CN211219265U - Building component welding device capable of being cooled rapidly - Google Patents

Building component welding device capable of being cooled rapidly Download PDF

Info

Publication number
CN211219265U
CN211219265U CN201921618764.1U CN201921618764U CN211219265U CN 211219265 U CN211219265 U CN 211219265U CN 201921618764 U CN201921618764 U CN 201921618764U CN 211219265 U CN211219265 U CN 211219265U
Authority
CN
China
Prior art keywords
box body
water
nut
box
welding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921618764.1U
Other languages
Chinese (zh)
Inventor
麦明宝
温雄展
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921618764.1U priority Critical patent/CN211219265U/en
Application granted granted Critical
Publication of CN211219265U publication Critical patent/CN211219265U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a but quick refrigerated building element welding set, including box and operation panel, fixed surface installs electric putter under the inside of box, electric putter's top fixed mounting has the operation panel, fixed surface installs the backup pad on the left of the rear surface of box, the last fixed surface of backup pad installs the motor, the output shaft of motor and the rear end fixed connection of lead screw. This but quick refrigerated building component welding set, electric putter through setting up can make welding seam bottom and the water contact among the work piece welding process, thereby can carry out certain heat dissipation with regard to the welding seam in welding process, through the lead screw nut who sets up, can drive the water jet equipment back-and-forth movement, through the water jet equipment who sets up, can make the work piece welding accomplish the back and carry out the cooling of circulated water spray to the welding seam, whole device can realize the quick cooling of welding seam, the cooling time is reduced, the effect of work efficiency is improved.

Description

Building component welding device capable of being cooled rapidly
Technical Field
The utility model relates to the field of welding technique, specifically be a but quick refrigerated building element welding set.
Background
Welding, also known as fusion, welding, is a manufacturing process and technique for joining metals or other thermoplastic materials, such as plastics, in a heated, high temperature or high pressure manner. Most of the existing welding devices do not have a quick cooling function, welded components need to be cooled slowly in the air, the cooling time is long, deformation is increased, and the working efficiency is reduced to a certain extent.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a but quick refrigerated building element welding set to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a building component welding device capable of being cooled rapidly comprises a box body and an operation table, wherein an electric push rod is fixedly mounted on the lower surface inside the box body, the operation table is fixedly mounted at the top end of the electric push rod, a supporting plate is fixedly mounted on the left side of the rear surface of the box body, a motor is fixedly mounted on the upper surface of the supporting plate, an output shaft of the motor is fixedly connected with the rear end of a lead screw, the front end of the lead screw penetrates through the rear surface of the box body to be sleeved with the front surface inside the box body, a nut is connected to the lead screw in a threaded mode, an L-shaped supporting rod is fixedly mounted on the upper surface of the nut, a water spraying device is fixedly mounted on the right surface of the nut, a water outlet is formed in the position;
the left and right sides in the middle of the operation panel upper surface has all seted up the T-slot, two equal sliding connection has T shape slider in the T-slot, the top fixedly connected with L shape mount of T shape slider, the upper surface threaded connection of L shape mount has the clamping bar, fixedly connected with handle and conical disk are distinguished to the top and the bottom of clamping bar, the rectangular channel has been seted up to the fore-and-aft direction in the middle of the operation panel upper surface, the upper surface swing joint of operation panel has work piece one and work piece two.
Preferably, the electric push rods are symmetrically arranged at the front, the back and the left and the right of the lower surface of the inner part of the box body, and the total number of the electric push rods is four.
Preferably, the nut is a cuboid, and the left surface of the nut is connected with the left surface inside the box body.
Preferably, water jet equipment includes water pump, water pipe one, water pipe two and shower nozzle, and water pump fixed mounting is on the right surface of nut, and the input fixedly connected with water pipe one of water pump, and water pipe one extends to the inside lower surface of box, and the output fixedly connected with water pipe two of water pump, and water pipe two passes through the rope to be fixed on L shape bracing piece, the play water end fixedly connected with shower nozzle of water pipe two.
Preferably, the control box is electrically connected with three control buttons, and the three control buttons are respectively electrically connected with the electric push rod, the motor and the water pump.
Preferably, the interior of the box body is filled with cold water, and the height of the cold water is 3/4 of the height of the inner wall of the box body.
Compared with the prior art, the beneficial effects of the utility model are that: this but quick refrigerated building component welding set, electric putter through setting up can make welding seam bottom and the water contact among the work piece welding process, thereby can carry out certain heat dissipation with regard to the welding seam in welding process, through the lead screw nut who sets up, can drive the water jet equipment back-and-forth movement, through the water jet equipment who sets up, can make the work piece welding accomplish the back and carry out the cooling of circulated water spray to the welding seam, whole device can realize the quick cooling of welding seam, the cooling time is reduced, the effect of work efficiency is improved.
Drawings
Fig. 1 is a schematic view of the front cross-sectional structure of the present invention;
FIG. 2 is a schematic top view of the present invention;
FIG. 3 is a left side view of the structure of the present invention;
fig. 4 is a schematic view of the front view structure of the water spraying device of the present invention.
In the figure: the automatic water spraying device comprises a box body 1, an electric push rod 2, an operation table 3, a supporting plate 4, a motor 5, a lead screw 6, a nut 7, an 8L-shaped supporting rod, a water spraying device 9, a 91 water pump, a 92 water pipe I, a 93 water pipe II, a 94 spray head, a 10 rope, a 11 water outlet, a 12 control box, a 13T-shaped groove, a 14T-shaped sliding block, a 15L-shaped fixing frame, a 16 clamping rod, a 17 handle, an 18 conical disc, a 19 rectangular groove, a 20 workpiece I and a 21 workpiece II.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a but quick refrigerated building component welding set, including box 1 and operation panel 3, box 1 through setting up can be used for installing electric putter 2 and water jet equipment 9, provide the cooling environment for the welding seam, box 1 is inside to be equipped with cold water, and the height of cold water is 3/4 of box 1 inner wall height, box 1's inside lower surface fixed mounting has electric putter 2, can realize reciprocating of operation panel 3 through electric putter 2 that sets up, thereby can make the welding seam soak the aquatic and cool off, can also release the work piece one 20 and the work piece two 21 that have cooled off from the aquatic, and electric putter 2 has water-proof effects, electric putter 2 is arranged at box 1 inside lower surface bilateral symmetry all around, totally four. An operation table 3 is fixedly arranged at the top end of the electric push rod 2, a first workpiece 20 and a second workpiece 21 are supported and fixed through the arranged operation table 3, a supporting plate 4 is fixedly arranged on the left side of the rear surface of the box body 1, the motor 5 is fixedly arranged through the arranged support plate 4, the motor 5 is fixedly arranged on the upper surface of the support plate 4, the motor 5 is arranged to provide power for the rotation of the screw rod 6, the output shaft of the motor 5 is fixedly connected with the rear end of the screw rod 6, the front end of the screw rod 6 penetrates through the rear surface of the box body 1 to be sleeved with the inner front surface of the box body 1, the screw rod 6 can drive the nut 7 to move back and forth, thereby make water jet equipment 9 circulate the water spray above the welding seam, make the welding seam cool off fast, threaded connection has nut 7 on the lead screw 6, nut 7 is the cuboid, and the left surface of nut 7 meets with the left surface of box 1 inside. The last fixed surface of nut 7 installs L shape bracing piece 8, L shape bracing piece 8 through setting up can fix water pipe two 93, make shower nozzle 94 be in the top of welding seam, the right fixed surface of nut 7 installs water jet equipment 9, water in can box 1 is taken out through the water jet equipment 9 that sets up, make the welding seam cool off fast, water jet equipment 9 includes water pump 91, water pipe one 92, water pipe two 93 and shower nozzle 94, water pump 91 fixed mounting is on the right surface of nut 7, water pump 91's input fixedly connected with water pipe one 92, and water pipe one 92 extends to the inside lower surface of box 1, water pump 91's output end fixedly connected with water pipe two 93, and water pipe two 93 fixes on L shape bracing piece 8 through rope 10, the play water end fixedly connected with shower nozzle 94 of water pipe two 93. The water outlet 11 is arranged on the lower portion of the right surface of the box body 1, the control box 12 is electrically connected to the left surface of the box body 1, the control box 12 can be used for controlling the work of the electric push rod 2, the motor 5 and the water pump 91, three control buttons are electrically connected to the control box 12, and the three control buttons are respectively electrically connected with the electric push rod 2, the motor 5 and the water pump 91.
The left side and the right side of the middle of the upper surface of the operating platform 3 are both provided with T-shaped grooves 13, T-shaped sliding blocks 14 are connected in the two T-shaped grooves 13 in a sliding way, the T-shaped grooves 13 and the T-shaped sliding blocks 14 can be freely adjusted, thereby adapting to workpieces with different sizes, the top end of the T-shaped sliding block 14 is fixedly connected with an L-shaped fixed frame 15, the upper surface of the L-shaped fixed frame 15 is connected with a clamping rod 16 by screw thread, the top end and the bottom end of the clamping rod 16 are respectively and fixedly connected with a handle 17 and a conical disc 18, the workpiece to be welded can be fixed on the upper surface of the operating platform 3 through the arranged clamping rod 16, the handle 17 and the conical disc 18, a rectangular groove 19 is arranged in the front-back direction of the middle of the upper surface of the operating platform 3, the rectangular groove 19 can make the water in the box body 1 flow into the bottom end of the welding seam, thereby performing heat dissipation and cooling, and the first workpiece 20 and the second workpiece 21 are movably connected to the upper surface of the operation table 3.
The working principle is as follows: when a workpiece needs to be welded, a button in a control box 12 is pressed down, an electric push rod 2 pushes an operation table 3 out of a box body 1, a T-shaped sliding block 14 is adjusted to a proper position in a T-shaped groove 13, a first workpiece 20 and a second workpiece 21 needing to be welded are placed on the operation table 3, a handle 17 is instantaneously rotated by a needle, a clamping rod 16 on an L-shaped fixing frame 15 drives a conical disc 18 to move downwards, the first workpiece 20 and the second workpiece 21 are fixed on the operation table 3, then the button is pressed down, the electric push rod 2 moves downwards, when the lower surfaces of the first workpiece 20 and the second workpiece 21 are immersed in water, the electric push rod 2 stops moving downwards, then a welder welds the first workpiece 20 and the second workpiece 21, because the lower surfaces of the first workpiece 20 and the second workpiece 21 are in the water, certain heat dissipation can be carried out on a seam in the welding process, after the welding is completed, the electric push rod 2 continuously moves downwards, the first workpiece 20 and the second workpiece 21 are completely immersed in water, the motor 5 is controlled through the control box 12 to drive the screw rod 6 to rotate, the nut 7 drives the water spraying device 9 to move back and forth, water in the box body 1 is pumped out through the water pump 91, circulating water spraying is conducted above a welding seam, the welding seam is rapidly cooled, after cooling is finished, the workbench is pushed out of the box body 1 through the electric push rod 2, the handle 17 is rotated anticlockwise, and the first workpiece 20 and the second workpiece 21 are taken down from the operating platform 3.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. A building component welding device capable of cooling rapidly comprises a box body (1) and an operation table (3), and is characterized in that: an electric push rod (2) is fixedly arranged on the lower surface in the box body (1), an operating platform (3) is fixedly arranged at the top end of the electric push rod (2), a supporting plate (4) is fixedly arranged on the left side of the rear surface of the box body (1), a motor (5) is fixedly arranged on the upper surface of the supporting plate (4), an output shaft of the motor (5) is fixedly connected with the rear end of the lead screw (6), the front end of the lead screw (6) penetrates through the rear surface of the box body (1) to be sleeved with the front surface inside the box body (1), a nut (7) is connected on the screw rod (6) in a threaded manner, an L-shaped support rod (8) is fixedly arranged on the upper surface of the nut (7), a water spraying device (9) is fixedly installed on the right surface of the nut (7), a water outlet (11) is formed in the position, close to the lower position, of the right surface of the box body (1), and the left outer surface of the box body (1) is electrically connected with a control box (12);
t-shaped groove (13), two have all been seted up to the left and right sides in the middle of operation panel (3) upper surface equal sliding connection has T shape slider (14) in T shape groove (13), the top fixedly connected with L shape mount (15) of T shape slider (14), the upper surface threaded connection of L shape mount (15) has clamping bar (16), the top and the bottom of clamping bar (16) are fixedly connected with handle (17) and conical disk (18) respectively, rectangular channel (19) have been seted up to the fore-and-aft direction in the middle of operation panel (3) upper surface, the upper surface swing joint of operation panel (3) has work piece (20) and work piece two (21).
2. A rapid-coolable construction element welding apparatus according to claim 1, wherein: the electric push rods (2) are symmetrically arranged at the front, the back and the left and the right of the lower surface in the box body (1), and the total number is four.
3. A rapid-coolable construction element welding apparatus according to claim 1, wherein: the nut (7) is a cuboid, and the left surface of the nut (7) is connected with the left surface inside the box body (1).
4. A rapid-coolable construction element welding apparatus according to claim 1, wherein: water jet equipment (9) includes water pump (91), water pipe one (92), water pipe two (93) and shower nozzle (94), water pump (91) fixed mounting is on the right surface of nut (7), the input fixedly connected with water pipe one (92) of water pump (91), and water pipe one (92) extend to the inside lower surface of box (1), the output fixedly connected with water pipe two (93) of water pump (91), and water pipe two (93) are fixed on L shape bracing piece (8) through rope (10), the play water outlet end fixedly connected with shower nozzle (94) of water pipe two (93).
5. A rapid-coolable construction element welding apparatus according to claim 1, wherein: the control box (12) is electrically connected with three control buttons, and the three control buttons are respectively electrically connected with the electric push rod (2), the motor (5) and the water pump (91).
6. A rapid-coolable construction element welding apparatus according to claim 1, wherein: the cold water is filled in the box body (1), and the height of the cold water is 3/4 of the height of the inner wall of the box body (1).
CN201921618764.1U 2019-09-26 2019-09-26 Building component welding device capable of being cooled rapidly Active CN211219265U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921618764.1U CN211219265U (en) 2019-09-26 2019-09-26 Building component welding device capable of being cooled rapidly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921618764.1U CN211219265U (en) 2019-09-26 2019-09-26 Building component welding device capable of being cooled rapidly

Publications (1)

Publication Number Publication Date
CN211219265U true CN211219265U (en) 2020-08-11

Family

ID=71930398

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921618764.1U Active CN211219265U (en) 2019-09-26 2019-09-26 Building component welding device capable of being cooled rapidly

Country Status (1)

Country Link
CN (1) CN211219265U (en)

Similar Documents

Publication Publication Date Title
CN209919115U (en) Laser cutting machine for producing laser optical lens
CN219026420U (en) Lifting type gantry welding robot
CN217513127U (en) Welding device capable of preventing welding surface deformation for production of anti-theft door
CN211219265U (en) Building component welding device capable of being cooled rapidly
CN205764319U (en) Low temperature solder joint automatic welding device
CN215468929U (en) Switching piece cutting machine capable of rapidly dissipating heat
CN207523034U (en) A kind of furniture 3D printer for increasing and decreasing material Compound Machining
CN210359815U (en) Adjustable facula swing soldered connection
CN217193460U (en) Electronic welding operation platform
CN215880318U (en) Welding station fast switching tool for robot laser welding equipment
CN215091488U (en) Special equipment for multipoint welding of glass back plate
CN115194277A (en) Automatic welding machine for circuit board components and use method thereof
CN220902492U (en) Automatic grinding machanism of laser welding
CN211589673U (en) Burnishing device is used in glass processing
CN211029225U (en) Cooling circulation sheet metal machining equipment
CN113857944A (en) Automatic numerical control machining equipment applied to mechanical guide wheel production
CN217166918U (en) Double-end welding machine with cooling function
CN213104999U (en) Cutting device for numerical control lathe
CN212217503U (en) Steel construction welding cooling arrangement
CN215551085U (en) Deburring device for vulcanization repair of flexible wire core insulating layer
CN219164830U (en) Partition heating structure of BGA repair bench
CN220073560U (en) High-efficient duplex position intelligence laser welding machine
CN217493105U (en) Automatic welding jig of laser
CN212949232U (en) High-efficient joint strip hot melt welding equipment
CN217529708U (en) Reflow soldering head structure with overheating protection structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant