CN211227919U - Water permeable brick for sponge city - Google Patents
Water permeable brick for sponge city Download PDFInfo
- Publication number
- CN211227919U CN211227919U CN201921492105.8U CN201921492105U CN211227919U CN 211227919 U CN211227919 U CN 211227919U CN 201921492105 U CN201921492105 U CN 201921492105U CN 211227919 U CN211227919 U CN 211227919U
- Authority
- CN
- China
- Prior art keywords
- brick
- layer
- water
- brick layer
- fixedly connected
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a brick that permeates water that sponge city was used, including the brick body that permeates water, the hole of permeating water has been opened to the front side of the brick body that permeates water, the brick body that permeates water includes first brick layer, the rear side fixedly connected with second brick layer on first brick layer, the rear side fixedly connected with woven wire on second brick layer, woven wire's rear side fixedly connected with third brick layer, the rear side fixedly connected with location brick frame layer on third brick layer. The utility model discloses a setting up the brick body that permeates water, the hole of permeating water, first constant head tank, the second locating piece, first locating piece, the second constant head tank, wire mesh, location brick frame layer, first brick layer, the cooperation on third brick layer and second brick layer is used, the brick intensity that permeates water that has solved current partial sponge city usefulness is low, the location effect is poor and the poor problem of effect of permeating water, this brick that permeates water that sponge city was used, it is high to possess intensity, the location is effectual and permeate water effectual advantage, be worth promoting.
Description
Technical Field
The utility model relates to a brick technical field that permeates water specifically is a brick that permeates water that sponge city was used.
Background
The water permeable brick is a small-sized pavement brick with the length of 200 mm, the width of 100 mm and the height of 50 mm or 60 mm, which is paved on a street pavement, and a gap of 2 mm is reserved between the bricks. Thus, rain water can seep into the ground from the gaps between the bricks in rain.
Need use the brick that permeates water in the aspect of some road construction, but the intensity of the brick that permeates water now is lower, at the in-process of using, appear cracked phenomenon because trample very easily, the life of the brick that permeates water has been shortened, and not have location structure to fix a position between the two adjacent bricks that permeate water of in-process that use, consequently the location effect is relatively poor, the phenomenon of rocking appears very easily, and the brick that permeates water now is owing to with ground in close contact with, and the surface does not set up the hole of permeating water, consequently the effect of permeating water is relatively poor.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a brick that permeates water that sponge city was used possesses intensity height, location effect and the effectual advantage that permeates water, has solved the brick intensity that permeates water that current partial sponge city was used low, location effect is poor and the poor problem of effect that permeates water.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a brick that permeates water that sponge city was used, includes the brick body that permeates water, the hole of permeating water is opened to the front side of the brick body that permeates water, the brick body that permeates water includes first brick layer, the rear side fixedly connected with second brick layer on first brick layer, the rear side fixedly connected with woven wire on second brick layer, woven wire's rear side fixedly connected with third brick layer, the rear side fixedly connected with location brick frame layer on third brick layer, the first locating piece of the equal fixedly connected with in both sides at second brick layer top, the first constant head tank that uses with the cooperation of first locating piece has all been seted up to the both sides of second brick layer bottom, the second constant head tank has been seted up in the left side on second brick layer, the right side fixedly connected with second locating piece on second brick layer.
Preferably, the number of the water permeable holes is a plurality of, and the water permeable holes are uniformly distributed on the surface of the water permeable brick body.
Preferably, the first brick layer and the positioning brick frame layer are made of the same material, and the first positioning block and the second positioning block are made of the same material as the second brick layer.
Preferably, the first positioning block and the second positioning block are both trapezoidal, and the second positioning block is matched with the second positioning groove for use.
Preferably, the wire mesh is made of metal aluminum, the diameter of the particles formed by the first brick layer and the positioning brick frame layer is 0.3-0.5mm, the diameter of the particles formed by the second brick layer is 0.7-1.1mm, and the diameter of the particles formed by the third brick layer is 3-5 mm.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a setting up the brick body that permeates water, the hole of permeating water, first constant head tank, the second locating piece, first locating piece, the second constant head tank, wire mesh, location brick frame layer, first brick layer, the cooperation on third brick layer and second brick layer is used, the brick intensity that permeates water that has solved current partial sponge city usefulness is low, the location effect is poor and the poor problem of effect of permeating water, this brick that permeates water that sponge city was used, it is high to possess intensity, the location is effectual and permeate water effectual advantage, be worth promoting.
2. The utility model is provided with the first brick layer, the second brick layer and the third brick layer, the density of the first brick layer, the second brick layer and the third brick layer is gradually increased, which is helpful for the efficiency of drainage, the strength of the permeable brick body is enhanced by arranging the metal wire mesh, and by arranging the positioning brick frame layer, when the permeable brick body is installed, the positioning brick frame layer and the ground concrete sand layer can be used for positioning, meanwhile, a gap is formed between the third brick layer and the ground, which is helpful for drainage, and the drainage efficiency of the permeable brick body is increased by arranging the permeable holes, the first positioning block is convenient to be assembled with the first positioning groove on the adjacent permeable brick body, the stability in connection is increased, through setting up the second locating piece, the second constant head tank equipment together on convenient and the adjacent brick body that permeates water increases the stability when connecting, avoids permeating water the brick body and trampling the phenomenon of rocking at will down.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a front view of the wire mesh of the present invention;
fig. 3 is a bottom view of the partial structure of the present invention;
fig. 4 is a front view of the positioning brick frame layer of the present invention.
In the figure: 1 brick body, 2 holes of permeating water, 3 first constant head tank, 4 second locating pieces, 5 first locating pieces, 6 second constant head tanks, 7 wire mesh, 8 location brick frame layers, 9 first brick layers, 10 third brick layers, 11 second brick layers permeate water.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to be referred must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "provided", "connected", and the like are to be construed broadly, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The utility model provides a brick body 1 permeates water, the hole 2 permeates water, first constant head tank 3, second locating piece 4, first locating piece 5, second constant head tank 6, wire mesh 7, location brick frame layer 8, first brick layer 9, third brick layer 10 and parts such as second brick layer 11 are the general standard or the parts that technical personnel in the field know, and its structure and principle all can learn through technical manual or learn through conventional experimental method for technical personnel in the field.
Referring to fig. 1-4, a water permeable brick for a sponge city comprises a water permeable brick body 1, a water permeable hole 2 is formed in the front side of the water permeable brick body 1, the water permeable brick body 1 comprises a first brick layer 9, a second brick layer 11 is fixedly connected to the rear side of the first brick layer 9, a wire mesh 7 is fixedly connected to the rear side of the second brick layer 11, a third brick layer 10 is fixedly connected to the rear side of the wire mesh 7, a positioning brick frame layer 8 is fixedly connected to the rear side of the third brick layer 10, first positioning blocks 5 are fixedly connected to both sides of the top of the second brick layer 11, first positioning grooves 3 matched with the first positioning blocks 5 are formed in both sides of the bottom of the second brick layer 11, a second positioning groove 6 is formed in the left side of the second brick layer 11, and a second positioning block 4 is fixedly connected to the right side of the second brick layer 11;
the number of the water permeable holes 2 is a plurality of, and the water permeable holes are uniformly distributed on the surface of the water permeable brick body 1, the first brick layer 9 and the positioning brick frame layer 8 are made of the same material, the first positioning block 5 and the second positioning block 4 are made of the same material as the second brick layer 11, the first positioning block 5 and the second positioning block 4 are both trapezoidal, the second positioning block 4 and the second positioning groove 6 are matched for use, the wire mesh 7 is made of metal aluminum, the diameter of the particle formed by the first brick layer 9 and the positioning brick frame layer 8 is 0.3-0.5mm, the diameter of the particle formed by the second brick layer 11 is 0.7-1.1mm, and the diameter of the particle formed by the third brick layer 10 is 3-5 mm;
when in use, the density of the first brick layer 9, the second brick layer 11 and the third brick layer 10 is gradually increased by arranging the first brick layer 9, the second brick layer 11 and the third brick layer 10, so that the efficiency of draining is facilitated, the strength of the water permeable brick body 1 is increased by arranging the metal wire mesh 7, the water permeable brick body 1 can be positioned by using the positioning brick frame layer 8 and a ground concrete sand layer when being installed by arranging the positioning brick frame layer 8, meanwhile, the third brick layer 10 and the ground are separated by a gap to facilitate draining, the water draining efficiency of the water permeable brick body 1 is increased by arranging the water permeable hole 2, the water permeable brick body 1 is conveniently assembled with the first positioning groove 3 on the adjacent water permeable brick body 1 by arranging the first positioning block 5, the stability during connection is increased, and the water permeable brick body is conveniently assembled with the second positioning groove 6 on the adjacent water permeable brick body 1 by arranging the second positioning block 4, stability when increasing the connection avoids permeating water brick body 1 and tramples the phenomenon of rocking at will down.
In summary, the following steps: this brick that permeates water of sponge city usefulness, through setting up brick body 1 that permeates water, permeate water hole 2, first constant head tank 3, second locating piece 4, first locating piece 5, second constant head tank 6, woven wire 7, location brick frame layer 8, first brick layer 9, third brick layer 10 and the cooperation of second brick layer 11 and use, solved the brick intensity that permeates water that current partial sponge city was used low, the location effect is poor and the poor problem of effect that permeates water.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. The utility model provides a brick that permeates water that sponge city was used, includes brick body (1) that permeates water, its characterized in that: the front side of the water permeable brick body (1) is provided with a water permeable hole (2), the water permeable brick body (1) comprises a first brick layer (9), the rear side of the first brick layer (9) is fixedly connected with a second brick layer (11), the rear side of the second brick layer (11) is fixedly connected with a wire mesh (7), the rear side of the wire mesh (7) is fixedly connected with a third brick layer (10), the rear side of the third brick layer (10) is fixedly connected with a positioning brick frame layer (8), the two sides of the top of the second brick layer (11) are fixedly connected with first positioning blocks (5), both sides of the bottom of the second brick layer (11) are provided with first positioning grooves (3) matched with the first positioning blocks (5), and a second positioning groove (6) is formed in the left side of the second brick layer (11), and a second positioning block (4) is fixedly connected to the right side of the second brick layer (11).
2. The water permeable brick for the sponge city according to claim 1, which is characterized in that: the number of the water permeable holes (2) is a plurality of, and the water permeable holes are uniformly distributed on the surface of the water permeable brick body (1).
3. The water permeable brick for the sponge city according to claim 1, which is characterized in that: the first brick layer (9) is made of the same material as the positioning brick frame layer (8), and the first positioning block (5) and the second positioning block (4) are made of the same material as the second brick layer (11).
4. The water permeable brick for the sponge city according to claim 1, which is characterized in that: the first positioning block (5) and the second positioning block (4) are both trapezoidal, and the second positioning block (4) is matched with the second positioning groove (6) for use.
5. The water permeable brick for the sponge city according to claim 1, which is characterized in that: the wire mesh (7) is made of metal aluminum, the diameter of particles formed by the first brick layer (9) and the positioning brick frame layer (8) is 0.3-0.5mm, the diameter of particles formed by the second brick layer (11) is 0.7-1.1mm, and the diameter of particles formed by the third brick layer (10) is 3-5 mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921492105.8U CN211227919U (en) | 2019-09-09 | 2019-09-09 | Water permeable brick for sponge city |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921492105.8U CN211227919U (en) | 2019-09-09 | 2019-09-09 | Water permeable brick for sponge city |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211227919U true CN211227919U (en) | 2020-08-11 |
Family
ID=71918655
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921492105.8U Active CN211227919U (en) | 2019-09-09 | 2019-09-09 | Water permeable brick for sponge city |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211227919U (en) |
-
2019
- 2019-09-09 CN CN201921492105.8U patent/CN211227919U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211227919U (en) | Water permeable brick for sponge city | |
CN211057539U (en) | A road surface penetrant unit for sponge city construction | |
CN210085961U (en) | Porous concrete water-permeable floor tile | |
CN116024860A (en) | Tensile water permeability concrete pavement structure for repairing | |
CN207277511U (en) | A kind of mouth of a river double-edged fine-toothed comb | |
CN207846119U (en) | A kind of water-permeable brick | |
CN210737276U (en) | Antiskid type brick that permeates water convenient to firm installation | |
CN211596830U (en) | Embedded anti-retaining wall of straining structure | |
CN205917552U (en) | Stone material bed charge brick that permeates water | |
CN212000422U (en) | Prevent subsiding highway subgrade | |
CN210597679U (en) | Glass fiber cloth rock wool board | |
CN209602919U (en) | The porous pavement of Double-layer water-filtering under a kind of sponge city | |
CN213625042U (en) | Sponge urban road brick that permeates water | |
CN218291479U (en) | Antiskid brick that permeates water | |
CN218116006U (en) | Antiskid sand-based water permeable brick | |
CN218292045U (en) | Concrete cover plate with good water permeability | |
CN215104360U (en) | Brick permeates water convenient to drainage | |
CN217231326U (en) | Assembled and combined water-permeable floor tile | |
CN218233010U (en) | Comb tooth type water permeable brick | |
CN214116151U (en) | Sponge city is laid with sintering brick that permeates water | |
CN216378996U (en) | Water permeable brick for sponge city and road | |
CN218322191U (en) | Pavement paving is with environmental protection brick that permeates water | |
CN220767581U (en) | Phosphogypsum water permeable brick and pavement structure | |
CN218233008U (en) | Garden road paving structure | |
CN214062243U (en) | Multilayer environmental protection terrace that permeates water |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |