixed post (4) on chassis (1), be provided with on fixed post (4) and be used for supplementary vertical component to install second fabrication hole structure (5) of pre-connection.
2. The geotechnical engineering vertical member installation and pre-connection fabrication hole according to claim 1, wherein: first fabrication hole structure (2) are including fixed bolster (201), blotter (202), rack (203) and pipe box (204), fixed bolster (201) set up on chassis (1), and the upper surface of fixed bolster (201) is provided with blotter (202) that are used for the buffering, rack (203) are placed on blotter (202), and fixed mounting has pipe box (204) on rack (203).
3. The geotechnical engineering vertical member installation and pre-connection fabrication hole according to claim 2, wherein: the fixing pad (201) is welded with the bottom frame (1), the fixing pad (201) is fixedly connected with the cushion pad (202) through glue, and the placing frame (203) is welded with the pipe sleeve (204).
4. The geotechnical engineering vertical member installation and pre-connection fabrication hole according to claim 1, wherein: the packing piece (3) comprises an outer shell (301), an inner shell (302), a cover plate (303) and a packing (304), wherein the outer shell (301) and the inner shell (302) are fixedly assembled together, a cavity is formed between the outer shell (301) and the inner shell (302), the packing (304) is arranged in the cavity, and the cover plate (303) is fixedly installed at the upper ends of the outer shell (301) and the inner shell (302).
5. The geotechnical engineering vertical member installation and pre-connection fabrication hole according to claim 1, wherein: the second fabrication hole structure (5) comprises a connecting sleeve (6), a fastening screw (7), a rubber sleeve (8) and a through hole (9), the connecting sleeve (6) is fixed on the fixed upright post (4) through the fastening screw (7), the rubber sleeve (8) is arranged on the inner side of the connecting sleeve (6), and the through hole (9) is formed in the rubber sleeve (8).
6. The geotechnical engineering vertical member installation and pre-connection fabrication hole according to claim 5, wherein: the fixing device is characterized in that a threaded hole is formed in the fixing upright column (4), a round hole is formed in the connecting sleeve (6), one end of the fastening screw (7) penetrates through the round hole to be in threaded connection with the threaded hole, and a gasket is arranged between the fastening screw (7) and the connecting sleeve (6).
CN201922157579.3U 2019-12-05 2019-12-05 Geotechnical engineering vertical component mounting and pre-connecting process hole Expired - Fee Related CN211257141U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922157579.3U CN211257141U (en) 2019-12-05 2019-12-05 Geotechnical engineering vertical component mounting and pre-connecting process hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922157579.3U CN211257141U (en) 2019-12-05 2019-12-05 Geotechnical engineering vertical component mounting and pre-connecting process hole

Publications (1)

Publication Number Publication Date
CN211257141U true CN211257141U (en) 2020-08-14

Family

ID=71958288

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922157579.3U Expired - Fee Related CN211257141U (en) 2019-12-05 2019-12-05 Geotechnical engineering vertical component mounting and pre-connecting process hole

Country Status (1)

Country Link
CN (1) CN211257141U (en)

Similar Documents

Publication Publication Date Title
CN211257141U (en) Geotechnical engineering vertical component mounting and pre-connecting process hole
CN213596408U (en) Pipeline cathodic protection intelligent pile
CN213930738U (en) Municipal street lamp that structure is firm and installation of being convenient for
CN213682085U (en) Steel-pipe pile foundation reinforcing apparatus
CN211083559U (en) Soil pressure cell fixing device
CN210770679U (en) Supporting device for oil conveying pipeline
CN211013836U (en) Dull and stereotyped load test appearance of building engineering
CN210562212U (en) Supporting device for civil engineering
CN217875104U (en) Stability auxiliary device based on special earth's surface of RTK is measured
CN217153554U (en) Geographical mapping device convenient to it is fixed
CN210604005U (en) Geotechnical sampling device in geotechnical engineering
CN216558891U (en) Underground garage construction is with subsiding observation device
CN216665179U (en) Steel construction assembled pond convenient to equipment
CN219391433U (en) Ecological environment water quality sampling device
CN210127862U (en) Geotechnical engineering construction is with supporting protector
CN212865885U (en) Excavation and sand filling test compaction degree soil taking device
CN211425572U (en) Mud water level sensor mounting structure
CN211717828U (en) Fresh soil sample collection device
CN212667161U (en) Fill quick mounting tool of electric pile
CN213632080U (en) Horizontal test equipment for hydraulic engineering survey
CN214584148U (en) Compaction device for geological exploration pit filling
CN217845677U (en) Can carry out soil sampler of sample to the soil of different degree of depth simultaneously
CN216559221U (en) Be used for hydraulic engineering monitoring to use water level measuring device
CN216520538U (en) Total powerstation suitable for field work
CN217078494U (en) Highway subgrade landslide prevention device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200814

Termination date: 20211205

CF01 Termination of patent right due to non-payment of annual fee