CN211239244U - Building engineering power cable erects structure - Google Patents

Building engineering power cable erects structure Download PDF

Info

Publication number
CN211239244U
CN211239244U CN202020269922.3U CN202020269922U CN211239244U CN 211239244 U CN211239244 U CN 211239244U CN 202020269922 U CN202020269922 U CN 202020269922U CN 211239244 U CN211239244 U CN 211239244U
Authority
CN
China
Prior art keywords
base
power cable
support column
hand wheel
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020269922.3U
Other languages
Chinese (zh)
Inventor
赖建龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020269922.3U priority Critical patent/CN211239244U/en
Application granted granted Critical
Publication of CN211239244U publication Critical patent/CN211239244U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Installation Of Indoor Wiring (AREA)

Abstract

The utility model discloses a building engineering power cable erects structure, the on-line screen storage device comprises a base, base fixedly connected with elevating system, elevating system includes hand wheel, driving medium and axis of rotation, the hand wheel passes through locating part and base swing joint, hand wheel and driving medium fixed connection, the coaxial fixed connection of driving medium and axis of rotation, the one end threaded connection that the base was kept away from to the axis of rotation has the support column, support column sliding connection has the sleeve, the sleeve is close to the one end and the base fixed connection of base, the one end that the base was kept away from to the support column can be dismantled and is connected with the wiring board. The utility model discloses simple structure, convenient operation through setting up the building engineering power cable erection structure of the dismouting of being convenient for, effectively improves the efficiency of erectting of cable in the work progress, reduces staff's intensity of labour, increases the stability of cable in the structure, and the device reuse of being convenient for increases economic benefits.

Description

Building engineering power cable erects structure
Technical Field
The utility model relates to a building engineering equipment technical field especially relates to a building engineering power cable erects structure.
Background
The power cable is often seen in the building engineering to erect, so that the construction is convenient for workers to construct, and with the continuous improvement of the construction technology, the hidden danger and the defect existing in the process of erecting the power cable are continuously improved, and the construction safety is ensured.
In the prior art, the erection structure of the power cable in the building engineering is simple, the whole flexibility is poor, the erection structure cannot be adjusted according to construction requirements, the applicability of the erection structure under the actual condition is low, the resource investment is increased, and the economic benefit is reduced.
Therefore, the construction engineering power cable erection structure is provided to solve the problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem that the cable erection structure uses the flexibility poor among the prior art, and the building engineering power cable erects structure that provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a building engineering power cable erects structure, includes the base, base fixedly connected with elevating system, elevating system includes hand wheel, driving medium and axis of rotation, the hand wheel passes through locating part and base swing joint, hand wheel and driving medium fixed connection, the coaxial fixed connection of driving medium and axis of rotation, the one end threaded connection that the base was kept away from to the axis of rotation has the support column, support column sliding connection has the sleeve, the sleeve is close to the one end and the base fixed connection of base, the one end that the base was kept away from to the support column can be dismantled and be connected with the wiring board.
Preferably, the transmission part comprises a worm and a worm wheel which are meshed with each other, the worm is fixedly connected with the hand wheel, and the worm wheel is coaxially and fixedly connected with the rotating shaft.
Preferably, the end of the rotating shaft far away from the base is provided with a thread, the end of the support column close to the rotating shaft is provided with a thread groove, and the rotating shaft is in threaded connection with the support column through the thread groove.
Preferably, the support column is close to the one end symmetry of base and is equipped with the slider, the sleeve is equipped with the spout, slider and spout sliding connection.
Preferably, the wiring board middle part is equipped with annular connecting plate, the support column is kept away from the one end of base and is equipped with the multiunit screw hole, the connecting plate passes through the screw rod and the connection can be dismantled to the support column.
Preferably, both ends of the wire bundling plate are provided with wire bundling grooves, and the wire bundling grooves are matched with the wire clamp through bolts.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a set up the building engineering power cable erection structure of being convenient for dismouting, effectively improve the efficiency of erection of cable in the work progress, reduce staff's intensity of labour, the device can be adjusted to a certain extent according to actual construction demand simultaneously, improves the reuse of equipment resource, increases economic benefits;
2. the utility model can increase or decrease the number of the wiring boards according to the construction requirements by arranging a plurality of groups of threaded holes on the supporting columns, increase or decrease the distance between adjacent wiring boards, and effectively improve the practicability of the device;
3. the utility model discloses a set up dedicated ply-yarn drill cooperation wiring board and fix the cable, effectively improve the stability of cable in the structure, can satisfy multiple diameter size's cable simultaneously to a certain extent and erect, increase the functional of device, improve economic benefits.
Drawings
Fig. 1 is a schematic structural view of a power cable erection structure in building engineering provided by the present invention;
fig. 2 is a schematic top view of the structure of fig. 1.
In the figure: the device comprises a base 1, a lifting mechanism 2, a hand wheel 21, a transmission part 22, a worm 221, a worm wheel 222, a rotating shaft 23, a limiting part 3, a supporting column 4, a thread groove 41, a sliding block 42, a threaded hole 43, a sleeve 5, a sliding groove 51, a thread binding plate 6, a connecting plate 61, a thread binding groove 62 and a thread clamp 63.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-2, a building engineering power cable erects structure, including base 1, base 1 fixedly connected with elevating system 2, elevating system 2 includes hand wheel 21, driving medium 22 and axis of rotation 23, hand wheel 21 passes through locating part 3 and base 1 swing joint, it needs to be explained that base 1 adopts cylindrical structure, increase the stability of device, hand wheel 21 edge is equipped with the through-hole, locating part 3 adopts common spacing bolt to carry on spacingly, base 1 is equipped with the spacing groove, spacing bolt passes through-hole and spacing groove threaded connection and fixes hand wheel 21.
Further, the hand wheel 21 is fixedly connected with the transmission member 22, and the transmission member 22 is coaxially and fixedly connected with the rotation shaft 23, it should be noted that the transmission member 22 includes a worm 221 and a worm wheel 222 which are meshed with each other, the worm 221 is fixedly connected with the hand wheel 21, the worm wheel 222 is coaxially and fixedly connected with the rotation shaft 23, and the rotation shaft 23 is rotatably connected with the base 1 through a bearing.
Furthermore, a supporting column 4 is connected to one end of the rotating shaft 23 away from the base 1 through a thread, it should be noted that one end of the rotating shaft 23 away from the base 1 is provided with a thread, one end of the supporting column 4 close to the rotating shaft 23 is provided with a thread groove 41, and the rotating shaft 23 is connected to the supporting column 4 through the thread groove 41.
Further, support column 4 sliding connection has sleeve 5, and sleeve 5 is close to base 1's one end and base 1 fixed connection, and it is worth mentioning that the one end symmetry that support column 4 is close to base 1 is equipped with slider 42, and sleeve 5 is equipped with spout 51, and slider 42 and spout 51 sliding connection guarantee that support column 4 moves vertically upwards under the rotation of axis of rotation 23.
Further, a wiring harness board 6 is detachably connected to one end, far away from the base 1, of the support column 4.
Specifically, 6 middle parts of bunch boards are equipped with annular connecting plate 61, and the one end that base 1 was kept away from to support column 4 is equipped with multiunit screw hole 43, and bunch boards 6 passes through connecting plate 61 cover on support column 4, is equipped with the through-hole on the connecting plate 61, and connecting plate 61 passes through the through-hole and screw hole 43 and support column 4 can dismantle the connection through the screw rod, according to the construction demand, increases or reduces the quantity of bunch boards 6, and the distance between bunch boards 6 simultaneously also can be adjusted, the practicality of improving device.
More specifically, bunch board 6 both ends all are equipped with bunch groove 62, and bunch groove 62 sets up through bolt and ply-yarn drill 63 cooperation, and the cable that will erect is placed in bunch groove 62, fixes ply-yarn drill 63 and bunch board 6 through the bolt, guarantees the stability of power cable in the structure.
Now, the operation principle of the present invention is described as follows:
when the utility model is used, the device is transported to a specified place, the base 1 and the ground are firstly fixed according to the direction and the position of the power cable to be erected, the wiring board 6 is sleeved on the supporting column 4 through the connecting plate 61 and is fixedly connected with the supporting column 4 through the screw rod, the number of the wiring boards 6 and the distance between the adjacent wiring boards 6 are adjusted according to the requirement, then the cable is placed in the wiring groove 62 to fix the wire clamp 63 and the wiring board 6 through the bolt, the hand wheel 21 is shaken after the installation of the cable is completed, the hand wheel 21 drives the meshed worm wheel 222 to rotate through the worm 221, the worm wheel 222 drives the rotating shaft 23 of the coaxial fixed connection to rotate, one end of the rotating shaft 23, which is far away from the base 1, drives the supporting column 4 to move through the thread groove 41, because the bottom of the supporting column 4 is provided with the slide block 42, the slide block 42, after the supporting column 4 drives the wiring board 6 to rise to a specified position, the hand wheel 21 is fixedly connected with the base 1 through the limiting part 3, and erection and installation of the power cable are completed.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. A construction engineering power cable erection structure comprises a base (1) and is characterized in that, the base (1) is fixedly connected with a lifting mechanism (2), the lifting mechanism (2) comprises a hand wheel (21), a transmission piece (22) and a rotating shaft (23), the hand wheel (21) is movably connected with the base (1) through a limiting piece (3), the hand wheel (21) is fixedly connected with the transmission piece (22), the transmission piece (22) is coaxially and fixedly connected with the rotating shaft (23), one end of the rotating shaft (23) far away from the base (1) is in threaded connection with a supporting column (4), the supporting column (4) is connected with a sleeve (5) in a sliding way, one end of the sleeve (5) close to the base (1) is fixedly connected with the base (1), the supporting column (4) is far away from one end of the base (1) and is detachably connected with a wire bundling plate (6).
2. Construction engineering power cable erection structure according to claim 1, characterized in that, the transmission piece (22) includes worm (221) and worm wheel (222) that mesh with each other, the worm (221) and hand wheel (21) are fixedly connected, the worm wheel (222) and rotation shaft (23) are coaxially and fixedly connected.
3. Construction engineering power cable erection structure according to claim 1, characterized in that, the end of the rotation axis (23) far away from the base (1) is provided with a screw thread, the end of the support column (4) near the rotation axis (23) is provided with a screw thread groove (41), and the rotation axis (23) is in threaded connection with the support column (4) through the screw thread groove (41).
4. A construction engineering power cable erection structure according to claim 1, characterized in that, the one end of the support column (4) near the base (1) is symmetrically provided with a slide block (42), the sleeve (5) is provided with a slide groove (51), and the slide block (42) and the slide groove (51) are connected in a sliding manner.
5. Construction engineering power cable erection structure according to claim 1, characterized in that, the wiring board (6) middle part is equipped with annular connecting plate (61), the support column (4) one end of keeping away from base (1) is equipped with multiunit screw hole (43), connecting plate (61) through screw rod and support column (4) detachable connection.
6. A construction engineering power cable erection structure according to claim 1, characterized in that, both ends of the wire bundling plate (6) are provided with wire bundling grooves (62), and the wire bundling grooves (62) are matched with the wire clip (63) through bolts.
CN202020269922.3U 2020-03-07 2020-03-07 Building engineering power cable erects structure Expired - Fee Related CN211239244U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020269922.3U CN211239244U (en) 2020-03-07 2020-03-07 Building engineering power cable erects structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020269922.3U CN211239244U (en) 2020-03-07 2020-03-07 Building engineering power cable erects structure

Publications (1)

Publication Number Publication Date
CN211239244U true CN211239244U (en) 2020-08-11

Family

ID=71921918

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020269922.3U Expired - Fee Related CN211239244U (en) 2020-03-07 2020-03-07 Building engineering power cable erects structure

Country Status (1)

Country Link
CN (1) CN211239244U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111952888A (en) * 2020-08-12 2020-11-17 吴振亮 Cable erection supporting device for electromechanical installation
CN113067282A (en) * 2021-03-22 2021-07-02 合肥轩杰环境工程有限公司 Building electromechanical installation auxiliary device and working method thereof
CN113914219A (en) * 2021-09-17 2022-01-11 山东高速工程建设集团有限公司 Frame falling device and method for bridge rapid construction
CN115549009A (en) * 2022-12-02 2022-12-30 黑龙江省建筑安装集团有限公司 Cable erecting device for building electromechanical installation

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111952888A (en) * 2020-08-12 2020-11-17 吴振亮 Cable erection supporting device for electromechanical installation
CN113067282A (en) * 2021-03-22 2021-07-02 合肥轩杰环境工程有限公司 Building electromechanical installation auxiliary device and working method thereof
CN113067282B (en) * 2021-03-22 2022-08-23 上海冯源建设发展有限公司 Building electromechanical installation auxiliary device and working method thereof
CN113914219A (en) * 2021-09-17 2022-01-11 山东高速工程建设集团有限公司 Frame falling device and method for bridge rapid construction
CN115549009A (en) * 2022-12-02 2022-12-30 黑龙江省建筑安装集团有限公司 Cable erecting device for building electromechanical installation

Similar Documents

Publication Publication Date Title
CN211239244U (en) Building engineering power cable erects structure
CN208866455U (en) The fixed bracket of automatic drilling machine
CN206972169U (en) Drilling equipment
CN114046044B (en) Formwork support fastening tool
CN210577392U (en) Overhead device for cable maintenance
CN215801134U (en) Culvert template trolley with adjustable span and height
CN212866333U (en) Novel steel structure supporting structure
CN218509172U (en) Electric power tower convenient to personnel install fast
CN218970806U (en) Annular concrete pole
CN110745698B (en) Portable framework hoisting device
CN210182907U (en) Temporary stringing device for electric power construction
CN220814866U (en) Upright post structure on scaffold
CN218479575U (en) Device for adjusting verticality of vertical structure
CN212385661U (en) Prefabricated plate napping device
CN219910249U (en) Electric power iron tower base structure
CN221255900U (en) Steel structure truss
CN216235745U (en) Tower crane standard festival with swift dismouting structure
CN212224907U (en) Side-dismantling type fence for building construction
CN218562988U (en) Hanging point truss of attached lifting scaffold
CN114562099B (en) High scaffold frame for building engineering construction of security
CN220116048U (en) Pipeline installation equipment for building construction
CN210263133U (en) Piping lane unilateral template strutting arrangement
CN220427063U (en) Pre-buried steel sheet trompil awl silk device
CN218595391U (en) High-stability elevator
CN215629955U (en) Protective equipment for precast pile construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200811