CN211231846U - Municipal works pipeline quick connect device - Google Patents

Municipal works pipeline quick connect device Download PDF

Info

Publication number
CN211231846U
CN211231846U CN201922230143.2U CN201922230143U CN211231846U CN 211231846 U CN211231846 U CN 211231846U CN 201922230143 U CN201922230143 U CN 201922230143U CN 211231846 U CN211231846 U CN 211231846U
Authority
CN
China
Prior art keywords
fixed
gear
clamping
fixing
grooves
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922230143.2U
Other languages
Chinese (zh)
Inventor
张宁
刘海
宛树旗
贺红玉
唐芹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Science and Industry Corp Ltd
Original Assignee
China Construction Science and Industry Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Science and Industry Corp Ltd filed Critical China Construction Science and Industry Corp Ltd
Priority to CN201922230143.2U priority Critical patent/CN211231846U/en
Application granted granted Critical
Publication of CN211231846U publication Critical patent/CN211231846U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Quick-Acting Or Multi-Walled Pipe Joints (AREA)

Abstract

The utility model belongs to the municipal works field, especially, municipal works pipeline quick connect device, it is slow to current municipal works pipeline connect device connection speed, and is inefficient, and is not convenient for carry out the problem of high-speed joint to not unidimensional pipeline, now proposes following scheme, and it includes two fixed plates, and one side fixed mounting that two fixed plates are close to each other has same connecting plate, two fixed orificess have been seted up at the top of connecting plate, and equal slidable mounting in two fixed orificess has the removal post, and the equal fixed mounting in top of two removal posts has first rack, the top fixed mounting of connecting plate has first motor, the first gear of fixedly connected with on the output shaft of first motor, two first racks all with first gear engagement, and the fixed slot has all been seted up to the bottom of two removal posts. The utility model discloses rational in infrastructure, convenient operation, this jointing equipment connecting speed is fast, and is efficient, and is convenient for carry out the high-speed joint to not unidimensional pipeline.

Description

Municipal works pipeline quick connect device
Technical Field
The utility model relates to a municipal works technical field especially relates to a municipal works pipeline quick connect device.
Background
Municipal works refer to municipal facility construction works, in China, municipal facilities refer to various buildings, structures, equipment and the like which are arranged in planning and construction ranges of urban areas and towns (villages) and provide paid or unpaid public products and services for residents based on government responsibilities and obligations, various public infrastructure constructions matched with urban lives belong to the category of municipal works, and municipal engineering pipelines need to be connected in the construction process of the municipal works;
however, the existing municipal engineering pipeline connecting equipment is slow in connecting speed, low in efficiency and inconvenient to quickly connect pipelines with different sizes.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem that the municipal engineering pipeline connecting equipment in the prior art is slow in connecting speed and low in efficiency, and is not convenient for carry out the shortcoming of high-speed joint to the pipeline of different sizes, and the municipal engineering pipeline high-speed connecting equipment who provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a municipal engineering pipeline quick connecting device comprises two fixing plates, one side of the two fixing plates close to each other is fixedly provided with a same connecting plate, the top of the connecting plate is provided with two fixing holes, the two fixing holes are internally provided with a movable column in a sliding way, the top of the two movable columns is fixedly provided with a first rack, the utility model discloses a pipeline clamping device, including connecting plate, fixed connection post, clamping mechanism and corresponding pipeline looks adaptation, the top fixed mounting of connecting plate has first motor, the first gear of fixedly connected with on the output shaft of first motor, two first racks all with first gear engagement, the fixed slot has all been seted up to two bottoms of removing the post, equal slidable mounting has the spliced pole in two fixed slots, the equal fixed mounting in bottom of two spliced poles has the fixing base, the centre gripping groove has all been seted up to the bottom of two fixing bases, equal movable mounting has the pipeline in two centre gripping inslots, all be equipped with fixture in two centre gripping inslots, fixture.
Preferably, fixture includes two grip slipper, two second racks and second gear, all sets up flutedly on the both sides inner wall in centre gripping groove, grip slipper slidable mounting is in the recess that corresponds, and two grip slipper all with pipeline looks adaptation, set up fixed chamber on the fixing base, set up two slide openings on one side inner wall in fixed chamber, equal slidable mounting has the dead lever in two slide openings, and the cylinder drives one of them grip slipper and removes, and the grip slipper drives the dead lever and removes, and the dead lever drives the second rack and removes.
Preferably, one end fixed connection of dead lever is on the grip slipper that corresponds, the one end fixed mounting of second rack is on the dead lever that corresponds, two equal slidable mounting of second rack are in fixed intracavity, the second gear rotates and installs in fixed intracavity, two second racks all with the meshing of second gear, one side fixed mounting of fixing base has the cylinder, the output shaft fixed connection of cylinder is in one side of grip slipper, the second gear moves the second gear and rotates, the second gear drives another second rack and removes, the second gear moves the dead lever that corresponds and removes.
Preferably, the two sides of the second gear are fixedly provided with rotating blocks, rotating grooves are formed in the inner walls of the two sides of the fixed cavity, the rotating blocks are rotatably arranged in the corresponding rotating grooves, and the second gear is driven to rotate in the rotating grooves, so that the rotating position of the second gear can be stabilized.
Preferably, the square hole has been seted up to one side of removing the post, and slidable mounting has square pole in the square hole, and the both ends of square pole are fixed connection respectively on the both sides inner wall of fixed orifices, and square pole slides passively in the square hole when removing the post and removes, can stabilize the position when removing the post and remove.
Preferably, the threaded groove has been seted up on the top of spliced pole, and the lead screw is installed to the threaded groove internal thread, and the top of lead screw is rotated and is installed on the top inner wall of fixed slot, and fixed cover is equipped with first bevel gear on the lead screw, and one side fixed mounting that removes the post has the second motor, fixedly connected with second bevel gear on the output shaft of second motor, second bevel gear and the meshing of first bevel gear.
Compared with the prior art, the beneficial effects of the utility model reside in that:
(1) in the scheme, the second motor drives the corresponding second bevel gear to rotate, the second bevel gear drives the corresponding first bevel gear to rotate, so that the two pipelines passively enter the two corresponding clamping grooves, the cylinder drives one of the clamping seats to move, and the second gear drives the other second rack to move;
(2) in the scheme, the second rack drives the corresponding fixed rod to move, the two clamping seats clamp and fix the pipelines, the first motor drives the first gear to rotate, the moving column drives the corresponding fixed seat to move, and the two pipelines move towards the directions close to each other, so that quick butt joint can be realized;
the utility model discloses rational in infrastructure, convenient operation, this jointing equipment connecting speed is fast, and is efficient, and is convenient for carry out the high-speed joint to not unidimensional pipeline.
Drawings
Fig. 1 is a schematic view of a front view structure provided by the present invention;
FIG. 2 is a top sectional view of the fixing base of the present invention;
fig. 3 is a schematic view of a part a of the structure of the present invention.
In the figure: 1. a fixing plate; 2. a connecting plate; 3. moving the column; 4. a first rack; 5. a first motor; 6. a first gear; 7. connecting columns; 8. a fixed seat; 9. a clamping groove; 10. a pipeline; 11. a clamping seat; 12. a screw rod; 13. a first bevel gear; 14. a second motor; 15. a second bevel gear; 16. fixing the rod; 17. a second rack; 18. a second gear.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, a municipal engineering pipeline quick connection device comprises two fixed plates 1, one side of each of the two fixed plates 1 close to each other is fixedly provided with a same connecting plate 2, the top of the connecting plate 2 is provided with two fixed holes, two movable columns 3 are slidably mounted in the two fixed holes, the tops of the two movable columns 3 are fixedly provided with first racks 4, the top of the connecting plate 2 is fixedly provided with a first motor 5, an output shaft of the first motor 5 is fixedly connected with a first gear 6, the two first racks 4 are both meshed with the first gear 6, the bottom ends of the two movable columns 3 are both provided with fixed grooves, connecting columns 7 are slidably mounted in the two fixed grooves, the bottom ends of the two connecting columns 7 are both fixedly provided with fixed seats 8, the bottoms of the two fixed seats 8 are both provided with clamping grooves 9, and pipelines 10 are both movably mounted in the two, and clamping mechanisms are arranged in the two clamping grooves 9 and are matched with the corresponding pipelines 10.
In this embodiment, fixture includes two grip slipper 11, two second racks 17 and second gear 18, all set up flutedly on the both sides inner wall of centre gripping groove 9, 11 slidable mounting of grip slipper are in the recess that corresponds, two grip slipper 11 all with pipeline 10 looks adaptation, fixed chamber has been seted up on the fixing base 8, two slide holes have been seted up on one side inner wall in fixed chamber, equal slidable mounting has dead lever 16 in two slide holes, the cylinder drives one of them grip slipper 11 and removes, grip slipper 11 drives dead lever 16 and removes, dead lever 16 drives second rack 17 and removes.
In this embodiment, the one end fixed connection of dead lever 16 is on the grip slipper 11 that corresponds, the one end fixed mounting of second rack 17 is on the dead lever 16 that corresponds, two equal slidable mounting of second rack 17 are in fixed intracavity, second gear 18 rotates and installs in fixed intracavity, two second racks 17 all mesh with second gear 18, one side fixed mounting of fixing base 8 has the cylinder, the output shaft fixed connection of cylinder is in one side of grip slipper 11, second rack 17 drives second gear 18 and rotates, second gear 18 drives another second rack 17 and removes, second rack 17 drives the dead lever 16 that corresponds and removes.
In this embodiment, the equal fixed mounting in both sides of second gear 18 has the turning block, has all seted up on the both sides inner wall in fixed chamber and has rotated the groove, and the turning block rotates to be installed in the rotation inslot that corresponds, drives the turning block at the rotation inslot rotation when second gear 18 rotates, can stabilize the position when second gear 18 rotates.
In this embodiment, the quad slit has been seted up to one side of removing post 3, and slidable mounting has square pole in the quad slit, and the both ends of square pole are fixed connection respectively on the both sides inner wall of fixed orifices, and square pole slides in the quad slit passively when removing post 3 and removes, can stabilize the position when removing post 3 and remove.
In this embodiment, a thread groove is formed in the top end of the connecting column 7, a screw rod 12 is installed in the thread groove, the top end of the screw rod 12 is rotatably installed on the inner wall of the top of the fixing groove, a first bevel gear 13 is fixedly sleeved on the screw rod 12, a second motor 14 is fixedly installed on one side of the moving column 3, a second bevel gear 15 is fixedly connected to an output shaft of the second motor 14, and the second bevel gear 15 is meshed with the first bevel gear 13.
In this embodiment, the worker checks each component to ensure that the component can be used after no error, the second motor 14 drives the corresponding second bevel gear 15 to rotate, the second bevel gear 15 drives the corresponding first bevel gear 13 to rotate, the first bevel gear 13 drives the corresponding lead screw 12 to rotate, the lead screw 12 drives the corresponding connecting post 7 to move, the connecting post 7 drives the corresponding fixing seat 8 to move, so that the two pipelines 10 passively enter the corresponding two clamping grooves 9, the cylinder drives one of the clamping seats 11 to move, the clamping seat 11 drives the fixing rod 16 to move, the fixing rod 16 drives the second rack 17 to move, the second rack 17 drives the second gear 18 to rotate, the second gear 18 drives the other second rack 17 to move, the corresponding fixing rod 16 is driven by the second rack 17 to move, the fixing rod 16 drives the corresponding clamping seat 11 to move, the two clamping seats 11 clamp and fix the pipelines 10, first motor 5 drives first gear 6 and rotates, and first gear 6 drives two first racks 4 and removes to the direction that is close to each other, and first rack 4 drives the removal post 3 that corresponds and removes, and removal post 3 drives the fixing base 8 that corresponds and removes, and fixing base 8 drives the pipeline 10 that corresponds and removes, and two pipelines 10 remove to the direction that is close to each other, can realize quick butt joint, the utility model discloses rational in infrastructure, convenient operation, this jointing equipment connecting speed is fast, and is efficient, and is convenient for carry out the high-speed joint to not unidimensional pipeline 10.
The utility model discloses the standard part that uses all can purchase from the market, and dysmorphism piece all can be customized according to the description with the record of drawing of description, and the concrete connection mode of each part all adopts conventional means such as ripe bolt, rivet, welding among the prior art, and machinery, part and equipment all adopt prior art, and conventional model, including circuit connection adopts conventional connection mode among the prior art, does not detailed here again.

Claims (6)

1. A municipal engineering pipeline quick connection device comprises two fixed plates (1), and is characterized in that one side, close to each other, of the two fixed plates (1) is fixedly provided with the same connecting plate (2), the top of the connecting plate (2) is provided with two fixed holes, two fixed holes are internally and slidably provided with moving columns (3), the tops of the two moving columns (3) are respectively and fixedly provided with a first rack (4), the top of the connecting plate (2) is fixedly provided with a first motor (5), an output shaft of the first motor (5) is fixedly connected with a first gear (6), the two first racks (4) are respectively meshed with the first gear (6), the bottoms of the two moving columns (3) are respectively provided with a fixed groove, two fixed grooves are respectively and slidably provided with a connecting column (7), the bottoms of the two connecting columns (7) are respectively and fixedly provided with a fixed seat (8), clamping grooves (9) are formed in the bottoms of the two fixing seats (8), pipelines (10) are movably mounted in the two clamping grooves (9), clamping mechanisms are arranged in the two clamping grooves (9), and the clamping mechanisms are matched with the corresponding pipelines (10).
2. The municipal engineering pipeline quick connecting equipment according to claim 1, wherein the clamping mechanism comprises two clamping seats (11), two second racks (17) and a second gear (18), grooves are formed in inner walls of two sides of each clamping groove (9), the clamping seats (11) are slidably mounted in the corresponding grooves, the two clamping seats (11) are respectively matched with the pipeline (10), a fixed cavity is formed in the fixed seat (8), two sliding holes are formed in an inner wall of one side of the fixed cavity, and fixing rods (16) are slidably mounted in the two sliding holes.
3. The municipal engineering pipeline quick connection device according to claim 2, wherein one end of the fixing rod (16) is fixedly connected to the corresponding clamping seat (11), one end of each second rack (17) is fixedly installed on the corresponding fixing rod (16), the two second racks (17) are slidably installed in the fixing cavity, the second gear (18) is rotatably installed in the fixing cavity, the two second racks (17) are engaged with the second gear (18), one side of the fixing seat (8) is fixedly provided with the air cylinder, and the output shaft of the air cylinder is fixedly connected to one side of the clamping seat (11).
4. The municipal engineering pipeline quick connection device according to claim 2, wherein the second gear (18) is fixedly provided with a rotating block at each side, the inner walls of the two sides of the fixed cavity are provided with rotating grooves, and the rotating blocks are rotatably arranged in the corresponding rotating grooves.
5. The municipal engineering pipeline quick connecting equipment according to claim 1, wherein one side of the moving column (3) is provided with a square hole, a square rod is slidably mounted in the square hole, and two ends of the square rod are respectively and fixedly connected to the inner walls of two sides of the fixing hole.
6. The municipal engineering pipeline quick connection equipment according to claim 1, wherein a thread groove is formed in the top end of the connecting column (7), a screw rod (12) is installed in the thread groove in a threaded manner, the top end of the screw rod (12) is rotatably installed on the inner wall of the top of the fixing groove, a first bevel gear (13) is fixedly sleeved on the screw rod (12), a second motor (14) is fixedly installed on one side of the moving column (3), a second bevel gear (15) is fixedly connected to an output shaft of the second motor (14), and the second bevel gear (15) is meshed with the first bevel gear (13).
CN201922230143.2U 2019-12-13 2019-12-13 Municipal works pipeline quick connect device Expired - Fee Related CN211231846U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922230143.2U CN211231846U (en) 2019-12-13 2019-12-13 Municipal works pipeline quick connect device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922230143.2U CN211231846U (en) 2019-12-13 2019-12-13 Municipal works pipeline quick connect device

Publications (1)

Publication Number Publication Date
CN211231846U true CN211231846U (en) 2020-08-11

Family

ID=71916118

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922230143.2U Expired - Fee Related CN211231846U (en) 2019-12-13 2019-12-13 Municipal works pipeline quick connect device

Country Status (1)

Country Link
CN (1) CN211231846U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111982517A (en) * 2020-10-16 2020-11-24 韩兴 Aeroengine vibration control experiment platform
CN112428181A (en) * 2020-11-18 2021-03-02 陈迪锋 A quick butt joint auxiliary device of pipeline for municipal works
CN113089803A (en) * 2021-04-30 2021-07-09 刘建辉 A drainage pipe connection auxiliary device for municipal works road water supply and drainage
CN113216359A (en) * 2021-05-31 2021-08-06 姬鹏飞 Disposable embedded connector for drainage of constructional engineering and construction method thereof
CN113374934A (en) * 2021-07-06 2021-09-10 安徽森通建设工程有限公司 Quick calibrating device is used in pipeline construction
CN113931277A (en) * 2021-11-04 2022-01-14 王中华 Water conservancy construction pipe laying pay-off device and use method thereof
CN114738572A (en) * 2022-03-15 2022-07-12 刘智 Auxiliary connecting equipment for water utilization pipeline
CN115143319A (en) * 2022-09-05 2022-10-04 山西天然气有限公司 Natural gas line fixed mounting structure
CN117364899A (en) * 2023-12-05 2024-01-09 山西一建集团有限公司 Drainage pipeline civil engineering structure

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111982517A (en) * 2020-10-16 2020-11-24 韩兴 Aeroengine vibration control experiment platform
CN112428181A (en) * 2020-11-18 2021-03-02 陈迪锋 A quick butt joint auxiliary device of pipeline for municipal works
CN113089803B (en) * 2021-04-30 2022-07-05 刘建辉 A drainage pipe connects auxiliary device for municipal works road plumbing
CN113089803A (en) * 2021-04-30 2021-07-09 刘建辉 A drainage pipe connection auxiliary device for municipal works road water supply and drainage
CN113216359A (en) * 2021-05-31 2021-08-06 姬鹏飞 Disposable embedded connector for drainage of constructional engineering and construction method thereof
CN113374934A (en) * 2021-07-06 2021-09-10 安徽森通建设工程有限公司 Quick calibrating device is used in pipeline construction
CN113931277A (en) * 2021-11-04 2022-01-14 王中华 Water conservancy construction pipe laying pay-off device and use method thereof
CN113931277B (en) * 2021-11-04 2023-07-14 广州市市政工程机械施工有限公司 Water conservancy construction buried pipe paying-off device and application method thereof
CN114738572A (en) * 2022-03-15 2022-07-12 刘智 Auxiliary connecting equipment for water utilization pipeline
CN115143319A (en) * 2022-09-05 2022-10-04 山西天然气有限公司 Natural gas line fixed mounting structure
CN115143319B (en) * 2022-09-05 2022-12-27 山西天然气有限公司 Natural gas line fixed mounting structure
CN117364899A (en) * 2023-12-05 2024-01-09 山西一建集团有限公司 Drainage pipeline civil engineering structure
CN117364899B (en) * 2023-12-05 2024-03-12 山西一建集团有限公司 Drainage pipeline civil engineering structure

Similar Documents

Publication Publication Date Title
CN211231846U (en) Municipal works pipeline quick connect device
CN210060489U (en) Efficient punching device for production of battery steel shell
CN210173793U (en) High-precision cutting device for wood board processing
CN211804295U (en) Fixing device for welding notebook display driving circuit board
CN210547668U (en) A making devices for concrete wire pole framework of steel reinforcement
CN213259927U (en) Fixing device for cable iron-wood disc machining sawing machine
CN220660528U (en) High-performance photovoltaic profile machining tool
CN220362288U (en) Frock clamp for planer-type milling
CN220104705U (en) Welding net steel wire strength testing device
CN211775907U (en) Assembly type concrete wallboard in-place device
CN213857898U (en) Rotating equipment convenient for automobile parts to rotate
CN219004849U (en) Guiding device of electric spark machine for machining internal spline flange
CN213499832U (en) Optical cable is punch press for ironwood dish convenient to adjust position of punching a hole
CN116780827B (en) Motor steering gear convenient to mount and dismount and connecting method
CN210342565U (en) Plastic-wood composite material environment-friendly floor
CN212886164U (en) Automatic drilling and tapping machine for glass cement gun handle
CN218383103U (en) Inverter aging detection energization installation tool structure
CN211639592U (en) Wood working clamping device
CN221042608U (en) Winding auxiliary device for motor stator
CN216370245U (en) Drilling equipment is used in production of new energy automobile accessory
CN217413806U (en) Splicing clamp of motor
CN219211888U (en) Fixing clamp for tapping
CN217776032U (en) Welding jig is used in robot production
CN220825967U (en) Positioning device for manufacturing electromechanical equipment
CN211774586U (en) Assembly type house structure convenient to disassemble and assemble

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200811