CN210396062U - Scaffold for building installation - Google Patents

Scaffold for building installation Download PDF

Info

Publication number
CN210396062U
CN210396062U CN201920879601.2U CN201920879601U CN210396062U CN 210396062 U CN210396062 U CN 210396062U CN 201920879601 U CN201920879601 U CN 201920879601U CN 210396062 U CN210396062 U CN 210396062U
Authority
CN
China
Prior art keywords
vice
main tributary
main
support
support column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920879601.2U
Other languages
Chinese (zh)
Inventor
孙泽亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pu Panfeng
Original Assignee
Pu Panfeng
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pu Panfeng filed Critical Pu Panfeng
Priority to CN201920879601.2U priority Critical patent/CN210396062U/en
Application granted granted Critical
Publication of CN210396062U publication Critical patent/CN210396062U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a scaffold frame for building installation, including two sets of support frames, be equipped with the backup pad between two sets of support frames, every group support frame includes two main tributary daggers, and welded connection has the main beam between two main tributary daggers, and the upper end of two main tributary daggers is connected with vice support column through the connector, has vice crossbeam through the articulate between two vice support columns, the bottom welding of main tributary dagger is equipped with the stabilizer blade, all alternately is equipped with the connecting rod between the front and back both sides of two sets of support frames, the both sides of every group support frame, the one end of connecting rod can be dismantled with the lower extreme of main tributary dagger through the fastener and be connected, and the other end of connecting rod can be dismantled through the fastener with the upper end of vice support. The utility model discloses the structure is whole very stable, and assembly and disassembly convenient and fast moreover reduces area occupied after the dismantlement, easily accomodates.

Description

Scaffold for building installation
Technical Field
The utility model relates to a building tool technical field specifically indicates a scaffold frame for building installation.
Background
The scaffold is various supports which are set up for workers to operate and solve vertical and horizontal transportation on a construction site, is used for building outer walls, interior decoration or places with higher floor height and incapable of direct construction, and can be changed into the scaffold with higher height in a superposition mode, so that the workers can carry out construction work on buildings at higher positions. Scaffold frame among the prior art is unstable structure either, and it is troublesome either to dismantle, wastes time and energy, lacks a stable in structure and easy dismounting swift scaffold frame.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to overcome above technical defect, provide a scaffold frame for building installation.
In order to solve the technical problem, the utility model provides a technical scheme does: a scaffold for building installation comprises two groups of parallel and opposite support frames, a support plate is arranged between the two groups of support frames, each group of support frame comprises two main support columns, a main cross beam is welded between the two main support columns, the upper ends of the two main support columns are connected with an auxiliary support column through a connector, an auxiliary cross beam is connected between the two auxiliary support columns through a connector, the bottom end of the main supporting column is welded with a supporting leg which is of a splayed structure, the two ends of the bottom of the supporting leg are respectively positioned at the inner side and the outer side of the main supporting column, connecting rods are respectively arranged between the front side and the rear side of the two groups of supporting frames and between the two sides of each group of supporting frames in a crossed manner, one end of the connecting rod is detachably connected with the lower end of the main supporting column through a fastening piece, the other end of the connecting rod is detachably connected with the upper end of the auxiliary supporting column through a fastening piece, hooks are arranged at two ends of the supporting plate and hung between the two opposite auxiliary cross beams through the hooks.
As an improvement, through holes are formed in the lower end of the main supporting column, the upper end of the auxiliary supporting column and the two ends of the connecting rod, the connecting rod is fixed with the main supporting column and the auxiliary supporting column through fasteners, and the fasteners are bolts.
As the improvement, the connector includes the main part, and the upper and lower both ends of main part all weld the sleeve, one side welding branch of main part, main tributary support column and vice support column diameter equal, telescopic internal diameter and the external diameter phase-match of main tributary support column and vice support column, the both ends of vice crossbeam are the hollow tube, the external diameter of branch and the internal diameter phase-match at vice crossbeam both ends.
As an improvement, one end of each hook supports the bottom of the supporting plate, the end part of the supporting plate is fastened with the hooks through a plurality of screws, and four hooks are arranged at two ends of the supporting plate.
Compared with the prior art, the utility model the advantage lie in: the structure is overall very stable, and the assembly and disassembly is convenient and fast, reduces the occupied area after the disassembly, and is easy to store.
Drawings
Fig. 1 is a front view of the scaffold for building and installation of the present invention.
Fig. 2 is a side view of the scaffold for building and installation of the present invention.
Fig. 3 is a schematic structural diagram of the connecting head.
Fig. 4 is a schematic structural view of the connection of the support plate and the hook.
As shown in the figure: 1. the support plate comprises a support plate, 2, a main supporting column, 3, a main cross beam, 4, an auxiliary supporting column, 5, an auxiliary cross beam, 6, a supporting leg, 7, a connecting rod, 8, a hook, 9, a connector, 10, a screw, 9.1, a main body, 9.2, a sleeve, 9.3 and a supporting rod.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
With the attached drawings, the scaffold for building installation comprises two groups of parallel and opposite support frames, a support plate 1 is arranged between the two groups of support frames, each group of support frame comprises two main support columns 2, a main cross beam 3 is welded between the two main support columns 2, the upper ends of the two main support columns 2 are connected with auxiliary support columns 4 through joints, an auxiliary cross beam 5 is connected between the two auxiliary support columns 4 through a connector 9, support legs 6 are welded at the bottom ends of the main support columns 2, the support legs 6 are of a splayed structure, the two ends of the bottom of each support leg 6 are respectively positioned at the inner side and the outer side of the main support column 2, connecting rods 7 are respectively arranged between the front side and the rear side of each group of support frames in a crossed manner, one end of each connecting rod 7 is detachably connected with the lower ends of the main support columns 2 through fasteners, and the other, two ends of the supporting plate 1 are provided with hooks 8, and the hooks 8 are hung between the two opposite auxiliary cross beams 5.
The lower extreme of main tributary dagger 2, the upper end of vice support column 4, the both ends of connecting rod 7 all are equipped with the through-hole, and connecting rod 7 passes through the fastener with main tributary dagger 2 and vice support column 4 and fixes, the fastener adopts the bolt. Connector 9 includes main part 9.1, and the upper and lower both ends of main part 9.1 all weld sleeve 9.2, one side welding branch 9.3 of main part 9.1, main tributary strut 2 equals with vice support column 4 diameter, sleeve 9.2's internal diameter and main tributary strut 2 and vice support column 4's external diameter phase-match, the both ends of vice crossbeam 5 are the hollow tube, the external diameter of branch 9.3 and the internal diameter phase-match at vice crossbeam 5 both ends. One end of the hook 8 supports the bottom of the supporting plate 1, the end of the supporting plate 1 is fastened with the hook 8 through a plurality of screws 10, and four hooks 8 are arranged at two ends of the supporting plate 1.
When the utility model is implemented, the main supporting column 2, the main beam 3 and the supporting legs 6 are welded, which is beneficial to enhancing the stability of the bottom foundation of the supporting frame, and the connecting head 9, the main supporting column 2, the auxiliary supporting column 4 and the auxiliary beam 4 are all sleeved, which is convenient for disassembly; after the two groups of supporting frames are assembled, the connecting rods 7 are crossed on the front, the back, the left and the right, and then are fastened and connected through bolts, so that the integral stability of the device is enhanced; the support frame sets up backup pad 1 topmost, and backup pad 1 has the dead weight, and vice crossbeam 5 is pushed down at the both ends of backup pad 1, and connector 9 and vice crossbeam 5 and vice support column 4 zonulae occludens, and consequently the upper end is also very stable, and the height of support frame can be confirmed through the perpendicular installation quantity of increase and decrease vice support column 4 as required.
The present invention and the embodiments thereof have been described above, but the description is not limited thereto, and the embodiment shown in the drawings is only one of the embodiments of the present invention, and the actual structure is not limited thereto. In summary, those skilled in the art should understand that they should not be limited to the embodiments described above, and that they can design the similar structure and embodiments without departing from the spirit of the invention.

Claims (4)

1. The utility model provides a scaffold frame for building installation, includes two sets of support frames that parallel is relative, is equipped with backup pad, its characterized in that between two sets of support frames: every group support frame includes two main tributary daggers, and welded connection has the main beam between two main tributary daggers, and there is vice support column upper end of two main tributary daggers through articulate connection, is connected with vice crossbeam through the connector between two vice support columns, the bottom welding of main tributary dagger is equipped with the stabilizer blade, the stabilizer blade is splayed structure, and the bottom both ends of stabilizer blade are located the inside and outside both sides of main tributary dagger respectively, all alternately is equipped with the connecting rod between both sides around two sets of support frames, the both sides of every group support frame, the one end of connecting rod can be dismantled with the lower extreme of main tributary dagger through the fastener and be connected, and the other end of connecting rod can be dismantled with the upper end of vice support column through the fastener.
2. A scaffolding for building and installation according to claim 1, wherein: the lower extreme of main tributary dagger, the upper end of vice support column, the both ends of connecting rod all are equipped with the through-hole, and the connecting rod passes through the fastener with main tributary dagger and vice support column and fixes, the fastener adopts the bolt.
3. A scaffolding for building and installation according to claim 1, wherein: the connector includes the main part, and the upper and lower both ends of main part all weld the sleeve, one side welding branch of main part, main tributary support column and vice support column diameter equal, telescopic internal diameter and the external diameter phase-match of main tributary support column and vice support column, the both ends of vice crossbeam are the hollow tube, the external diameter of branch and the internal diameter phase-match at vice crossbeam both ends.
4. A scaffolding for building and installation according to claim 3, wherein: one end of each hook supports the bottom of the supporting plate, the end of the supporting plate is fastened with the hooks through a plurality of screws, and four hooks are arranged at two ends of the supporting plate.
CN201920879601.2U 2019-06-12 2019-06-12 Scaffold for building installation Expired - Fee Related CN210396062U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920879601.2U CN210396062U (en) 2019-06-12 2019-06-12 Scaffold for building installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920879601.2U CN210396062U (en) 2019-06-12 2019-06-12 Scaffold for building installation

Publications (1)

Publication Number Publication Date
CN210396062U true CN210396062U (en) 2020-04-24

Family

ID=70349262

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920879601.2U Expired - Fee Related CN210396062U (en) 2019-06-12 2019-06-12 Scaffold for building installation

Country Status (1)

Country Link
CN (1) CN210396062U (en)

Similar Documents

Publication Publication Date Title
CN211736298U (en) Double-rod diagonal cantilever scaffold
CN210396062U (en) Scaffold for building installation
CN210659407U (en) Tool type protective shed for machining of reinforcing steel bars
CN218205601U (en) Scaffold with telescopic auxiliary stay pole
CN201802071U (en) Diagonal frame for strengthening construction framework support system
CN212000638U (en) Overhead cover beam type steel supporting structure
CN213268818U (en) Wall-hung type angle steel triangular cantilever base frame for scaffold
CN218541407U (en) Multifunctional scaffold
CN107476200B (en) Full-hall support staggered overlapping structure and method
CN214942204U (en) Telescopic heightening device for attached lifting scaffold
CN104234189A (en) Four-pipe truss structure of prefabricated house
CN220058310U (en) Assembled steel structure frame
CN221143380U (en) Stone material unit plate mounting structure of steel truss
CN203394010U (en) Scaffold structure for building
CN219931859U (en) Recyclable steel member
CN217602024U (en) High-altitude overhanging type steel support frame
CN212105052U (en) Scaffold for building installation
CN220377876U (en) Novel supporting beam steel bar binding auxiliary frame
CN211690761U (en) Steel structure column node connecting device
CN210096861U (en) Assembled climbing wall
CN210563516U (en) Movable edge-facing operation anti-falling device for large-span structure
CN211973511U (en) Portable support frame for foundation pit
CN216276848U (en) Corner double-rod type high-altitude operation hanging basket counterweight-free overhanging device
CN211286560U (en) Spherical node suspension adjustable operation platform
CN103758334A (en) Scaffold structure for constructing exterior wall of building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200424

Termination date: 20210612

CF01 Termination of patent right due to non-payment of annual fee