CN211254723U - Hydraulic engineering construction pipeline buries puts device - Google Patents

Hydraulic engineering construction pipeline buries puts device Download PDF

Info

Publication number
CN211254723U
CN211254723U CN201922214690.1U CN201922214690U CN211254723U CN 211254723 U CN211254723 U CN 211254723U CN 201922214690 U CN201922214690 U CN 201922214690U CN 211254723 U CN211254723 U CN 211254723U
Authority
CN
China
Prior art keywords
support frame
backup pad
live
rollers
engineering construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922214690.1U
Other languages
Chinese (zh)
Inventor
何少凡
郑芙蓉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201922214690.1U priority Critical patent/CN211254723U/en
Application granted granted Critical
Publication of CN211254723U publication Critical patent/CN211254723U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Manipulator (AREA)

Abstract

The utility model discloses a device is buried to hydraulic engineering construction pipeline, the on-line screen storage device comprises an installation base, first support frame is installed to one side of the top surface of installation base, the second support frame is installed to the opposite one side of first support frame, the piston rod top fixed mounting of hydraulic stem has first rotating disk, the rotating shaft top fixed mounting of first motor has the second rolling disc, be provided with electric lift platform between first support frame and the second support frame, electric lift platform's top surface mounting has the arc layer board, the joint has first live-rollers between first backup pad and the second backup pad, the top of first live-rollers is provided with the second live-rollers, the second motor is installed to the side of second backup pad. The utility model discloses an electric lift platform holds in the palm moves a line section of thick bamboo, makes a line section of thick bamboo change more easily, can make the automatic unwrapping wire of pipeline at the unwrapping wire in-process simultaneously, need not artifical act as go-between, has effectively promoted work efficiency.

Description

Hydraulic engineering construction pipeline buries puts device
Technical Field
The utility model relates to a hydraulic engineering field, in particular to hydraulic engineering construction pipeline buries puts device.
Background
The water conservancy industry is continuously developed along with the development of social productivity and becomes an important support for the civilization and economic development of human society. Water is a source of all lives and is an essential substance in human life and production activities. In the survival and development of human society, there is a continuing need to adapt, utilize, transform and protect the aqueous environment. Productivity in the original society is low and humans have no ability to change the natural environment. People live in water and grass, select hills and live in the way of fishery, hunting, collection and nomadism, and can only benefit and avoid harm to water in the nature and adapt to the water in a negative way. After entering the slavery society and the sealing society, along with the development of ironware tools, people develop agriculture on both sides of rivers, build villages and towns, and meet the requirements of flood control, flood drainage, irrigation, shipping and town water supply, so that water conservancy projects are created and developed, and pipe burying and paying off are needed in the water conservancy construction process.
Current hydraulic engineering construction pipe laying pay-off simple structure carries out the unwrapping wire through the line wheel to the pipeline, and stability is not enough in the use, simultaneously at the unable automatic transmission line of unwrapping wire in-process, needs the manpower fit to act as go-between, and unwrapping wire efficiency is not high, and when the pipeline runs out, the unable quick replacement pipeline has slowed down going on of construction simultaneously.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is overcome prior art's defect, provide a hydraulic engineering construction pipeline and bury and put the device, possible unwrapping wire is stable, but the quick replacement pipeline simultaneously.
In order to solve the technical problem, the utility model provides a following technical scheme:
the utility model relates to a hydraulic engineering construction pipeline imbedding device, which comprises an installation base, wherein a first support frame is arranged on one side of the top surface of the installation base, a second support frame is arranged on the opposite side of the first support frame, a hydraulic rod is arranged on the top end of one side surface of the first support frame facing to the second support frame, a first rotating disc is fixedly arranged on the top end of a piston rod of the hydraulic rod, a first motor is embedded on the top end of one side surface of the second support frame facing to the first support frame, a second rotating disc is fixedly arranged on the top end of a rotating shaft of the first motor, an electric lifting platform is arranged between the first support frame and the second support frame and is arranged on the top surface of the installation base, an arc-shaped supporting plate is arranged on the top surface of the electric lifting platform, a first supporting plate and a second supporting plate are arranged on, and first backup pad and second backup pad are located the both sides of installation base respectively and oppose each other, the joint has first live-rollers between first backup pad and the second backup pad, the top of first live-rollers is provided with the second live-rollers, the second motor is installed to the side of second backup pad, and the axis of rotation of second motor is connected with the one end of first live-rollers.
As an optimized technical scheme of the utility model, a side surface that first rolling disc and second rolling disc are relative each other all is provided with the rubber skid resistant course, and surperficial central authorities all outwards extend there is the cylinder dop.
As a preferred technical scheme of the utility model, first rolling disc is provided with the bearing and can rotates around the centre of a circle, second rolling disc structure as an organic whole.
As an optimized technical scheme of the utility model, the width of arc layer board is less than the interval between first rolling disc and the second rolling disc.
As an optimized technical scheme of the utility model, electric lift's position is partial to one side of second support frame.
Compared with the prior art, the beneficial effects of the utility model are as follows:
the utility model discloses an electric lift platform holds in the palm moves a line section of thick bamboo, makes a line section of thick bamboo change more easily, can make the automatic unwrapping wire of pipeline at the unwrapping wire in-process simultaneously, need not artifical act as go-between, has effectively promoted work efficiency.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is an overall structure front view of the present invention;
FIG. 2 is a sectional view of the present invention with a partial structure A-A facing;
in figure 1, a base is installed; 2. a first support frame; 3. a second support frame; 4. a hydraulic lever; 5. a first rotating disk; 6. a first motor; 7. a second rotating disk; 8. an electric lifting table; 9. an arc-shaped supporting plate; 10. A first support plate; 11. a second support plate; 12. a first rotating roller; 13. a second rotating roller; 14. a second motor; 15. a cylindrical chuck.
Detailed Description
The preferred embodiments of the present invention will be described in conjunction with the accompanying drawings, and it will be understood that they are presented herein only to illustrate and explain the present invention, and not to limit the present invention.
Wherein like reference numerals refer to like parts throughout.
Example 1
As shown in fig. 1-2, the utility model provides a hydraulic engineering construction pipeline embedding device, which comprises an installation base 1, a first support frame 2 is installed on one side of the top surface of the installation base 1, a second support frame 3 is installed on the opposite side of the first support frame 2, a hydraulic rod 4 is installed on the top end of the side surface of the first support frame 2 facing the second support frame 3, a first rotary disc 5 is fixedly installed on the top end of the piston rod of the hydraulic rod 4, a first motor 6 is embedded on the top end of the side surface of the second support frame 3 facing the first support frame 2, a second rotary disc 7 is fixedly installed on the top end of the rotary shaft of the first motor 6, an electric lifting platform 8 is arranged between the first support frame 2 and the second support frame 3, the electric lifting platform 8 is installed on the top surface of the installation base 1, an arc-shaped supporting plate 9 is installed on the top surface of the electric lifting platform 8, a first supporting plate 10 and a second supporting, and first backup pad 10 and second backup pad 11 are located the both sides of installation base 1 respectively and oppose each other, and the joint has first live-rollers 12 between first backup pad 10 and the second backup pad 11, and the top of first live-rollers 12 is provided with second live-rollers 13, and second motor 14 is installed to the side of second backup pad 11, and the axis of rotation of second motor 14 is connected with the one end of first live-rollers 12.
Further, a side surface that first rolling disc 5 and second rolling disc 7 are relative each other all is provided with the rubber anti-skidding bed course, and surface central authorities all outwards extend has cylinder dop 15, sets up the centre gripping line section of thick bamboo that the rubber anti-skidding bed course can be more stable, can further increase stability in the through-hole of a line section of thick bamboo through cylinder dop 15 insertion line simultaneously.
First rotating disk 5 is provided with the bearing and can rotates around the centre of a circle, and second rotating disk 7 structure as an organic whole, and when the bobbin was by the centre gripping between first rotating disk 5 and second rotating disk 7, second rotating disk 7 rotated and drives the bobbin, and the other end of bobbin uses first rotating disk 5 to rotate as the fulcrum.
The width of the arc-shaped supporting plate 9 is smaller than the distance between the first rotating disc 5 and the second rotating disc 7.
The position of the electric lifting platform 8 is deviated to one side of the second support frame 3, so that the clamping process of the two sides of the bobbin is easier.
Specifically, when a pipeline is installed, firstly, the electric lifting platform 8 is descended, the bobbin wound with the pipeline is placed on the surface of the arc-shaped supporting plate 9, the bobbin is supported to control the electric lifting platform 8 to ascend to be level with the first rotating disc 5, firstly, the bobbin is drawn close to the second rotating disc 7, the cylindrical chuck 15 of the second rotating disc 7 is inserted into the circular shaft through hole of the bobbin, then, the hydraulic rod 4 is controlled to extend outwards, the first rotating disc 5 is made to approach the bobbin, after the cylindrical chuck 15 of the first rotating disc 5 is inserted into the circular shaft through hole of the bobbin, the bobbin is clamped, the electric lifting platform 8 is controlled to descend, the arc-shaped supporting plate 9 is made to leave the bottom of the bobbin, the pipeline head is drawn between the first rotating roller 12 and the second rotating roller 13, in the paying-off process, the first motor 6 drives the second rotating disc 7 to rotate, the bobbin is further driven to rotate, and meanwhile, the second motor 4 drives the first rotating roller 12 to rotate, thereby make the unwrapping wire more smooth and easy, effectively promoted unwrapping wire efficiency.
To sum up, the utility model discloses an electric lift platform holds in the palm moves a line section of thick bamboo, makes a line section of thick bamboo change more easily, can make the automatic unwrapping wire of pipeline at the unwrapping wire in-process simultaneously, need not artifical acting as go-between, has effectively promoted work efficiency.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (5)

1. The utility model provides a device is buried and put to hydraulic engineering construction pipeline, includes installation base (1), its characterized in that, first support frame (2) are installed to one side on the top surface of installation base (1), second support frame (3) are installed to opposite one side of first support frame (2), hydraulic stem (4) are installed towards one side surface top of second support frame (3) to first support frame (2), the piston rod top fixed mounting of hydraulic stem (4) has first rotating disk (5), first motor (6) have been inlayed towards one side surface top of first support frame (2) to second support frame (3), the axis of rotation top fixed mounting of first motor (6) has second rolling disc (7), be provided with between first support frame (2) and second support frame (3) electric lift platform (8), and electric lift platform (8) install in the top surface of installation base (1), the top surface mounting of electric lift platform (8) has arc layer board (9), one side of electric lift platform (8) is provided with first backup pad (10) and second backup pad (11), and first backup pad (10) and second backup pad (11) are located the both sides of installation base (1) respectively and oppose each other, the joint has first live-rollers (12) between first backup pad (10) and second backup pad (11), the top of first live-rollers (12) is provided with second live-rollers (13), second motor (14) are installed to the side of second backup pad (11), and the axis of rotation of second motor (14) is connected with the one end of first live-rollers (12).
2. The hydraulic engineering construction pipeline burying device as recited in claim 1, characterized in that, the surfaces of one side of said first rotating disk (5) and said second rotating disk (7) opposite to each other are provided with rubber anti-slip pad layers, and the centers of the surfaces are extended with cylindrical chucks (15).
3. The hydraulic engineering construction pipeline burying device as claimed in claim 1, wherein said first rotating disc (5) is provided with a bearing capable of rotating around a circle center, and said second rotating disc (7) is of an integral structure.
4. A hydraulic engineering construction pipeline burying device according to claim 1, wherein the width of said arc shaped supporting plate (9) is smaller than the distance between the first rotating disc (5) and the second rotating disc (7).
5. The hydraulic engineering construction pipeline burying device as claimed in claim 1, wherein the position of said electric lifting platform (8) is biased to one side of the second support frame (3).
CN201922214690.1U 2019-12-11 2019-12-11 Hydraulic engineering construction pipeline buries puts device Expired - Fee Related CN211254723U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922214690.1U CN211254723U (en) 2019-12-11 2019-12-11 Hydraulic engineering construction pipeline buries puts device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922214690.1U CN211254723U (en) 2019-12-11 2019-12-11 Hydraulic engineering construction pipeline buries puts device

Publications (1)

Publication Number Publication Date
CN211254723U true CN211254723U (en) 2020-08-14

Family

ID=71990497

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922214690.1U Expired - Fee Related CN211254723U (en) 2019-12-11 2019-12-11 Hydraulic engineering construction pipeline buries puts device

Country Status (1)

Country Link
CN (1) CN211254723U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116639546A (en) * 2023-07-24 2023-08-25 河北戴歌液压科技有限公司 Auxiliary vulcanization equipment for hydraulic rubber pipe production

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116639546A (en) * 2023-07-24 2023-08-25 河北戴歌液压科技有限公司 Auxiliary vulcanization equipment for hydraulic rubber pipe production
CN116639546B (en) * 2023-07-24 2023-11-24 河北戴歌液压科技有限公司 Auxiliary vulcanization equipment for hydraulic rubber pipe production

Similar Documents

Publication Publication Date Title
CN206108547U (en) Cable reeling device
CN204160207U (en) A kind of steering wheel clamp for machining
CN211254723U (en) Hydraulic engineering construction pipeline buries puts device
CN203959552U (en) Novel cable draw off gear
CN206116142U (en) Dry -type transformer of simple and easy installation
CN203278102U (en) Vertical type wire barrow
CN203960755U (en) Bridge is accurately turned and is rotated and draw-gear
CN210661643U (en) Pipeline embedding device for hydraulic engineering
CN204434049U (en) A kind of new type auto permanent magnetic lifter
GB2405680A (en) Method and apparatus for laying/recovery of lines on a seabed
CN215468433U (en) Pipeline cutting device for municipal works
CN206708689U (en) The hydraulic support leg with caltrop may be reversed in a kind of refuse landfill special purpose robot
CN204675641U (en) A kind of hoisting crane walked frame
CN202220070U (en) Shaft lifting device for nuclear power station
CN204093686U (en) Pipeline coatings equipment
CN218267612U (en) Fixing device for melt pipeline
CN218841470U (en) Hoisting device for hydroelectric engineering equipment
CN217381910U (en) Pipeline connecting device for hydraulic engineering
CN204643735U (en) A kind of for the little swing arm SUV supporting mechanism cutting lifting machine
CN217977771U (en) Pipeline installation assembly
CN205799698U (en) A kind of four axle exchange cutting equipment
CN219892814U (en) Support frame for municipal construction
CN210800241U (en) Multi-section pipeline supporting and connecting structure for hydraulic engineering
CN217539876U (en) A pipeline fixing device for hydraulic engineering
CN216662284U (en) Buried pipeline laying device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200814

Termination date: 20201211

CF01 Termination of patent right due to non-payment of annual fee