CN211229449U - Dual-purpose tool for up-down passing and operating platform of rack - Google Patents

Dual-purpose tool for up-down passing and operating platform of rack Download PDF

Info

Publication number
CN211229449U
CN211229449U CN201921870497.7U CN201921870497U CN211229449U CN 211229449 U CN211229449 U CN 211229449U CN 201921870497 U CN201921870497 U CN 201921870497U CN 211229449 U CN211229449 U CN 211229449U
Authority
CN
China
Prior art keywords
long steel
steel pipe
telescopic
reinforcement
telescopic reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921870497.7U
Other languages
Chinese (zh)
Inventor
黄渊
申诗文
安强华
胡林含
徐国艳
邹鹏威
唐香敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201921870497.7U priority Critical patent/CN211229449U/en
Application granted granted Critical
Publication of CN211229449U publication Critical patent/CN211229449U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Warehouses Or Storage Devices (AREA)

Abstract

The utility model discloses a frame is expert at from top to bottom and dual-purpose instrument of operation platform, include: two long steel pipes, two long steel pipe bilateral symmetry and parallel, two upper and lower both ends between the long steel pipe all are provided with flexible shelves the subassembly, flexible shelves include telescopic reinforcement and No. two telescopic reinforcement to the subassembly, telescopic reinforcement right-hand member runs through the long steel pipe in left side, and the right-hand welding that the lower side of telescopic reinforcement right-hand member is in the long steel pipe in left side has a sleeve pipe No. one, telescopic reinforcement left end has a reinforcing bar shelves handle in the left side long steel pipe left welding. The utility model discloses when using, can hang this instrument through the couple and lean on between two adjacent horizon bars from top to bottom to the staff is current from top to bottom, and it is easy to fall to avoid the workman to creep from top to bottom as far as possible, falls and hinders, and can carry out interconnect with a plurality of this instruments, just so can realize once setting up the layer of setting up of multilayer support body, and the workman's of being convenient for about more is current.

Description

Dual-purpose tool for up-down passing and operating platform of rack
Technical Field
The utility model belongs to the technical field of the construction, especially, relate to a frame is expert at from top to bottom and dual-purpose instrument of operation platform.
Background
Scaffolding refers to various supports erected on a construction site for workers to handle and solve vertical and horizontal transportation. Mainly for constructors to live up and down or for peripheral safety net enclosure, overhead installation components and the like, the scaffold is said to be made of bamboo, wood, steel pipes or synthetic materials. Some projects also use scaffolds as templates, and in addition, the scaffold is widely used in advertising, municipal administration, traffic roads and bridges, mines and other departments.
At present, steel pipes are generally adopted to set up scaffold support frames on building sites in places where external walls, interior decoration or high floor heights cannot be directly constructed. Traditional reinforcing bar helps bundle, formwork constructor upper and lower support body adoption people climb the mode, set up temporarily, and the flitch template is as interim construction operation platform.
Therefore, workers can easily climb up and down, fall off and fall down to be injured; the temporary operating platform is not fixed and is easy to slide, and people fall off risks.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a frame is expert at from top to bottom and operation platform dual-purpose instrument to solve the technical problem that above-mentioned background art mentioned.
The utility model provides an above-mentioned technical problem's technical scheme as follows: a tool for up-down passing of a frame body and operation of a platform comprises two long steel pipes which are bilaterally symmetrical and parallel, telescopic gear handle assemblies are arranged at the upper ends and the lower ends between the two long steel pipes and comprise a first telescopic steel bar and a second telescopic steel bar, the right end of the first telescopic steel bar penetrates through the left long steel pipe, a first sleeve is welded at the right side of the left long steel pipe at the lower side of the right end of the first telescopic steel bar, a first steel bar handle is welded at the left of the left long steel pipe at the left end of the first telescopic steel bar, a second telescopic steel bar penetrates through the right long steel pipe at the left side of the right long steel pipe at the upper side of the left end of the second telescopic steel bar, a second sleeve is sleeved on the outer surface of the first telescopic steel bar, and the first sleeve is sleeved on the outer surface of the second telescopic steel bar, no. two flexible reinforcing bar right-hand members have No. two reinforcing bar shelves at the right-hand welding of right side long steel pipe, two just two between the long steel pipe flexible shelves are provided with the pedal reinforcing bar that a plurality of equidistance were arranged between the subassembly, both ends all are provided with the couple about the long steel pipe.
The utility model adopts the above be used for the support body current and the dual-purpose instrument of operation platform from top to bottom, further: the utility model discloses a steel pipe, including long steel pipe, short steel pipe, bolt fixed connection couple, long steel pipe is inboard, both ends cover is equipped with short steel pipe about the long steel pipe is inboard, short steel pipe one end is inserted in the long steel pipe and is passed through a bolt fixed connection long steel pipe, the short steel pipe other end stretches out the long steel pipe and wears to be equipped with No. two bolts, through a bolt and No. two bolt fixed connection couples in the short steel pipe, a bolt and No. two bolt sizes are the same.
The utility model adopts the above be used for the support body current and the dual-purpose instrument of operation platform from top to bottom, further: the couple includes straight rod portion and crotch portion, crotch portion is located straight rod portion one end, and the straight rod portion other end inserts in the short steel pipe, and corresponds No. one pinhole and No. two pinholes with a bolt and No. two bolts respectively on the straight rod portion.
The utility model adopts the above be used for the support body current and the dual-purpose instrument of operation platform from top to bottom, further: a flexible reinforcing bar and left side long steel pipe relative slip, and a flexible reinforcing bar and No. two sleeve pipe relative slips, No. two flexible reinforcing bars and right side long steel pipe relative slip, and No. two flexible reinforcing bars and a sleeve pipe relative slip.
The utility model adopts the above be used for the support body current and the dual-purpose instrument of operation platform from top to bottom, further: the left end and the right end of the pedal steel bar penetrate through the long steel pipes on the two sides respectively, and the left end and the right end of the pedal steel bar are welded with the long steel pipes on the two sides respectively.
The utility model adopts the above be used for the support body current and the dual-purpose instrument of operation platform from top to bottom, further: the long steel pipes are made of steel pipes with the model diameter of 48 multiplied by 3.0mm, the length of each long steel pipe is 1200mm, and the distance between the two long steel pipes is 400 mm; the distance between the two telescopic handle components is larger than 900 mm.
The utility model has the advantages that:
1. the utility model discloses when using, can be through couple 7 with this instrument hang by between two adjacent horizon bars from top to bottom to the staff is current from top to bottom, avoids the workman to creep from top to bottom easily and falls, falls to hinder as far as possible, and can carry out interconnect with a plurality of this instruments, just so can realize once setting up the layer of setting up of multilayer support body, the workman's of being convenient for about more is current.
2. The utility model discloses can also lay between two adjacent horizon bars setting up the layer, and lay the flitch template on this instrument, with the operation platform practicality as zero hour, a reinforcing bar shelves that sets up on this instrument can play spacing firm effect with No. two reinforcing bar shelves, to down, can increase the stability of support body and this instrument, to last, can increase the stability of this instrument and template, and two reinforcing bar shelves can stretch out and draw back the regulation, the width that can have more the template carries out corresponding regulation, thereby can lay multiple size's template on making this instrument.
Drawings
The above and/or other aspects and advantages of the present invention will become more apparent and more readily appreciated from the detailed description taken in conjunction with the following drawings, which are given by way of illustration only and not by way of limitation, wherein:
fig. 1 is a schematic front view of an embodiment of the present invention;
fig. 2 is a schematic structural view of a telescopic handle assembly according to an embodiment of the present invention;
fig. 3 is a schematic left side view of an embodiment of the present invention;
fig. 4 is a schematic view of a hook structure according to an embodiment of the present invention.
In the drawings, the components represented by the respective reference numerals are listed below:
1. a long steel pipe; 2. a telescoping bar handle assembly; 21. a first telescopic steel bar; 22. a first reinforcing steel bar retaining handle; 23. a first sleeve; 24. a second telescopic reinforcing steel bar; 25. a second reinforcing steel bar blocking handle; 26. a second sleeve; 3. pedaling the steel bars; 4. short steel pipes; 5. a first bolt; 6. a second bolt; 7. hooking; 71. a straight rod part; 711. a first pin hole; 712. a second pin hole; 72. a hook portion.
Detailed Description
Hereinafter, an embodiment of the present invention will be described with reference to the drawings.
The embodiments described herein are specific embodiments of the present invention, and are intended to be illustrative of the concepts of the present invention, which are intended to be illustrative and exemplary, and should not be construed as limiting the scope of the embodiments of the present invention. In addition to the embodiments described herein, those skilled in the art will be able to employ other technical solutions which are obvious based on the disclosure of the claims and the specification of the present application, and these technical solutions include technical solutions which make any obvious replacement or modification for the embodiments described herein.
The drawings in the present specification are schematic views to assist in explaining the concept of the present invention, and schematically show the shapes of the respective portions and the mutual relationships thereof. It should be noted that for the sake of clarity in showing the structures of the various components of the embodiments of the present invention, the drawings are not drawn to the same scale. Like reference numerals are used to denote like parts.
Fig. 1-4 show the utility model discloses a dual-purpose instrument of current and operation platform about the support body of embodiment, it includes: two long steel pipes 1, the two long steel pipes 1 are bilaterally symmetrical and parallel, the long steel pipes 1 are made of steel pipes with the model diameter of 48 multiplied by 3.0mm, the length of the long steel pipes 1 is 1200mm, the distance between the two long steel pipes 1 is 400mm, the upper end and the lower end between the two long steel pipes 1 are both provided with telescopic shift handle assemblies 2, the distance between the two telescopic shift handle assemblies 2 is more than 900mm, each telescopic shift handle assembly 2 comprises a first telescopic steel bar 21 and a second telescopic steel bar 24, the right end of the first telescopic steel bar 21 penetrates through the left long steel pipe 1, the lower side of the right end of the first telescopic steel bar 21 is welded with a first sleeve 23 at the right side of the left long steel pipe 1, the left end of the first telescopic steel bar 21 is welded with a first steel bar shift handle 22 on the left long steel pipe 1, the left end of the second telescopic steel bar 24 penetrates through the right long steel pipe 1, and the upper side of the left end of the second telescopic steel, the second sleeve 26 is sleeved on the outer side surface of the first telescopic steel bar 21, the first sleeve 23 is sleeved on the outer side surface of the second telescopic steel bar 24, the right end of the second telescopic steel bar 24 is welded with a second steel bar shift handle 25 at the right side of the right long steel pipe 1, wherein the first telescopic steel bar 21 slides relative to the left long steel pipe 1, the first telescopic steel bar 21 slides relative to the second sleeve 26, the second telescopic steel bar 24 slides relative to the right long steel pipe 1, the second telescopic steel bar 24 slides relative to the first sleeve 23, a plurality of pedal steel bars 3 which are arranged at equal intervals are arranged between the two long steel pipes 1 and between the two telescopic shift handle assemblies 2, specifically, the left end and the right end of each pedal steel bar 3 respectively penetrate through the long steel pipes 1 at the two sides, the left end and the right end of each pedal steel bar 3 are respectively welded with the long steel pipes 1 at the two sides, hooks 7 are arranged at the upper end and the lower end of each long steel pipe 1, 4 one ends of short steel pipe insert in long steel pipe 1 and through a bolt 5 fixed connection long steel pipe 1, the 4 other ends of short steel pipe stretch out long steel pipe 1 and wear to be equipped with No. two bolts 6, couple 7 through a bolt 5 and No. two bolt 6 fixed connection in the short steel pipe 4, a bolt 5 is the same with No. two bolt 6 sizes, couple 7 includes straight rod portion 71 and crotch portion 72, crotch portion 72 is located straight rod portion 71 one end, and the straight rod portion 71 other end inserts in the short steel pipe 4, and correspond with a bolt 5 and No. two bolts 6 respectively on the straight rod portion 71 and seted up a pinhole 711 and No. two pinhole 712.
The working principle is as follows: when the utility model is used, according to the characteristics of the parameters of the project bowl buckle supporting frame horizontal rods with the vertical spacing of 1200mm and the horizontal spacing of 900mm, the tool can be hung between two vertically adjacent horizontal rods through the hook 7 so as to facilitate the up-and-down passage of workers, avoid the problem that the workers climb up and down and easily fall down and fall down as much as possible, and can be connected with each other, if two tools are connected, the long steel pipes 1 on the two tools are connected through two short steel pipes 4 and four bolts, so that the multilayer supporting frame can be connected once, and the workers can pass up and down more conveniently; the utility model discloses can also lay between two adjacent horizon bars setting up the layer, and lay the flitch template on this instrument, with the operation platform practicality as zero hour, a reinforcing bar shelves that sets up on this instrument can play spacing firm effect to 22 and No. two reinforcing bar shelves 25, to down, can increase the stability of support body and this instrument, to last, can increase the stability of this instrument and template, and two reinforcing bar shelves can stretch out and draw back the regulation, the width that can more possess the template carries out corresponding regulation, thereby can lay the template of multiple size on making this instrument.
The technical features disclosed above are not limited to the combinations with other features disclosed, and other combinations between the technical features can be performed by those skilled in the art according to the purpose of the invention to achieve the aim of the invention.

Claims (6)

1. The utility model provides a dual-purpose instrument of passing through and operation platform about the framework which characterized in that includes: two long steel pipes (1), two long steel pipes (1) bilateral symmetry and parallel, two upper and lower both ends between long steel pipe (1) all are provided with flexible shelves to subassembly (2), flexible shelves include telescopic reinforcement (21) and No. two telescopic reinforcement (24) to subassembly (2), telescopic reinforcement (21) right-hand member runs through left side long steel pipe (1), and the lower side of telescopic reinforcement (21) right-hand member in left side long steel pipe (1) has a sleeve pipe (23), telescopic reinforcement (21) left end has a reinforcing bar shelves (22) in left side long steel pipe (1) left welding, No. two telescopic reinforcement (24) left end runs through right side long steel pipe (1), and the upside limit of No. two telescopic reinforcement (24) left end portion is in right side long steel pipe (1) left welding and has No. two sleeve pipes (26), no. two sleeve pipes (26) cover are located flexible reinforcing bar (21) outside surface, and sleeve pipe (23) cover is located flexible reinforcing bar (24) outside surface No. two, flexible reinforcing bar (24) right-hand welding of right side long steel pipe (1) of No. two reinforcing bar shelves (25), two just two between long steel pipe (1) flexible shelves are provided with pedal reinforcing bar (3) that a plurality of equidistance were arranged between subassembly (2), both ends all are provided with couple (7) about long steel pipe (1).
2. The dual-purpose tool for the up-down passing of the rack and the operation platform as claimed in claim 1, wherein short steel pipes (4) are sleeved at the upper end and the lower end of the inner side of the long steel pipe (1), one end of each short steel pipe (4) is inserted into the long steel pipe (1) and fixedly connected with the long steel pipe (1) through a first bolt (5), the other end of each short steel pipe (4) extends out of the long steel pipe (1) and is provided with a second bolt (6) in a penetrating manner, a first bolt (5) and a second bolt (6) are fixedly connected with a hook (7) in the short steel pipe (4), and the first bolt (5) and the second bolt (6) are the same in size.
3. The dual-purpose tool for the up-down passing of a rack and the operation of a platform as claimed in claim 1, wherein the hook (7) comprises a straight rod part (71) and a hook part (72), the hook part (72) is located at one end of the straight rod part (71), the other end of the straight rod part (71) is inserted into the short steel pipe (4), and the straight rod part (71) is provided with a first pin hole (711) and a second pin hole (712) corresponding to the first pin (5) and the second pin (6), respectively.
4. The tool for both up-down passing of a frame and operation of a platform as claimed in claim 1, wherein the first telescopic reinforcement (21) slides relative to the left long steel tube (1), the first telescopic reinforcement (21) slides relative to the second sleeve (26), the second telescopic reinforcement (24) slides relative to the right long steel tube (1), and the second telescopic reinforcement (24) slides relative to the first sleeve (23).
5. The dual-purpose tool for the up-down passing of a rack and the operation of a platform as claimed in claim 1, wherein the left and right ends of the pedal reinforcement (3) respectively penetrate through the long steel pipes (1) at the two sides, and the left and right ends of the pedal reinforcement (3) are respectively welded with the long steel pipes (1) at the two sides.
6. The tool for the upper and lower passing of the rack and the operation platform as claimed in claim 1, wherein the long steel tube (1) is made of a steel tube with a model diameter of 48 x 3.0mm, the length of the long steel tube (1) is 1200mm, and the distance between the two long steel tubes (1) is 400 mm; the distance between the two telescopic handle components (2) is larger than 900 mm.
CN201921870497.7U 2019-11-01 2019-11-01 Dual-purpose tool for up-down passing and operating platform of rack Expired - Fee Related CN211229449U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921870497.7U CN211229449U (en) 2019-11-01 2019-11-01 Dual-purpose tool for up-down passing and operating platform of rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921870497.7U CN211229449U (en) 2019-11-01 2019-11-01 Dual-purpose tool for up-down passing and operating platform of rack

Publications (1)

Publication Number Publication Date
CN211229449U true CN211229449U (en) 2020-08-11

Family

ID=71940500

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921870497.7U Expired - Fee Related CN211229449U (en) 2019-11-01 2019-11-01 Dual-purpose tool for up-down passing and operating platform of rack

Country Status (1)

Country Link
CN (1) CN211229449U (en)

Similar Documents

Publication Publication Date Title
CN101397844B (en) Construction method of special section steel concrete composite structure inclined wall mould base engineering
CN210341667U (en) Pier shaft embedded steel bar clamp
CN211229449U (en) Dual-purpose tool for up-down passing and operating platform of rack
CN211173007U (en) Novel tripod of encorbelmenting
CN208564560U (en) Shield tunnel construction door frame
CN218205601U (en) Scaffold with telescopic auxiliary stay pole
CN104453243B (en) Cast-in-situ concrete beam steadily enters the erection device and method of mould
CN206205407U (en) It is a kind of can flexible combination multi-functional scaffold
CN207538481U (en) A kind of floor height changeable type input and output material platform
CN215055177U (en) Protection dress is built to irregular facade building scaffold
CN207633773U (en) A kind of glomeration building prefabricated construction reinforcing bar guiding tube dismounting system
CN206693590U (en) A kind of Quick-mounting aluminium alloy scaffold
CN215858986U (en) Crane beam operation cage
CN210622261U (en) Movable scaffold with telescopic pedals
CN208152516U (en) A kind of concrete scaffold
CN206205446U (en) A kind of steel assembles passage
CN218175600U (en) Suspension frame for welding arch rib segments
CN213419106U (en) 12-meter long and light manual waterproof board hanging trolley
CN206308627U (en) A kind of portable beam body side operation frame
CN208843688U (en) A kind of hanging cage
CN107035132A (en) The scaffold of convenient rest during climbing
CN204282839U (en) The frame that cast-in-situ concrete beam steadily enters mould founds device
CN210396062U (en) Scaffold for building installation
CN216194071U (en) Cast-in-place diaphragm construction safety operation platform of precast beam
CN209837663U (en) Template system for high-rise building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200811

CF01 Termination of patent right due to non-payment of annual fee