CN211223411U - Improved structure of mining ropeway rope clip - Google Patents

Improved structure of mining ropeway rope clip Download PDF

Info

Publication number
CN211223411U
CN211223411U CN201922388713.0U CN201922388713U CN211223411U CN 211223411 U CN211223411 U CN 211223411U CN 201922388713 U CN201922388713 U CN 201922388713U CN 211223411 U CN211223411 U CN 211223411U
Authority
CN
China
Prior art keywords
rope
main
auxiliary
clamp body
arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922388713.0U
Other languages
Chinese (zh)
Inventor
何盛
刘云
杨徐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Plateau Huanyu Mining Machinery Manufacturing Co ltd
Original Assignee
Guiyang Plateau Huanyu Mining Machinery Manufacturing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Plateau Huanyu Mining Machinery Manufacturing Co ltd filed Critical Guiyang Plateau Huanyu Mining Machinery Manufacturing Co ltd
Priority to CN201922388713.0U priority Critical patent/CN211223411U/en
Application granted granted Critical
Publication of CN211223411U publication Critical patent/CN211223411U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Clamps And Clips (AREA)

Abstract

The utility model discloses a mining cableway rope clip improves structure aims at providing one kind and embraces that the power degree of a rope is big, the good reliability, and pick up and hang convenient operation's rope clip. Comprises a clamp body and a hanging chair connecting rod which are positioned on a body; the body consists of an installation sleeve (6) and a connecting block (12), and the clamp body consists of a main clamp body and an auxiliary clamp body; the main clamp body consists of a lining (5), a main clamp arm (2) and a rope holding part (1), the back of the rope holding part is provided with a main clamp opening, and the surface of the main clamp arm (2) is provided with a sliding groove (2-1); the auxiliary clamp body consists of an auxiliary clamp arm (3) and a rope clamping part (13), and an auxiliary clamp jaw is arranged on the surface of the rope clamping part; the auxiliary clamp arm (3) is connected with a mandril (7) in the bushing (5), and the right end is connected with a chair-lift connecting rod (11) on the connecting block (12) in a floating way. The utility model discloses safe and reliable can satisfy the mining cableway operation requirement of heavy grade, is the improvement structure of a rope clip.

Description

Improved structure of mining ropeway rope clip
Technical Field
The utility model relates to a mining ropeway rope clip especially relates to a mining ropeway rope clip improves structure, belongs to mining machinery.
Background
The mine ropeway rope clip is a clamping device fixed on a cable rope, and can convey personnel to enter and exit a mine through the movement of a ropeway.
At present, the widely used detachable rope clip is generally composed of a body, a clamp body for clamping a rope, and a swing rod for connecting a hanging chair. The clamp body of the traditional structure is unreasonable in design and has the following defects:
1) the main clamp body sliding groove is unreasonable in design and poor in guiding performance, so that the main clamp opening and the auxiliary clamp opening are prone to dislocation, and the cable holding force is reduced.
2) After the cable-holding clamp is used for a period of time, the main clamp body is easy to loosen and rotate, so that the main clamp opening and the auxiliary clamp opening are easy to stagger, and the cable-holding strength is reduced.
3) The friction force of the rope holding jaw is small, the slip phenomenon easily occurs when the rope holding jaw passes through a large-gradient (35 degrees) road section, and the large potential safety hazard exists.
4) The rope embracing jaw has no guide structure, and the operation of removing and hanging the rope embracing device is relatively troublesome.
Disclosure of Invention
In order to overcome the above-mentioned defect that exists among the prior art, the utility model aims at providing a mining cableway rope clip improves structure that the power degree of embracing is big, good reliability, and pick up and hang convenient operation.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the lifting chair comprises a clamp body positioned on a body and a hanging chair connecting rod connected with the body; the body is composed of a connecting block fixedly connected with the mounting sleeve into a whole, and the clamp body is composed of a main clamp body and an auxiliary clamp body; the main plier body consists of a lining fixed in the mounting sleeve, a main plier arm connected with the left end of the lining into a whole and a rope holding part connected with the right end of the main plier arm into a whole, wherein the back surface of the rope holding part is provided with a C-shaped main plier mouth with an inward opening, and the surface of the main plier arm is provided with a chute in an inverted convex shape; the auxiliary clamp body consists of an auxiliary clamp arm which is arranged in the sliding groove and matched with the sliding groove and a rope clamping part which is connected with the left end of the auxiliary clamp arm into a whole, and the surface of the rope clamping part is provided with a C-shaped auxiliary clamp opening with an outward opening; the right end of the auxiliary clamp arm is connected with a push rod in the bush through internal threads, and the right end of the push rod extends out of the bush to be connected with a hanging chair hinged on the connecting block in a floating mode.
Two sides of the rope holding part are provided with guide wings which are fixedly connected with the rope holding part into a whole; anti-skid teeth are distributed on the surfaces of the main jaw and the auxiliary jaw; an anti-rotation plane is arranged on the bushing, and a stop block matched with the anti-rotation plane is fixed at the left end of the mounting sleeve.
Compared with the prior art, the utility model discloses adopted above-mentioned technical scheme on traditional structure's basis, consequently had following advantage:
1) the main plier body sliding groove adopts an inverted convex structure, and the auxiliary plier body adopts a T-shaped structure matched with the sliding groove, so that the guiding precision of the auxiliary plier body in the sliding groove can be effectively improved, and the defect that the main plier mouth and the auxiliary plier mouth are easy to misplace is overcome.
2) The main plier body is provided with a plane for preventing rotation, and the body is provided with a stop block, so that the main plier body can not rotate even if the main plier body is slightly loosened, and the defect that the main plier mouth and the auxiliary plier mouth are easy to stagger is overcome.
3) The anti-skid teeth which are vertically distributed are arranged on the arc surfaces of the main jaw and the auxiliary jaw, so that the friction force between the anti-skid teeth and the cable is increased, and the use requirement of a large-gradient road section can be completely met.
4) The two sides of the rope holding part are provided with the guide wings which are fixedly connected with the rope holding part into a whole, so that the rope clip is convenient and quick to pick up or hang.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
FIG. 2 is a cross-sectional view A-A of FIG. 1;
FIG. 3 is a schematic structural view of the main clamp body of the present invention;
FIG. 4 is a top view of FIG. 3;
FIG. 5 is a cross-sectional view B-B of FIG. 3;
FIG. 6 is a schematic structural view of the auxiliary clamp body of the present invention;
FIG. 7 is a top view of FIG. 6;
FIG. 8 is a left side view of FIG. 6;
fig. 9 is a schematic structural view of the anti-slip tooth of the present invention.
In the figure: the rope clamping device comprises a rope clamping part 1, a guide wing 1-1, a main clamp arm 2, a sliding groove 2-1, an auxiliary clamp arm 3, a stop block 4, a lining 5, a mounting sleeve 6, a mandril 7, a nut 8, a sliding pin 9, a pin shaft 10, a hanging chair connecting rod 11, a connecting block 12, a rope clamping part 13, a cable 14 and an anti-skidding tooth 15.
Detailed Description
The invention will be further described with reference to the following drawings and specific examples:
as shown in fig. 1 to 9, the main body is composed of a connecting block 12 fixedly connected with the mounting sleeve 6 into a whole, and the forceps body is composed of a main forceps body and an auxiliary forceps body. The main clamp body consists of a bushing 5 which is positioned in an installation sleeve 6 and locked by a nut 8, a main clamp arm 2 which is welded and connected with the left end of the bushing into a whole, and a rope holding part 1 which is connected with the right end of the main clamp arm into a whole; the back (right side) of the rope holding part is provided with a main jaw (not marked in the figure) with an inward opening (rightward) C-shaped structure, and the surface of the main jaw arm 2 is provided with a chute 2-1 which is communicated up and down and is in an inverted convex structure. The auxiliary clamp body consists of an auxiliary clamp arm 3 which is arranged in the chute 2-1 and is in a T-shaped structure and a rope clamping part 13 which is connected with the left end of the auxiliary clamp arm into a whole; the auxiliary clamp arm 3 is matched with the sliding groove 2-1, and the surface of the rope clamping part 13 is provided with a C-shaped auxiliary jaw with an outward (leftward) opening.
The right end of the auxiliary tong arm 3 is connected with a mandril 7 positioned in the bushing 5 through internal threads, and the right end of the mandril extends out of the bushing 5; a slide pin 9 is fixed at the right end of the top bar 7 and is connected with a waist groove (not shown) arranged on a chair lift connecting rod 11 in a sliding way. The chair lift connecting rod 11 is hinged with the connecting block 12 through a pin shaft 10.
In order to facilitate picking and hanging the rope clip, two sides of the rope clipping part 1 are provided with guide wings 1-1 which are fixedly connected with the rope clipping part into a whole, and the guide wings and the rope clipping part 1 form a spindle-shaped structure together.
In order to increase the gripping friction to the cable 14, a plurality of anti-slip teeth 15 are vertically distributed on the arc-shaped surface of the main jaw and the arc-shaped surface of the auxiliary jaw.
In order to prevent the bush 5 from rotating, on the top of the bush there is a spot-faced anti-rotation plane (not shown in the figures); the left end of the mounting sleeve 6 is provided with a stop block 4 matched with the anti-rotation plane.

Claims (5)

1. An improved structure of a mining ropeway rope clip comprises a clamp body positioned on a body and a hanging chair connecting rod connected with the body; the method is characterized in that: the body is composed of a connecting block (12) fixedly connected with the mounting sleeve (6) into a whole, and the clamp body is composed of a main clamp body and an auxiliary clamp body; the main plier body consists of a lining (5) fixed in an installation sleeve (6), a main plier arm (2) connected with the left end of the lining into a whole and a rope holding part (1) connected with the right end of the main plier arm into a whole, wherein the back surface of the rope holding part is provided with a C-shaped main plier mouth with an inward opening, and the surface of the main plier arm (2) is provided with an inverted convex chute (2-1); the auxiliary clamp body consists of an auxiliary clamp arm (3) which is positioned in the sliding groove (2-1) and is matched with the sliding groove and a rope clamping part (13) which is connected with the left end of the auxiliary clamp arm into a whole, and the surface of the rope clamping part is provided with a C-shaped auxiliary jaw with an outward opening; the right end of the auxiliary clamp arm (3) is connected with a mandril (7) positioned in the bushing (5) through internal threads, and the right end of the mandril extends out of the bushing (5) and is in floating connection with a chair-lift connecting rod (11) hinged on the connecting block (12).
2. The improved structure of the mining ropeway rope clip according to claim 1, characterized in that: two sides of the rope holding part (1) are provided with guide wings (1-1) which are fixedly connected with the rope holding part into a whole.
3. The improved structure of the mining ropeway rope clip according to claim 1 or 2, characterized in that: anti-skid teeth (15) are vertically distributed on the surfaces of the main jaw and the auxiliary jaw.
4. The improved structure of the mining ropeway rope clip according to claim 1 or 2, characterized in that: an anti-rotation plane is arranged on the bushing (5), and a stop block (4) matched with the anti-rotation plane is arranged at the left end of the mounting sleeve (6).
5. The improved structure of the mining ropeway rope clip according to claim 3, characterized in that: an anti-rotation plane is arranged on the bushing (5), and a stop block (4) matched with the anti-rotation plane is arranged at the left end of the mounting sleeve (6).
CN201922388713.0U 2019-12-26 2019-12-26 Improved structure of mining ropeway rope clip Active CN211223411U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922388713.0U CN211223411U (en) 2019-12-26 2019-12-26 Improved structure of mining ropeway rope clip

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922388713.0U CN211223411U (en) 2019-12-26 2019-12-26 Improved structure of mining ropeway rope clip

Publications (1)

Publication Number Publication Date
CN211223411U true CN211223411U (en) 2020-08-11

Family

ID=71939422

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922388713.0U Active CN211223411U (en) 2019-12-26 2019-12-26 Improved structure of mining ropeway rope clip

Country Status (1)

Country Link
CN (1) CN211223411U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113997957A (en) * 2021-10-22 2022-02-01 北京起重运输机械设计研究院有限公司 Unhooking rope clip with broken shaft protection device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113997957A (en) * 2021-10-22 2022-02-01 北京起重运输机械设计研究院有限公司 Unhooking rope clip with broken shaft protection device

Similar Documents

Publication Publication Date Title
CN211223411U (en) Improved structure of mining ropeway rope clip
CN104836160B (en) A kind of transmission circuit insulator string maintenance transmission coaster
CN110700772A (en) Portable drilling tool hydraulic tong
CN203008822U (en) Multifunctional power tongs
CN205714036U (en) Underground work lower oil tube ground carries assembly pulley
CN202465077U (en) Novel rail clamping device
CN211081759U (en) Portable drilling tool hydraulic tong
CN211871094U (en) Locking device for traction-free elevator mounting platform
CN203855307U (en) Clamping tool for hoisting electric pole
CN208684236U (en) A kind of safe crampon
CN209210216U (en) A kind of clipping hoisting steel plate tool
CN112726526A (en) Mechanical automatic beam grabbing device and using method thereof
CN204702355U (en) A kind of for machine-roomless lift Quick rescue rope fixture
CN201338891Y (en) Progressive safety device
CN214570034U (en) Manual clamping hanger tool
CN212022622U (en) Novel cable jib is embraced to mining monkey car
CN212447583U (en) Full-automatic coal mine car picking and hanging pin chain device
CN205801121U (en) Auto-coupling between gurmy tunnel electric locomotive and vehicle
CN214141496U (en) Light hydraulic chain tightening device
CN215249068U (en) Intelligent crane based on Internet of things
CN204736870U (en) Parking lot automatic unhooking device under sub -inclined shaft
CN212955396U (en) Hanger for anodic oxidation of aluminum oxide
CN217172971U (en) Unhooking-proof lifting hook
CN205527326U (en) Can loosen fast hook high altitude construction with breaking out
CN212150435U (en) High-strength belt carrier roller hanging device for underground excavation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant