CN202853103U - Device with heating water heater multimachine parallel system - Google Patents

Device with heating water heater multimachine parallel system Download PDF

Info

Publication number
CN202853103U
CN202853103U CN 201220263407 CN201220263407U CN202853103U CN 202853103 U CN202853103 U CN 202853103U CN 201220263407 CN201220263407 CN 201220263407 CN 201220263407 U CN201220263407 U CN 201220263407U CN 202853103 U CN202853103 U CN 202853103U
Authority
CN
China
Prior art keywords
heating
water
pipe
circulation system
circulating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220263407
Other languages
Chinese (zh)
Inventor
余少言
仇明贵
王克军
胡旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MACRO THERMAL ENERGY TECHNOLOGY Co Ltd
Original Assignee
Guangdong Macro Gas Appliance Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Macro Gas Appliance Co Ltd filed Critical Guangdong Macro Gas Appliance Co Ltd
Priority to CN 201220263407 priority Critical patent/CN202853103U/en
Application granted granted Critical
Publication of CN202853103U publication Critical patent/CN202853103U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Steam Or Hot-Water Central Heating Systems (AREA)

Abstract

The utility model discloses a device with a heating water heater multimachine parallel system. The device comprises a heating system, a hot water circulation system and a heating circulation system, wherein the hot water circulation system and the heating circulation system are connected with the heating system. The heating system is formed by the parallel connection of several gas wall-mounted rapid heating water heaters. The hot water circulation system and the heating circulation system are in mutual independence and heated in shared with a same heating system. A central controller is connected with the hot water circulation system and the heating circulation system in a controlling mode. The device with a heating water heater multimachine parallel system is characterized by having large loads, low noise and low power dissipation. The mutual independent design of the hot water circulation system and the heating circulation system can avoid the problem of stopping supplying heating in a long time under a traditional bath priority model and solve the problem of unbalancing waterpower between the heating system and the multimachine parallel system.

Description

A kind of device with water heater for heating multi-machine parallel connection system
Technical field
The utility model relates to the heating apparatus with function of heat storage field, relates in particular to a kind of device with water heater for heating multi-machine parallel connection system.
Background technology
Traditional separate unit gas-heating water heater thermic load is lower, is applicable to single household family, in the larger occasion of some workload demand, such as, the places such as hospital, school, hotel are difficult to be suitable for.If adopt central heating appliance or big-and-middle-sized gas-heating water heater in the large place of these workload demands, will have that noise is large, dangerous, the irrational defective of expense, eliminated by market gradually.
For this reason, the Chinese patent that one piece of patent No. is CN99248707.2 has disclosed a kind of combination type gas heating hot water furnace apparatus, and its formation is a plurality of burners in parallel and heat exchanger in a wall-hung boiler, to reach the effect of large load heating.This patent weak point is that Installation Flexibility is not strong, needs special design for different workload demand, and burner also can be subject to great impact with the heat exchanger combustion heat-exchange other parts of partly causing danger that interact.
At present, the integrated design of heating system and hot water supply system is another developing direction of water heater for heating, be that 200420083381.6 Chinese patent discloses a kind of many thermals source (solar energy, gas, electricity) central heater such as one piece of patent No., as shown in Figure 1, comprising: solar heat collector 01, gas-operated thermal bath facility 02, thermostatic pump 03, water storing tank 04, temperature sensor 1, temperature sensor 2 06, temperature control system 07, heating pipe 08 and hot-water line 09.This patent is located at temperature sensor one in the water storing tank, and the signal of telecommunication of its output opens and closes by temperature control system processing controls circulating pump, thereby the water in the control gas-operated thermal bath facility heating water storing tank guarantees constant temperature and pressure in the water storing tank to the temperature of setting; And utilize temperature sensor two to monitor the water temperature of heating pipe recirculation waters, its output electrical signals controlled circulation pump running, energy efficient.But because heating pipe and hot-water line share a water storing tank, when bathing, cause easily waterpower imbalance between heating pipe and the hot-water line, the impact heating.For single household family, it is perhaps little to stop heating problem under this bathing mode of priority that causes because of the waterpower imbalance; But for the place of using as many families such as hospital, school, hotel, just may cause stopping for a long time heating, affect normal life.
Therefore, very be necessary to develop a kind of New-type heating hot water boiler device large, that Installation Flexibility is good, heating system and hot-water heating system are independent of each other mutually and use of loading.
Summary of the invention
The purpose of this utility model is, for the defective of existing water heater for heating, provides a kind of device with water heater for heating multi-machine parallel connection system large, that Installation Flexibility is good, heating system and hot-water heating system are independent of each other mutually and use of loading.
For reaching above purpose, the utility model adopts following technical scheme.
A kind of device with water heater for heating multi-machine parallel connection system comprises: heating system, and the hot water cyclesystem that is connected with heating system and heating circulation system is characterized in that, described heating system is composed in parallel by a plurality of water heater for heatings; Described hot water cyclesystem and described heating circulation system are separate, and share same heating system heating; The described heating system of one central control system control connection, hot water cyclesystem and heating circulation system.
The former hotter water circulatory system comprises: the pressure-bearing water pot, gondola water faucet, the first circulating water pipe of connection pressure-bearing water pot and gondola water faucet is arranged on the circulating pipe pump in the first circulating water pipe, the second circulating water pipe that connects pressure-bearing water pot and a plurality of water heater for heatings is arranged on the hot water heating pump in the second circulating water pipe; Described the second circulating water pipe has first thermal treatment zone that is positioned at a plurality of water heater for heatings.
Be provided with the first temperature sensor in the aforementioned pressure-bearing water pot, the second temperature sensor is set on the loop of aforementioned the first circulating water pipe.
Water outlet place of aforementioned the second circulating water pipe arranges three-temperature sensor.
Aforementioned heating circulation system comprises: radiator, the 3rd circulating water pipe of connection radiator and heating system, the expansion tank that is arranged on the heating pipe pump in the 3rd circulation pipe and is communicated with the 3rd circulating water pipe; Described the 3rd circulating water pipe has second thermal treatment zone that is positioned at a plurality of water heater for heatings.
Aforementioned water outlet place of stating the 3rd circulating water pipe is provided with the 4th temperature sensor, and the backwater place of aforementioned the 3rd circulating water pipe is provided with the 5th temperature sensor.
Aforementioned first thermal treatment zone is positioned at the below of aforementioned second thermal treatment zone.
Compare with conventional art, a kind of device with water heater for heating multi-machine parallel connection system that the utility model provides, at first a plurality of water heater for heatings are composed in parallel heating system, each water heater for heating is separately lighted control, load is large, Installation Flexibility is good, is fit to the large places of workload demand such as hospital, school, hotel; Secondly be arranged by hot water cyclesystem and heating circulation system are divided, solved waterpower imbalance problem between heating system and hot-water supply system two systems; Avoided stopping for a long time heating problem under traditional bathing mode of priority; Again utilize different sensors to control respectively the startup of gas-heating water heater under two kinds of patterns of supplying hot water and heating and start quantity, and first thermal treatment zone is arranged on the below of second thermal treatment zone, take full advantage of waste heat, good energy-conserving effect.
Description of drawings
Figure 1 shows that the structural representation of traditional many heat-source centrals water heater;
Figure 2 shows that the apparatus structure schematic diagram with water heater for heating multi-machine parallel connection system that the utility model provides;
Figure 3 shows that the device operational flowchart with water heater for heating multi-machine parallel connection system that the utility model provides.
Description of reference numerals
01, solar heat collector 02, gas-operated thermal bath facility 03, constant temperature 04, pump water storing tank
05, temperature sensor 1, temperature sensor 2 07, temperature control system 08, heating pipe
09, hot-water line
1, heating system 2, hot water cyclesystem 3, heating circulation system 4, central control system
11, water heater for heating
21, pressure-bearing water pot 22, gondola water faucet 23, the first circulating water pipe 24, circulating pipe pump 25, the second circulating water pipe 26, hot water heating pump 27, the first temperature sensor 28, the second temperature sensor
29, three-temperature sensor
31, radiator 32, the 3rd circulating water pipe 33, heating pipe pump 34 three-temperature sensors.
The specific embodiment
For setting forth better the utility model essence, below in conjunction with accompanying drawing the device specific embodiment with gas-heating water heater multi-machine parallel connection system that the utility model provides is described as follows.
As shown in Figure 2, a kind of device with water heater for heating multi-machine parallel connection system comprises: heating system 1, the hot water cyclesystem 2 that is connected with heating system 1 and heating circulation system 3, it is characterized in that described heating system 1 is composed in parallel by a plurality of water heater for heatings 11; Described hot water cyclesystem 2 and described heating circulation system 3 are separate, and share same heating system 1 heating; The described heating system 1 of one central control system, 4 control connections, hot water cyclesystem 2 and heating circulation system 3.Preferably, described water heater for heating 11 is the quick heater of water for heating of fuel wall hanging formula, and described central control system is central controller.
Wherein, described hot water cyclesystem 2 comprises: pressure-bearing water pot 21, gondola water faucet 22, the first circulating water pipe 23 that connects pressure-bearing water pot 21 and gondola water faucet 22, be arranged on the circulating pipe pump 24 in the first circulating water pipe 23, the second circulating water pipe 25 that connects pressure-bearing water pot 21 and a plurality of water heater for heatings 11 is arranged on the hot water heating pump 26 in the second circulating water pipe 25; Described the second circulating water pipe 25 has first thermal treatment zone that is positioned at a plurality of water heater for heatings 11.Preferably, the bottom of described pressure-bearing water pot 21 is provided with sewage draining exit, and the top of pressure-bearing water pot is provided with magnesium rod and Pressure gauge; Described the first circulation water pot 23 and the second circulation water pot 25 are provided with air bleeding valve and stop valve, are used for respectively getting rid of the size of current in ducted waste gas and the control water pipe and opening.Further, be provided with the first temperature sensor 27 in the described pressure-bearing water pot 21, the second temperature sensor 28 is set on the loop of described the first circulating water pipe 23; Water outlet place of described the second circulating water pipe 25 arranges three-temperature sensor 29; Be used for respectively monitoring temperature T 1, the temperature T 2 in the first circulation water pot 23 and the temperature T 3 in the second circulating water pipe 25 in the pressure-bearing water pot 21.
Described heating circulation system 3 comprises: radiator 31, and the 3rd circulating water pipe 32 of connection radiator 31 and a plurality of water heater for heatings 11 is arranged on the heating pipe pumps 33 in the 3rd circulation pipe 32 and the expansion tank that is communicated with the 3rd circulating water pipe 32; Described the 3rd circulating water pipe 32 has second thermal treatment zone that is positioned at a plurality of water heater for heatings 11.Water outlet place of described the 3rd circulating water pipe 32 is provided with the 4th temperature sensor, and the backwater place of described the 3rd circulating water pipe 32 is provided with the 5th temperature sensor 34, is used for respectively monitoring output water temperature T4 and the backwater water temperature T 5 of the 3rd circulating water pipe.Further, for better control indoor temperature, improve the room comfort level, described heating circulation system also comprises room temperature controller.
Further, in the present embodiment, described first thermal treatment zone that is positioned at a plurality of water heater for heatings is positioned at the below of second thermal treatment zone, improves the utilization rate of heat, is not limited to present embodiment.
During actual the use, the circulating pipe pump in the central controller controls hot water cyclesystem and heat pump not timing start, and control heating pipe pump starts always.The three-temperature sensor that is arranged on the second circulating water pipe water outlet place is used for controlling the gas-heating water heater startup quantity of hot water, and the 5th temperature sensor that is arranged on the 3rd circulating water pipe backwater place is used for controlling the gas-heating water heater startup quantity of heating.
Wherein, it is as follows that the not timing of described heat pump and circulating pipe pump starts control: when the water temperature T 1 that records when the first temperature sensor was lower than 50 ℃, central control system control heat pump started; The water temperature T 1 that records when the first temperature sensor is during more than or equal to 60 ℃, and central control system control heat pump stops.When the water temperature T 2 that records when the second temperature sensor is lower than water temperature T 1 that 45 ℃ and the first temperature sensor record greater than 48 ℃, the circulating line pump startup; The water temperature T 1 that the water temperature T 2 that records when the second temperature sensor records more than or equal to 45 ℃ or the first temperature sensor is during less than or equal to 48 ℃, and circulating pipe pump stops.Described the 4th temperature sensor that is arranged on the 3rd circulating water pipe water outlet place controls heating with the startup of water heater for heating and cuts out.
Particularly, as shown in Figure 3, the workflow of heating system is as follows in the present embodiment.
First step step1, starting up's power supply.
Second step step2, System self-test.If fault is arranged, system namely reports to the police, and judges simultaneously the fault rate of machine.If fault rate is less than 50%, trouble-free wall-hung boiler can normally start; If fault rate is greater than 50%, all outputs stop.
The 3rd step step3, the user arranges.Set the fiducial temperature of the 3rd circulating water pipe water outlet place in the heating system, and water heater for heating starts the relation of quantity and T3, T5.
The 4th step step4, water heater for heating work starts.In T1<50 ℃ or T4 during less than fiducial temperature, water heater for heating starts, and starts quantity by T3, T5 control, to start a fairly large number of being as the criterion.
The 5th step step5, water heater for heating work stops.During more than or equal to fiducial temperature and T1 〉=60 ℃, water heater for heating work stops at T4.
A kind of device with water heater for heating multi-machine parallel connection system that present embodiment provides, at first, by being divided, hot water cyclesystem and heating circulation system be arranged, utilize different sensors to control respectively startup and the startup quantity of gas-heating water heater under two kinds of patterns of supplying hot water and heating, solved waterpower imbalance problem between heating system and hot-water supply system two systems; Avoided stopping for a long time heating problem under traditional bathing mode of priority.Secondly, be arranged on the below, second thermal treatment zone of the 3rd circulating water pipe by first thermal treatment zone with the second circulating water pipe, so that utilize waste heat to the heating circulation system heating that starts the heating pump, energy efficient always along band during the hot water cyclesystem heating.
Although the above specific embodiment is described in detail the utility model, with this utility model is not limited.Apparently, still there are many parts of improving and modify in the utility model; The simple modifications that those of ordinary skills do under the enlightenment of the utility model essence and modification all drop within the utility model claim scope.

Claims (6)

1. device with water heater for heating multi-machine parallel connection system comprises: heating system, and the hot water cyclesystem that is connected with heating system and heating circulation system is characterized in that, described heating system is composed in parallel by a plurality of water heater for heatings; Described hot water cyclesystem and described heating circulation system are separate, and share same heating system heating; The described heating system of one central control system control connection, hot water cyclesystem and heating circulation system.
2. device according to claim 1, it is characterized in that, described hot water cyclesystem comprises: the pressure-bearing water pot, gondola water faucet, the first circulating water pipe that connects pressure-bearing water pot and gondola water faucet, be arranged on the circulating pipe pump in the first circulating water pipe, connect the second circulating water pipe of pressure-bearing water pot and a plurality of water heater for heatings, be arranged on the hot water heating pump in the second circulating water pipe; Described the second circulating water pipe has first thermal treatment zone that is positioned at a plurality of water heater for heatings.
3. device according to claim 2 is characterized in that, is provided with the first temperature sensor in the described pressure-bearing water pot, and the second temperature sensor is set on the loop of described the first circulating water pipe, and water outlet place of described the second circulating water pipe arranges three-temperature sensor.
4. device according to claim 1, it is characterized in that, described heating circulation system comprises: radiator, the 3rd circulating water pipe of connection radiator and heating system, the expansion tank that is arranged on the heating pipe pump in the 3rd circulation pipe and is communicated with the 3rd circulating water pipe; Described the 3rd circulating water pipe has second thermal treatment zone that is positioned at a plurality of water heater for heatings.
5. device according to claim 4 is characterized in that, water outlet place of described the 3rd circulating water pipe is provided with the 4th temperature sensor, and the backwater place of described the 3rd circulating water pipe is provided with the 5th temperature sensor.
6. according to claim 2 or 4 described devices, it is characterized in that first thermal treatment zone is positioned at the below of second thermal treatment zone.
CN 201220263407 2012-06-06 2012-06-06 Device with heating water heater multimachine parallel system Expired - Fee Related CN202853103U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220263407 CN202853103U (en) 2012-06-06 2012-06-06 Device with heating water heater multimachine parallel system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220263407 CN202853103U (en) 2012-06-06 2012-06-06 Device with heating water heater multimachine parallel system

Publications (1)

Publication Number Publication Date
CN202853103U true CN202853103U (en) 2013-04-03

Family

ID=47984292

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220263407 Expired - Fee Related CN202853103U (en) 2012-06-06 2012-06-06 Device with heating water heater multimachine parallel system

Country Status (1)

Country Link
CN (1) CN202853103U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102705980A (en) * 2012-06-06 2012-10-03 广东万家乐燃气具有限公司 Device with heating and water-heating device multi-machine parallel system and use method thereof
CN104633746A (en) * 2015-02-10 2015-05-20 芜湖美的厨卫电器制造有限公司 Control method of burning pump complementary water heating system
CN106152488A (en) * 2016-08-24 2016-11-23 益阳玛山产业机械有限公司 Two-chamber replaces heated type constant-temperature hot water supply unit

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102705980A (en) * 2012-06-06 2012-10-03 广东万家乐燃气具有限公司 Device with heating and water-heating device multi-machine parallel system and use method thereof
CN104633746A (en) * 2015-02-10 2015-05-20 芜湖美的厨卫电器制造有限公司 Control method of burning pump complementary water heating system
CN104633746B (en) * 2015-02-10 2017-07-25 芜湖美的厨卫电器制造有限公司 Fire the control method of pump complementary hot-water system
CN106152488A (en) * 2016-08-24 2016-11-23 益阳玛山产业机械有限公司 Two-chamber replaces heated type constant-temperature hot water supply unit

Similar Documents

Publication Publication Date Title
CN102705980B (en) Device with heating and water-heating device multi-machine parallel system and use method thereof
CN102213489A (en) Method and system for parallel connection of multiple gas heaters
CN110044066A (en) Water storage type gas heating water heater and control method
CN201463079U (en) Solar energy and heating furnace combined heating system
CN201463076U (en) Solar energy ground heating apparatus
CN201203200Y (en) Solar energy and gas dual-purpose combined type heating apparatus
CN202853103U (en) Device with heating water heater multimachine parallel system
CN102042636A (en) Household central heating and water heating device
CN202018081U (en) Solar central heating system
CN101598361B (en) Heating system with the combination of solar water heater and wall-mounted boiler
CN204301172U (en) Multifunctional room internal heat exchanger and Indoor Thermal switch
CN207975720U (en) A kind of electric boiler and solar united use heating installation
CN101586827A (en) Solar ground heating system
CN201866843U (en) Household central heating hot water apparatus
CN205425137U (en) Local floor heating device of family
CN206037384U (en) Gas wall-mounted furnace and water supplementing control device and control system
CN205332566U (en) High -efficient solar water heating system of safe type
CN205119511U (en) Heat storage tank and have its combination heating device
CN210532674U (en) Gas water heating equipment
CN204301185U (en) Multifunctional energy saving water heating stove
CN103411250A (en) Solar warming and water heating integrated machine
CN106979547A (en) A kind of integrated hot-water heating system of multiple-energy-source
CN102679432B (en) A kind of floor heating system using air source hybrid power
CN107560147B (en) Household air source heat pump hot water system assisted by gas wall-mounted boiler and control method thereof
CN110701787A (en) Gas wall-mounted boiler and quick hot water assembly thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: MACRO THERMAL ENERGY TECHNOLOGY CO., LTD.

Free format text: FORMER OWNER: GUANGDONG WANJIALE GAS BURNING APPLIANCE CO., LTD.

Effective date: 20150521

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 528333 FOSHAN, GUANGDONG PROVINCE TO: 410200 CHANGSHA, HUNAN PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20150521

Address after: 410200 No. 1 Tongxin Road, Wangcheng Economic Development Zone, Hunan, Changsha

Patentee after: MACRO THERMAL ENERGY TECHNOLOGY CO., LTD.

Address before: 528333 Guangdong province Foshan city Shunde District Daliang Shunfengshan Industrial Zone

Patentee before: Guangdong Wanjiale Gas Burning Appliance Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130403

Termination date: 20210606

CF01 Termination of patent right due to non-payment of annual fee