CN211199947U - Water-permeable floor tile for sponge city - Google Patents

Water-permeable floor tile for sponge city Download PDF

Info

Publication number
CN211199947U
CN211199947U CN201921885305.XU CN201921885305U CN211199947U CN 211199947 U CN211199947 U CN 211199947U CN 201921885305 U CN201921885305 U CN 201921885305U CN 211199947 U CN211199947 U CN 211199947U
Authority
CN
China
Prior art keywords
ceramic tile
tile
floor tile
floor tiles
end floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921885305.XU
Other languages
Chinese (zh)
Inventor
常国伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hainan Botai Color Brick Co ltd
Original Assignee
Hainan Botai Color Brick Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hainan Botai Color Brick Co ltd filed Critical Hainan Botai Color Brick Co ltd
Priority to CN201921885305.XU priority Critical patent/CN211199947U/en
Application granted granted Critical
Publication of CN211199947U publication Critical patent/CN211199947U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Floor Finish (AREA)

Abstract

The utility model discloses a ceramic tile that permeates water for sponge city, including upper end ceramic tile and bottom ceramic tile, upper end ceramic tile and bottom ceramic tile are the rectangle setting, the upper end ceramic tile is located bottom ceramic tile upside, upper end ceramic tile bottom and bottom ceramic tile upside are trapezoidal setting, upper end ceramic tile bottom is provided with the slot all around, bottom ceramic tile upper end is provided with the inserted bar all around, the inserted bar sets up as an organic whole with the bottom ceramic tile, the inserted bar inserts inside the slot. The utility model discloses during the installation, fix the bottom ceramic tile through the concrete for the bottom ceramic tile can not produce the removal when using, and bottom ceramic tile upside is the rectangle setting, when the concatenation, forms the basin, and during the rainy time, inside water stretched into the basin through the upper end ceramic tile, was convenient for carry out directional flow, had better drainage.

Description

Water-permeable floor tile for sponge city
Technical Field
The utility model relates to a ceramic tile equipment technical field specifically is a ceramic tile permeates water for sponge city.
Background
Floor tiles are a floor finishing material, also called floor tiles. Is prepared by firing clay. The specifications are various. Firm, pressure-resistant, wear-resistant and moisture-proof. Some of them are glazed and have a decorative effect. The existing floor tiles are generally paved on the upper side of a sand so as to facilitate the drainage of the floor tiles, but the sand does not have fixity, so that the floor tiles often sink to form grooves, and water is easily accumulated in the grooves and cannot be drained when raining.
Therefore, the permeable floor tile for the sponge city is provided.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a ceramic tile permeates water for sponge city, during the installation, fixes the bottom ceramic tile through the concrete for the bottom ceramic tile can not produce the removal when using, and bottom ceramic tile upside is the rectangle setting, when the concatenation, forms the basin, and during the rainy time, inside water stretched into the basin through the upper end ceramic tile, be convenient for carry out directional flow, had better drainage nature, with the problem of proposing in solving above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the permeable floor tiles for the sponge city comprise upper-end floor tiles and bottom-end floor tiles, wherein the upper-end floor tiles and the bottom-end floor tiles are arranged in a rectangular mode, the upper-end floor tiles are located on the upper sides of the bottom-end floor tiles, the bottom ends of the upper-end floor tiles and the upper sides of the bottom-end floor tiles are arranged in a trapezoidal mode, slots are formed in the bottom ends of the upper-end floor tiles all around, inserting rods are arranged on the upper ends of the bottom-end floor tiles all around, the inserting rods and the bottom-end floor.
The bottom floor tiles are used for being laid on the upper side of the concrete layer and used for supporting the upper end floor tiles, the upper end floor tiles are used for laying the ground and the floor of public buildings and civil buildings, and the inserted rods are used for being inserted into the slots.
Preferably, the bottom end of the slot is provided with a conical groove, the conical groove and the slot are arranged integrally, and the large-caliber end of the conical groove faces downwards.
The large-caliber end of the conical groove faces downwards, so that the inserted rod can be conveniently and quickly and accurately inserted into the slot, and the laying speed of the floor tiles at the upper end is increased.
Preferably, the upper side of the upper end floor tile is provided with a friction strip, and the friction strip and the upper end floor tile are arranged integrally.
The friction strips are arranged to increase the friction force of the upper surface of the upper-end floor tile, so that the phenomenon that the friction force of the upper surface of the upper-end floor tile is small and the upper surface of the upper-end floor tile slips when a pedestrian walks is avoided.
Preferably, the bottom end of the bottom floor tile is provided with a convex strip, and the convex strip and the upper side of the bottom floor tile are integrally arranged.
The setting of sand grip can increase the area of contact between bottom ceramic tile bottom and the delayed coagulation soil for more stable of bottom ceramic tile installation makes the bottom ceramic tile be difficult for droing from the concrete upside.
Preferably, the bottom end of the inserted bar is provided with a limiting table, and the limiting table and the inserted bar are arranged integrally.
The limiting table is used for limiting the distance between the upper end floor tiles and the bottom end floor tiles, so that gaps are reserved between the upper end floor tiles and the bottom end floor tiles, and water is rapidly discharged through the gaps between the upper end floor tiles and the bottom end floor tiles when raining.
Preferably, the two sides of the upper floor tile are provided with arc-shaped convex blocks, the arc-shaped convex blocks and the upper floor tile are arranged integrally, the arc-shaped convex blocks are embedded into the arc-shaped grooves, and the arc-shaped grooves are positioned on the two sides of the upper floor tile.
When laying the upper end ceramic tile 3, with inside the arc lug 8 embedding arc groove 7 for adjacent upper end ceramic tile links up inseparabler, difficult production removes.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses, when installing, fix the bottom ceramic tile through the concrete, make the bottom ceramic tile can not produce when using and move, the bottom ceramic tile upside is the rectangle setting, when the concatenation, forms the basin, when raining, water stretches into the basin inside through the upper end ceramic tile, is convenient for carry out the directional flow, has better drainage;
2. when the upper end floor tiles are laid, the arc-shaped convex blocks are embedded into the arc-shaped grooves, so that the adjacent upper end floor tiles are connected more closely and are not easy to move;
3. the utility model discloses, spacing platform is used for restricting the distance between upper end ceramic tile and the bottom ceramic tile for upper end ceramic tile and bottom ceramic tile leave the space, when raining greatly, through the quick with water discharge in space between upper end ceramic tile and the bottom ceramic tile.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the bottom floor tile of the present invention;
FIG. 3 is a schematic view of the top floor tile of the present invention;
fig. 4 is a schematic side view of the upper floor tile of the present invention.
In the figure: 1. bottom floor tiles; 2. a convex strip; 3. upper end floor tiles; 4. inserting a rod; 5. a limiting table; 6. rubbing the strips; 7. an arc-shaped slot; 8. an arc-shaped bump; 9. a slot; 10. and (4) a tapered groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a water permeable floor tile for a sponge city is shown in figures 1-4 and comprises an upper end floor tile 3 and a bottom end floor tile 1, wherein the upper end floor tile 3 and the bottom end floor tile 1 are both rectangular, the upper end floor tile 3 is positioned on the upper side of the bottom end floor tile 1, the bottom end of the upper end floor tile 3 and the upper side of the bottom end floor tile 1 are both trapezoidal, slots 9 are formed in the periphery of the bottom end of the upper end floor tile 3, inserting rods 4 are arranged in the periphery of the upper end of the bottom end floor tile 1, the inserting rods 4 and the bottom end floor tile 1 are integrated, and the inserting.
Through above-mentioned technical scheme, bottom ceramic tile 1 is used for laying at the concrete layer upside for the upper end ceramic tile 3 to support, and upper end ceramic tile 3 is used for the laying of public building and civil buildings's ground and floor, and inserted bar 4 is used for inserting inside slot 9.
Specifically, as shown in fig. 3, a tapered groove 10 is provided at the bottom end of the slot 9, the tapered groove 10 and the slot 9 are integrally provided, and the large-caliber end of the tapered groove 10 faces downward.
Through the technical scheme, the large-caliber end of the conical groove 10 is downward, so that the inserted rod 4 can be rapidly and accurately inserted into the slot 9 conveniently, and the laying speed of the floor tiles 3 at the upper end is accelerated.
Through above-mentioned technical scheme, bottom ceramic tile 1 is used for laying at the concrete layer upside for the upper end ceramic tile 3 to support, and upper end ceramic tile 3 is used for the laying of public building and civil buildings's ground and floor, and inserted bar 4 is used for inserting inside slot 9.
Specifically, as shown in fig. 1, the rubbing strip 6 is disposed on the upper side of the upper floor tile 3, and the rubbing strip 6 and the upper floor tile 3 are integrally disposed.
Through above-mentioned technical scheme, the setting of friction strip 6 is used for increasing the frictional force of 3 upper surfaces of upper end ceramic tile, avoids the pedestrian when walking, and 3 upper surfaces of upper end ceramic tile frictional force is less, the phenomenon of skidding appears.
Specifically, as shown in fig. 2, the bottom end of the bottom floor tile 1 is provided with a convex strip 2, and the convex strip 2 and the upper side of the bottom floor tile 1 are integrally arranged.
Through above-mentioned technical scheme, the setting of sand grip 2 can increase the area of contact between 1 bottom of bottom ceramic tile and the slow setting soil for 1 installation more stable of bottom ceramic tile, make 1 difficult follow concrete upside of bottom ceramic tile drop.
Specifically, as shown in fig. 2, a limiting table 5 is disposed at the bottom end of the insertion rod 4, and the limiting table 5 and the insertion rod 4 are integrally disposed.
Through the technical scheme, the limiting table 5 is used for limiting the distance between the upper end floor tiles 3 and the bottom end floor tiles 1, so that gaps are reserved between the upper end floor tiles 3 and the bottom end floor tiles 1, and when heavy rain falls, water is rapidly discharged through the gaps between the upper end floor tiles 3 and the bottom end floor tiles 1.
Specifically, as shown in fig. 4, arc-shaped protrusions 8 are disposed on two sides of the upper floor tile 3, the arc-shaped protrusions 8 and the upper floor tile 3 are integrally disposed, the arc-shaped protrusions 8 are embedded into the arc-shaped grooves 7, and the arc-shaped grooves 7 are located on two sides of the upper floor tile 3.
Through above-mentioned technical scheme, when laying upper end ceramic tile 3, with inside arc lug 8 embedding arc wall 7 for adjacent upper end ceramic tile 3 links up inseparabler more, difficult production removes.
The working principle is as follows: when laying, firstly concrete is laid on the upper side of the earth surface, the bottom floor tiles 1 are neatly laid on the upper side of the concrete layer, after laying is finished, the upper end floor tiles 3 are laid on the upper sides of the bottom floor tiles 1, when the upper end floor tiles 3 are laid, the slots 9 at the bottom ends of the upper end floor tiles 3 are sleeved inside the inserted rods 4, and the upper end floor tiles 3 and the bottom floor tiles 1 are fixed on one side.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a ceramic tile that permeates water for sponge city which characterized in that: the floor tile is characterized by comprising upper end floor tiles (3) and bottom end floor tiles (1), wherein the upper end floor tiles (3) and the bottom end floor tiles (1) are arranged in a rectangular mode, the upper end floor tiles (3) are located on the upper sides of the bottom end floor tiles (1), the bottom ends of the upper end floor tiles (3) and the upper sides of the bottom end floor tiles (1) are arranged in a trapezoidal mode, inserting grooves (9) are formed in the bottom ends of the upper end floor tiles (3) all around, inserting rods (4) are arranged on the upper ends of the bottom end floor tiles (1) all around, the inserting rods (4) and the bottom end floor tiles (1) are arranged in an integrated mode.
2. The water permeable floor tile for sponge cities as claimed in claim 1, wherein: the bottom end of the slot (9) is provided with a conical groove (10), the conical groove (10) and the slot (9) are arranged integrally, and the large-caliber end of the conical groove (10) faces downwards.
3. The water permeable floor tile for sponge cities as claimed in claim 1, wherein: the upper side of the upper end floor tile (3) is provided with a friction strip (6), and the friction strip (6) and the upper end floor tile (3) are arranged integrally.
4. The water permeable floor tile for sponge cities as claimed in claim 1, wherein: the bottom floor tile is characterized in that the bottom end of the bottom floor tile (1) is provided with a convex strip (2), and the convex strip (2) and the upper side of the bottom floor tile (1) are integrally arranged.
5. The water permeable floor tile for sponge cities as claimed in claim 1, wherein: the bottom end of the inserted bar (4) is provided with a limiting table (5), and the limiting table (5) and the inserted bar (4) are integrally arranged.
6. The water permeable floor tile for sponge cities as claimed in claim 1, wherein: arc-shaped convex blocks (8) are arranged on two sides of the upper end floor tile (3), the arc-shaped convex blocks (8) and the upper end floor tile (3) are arranged integrally, the arc-shaped convex blocks (8) are embedded into the arc-shaped grooves (7), and the arc-shaped grooves (7) are located on two sides of the upper end floor tile (3).
CN201921885305.XU 2019-11-05 2019-11-05 Water-permeable floor tile for sponge city Expired - Fee Related CN211199947U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921885305.XU CN211199947U (en) 2019-11-05 2019-11-05 Water-permeable floor tile for sponge city

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921885305.XU CN211199947U (en) 2019-11-05 2019-11-05 Water-permeable floor tile for sponge city

Publications (1)

Publication Number Publication Date
CN211199947U true CN211199947U (en) 2020-08-07

Family

ID=71852961

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921885305.XU Expired - Fee Related CN211199947U (en) 2019-11-05 2019-11-05 Water-permeable floor tile for sponge city

Country Status (1)

Country Link
CN (1) CN211199947U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112048961A (en) * 2020-08-18 2020-12-08 杭州王之新创信息技术研究有限公司 Solid structure, floor tile, drainage floor tile and sponge city

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112048961A (en) * 2020-08-18 2020-12-08 杭州王之新创信息技术研究有限公司 Solid structure, floor tile, drainage floor tile and sponge city

Similar Documents

Publication Publication Date Title
CN106988184B (en) porous pavement
AU2016228704B2 (en) Hard road construction method for natural groundwater recharge
CN211199947U (en) Water-permeable floor tile for sponge city
CN206655077U (en) A kind of porous base course brick suitable for porous pavement and the basic road surface using the brick
CN107974890B (en) Permeable sidewalk road brick convenient to lay
CN206189239U (en) Splash -prevented floor tile
CN212771795U (en) Environment-friendly sidewalk brick paving structure
CN206736666U (en) A kind of base course suitable for porous pavement and the basic road surface using the brick
CN204780507U (en) Drainage garden way
CN105239751B (en) A kind of combined type floor tile of easily draining
CN209722651U (en) A kind of water-permeable brick and its pavement with the water-permeable brick
KR101096195B1 (en) Sidewalk block assembly system
CN109138357B (en) Combined anti-slip brick anti-slip strip
CN207484200U (en) Ashlar brick
CN202401370U (en) Municipal pavement drainage brick
CN207537832U (en) A kind of road surface water-permeable brick
CN214194011U (en) Drainage antiskid square brick
CN206267164U (en) A kind of basic blocks of ecological revetment barricade concrete segment
CN221320548U (en) Spliced ground paving stone
CN216688865U (en) Stable in structure, do benefit to pavior brick of quick drainage water storage
CN104452524B (en) Splashproof pervious floor tile
CN205206156U (en) Ground plate structure of view roofing with be used for colored pond of this view roofing to enclose fender structure
CN214782995U (en) Water-accumulation-preventing garden pavement brick and garden road thereof
CN210194366U (en) Environment-friendly brick capable of being regenerated on garden pavement
CN216999127U (en) Novel municipal administration paving brick

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200807

Termination date: 20211105