CN211233382U - fireplace - Google Patents

fireplace Download PDF

Info

Publication number
CN211233382U
CN211233382U CN201922191905.2U CN201922191905U CN211233382U CN 211233382 U CN211233382 U CN 211233382U CN 201922191905 U CN201922191905 U CN 201922191905U CN 211233382 U CN211233382 U CN 211233382U
Authority
CN
China
Prior art keywords
heat
heating
pipeline
heat storage
temperature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201922191905.2U
Other languages
Chinese (zh)
Inventor
梁桂源
陈佳锋
马曾文
张霞
李良潭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201922191905.2U priority Critical patent/CN211233382U/en
Application granted granted Critical
Publication of CN211233382U publication Critical patent/CN211233382U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Heat-Pump Type And Storage Water Heaters (AREA)

Abstract

本实用新型涉及家用电器技术领域,具体涉及一种壁挂炉,包括:第一主供热管路,具有第一入口和第一出口;第二主供热管路,具有第二入口和第二出口;加热装置,对第一主供热管路进行加热;流量分配器,设于第一主供热管路上,位于加热装置与第一出口之间;辅助供热管路,一端与流量分配器的辅助端口连通,另一端与第一入口连通;蓄热换热器,设于辅助供热管路上,蓄热换热器包括蓄热介质,蓄热介质吸收辅助供热管路的热量对第二主供热管路进行换热。通过设置流量分配器,实现了同时供应采暖用水和生活用水;同时蓄热介质吸收热量并储存起来,在用户有需求时,生活冷水与蓄热介质储存的热量直接进行换热,无需等待,加热较及时,提高了用户体验。

Figure 201922191905

The utility model relates to the technical field of household appliances, in particular to a wall-hung boiler, comprising: a first main heating pipeline with a first inlet and a first outlet; a second main heating pipeline with a second inlet and a second outlet outlet; heating device, heating the first main heating pipeline; flow distributor, arranged on the first main heating pipeline, located between the heating device and the first outlet; auxiliary heating pipeline, one end of which is distributed with the flow The auxiliary port of the heat storage device is connected to the auxiliary port, and the other end is connected to the first inlet; the heat storage heat exchanger is arranged on the auxiliary heat supply pipeline. The second main heat supply pipeline conducts heat exchange. By setting the flow distributor, it is possible to supply heating water and domestic water at the same time; at the same time, the heat storage medium absorbs heat and stores it. When the user needs it, the domestic cold water and the heat stored in the heat storage medium directly exchange heat, without waiting, heating It is more timely and improves the user experience.

Figure 201922191905

Description

壁挂炉fireplace

技术领域technical field

本实用新型涉及家用电器技术领域,具体涉及一种壁挂炉。The utility model relates to the technical field of household appliances, in particular to a wall-hung furnace.

背景技术Background technique

壁挂炉,是以天然气、人工煤气或液化气作为燃料,燃料在燃烧室内燃烧后,由主换热器将热量吸收,建筑物中的循环水在途经主换热器时,经过往复加热、从而不断将热量输出给建筑物,为建筑物提供热源。The wall-hung boiler uses natural gas, artificial gas or liquefied gas as fuel. After the fuel is burned in the combustion chamber, the heat is absorbed by the main heat exchanger. When the circulating water in the building passes through the main heat exchanger, it is heated back and forth, thereby Continuously output heat to the building, providing a heat source for the building.

现有技术中公开了一种壁挂炉,采用分流控制器件将燃烧器加热后的水分成两个支路,一路通往采暖用水,一路通往卫浴用水等生活用水,以实现在冬季可以同时供应采暖和生活用水,夏季供应生活热水,但是该结构在供应生活用水时,生活用水是通过换热器与燃烧器加热后的水直接换热来获得升温,这样在用户有需求时,分流控制器件才会控制通往生活用水的支路流通,然后由该支路流过的被燃烧器加热后的水流入到换热器对生活用水进行换热升温,加热不及时,同时,受用户水压和水流量影响,用户打开水龙头时,不能直接获取到热水,用户体验差。A wall-hung boiler is disclosed in the prior art, and the water heated by the burner is divided into two branches by a split control device, one leads to heating water, and the other leads to domestic water such as bathroom water, so as to achieve simultaneous supply in winter. Heating and domestic water, supply domestic hot water in summer, but when this structure supplies domestic water, the domestic water is heated by direct heat exchange between the heat exchanger and the water heated by the burner, so that when the user has demand, the diversion control The device will control the flow of the branch leading to the domestic water, and then the water heated by the burner flowing through the branch will flow into the heat exchanger to heat up the domestic water. Due to the influence of pressure and water flow, when the user opens the faucet, the hot water cannot be directly obtained, and the user experience is poor.

实用新型内容Utility model content

因此,本实用新型要解决的技术问题在于克服现有技术中的能够同时供应采暖热水和生活热水的壁挂炉用户体验差的缺陷,从而提供一种能够同时供应采暖热水和生活热水且用户体验好的壁挂炉。Therefore, the technical problem to be solved by the present invention is to overcome the defect of poor user experience of wall-hung boilers capable of simultaneously supplying heating hot water and domestic hot water in the prior art, so as to provide a wall-hung boiler capable of simultaneously supplying heating hot water and domestic hot water And the user experience is a good wall hanging furnace.

一种壁挂炉,包括:A wall-mounted stove, comprising:

第一主供热管路,具有第一入口和第一出口;a first main heating pipeline with a first inlet and a first outlet;

第二主供热管路,具有第二入口和第二出口;a second main heating pipeline, having a second inlet and a second outlet;

加热装置,对所述第一主供热管路进行加热;a heating device for heating the first main heat supply pipeline;

流量分配器,设于所述第一主供热管路上,位于所述加热装置与所述第一出口之间;a flow distributor, arranged on the first main heating pipeline, between the heating device and the first outlet;

辅助供热管路,一端与所述流量分配器的辅助端口连通,另一端与所述第一入口连通;an auxiliary heating pipeline, one end of which is communicated with the auxiliary port of the flow distributor, and the other end is communicated with the first inlet;

蓄热换热器,设于所述辅助供热管路上,所述蓄热换热器包括蓄热介质,所述蓄热介质吸收所述辅助供热管路的热量对所述第二主供热管路进行换热。A heat storage heat exchanger is arranged on the auxiliary heat supply pipeline, the heat storage heat exchanger includes a heat storage medium, and the heat storage medium absorbs the heat of the auxiliary heat supply pipeline to supply the second main supply Heat pipe for heat exchange.

还包括保温结构,设于所述蓄热换热器的外壁上。It also includes a thermal insulation structure, which is arranged on the outer wall of the heat storage heat exchanger.

所述蓄热介质为水。The heat storage medium is water.

所述加热装置包括燃烧器和主换热器,所述燃烧器产生的高温烟气对所述第一主供热管路设于所述主换热器内的管路进行加热。The heating device includes a burner and a main heat exchanger, and the high-temperature flue gas generated by the burner heats the pipeline provided in the main heat exchanger of the first main heat supply pipeline.

还包括辅助支路,一端连接所述第一主供热管路位于所述流量分配器与所述第一出口之间的管路,另一端连接所述辅助供热管路位于所述蓄热换热器与所述第一入口之间的管路。It also includes an auxiliary branch, one end is connected to the pipeline between the flow distributor and the first outlet of the first main heat supply pipeline, and the other end is connected to the auxiliary heat supply pipeline located in the heat storage. A pipeline between the heat exchanger and the first inlet.

还包括:Also includes:

第一阀门,设于所述辅助支路上;a first valve, located on the auxiliary branch;

第二阀门,设于所述辅助供热管路处于所述蓄热换热器与所述第一入口之间的管路上。The second valve is arranged on the pipeline between the heat storage heat exchanger and the first inlet of the auxiliary heat supply pipeline.

还包括控制器,所述控制器与所述第一阀门和第二阀门连接,用于控制所述第一阀门和第二阀门的开闭。It also includes a controller, which is connected with the first valve and the second valve and used to control the opening and closing of the first valve and the second valve.

所述辅助供热管路处于所述蓄热换热器与所述第一入口之间的管路上设有第一温度检测装置,所述第一温度检测装置与所述控制器连接;A first temperature detection device is provided on the pipeline between the heat storage heat exchanger and the first inlet of the auxiliary heating pipeline, and the first temperature detection device is connected to the controller;

在所述第一温度检测装置的检测温度大于预设采暖温度,且两者之间的差值大于5℃时,所述控制器控制所述第一阀门开启,所述第二阀门关闭。When the detected temperature of the first temperature detection device is greater than the preset heating temperature, and the difference between the two is greater than 5° C., the controller controls the first valve to be opened and the second valve to be closed.

在生活用水满足预设温度,或者所述第一温度检测装置的检测温度小于等于预设采暖温度,且两者之间的差值小于5℃时,所述控制器控制所述第一阀门关闭,所述第二阀门开启。When the domestic water meets the preset temperature, or the detected temperature of the first temperature detection device is less than or equal to the preset heating temperature, and the difference between the two is less than 5°C, the controller controls the first valve to close , the second valve is opened.

还包括水压平衡管路,与所述第一主供热管路连接,所述水压平衡管路上设有膨胀水箱。It also includes a water pressure balance pipeline, which is connected to the first main heat supply pipeline, and an expansion water tank is arranged on the water pressure balance pipeline.

本实用新型技术方案,具有如下优点:The technical scheme of the utility model has the following advantages:

1.本实用新型提供的壁挂炉,包括:第一主供热管路,具有第一入口和第一出口;第二主供热管路,具有第二入口和第二出口;加热装置,对所述第一主供热管路进行加热;流量分配器,设于所述第一主供热管路上,位于所述加热装置与所述第一出口之间;辅助供热管路,一端与所述流量分配器的辅助端口连通,另一端与所述第一入口连通;蓄热换热器,设于所述辅助供热管路上,所述蓄热换热器包括蓄热介质,所述蓄热介质吸收所述辅助供热管路的热量对所述第二主供热管路进行换热。通过设置流量分配器、第一主供热管路和第二主供热管路,流量分配器将加热装置加热后的第一主供热管路的水分配至供应第一方面需求的热量和供应第二需求的热量,如在使用过程中,可以将第一入口与采暖管路的回水管连通,第一出口与采暖管路的供水管连通,第二入口与生活用水的回水管连通,第二出口与生活用水的供水管连通,以实现同时供应采暖用水和生活用水;同时,由于在辅助供热管路上设置了蓄热换热器,蓄热换热器内的蓄热介质吸收辅助供热管路的热量对第二主供热管路进行换热,使得蓄热介质吸收加热装置加热后的水的热量并储存起来,这样在用户有需求时,随时打开水龙头,经由第二入口流入的生活冷水就能与蓄热换热器内蓄热介质储存的热量直接进行换热,无需等待,加热较及时,且由于蓄热介质的储存热量,即便用户同时开启多个水龙头,也可以满足需求,受用户水压和水流量的影响较小,即用户打开水龙头时,均能直接获取到热水,也防止用户刷牙、洗手等小水量需求时,导致机组频繁开启的问题,提高了用户体验。1. The wall-hung boiler provided by the utility model comprises: a first main heating pipeline with a first inlet and a first outlet; a second main heating pipeline with a second inlet and a second outlet; The first main heat supply pipeline is heated; the flow distributor is arranged on the first main heat supply pipeline and is located between the heating device and the first outlet; the auxiliary heat supply pipeline has one end connected to the The auxiliary port of the flow distributor is in communication, and the other end is in communication with the first inlet; a heat storage heat exchanger is arranged on the auxiliary heat supply pipeline, the heat storage heat exchanger includes a heat storage medium, and the The heat storage medium absorbs the heat of the auxiliary heat supply line to exchange heat with the second main heat supply line. By arranging the flow distributor, the first main heat supply pipeline and the second main heat supply pipeline, the flow distributor distributes the water in the first main heat supply pipeline heated by the heating device to supply the heat and heat required by the first aspect. To supply the heat of the second demand, for example, during use, the first inlet can be connected with the return pipe of the heating pipeline, the first outlet can be connected with the water supply pipe of the heating pipeline, and the second inlet can be connected with the return pipe of domestic water, The second outlet is connected to the water supply pipe for domestic water, so as to supply heating water and domestic water at the same time; at the same time, since the heat storage heat exchanger is set on the auxiliary heat supply pipeline, the heat storage medium in the heat storage heat exchanger absorbs auxiliary The heat of the heat supply pipeline exchanges heat with the second main heat supply pipeline, so that the heat storage medium absorbs the heat of the water heated by the heating device and stores it, so that when the user needs it, the faucet can be opened at any time, through the second inlet. The inflowing domestic cold water can directly exchange heat with the heat stored in the heat storage medium in the heat storage heat exchanger, without waiting, and the heating is timely. Moreover, due to the stored heat of the heat storage medium, even if the user turns on multiple faucets at the same time, it can be To meet the demand, it is less affected by the user's water pressure and water flow, that is, when the user opens the faucet, he can directly obtain hot water, and it also prevents the frequent opening of the unit when the user needs a small amount of water such as brushing teeth and washing hands. user experience.

2.本实用新型提供的壁挂炉,还包括保温结构,设于所述蓄热换热器的外壁上。通过在蓄热换热器的外壁上设置保温结构,使得蓄热换热器的蓄热效果更好,防止热量向外散失过多。2. The wall-hung boiler provided by the utility model further comprises a heat preservation structure, which is arranged on the outer wall of the heat storage heat exchanger. By arranging the thermal insulation structure on the outer wall of the heat storage heat exchanger, the heat storage effect of the heat storage heat exchanger is better, and the heat is prevented from being dissipated too much outward.

3.本实用新型提供的壁挂炉,所述蓄热介质为水。通过将蓄热介质设置为水,使得满足蓄热作用的同时蓄热介质的获取较方便。3. In the wall-hung boiler provided by the utility model, the heat storage medium is water. By setting the heat storage medium as water, it is convenient to obtain the heat storage medium while satisfying the heat storage effect.

4.本实用新型提供的壁挂炉,还包括辅助支路,一端连接所述第一主供热管路位于所述流量分配器与所述第一出口之间的管路,另一端连接所述辅助供热管路位于所述蓄热换热器与所述第一入口之间的管路。通过设置辅助支路,使得壁挂炉在同时供应采暖和生活用水过程中,若蓄热换热器储存的热量在供应生活用水后还有剩余的话可以通过辅助支路供应至采暖用水,提高能量的利用率。4. The wall-hung boiler provided by the present invention further comprises an auxiliary branch, one end of which is connected to the pipeline between the flow distributor and the first outlet of the first main heating pipeline, and the other end is connected to the The auxiliary heat supply line is located between the heat storage heat exchanger and the first inlet. By setting an auxiliary branch, in the process of supplying heating and domestic water to the wall-hung boiler at the same time, if the heat stored in the heat storage heat exchanger still remains after the domestic water is supplied, it can be supplied to the heating water through the auxiliary branch to improve the energy consumption. utilization.

5.本实用新型提供的壁挂炉,还包括:第一阀门,设于所述辅助支路上;第二阀门,设于所述辅助供热管路处于所述蓄热换热器与所述第一入口之间的管路上。通过设置第一阀门和第二阀门,使得壁挂炉在同时供应采暖和生活用水过程中,可以很方便的控制采暖和生活用水两路的并联或者串联运行,合理利用能量。5. The wall-hung boiler provided by the utility model further comprises: a first valve, which is arranged on the auxiliary branch; a second valve, which is arranged on the auxiliary heat supply pipeline between the heat storage heat exchanger and the first valve. on the pipeline between the inlets. By setting the first valve and the second valve, in the process of supplying heating and domestic water at the same time, the wall-hung boiler can conveniently control the parallel or series operation of the heating and domestic water, and utilize energy rationally.

6.本实用新型提供的壁挂炉,还包括控制器,所述控制器与所述第一阀门和第二阀门连接,用于控制所述第一阀门和第二阀门的开闭。通过设置控制器与第一阀门和第二阀门连接,能够自动控制第一阀门和第二阀门的开启和关闭,实现壁挂炉的全自动化控制。6. The wall-hung boiler provided by the present invention further comprises a controller, the controller is connected with the first valve and the second valve, and is used to control the opening and closing of the first valve and the second valve. By setting the controller to be connected with the first valve and the second valve, the opening and closing of the first valve and the second valve can be automatically controlled, and the fully automatic control of the wall-hung boiler can be realized.

7.本实用新型提供的壁挂炉,所述辅助供热管路处于所述蓄热换热器与所述第一入口之间的管路上设有第一温度检测装置,所述第一温度检测装置与所述控制器连接;在所述第一温度检测装置的检测温度大于预设采暖温度,且两者之间的差值大于5℃时,所述控制器控制所述第一阀门开启,所述第二阀门关闭。通过设置第一温度检测装置,在第一温度检测装置的检测温度大于预设采暖温度,且两者的差值大于5℃时,控制器控制第一阀门开启,第二阀门关闭,使得采暖用水和生活用水的管路串联运行,即蓄热换热器的储存热量在满足生活用水的基础上还能有剩余再去供应采暖用水,保证了能量的充分利用。7. In the wall-hung boiler provided by the present invention, the auxiliary heating pipeline is provided with a first temperature detection device on the pipeline between the heat storage heat exchanger and the first inlet, and the first temperature detection device is The device is connected to the controller; when the detected temperature of the first temperature detection device is greater than the preset heating temperature, and the difference between the two is greater than 5°C, the controller controls the first valve to open, The second valve is closed. By setting the first temperature detection device, when the detected temperature of the first temperature detection device is greater than the preset heating temperature, and the difference between the two is greater than 5°C, the controller controls the first valve to open and the second valve to close, so that the heating water is used. It runs in series with the domestic water pipeline, that is, the heat stored in the heat storage heat exchanger can be used to supply heating water on the basis of meeting the domestic water supply, ensuring the full utilization of energy.

8.本实用新型提供的壁挂炉,在生活用水满足预设温度,或者所述第一温度检测装置的检测温度小于等于预设采暖温度,且两者之间的差值小于5℃时,所述控制器控制所述第一阀门关闭,所述第二阀门开启。由于生活用水满足了预设温度的需求,使得生活用水处无需再供应热量;或者在第一温度检测装置的检测温度小于等于采暖温度,且两者之间的差值小于5℃时,蓄热换热器的储存热量仅能供应生活用水,没有多余的能量供应采暖用水,控制器控制第一阀门关闭,第二阀门开启,采暖用水和生活用水开启并联模式运行,保证了壁挂炉的正常运行。8. In the wall-hung boiler provided by the present invention, when the domestic water meets the preset temperature, or the detected temperature of the first temperature detection device is less than or equal to the preset heating temperature, and the difference between the two is less than 5°C, the The controller controls the first valve to close and the second valve to open. Since the domestic water meets the preset temperature requirement, there is no need to supply heat to the domestic water; or when the temperature detected by the first temperature detection device is less than or equal to the heating temperature, and the difference between the two is less than 5°C, heat storage The stored heat of the heat exchanger can only supply domestic water, and there is no excess energy to supply heating water. The controller controls the first valve to close, the second valve to open, and the heating water and domestic water to operate in parallel mode to ensure the normal operation of the wall-hung boiler. .

9.本实用新型提供的壁挂炉,还包括水压平衡管路,与所述第一主供热管路连接,所述水压平衡管路上设有膨胀水箱。通过设置膨胀水箱,能够保证壁挂炉各管路的水压平衡。9. The wall-hung boiler provided by the present utility model further comprises a water pressure balance pipeline, which is connected to the first main heat supply pipeline, and an expansion water tank is arranged on the water pressure balance pipeline. By setting the expansion water tank, the water pressure balance of each pipeline of the wall-hung boiler can be ensured.

附图说明Description of drawings

为了更清楚地说明本实用新型具体实施方式或现有技术中的技术方案,下面将对具体实施方式或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图是本实用新型的一些实施方式,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the specific embodiments of the present invention or the technical solutions in the prior art, the following will briefly introduce the accompanying drawings that need to be used in the description of the specific embodiments or the prior art. Obviously, the following descriptions The accompanying drawings are some embodiments of the present invention. For those of ordinary skill in the art, other drawings can also be obtained based on these drawings without creative efforts.

图1为本实用新型的壁挂炉的结构示意图;Fig. 1 is the structural representation of the wall-hung boiler of the present utility model;

图2为本实用新型的壁挂炉单独供应采暖用水的结构示意图;Fig. 2 is the structural schematic diagram of the wall-hung boiler of the utility model supplying heating water alone;

图3为本实用新型的壁挂炉单独供应生活用水的结构示意图;3 is a schematic structural diagram of the wall-hung boiler of the present invention supplying domestic water alone;

图4为本实用新型的壁挂炉同时供应采暖用水和生活用水的并联方式的结构示意图;4 is a schematic structural diagram of a parallel mode in which the wall-hung boiler of the present invention simultaneously supplies heating water and domestic water;

图5为本实用新型的壁挂炉同时供应采暖用水和生活用水的串联方式的结构示意图;5 is a schematic structural diagram of a series connection mode in which the wall-hung boiler of the present invention simultaneously supplies heating water and domestic water;

附图标记说明:Description of reference numbers:

1-辅助支路;2-主换热器;3-燃烧器;4-第二温度检测装置;5-流量分配器;6-蓄热换热器;7-第四温度检测装置;8-第二出口;9-第二入口;10-第三温度检测装置;11-采暖管路;12-第一温度检测装置;13-第一阀门;14-第二阀门;15-水泵;16-比例阀;17-膨胀水箱;18-第一出口;19-第一入口;20-辅助供热管路;21-第一主供热管路;22-第二主供热管路。1- auxiliary branch; 2- main heat exchanger; 3- burner; 4- second temperature detection device; 5- flow distributor; 6- heat storage heat exchanger; 7- fourth temperature detection device; 8- 2nd outlet; 9-second inlet; 10-third temperature detection device; 11-heating pipeline; 12-first temperature detection device; 13-first valve; 14-second valve; 15-water pump; 16- Proportional valve; 17-expansion tank; 18-first outlet; 19-first inlet; 20-auxiliary heating pipeline; 21-first main heating pipeline; 22-second main heating pipeline.

具体实施方式Detailed ways

下面将结合附图对本实用新型的技术方案进行清楚、完整地描述,显然,所描述的实施例是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are a part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.

此外,下面所描述的本实用新型不同实施方式中所涉及的技术特征只要彼此之间未构成冲突就可以相互结合。In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as there is no conflict with each other.

如图1-图5所示,本实施例中提供了一种壁挂炉,包括:第一主供热管路21、第二主供热管路22、加热装置、流量分配器5、辅助供热管路20和蓄热换热器6。As shown in FIGS. 1-5 , a wall-hung boiler is provided in this embodiment, including: a first main heat supply pipeline 21 , a second main heat supply pipeline 22 , a heating device, a flow distributor 5 , and an auxiliary supply Heat circuit 20 and heat storage heat exchanger 6 .

第一主供热管路21,具有第一入口19和第一出口18;第二主供热管路22,具有第二入口9和第二出口8;加热装置,对第一主供热管路21进行加热;流量分配器5,设于第一主供热管路21上,位于加热装置与第一出口18之间;辅助供热管路20,一端与流量分配器5的辅助端口连通,另一端与第一入口19连通;蓄热换热器6,设于辅助供热管路20上,蓄热换热器6包括蓄热介质,蓄热介质吸收辅助供热管路20的热量对第二主供热管路22进行换热。The first main heating pipe 21 has a first inlet 19 and a first outlet 18; the second main heating pipe 22 has a second inlet 9 and a second outlet 8; The flow distributor 5 is arranged on the first main heat supply pipeline 21, between the heating device and the first outlet 18; the auxiliary heat supply pipeline 20, one end communicates with the auxiliary port of the flow distributor 5 , the other end is communicated with the first inlet 19; the heat storage heat exchanger 6 is arranged on the auxiliary heat supply pipeline 20, the heat storage heat exchanger 6 includes a heat storage medium, and the heat storage medium absorbs the heat of the auxiliary heat supply pipeline 20 Heat exchange is performed on the second main heat supply line 22 .

通过设置流量分配器5、第一主供热管路21和第二主供热管路22,流量分配器5将加热装置加热后的第一主供热管路21的水分配至供应第一方面需求的热量和供应第二需求的热量,如在使用过程中,可以将第一入口19与采暖管路11的回水管连通,第一出口18与采暖管路11的供水管连通,第二入口9与生活用水的回水管连通,第二出口8与生活用水的供水管连通,以实现同时供应采暖用水和生活用水(生活用水包括卫浴用水、厨房用水等);同时,由于在辅助供热管路20上设置了蓄热换热器6,蓄热换热器6内的蓄热介质吸收辅助供热管路20的热量对第二主供热管路22进行换热,使得蓄热介质吸收加热装置加热后的水的热量并储存起来,这样在用户有需求时,随时打开水龙头,经由第二入口9流入的生活冷水就能与蓄热换热器6内蓄热介质储存的热量直接进行换热,无需等待,加热较及时,且由于蓄热介质的储存热量,即便用户同时开启多个水龙头,也可以满足需求,受用户水压和水流量的影响较小,即用户打开水龙头时,均能直接获取到热水,也防止用户刷牙、洗手等小水量需求时,导致机组频繁开启的问题,提高了用户体验。By arranging the flow distributor 5, the first main heat supply line 21 and the second main heat supply line 22, the flow distributor 5 distributes the water in the first main heat supply line 21 heated by the heating device to supply the first main heat supply line 21. For example, during use, the first inlet 19 can be communicated with the return pipe of the heating pipeline 11, the first outlet 18 can be communicated with the water supply pipe of the heating pipeline 11, and the second The inlet 9 is communicated with the return pipe of domestic water, and the second outlet 8 is communicated with the water supply pipe of domestic water, so as to supply heating water and domestic water at the same time (domestic water includes bathroom water, kitchen water, etc.); A heat storage heat exchanger 6 is arranged on the pipeline 20, and the heat storage medium in the heat storage heat exchanger 6 absorbs the heat of the auxiliary heat supply pipeline 20 to perform heat exchange on the second main heat supply pipeline 22, so that the heat storage medium The heat of the water heated by the heating device is absorbed and stored, so that when the user needs it, the tap can be opened at any time, and the domestic cold water flowing in through the second inlet 9 can be directly stored with the heat stored in the heat storage medium in the heat storage heat exchanger 6. For heat exchange, there is no need to wait, the heating is more timely, and due to the stored heat of the heat storage medium, even if the user opens multiple faucets at the same time, it can still meet the demand, and is less affected by the user's water pressure and water flow, that is, when the user opens the faucet , can directly obtain hot water, and also prevent users from brushing teeth, washing hands and other small water needs, resulting in frequent opening of the unit, improving the user experience.

为了提高蓄热换热器6的蓄热效果,本实施例中的壁挂炉还包括保温结构,设于蓄热换热器6的外壁上。通过在蓄热换热器6的外壁上设置保温结构,防止热量向外散失过多。具体地,本实施例中的保温结构为保温层,如保温泡沫,敷设于蓄热换热器6的外壁上。作为可变换的实施方式,也可以是,在蓄热换热器6的外壁外设置保温装置。In order to improve the heat storage effect of the heat storage heat exchanger 6 , the wall-hung boiler in this embodiment further includes a heat preservation structure, which is arranged on the outer wall of the heat storage heat exchanger 6 . By arranging a thermal insulation structure on the outer wall of the heat storage heat exchanger 6, excessive heat dissipation to the outside is prevented. Specifically, the thermal insulation structure in this embodiment is an thermal insulation layer, such as thermal insulation foam, which is laid on the outer wall of the heat storage heat exchanger 6 . As an alternative embodiment, a heat insulating device may be provided outside the outer wall of the thermal storage heat exchanger 6 .

本实施例中的蓄热介质为水。通过将蓄热介质设置为水,使得满足蓄热作用的同时蓄热介质的获取较方便。作为可变换的实施方式,也可以是,蓄热介质为其他材质的显热蓄热材料或者相变蓄热材料,如熔融盐类、石蜡类、酯酸类等。The heat storage medium in this embodiment is water. By setting the heat storage medium as water, it is convenient to obtain the heat storage medium while satisfying the heat storage effect. As an alternative embodiment, the heat storage medium may also be a sensible heat storage material or a phase-change heat storage material of other materials, such as molten salts, paraffins, ester acids, and the like.

本实施例中的加热装置包括燃烧器3和主换热器2,燃烧器3产生的高温烟气对第一主供热管路21设于主换热器2内的管路进行加热。作为可变换的实施方式,也可以是,加热装置不采用燃烧器3进行加热,而是采用其他加热装置实现加热的功能,如电加热。The heating device in this embodiment includes a burner 3 and a main heat exchanger 2 , and the high-temperature flue gas generated by the burner 3 heats the first main heat supply pipeline 21 in the main heat exchanger 2 . As an alternative embodiment, it is also possible that the heating device does not use the burner 3 for heating, but uses other heating devices to realize the heating function, such as electric heating.

本实施例中的壁挂炉还包括辅助支路1,一端连接第一主供热管路21位于流量分配器5与第一出口18之间的管路,另一端连接辅助供热管路20位于蓄热换热器6与第一入口19之间的管路。通过设置辅助支路1,使得壁挂炉在同时供应采暖和生活用水过程中,若蓄热换热器6储存的热量在供应生活用水后还有剩余的话可以通过辅助支路1供应至采暖用水,提高能量的利用率。The wall-hung boiler in this embodiment also includes an auxiliary branch 1, one end of which is connected to the first main heating pipeline 21 between the flow distributor 5 and the first outlet 18, and the other end is connected to the auxiliary heating pipeline 20 located at the first outlet 18. The pipeline between the heat storage heat exchanger 6 and the first inlet 19 . By setting the auxiliary branch 1, in the process of supplying heating and domestic water to the wall-hung boiler at the same time, if the heat stored in the heat storage heat exchanger 6 still remains after the domestic water is supplied, it can be supplied to the heating water through the auxiliary branch 1. Improve energy utilization.

本实施例中的壁挂炉还包括:第一阀门13,设于辅助支路1上;第二阀门14,设于辅助供热管路20处于蓄热换热器6与第一入口19之间的管路上。通过设置第一阀门13和第二阀门14,使得壁挂炉在同时供应采暖和生活用水过程中,可以很方便的控制采暖和生活用水两路的并联或者串联运行,合理利用能量。The wall-hung boiler in this embodiment further includes: a first valve 13 , which is arranged on the auxiliary branch 1 ; a second valve 14 , which is arranged on the auxiliary heating pipeline 20 between the heat storage heat exchanger 6 and the first inlet 19 on the pipeline. By setting the first valve 13 and the second valve 14, in the process of simultaneously supplying heating and domestic water, the wall-hung boiler can conveniently control the parallel or series operation of heating and domestic water, and utilize energy rationally.

为了便于自动化控制,本实施例中的壁挂炉还包括控制器,控制器与第一阀门13和第二阀门14连接,用于控制第一阀门13和第二阀门14的开闭。通过设置控制器与第一阀门13和第二阀门14连接,能够自动控制第一阀门13和第二阀门14的开启和关闭,实现壁挂炉的全自动化控制。作为可变换的实施方式,也可以是,不设置控制器,人手动开闭第一阀门13和第二阀门14进行采暖和生活用水两路的并联或者串联切换。In order to facilitate automatic control, the wall-hung boiler in this embodiment further includes a controller, which is connected to the first valve 13 and the second valve 14 for controlling the opening and closing of the first valve 13 and the second valve 14 . By setting the controller to be connected with the first valve 13 and the second valve 14, the opening and closing of the first valve 13 and the second valve 14 can be automatically controlled, thereby realizing the fully automatic control of the wall-hung boiler. As an alternative embodiment, without a controller, the first valve 13 and the second valve 14 can be manually opened and closed to perform parallel or series switching between heating and domestic water.

本实施例中的辅助供热管路20处于蓄热换热器6与第一入口19之间的管路上设有第一温度检测装置12,第一温度检测装置12与控制器连接;在第一温度检测装置12的检测温度大于预设采暖温度,且两者之间的差值大于5℃时,控制器控制第一阀门13开启,第二阀门14关闭。通过设置第一温度检测装置12,在第一温度检测装置12的检测温度大于预设采暖温度,且两者的差值大于5℃时,控制器控制第一阀门13开启,第二阀门14关闭,使得采暖用水和生活用水的管路串联运行,即蓄热换热器6的储存热量在满足生活用水的基础上还能有剩余再去供应采暖用水,保证了能量的充分利用。In this embodiment, the auxiliary heat supply pipeline 20 is provided with a first temperature detection device 12 on the pipeline between the heat storage heat exchanger 6 and the first inlet 19, and the first temperature detection device 12 is connected to the controller; When the detected temperature of a temperature detection device 12 is greater than the preset heating temperature and the difference between the two is greater than 5°C, the controller controls the first valve 13 to open and the second valve 14 to close. By setting the first temperature detection device 12, when the detected temperature of the first temperature detection device 12 is greater than the preset heating temperature and the difference between the two is greater than 5°C, the controller controls the first valve 13 to open and the second valve 14 to close , so that the pipelines of heating water and domestic water run in series, that is, the stored heat of the heat storage heat exchanger 6 can be used to supply heating water on the basis of satisfying domestic water, ensuring full utilization of energy.

本实施例中的壁挂炉在生活用水满足预设温度,或者第一温度检测装置12的检测温度小于等于预设采暖温度,且两者之间的差值小于5℃时,控制器控制第一阀门13关闭,第二阀门14开启。由于生活用水满足了预设温度的需求,使得生活用水处无需再供应热量;或者在第一温度检测装置12的检测温度小于等于采暖温度,且两者之间的差值小于5℃时,蓄热换热器6的储存热量仅能供应生活用水,没有多余的能量供应采暖用水,控制器控制第一阀门13关闭,第二阀门14开启,采暖用水和生活用水开启并联模式运行,保证了壁挂炉的正常运行。In the wall-hung boiler in this embodiment, when the domestic water meets the preset temperature, or the temperature detected by the first temperature detection device 12 is less than or equal to the preset heating temperature, and the difference between the two is less than 5°C, the controller controls the first temperature. The valve 13 is closed and the second valve 14 is opened. Since the domestic water satisfies the preset temperature requirement, there is no need to supply heat to the domestic water; or when the temperature detected by the first temperature detection device 12 is less than or equal to the heating temperature, and the difference between the two is less than 5°C, the storage The stored heat of the heat exchanger 6 can only supply domestic water, and there is no excess energy to supply heating water. The controller controls the first valve 13 to close, the second valve 14 to open, and the heating water and domestic water to operate in parallel mode to ensure that the wall hanging normal operation of the furnace.

为了保证壁挂炉各管路的水压平衡,本实施例中的壁挂炉还包括水压平衡管路,与第一主供热管路21连接,水压平衡管路上设有膨胀水箱17。In order to ensure the water pressure balance of each pipeline of the wall-hung boiler, the wall-hung boiler in this embodiment also includes a water pressure balance pipeline, which is connected to the first main heat supply pipeline 21, and an expansion tank 17 is arranged on the water pressure balance pipeline.

为了保证壁挂炉各管路的水循环,本实施例中的壁挂炉还包括水泵15,设于第一主供热管路21上。In order to ensure the water circulation of each pipeline of the wall-hung boiler, the wall-hung boiler in this embodiment further includes a water pump 15 , which is arranged on the first main heating pipeline 21 .

为了便于温度控制,本实施例中的壁挂炉还包括第二温度检测装置4、第三温度检测装置10和第四温度检测装置7,第二温度检测装置4、第三温度检测装置10和第四温度检测装置7均与控制器电连接。第二温度检测装置4设于第一主供热管路21上,位于主换热器2与流量分配器5之间,第三温度检测装置10设于第一主供热管路21上,位于流量分配器5与第一出口18之间,第四温度检测装置7设于蓄热换热器6内。具体地,本实施例中的第一温度检测装置12、第二温度检测装置4、第三温度检测装置10和第四温度检测装置7均为感温包。作为可变换的实施方式,也可以是,第一温度检测装置12、第二温度检测装置4、第三温度检测装置10和第四温度检测装置7为其他能够检测温度的装置,如温度传感器,或者是感温包与温度传感器的任意组合。In order to facilitate temperature control, the wall-hung boiler in this embodiment further includes a second temperature detection device 4, a third temperature detection device 10 and a fourth temperature detection device 7, a second temperature detection device 4, a third temperature detection device 10 and a The four temperature detection devices 7 are all electrically connected to the controller. The second temperature detection device 4 is arranged on the first main heat supply pipeline 21, between the main heat exchanger 2 and the flow distributor 5, and the third temperature detection device 10 is arranged on the first main heat supply pipeline 21, Located between the flow distributor 5 and the first outlet 18 , the fourth temperature detection device 7 is provided in the heat storage heat exchanger 6 . Specifically, the first temperature detection device 12 , the second temperature detection device 4 , the third temperature detection device 10 and the fourth temperature detection device 7 in this embodiment are all temperature sensing packages. As an alternative embodiment, the first temperature detection device 12, the second temperature detection device 4, the third temperature detection device 10 and the fourth temperature detection device 7 may be other devices capable of detecting temperature, such as a temperature sensor, Or any combination of temperature sensor and temperature sensor.

本实施例中的控制器与流量分配器5连接,控制流量分配器5的各个端口的开度,在工作时,壁挂炉能够实现单独供应采暖用水模式、单独供应生活用水模式和同时供应采暖用水和生活用水模式,具体如下:The controller in this embodiment is connected to the flow distributor 5 to control the opening of each port of the flow distributor 5. During operation, the wall-hung boiler can realize the mode of supplying heating water separately, supplying domestic water separately and simultaneously supplying heating water. and domestic water patterns, as follows:

1)单独供应采暖用水模式:如图2所示,在冬季运行壁挂炉时,若用户无生活热水的需求,则控制器控制流量分配器5与蓄热换热器6连通的辅助端口的开度为0,流量分配器5与第一出口18连通的端口开度最大,流量分配器5控制所有被燃烧器3加热后的热水全部供应至采暖管路11,控制器控制第一阀门13和第二阀门14均处于关闭状态,壁挂炉中的水按照图2中箭头指示方向进行循环,经燃烧器3加热后的热水全部流向安装在室内的采暖管路11(如地暖或者散热片)进行热辐射,实现单独供应采暖用水模式。1) Separate heating water supply mode: As shown in Figure 2, when the wall-hung boiler is operated in winter, if the user has no demand for domestic hot water, the controller controls the flow distributor 5 and the auxiliary port of the heat storage heat exchanger 6. The opening degree is 0, and the opening degree of the port communicating with the first outlet 18 of the flow distributor 5 is the largest. The flow distributor 5 controls all the hot water heated by the burner 3 to be supplied to the heating pipeline 11, and the controller controls the first valve. 13 and the second valve 14 are both in the closed state, the water in the wall-hung boiler circulates in the direction indicated by the arrow in Figure 2, and all the hot water heated by the burner 3 flows to the heating pipeline 11 (such as floor heating or heat dissipation) installed in the room. sheet) for heat radiation to realize the mode of supplying heating water separately.

2)单独供应生活用水模式:如图3所示,在夏季运行壁挂炉时,由于用户无采暖的需求,则控制器控制流量分配器5与第一出口18连通的端口开度为0,流量分配器5与蓄热换热器6连通的辅助端口的开度最大,流量分配器5控制所有被燃烧器3加热后的热水全部供应至蓄热换热器6,控制器控制第一阀门13关闭,第二阀门14打开,壁挂炉中的水按照图3中箭头指示方向进行循环,经燃烧器3加热后的热水全部流向蓄热换热器6,通过蓄热换热器6内的盘管热传递把蓄热换热器6内的蓄热介质加热,进而实现把生活用水加热,实现单独供应生活用水模式,能够保持用户的设定水温恒定,用户即开即用,避免了用户刷牙、洗手等小水量需求导致的壁挂炉频繁开启的问题。2) The mode of supplying domestic water alone: As shown in Figure 3, when the wall-hung boiler is operated in summer, since the user has no heating demand, the controller controls the opening of the port communicating between the flow distributor 5 and the first outlet 18 to be 0, and the flow rate is 0. The opening of the auxiliary port of the distributor 5 that communicates with the heat storage heat exchanger 6 is the largest, the flow distributor 5 controls all the hot water heated by the burner 3 to be supplied to the heat storage heat exchanger 6, and the controller controls the first valve 13 is closed, the second valve 14 is opened, and the water in the wall-hung boiler circulates in the direction indicated by the arrow in FIG. The coil heat transfer heats the heat storage medium in the heat storage heat exchanger 6, thereby realizing the heating of domestic water and realizing the mode of supplying domestic water alone, which can keep the user's set water temperature constant, and the user can use it immediately, avoiding the need for The problem of frequent opening of the wall-hung boiler caused by the user's small water demand such as brushing teeth and washing hands.

3)同时供应采暖用水和生活用水模式:在冬季运行壁挂炉时,用户既有生活热水的需求,又有采暖热水的需求时,流量分配器5与蓄热换热器6连通的辅助端口及流量分配器5与第一出口18连通的端口均有开度,流量分配器5控制被燃烧器3加热后的热水分别供应至并联运行的采暖管路11和生活用水管路,如图4所示,控制器控制第一阀门13关闭,第二阀门14打开,壁挂炉中的水按照图4中箭头指示方向进行循环,满足用户采暖用水和生活用水的需求。3) Simultaneous supply of heating water and domestic water mode: when the wall-hung boiler is operated in winter, when the user has both domestic hot water demand and heating hot water demand, the flow distributor 5 is connected with the heat storage heat exchanger 6. The ports and the ports communicating with the flow distributor 5 and the first outlet 18 have opening degrees, and the flow distributor 5 controls the hot water heated by the burner 3 to be supplied to the heating pipeline 11 and the domestic water pipeline running in parallel, such as As shown in FIG. 4 , the controller controls the first valve 13 to close, the second valve 14 to open, and the water in the wall-hung boiler circulates in the direction indicated by the arrow in FIG.

具体地,为了提高用户的舒适度,控制器控制流量分配器5优先满足生活用水的需求,同时最大限度满足采暖用水的需求。当用户长时间使用卫浴热水时,蓄热换热器6内的水温会下降,用户的设定温度值与第四温度检测装置7的实际温度会有差值,控制器控制增大水泵15的流量和燃烧器3的比例阀16的开度,增大第二温度检测装置4处的温度,并控制流量分配器5加大向蓄热换热器6处的热水流量,当第四温度检测装置7检测的实际温度比用户的设定温度还低时,继续加大流量分配器5向蓄热换热器6处的热水流量,直至第四温度检测装置7检测的温度与用户的设定温度相等;然后判定第三温度检测装置10检测的实际温度是否低于用户设定的采暖温度,当第三温度检测装置10检测的实际温度低于用户设定的采暖温度时,控制器控制流量分配器5加大向采暖管路11处的热水流量,直至第三温度检测装置10检测的实际温度与用户设定的采暖温度相等。Specifically, in order to improve the user's comfort, the controller controls the flow distributor 5 to give priority to meeting the demand for domestic water, and at the same time, to meet the demand for heating water to the maximum extent. When the user uses hot water in the bathroom for a long time, the water temperature in the heat storage heat exchanger 6 will drop, and there will be a difference between the user's set temperature value and the actual temperature of the fourth temperature detection device 7, and the controller controls to increase the pump 15 The flow rate of the burner 3 and the opening of the proportional valve 16 of the burner 3 increase the temperature at the second temperature detection device 4, and control the flow distributor 5 to increase the hot water flow to the heat storage heat exchanger 6. When the fourth When the actual temperature detected by the temperature detection device 7 is lower than the user's set temperature, continue to increase the flow rate of hot water from the flow distributor 5 to the heat storage heat exchanger 6 until the temperature detected by the fourth temperature detection device 7 matches the user's temperature. Then it is determined whether the actual temperature detected by the third temperature detection device 10 is lower than the heating temperature set by the user, and when the actual temperature detected by the third temperature detection device 10 is lower than the heating temperature set by the user, control The controller controls the flow distributor 5 to increase the flow of hot water to the heating pipeline 11 until the actual temperature detected by the third temperature detection device 10 is equal to the heating temperature set by the user.

壁挂炉在同时供应采暖用水和生活用水模式时,也可以使两流路采用串联的方式运行,如图5所示,控制器控制流量分配器5与第一出口18连通的端口开度为0,流量分配器5与蓄热换热器6连通的辅助端口的开度最大,流量分配器5控制所有被燃烧器3加热后的热水全部供应至蓄热换热器6,且控制器控制第一阀门13开启,第二阀门14闭合,壁挂炉中的水按照图5中箭头指示方向进行循环,燃烧器3加热后的热水先与蓄热换热器6内的蓄热介质换热后剩余的热量再用于采暖管路11。壁挂炉采用串联的运行条件是经蓄热换热器6换热后的辅助供热管路20的水温仍大于预设采暖温度,且两者之间的差值大于5℃时,保证蓄热换热器6换热后的剩余热量能有效用于采暖,该运行方式是卫浴热水为主,采暖为辅,有利热量充分利用。在生活用水满足预设温度,或者第一温度检测装置12的检测温度小于等于预设采暖温度,且两者之间的差值小于5℃时,壁挂炉自动切换至如图4所示的并联运行方式。When the wall-hung boiler supplies heating water and domestic water at the same time, the two flow paths can also be operated in series. As shown in Figure 5, the controller controls the opening of the port connecting the flow distributor 5 with the first outlet 18 to be 0 , the opening degree of the auxiliary port communicating with the flow distributor 5 and the heat storage heat exchanger 6 is the largest, the flow distributor 5 controls all the hot water heated by the burner 3 to be supplied to the heat storage heat exchanger 6, and the controller controls The first valve 13 is opened, the second valve 14 is closed, the water in the wall-hung boiler circulates in the direction indicated by the arrow in FIG. 5 , and the hot water heated by the burner 3 first exchanges heat with the heat storage medium in the heat storage heat exchanger 6 The remaining heat is then used for the heating pipeline 11 . The operating condition of the wall-hung boilers in series is that the water temperature of the auxiliary heating pipeline 20 after heat exchange by the heat storage heat exchanger 6 is still greater than the preset heating temperature, and the difference between the two is greater than 5 ℃, the heat storage is guaranteed. The residual heat after the heat exchange of the heat exchanger 6 can be effectively used for heating. The operation mode is that the hot water for the bathroom is mainly used, and the heating is supplemented, which is beneficial to the full utilization of heat. When the domestic water meets the preset temperature, or the detected temperature of the first temperature detection device 12 is less than or equal to the preset heating temperature, and the difference between the two is less than 5°C, the wall-hung boiler automatically switches to the parallel connection shown in FIG. 4 . Operation mode.

显然,上述实施例仅仅是为清楚地说明所作的举例,而并非对实施方式的限定。对于所属领域的普通技术人员来说,在上述说明的基础上还可以做出其它不同形式的变化或变动。这里无需也无法对所有的实施方式予以穷举。而由此所引伸出的显而易见的变化或变动仍处于本实用新型创造的保护范围之中。Obviously, the above-mentioned embodiments are only examples for clear description, and are not intended to limit the implementation manner. For those of ordinary skill in the art, changes or modifications in other different forms can also be made on the basis of the above description. There is no need and cannot be exhaustive of all implementations here. And the obvious changes or changes derived from this are still within the protection scope of the present invention.

Claims (10)

1. A wall hanging stove, comprising:
a first primary heating line (21) having a first inlet (19) and a first outlet (18);
a second primary heating line (22) having a second inlet (9) and a second outlet (8);
a heating device for heating the first main heat supply pipeline (21);
a flow distributor (5) arranged on the first primary heating line (21) between the heating device and the first outlet (18);
an auxiliary heat supply pipeline (20) with one end communicated with the auxiliary port of the flow distributor (5) and the other end communicated with the first inlet (19);
and the heat storage heat exchanger (6) is arranged on the auxiliary heat supply pipeline (20), the heat storage heat exchanger (6) comprises a heat storage medium, and the heat storage medium absorbs the heat of the auxiliary heat supply pipeline (20) and exchanges heat with the second main heat supply pipeline (22).
2. The wall hanging stove according to claim 1, characterized by further comprising a heat insulating structure provided on an outer wall of the heat storage heat exchanger (6).
3. The wall hanging stove according to claim 1, wherein the heat storage medium is water.
4. The wall hanging stove according to claim 1, characterized in that the heating device comprises a burner (3) and a main heat exchanger (2), and the high temperature flue gas generated by the burner (3) heats the pipeline of the first main heat supply pipeline (21) arranged in the main heat exchanger (2).
5. Wall hanging stove according to any one of claims 1-4, further comprising an auxiliary branch (1) connected at one end to the first primary heating line (21) between the flow distributor (5) and the first outlet (18) and at the other end to the auxiliary heating line (20) between the heat storage heat exchanger (6) and the first inlet (19).
6. The wall hanging stove of claim 5, further comprising:
the first valve (13) is arranged on the auxiliary branch (1);
a second valve (14) arranged on the auxiliary heat supply line (20) in a line between the heat storage heat exchanger (6) and the first inlet (19).
7. The wall hanging stove according to claim 6, further comprising a controller connected to the first and second valves (13, 14) for controlling the opening and closing of the first and second valves (13, 14).
8. The wall hanging stove according to claim 7, characterized in that the auxiliary heat supply pipeline (20) is provided with a first temperature detection device (12) on the pipeline between the heat storage heat exchanger (6) and the first inlet (19), the first temperature detection device (12) being connected with the controller;
when the detection temperature of the first temperature detection device (12) is higher than the preset heating temperature and the difference between the detection temperature and the preset heating temperature is higher than 5 ℃, the controller controls the first valve (13) to be opened and the second valve (14) to be closed.
9. The hanging stove according to claim 8, characterized in that the controller controls the first valve (13) to close and the second valve (14) to open when domestic water meets a preset temperature or the temperature detected by the first temperature detecting device (12) is less than or equal to a preset heating temperature and the difference between the two is less than 5 ℃.
10. The wall hanging stove according to any one of claims 1 to 4, characterized by further comprising a water pressure balance pipeline connected with the first main heating pipeline (21), wherein an expansion tank (17) is arranged on the water pressure balance pipeline.
CN201922191905.2U 2019-12-09 2019-12-09 fireplace Withdrawn - After Issue CN211233382U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922191905.2U CN211233382U (en) 2019-12-09 2019-12-09 fireplace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922191905.2U CN211233382U (en) 2019-12-09 2019-12-09 fireplace

Publications (1)

Publication Number Publication Date
CN211233382U true CN211233382U (en) 2020-08-11

Family

ID=71916634

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922191905.2U Withdrawn - After Issue CN211233382U (en) 2019-12-09 2019-12-09 fireplace

Country Status (1)

Country Link
CN (1) CN211233382U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111306791A (en) * 2019-12-09 2020-06-19 珠海格力电器股份有限公司 Wall-mounted stove

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111306791A (en) * 2019-12-09 2020-06-19 珠海格力电器股份有限公司 Wall-mounted stove
CN111306791B (en) * 2019-12-09 2024-12-24 珠海格力电器股份有限公司 Wall-mounted boiler

Similar Documents

Publication Publication Date Title
CN109489241B (en) Gas water heater and control method thereof
CN201233054Y (en) Pre-warming and water supply system for multifunction wall hanging furnace
CN111043640B (en) A heating system and its control method
CN102705980B (en) Device with heating and water-heating device multi-machine parallel system and use method thereof
CN108895672A (en) Gas wall-mounted furnace
WO2020209819A1 (en) Hot water generator that has the characteristics of natural gas combi-boilers and boilers
CN111306791A (en) Wall-mounted stove
CN211290527U (en) Wall-mounted furnace
CN201121974Y (en) Water heater
CN210373667U (en) Ground heating and hot water circulating system combining air energy with natural gas wall-mounted boiler
JP7217628B2 (en) Heat source device
CN216080137U (en) Multi-mode central heating and hot water supply system
CN111306790B (en) Wall-mounted boiler
CN211204436U (en) Wall-mounted stove
CN114198904B (en) Gas Heating Hot Water Boiler
CN211503220U (en) Water heating stove
CN203586524U (en) Domestic water heater with gas-electric hybrid heating dual working condition complementary work mode
CN211400281U (en) Wall-mounted furnace
JP7235502B2 (en) Heat source device
JP2016164472A (en) Heat source device
CN107314531A (en) A kind of central hot water circulation system
CN207262520U (en) A kind of central hot-water system
CN222761132U (en) Gas water heater
CN207035311U (en) A kind of hierarchical control hot-water heating system
CN111043751A (en) Water heater and control method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20200811

Effective date of abandoning: 20241224

AV01 Patent right actively abandoned

Granted publication date: 20200811

Effective date of abandoning: 20241224

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned