CN211186133U - Novel engineering cost budgets toolbox - Google Patents

Novel engineering cost budgets toolbox Download PDF

Info

Publication number
CN211186133U
CN211186133U CN201922071727.XU CN201922071727U CN211186133U CN 211186133 U CN211186133 U CN 211186133U CN 201922071727 U CN201922071727 U CN 201922071727U CN 211186133 U CN211186133 U CN 211186133U
Authority
CN
China
Prior art keywords
bull stick
wall
box
handed screw
storage rack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922071727.XU
Other languages
Chinese (zh)
Inventor
高壮涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201922071727.XU priority Critical patent/CN211186133U/en
Application granted granted Critical
Publication of CN211186133U publication Critical patent/CN211186133U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Details Of Rigid Or Semi-Rigid Containers (AREA)

Abstract

The utility model discloses a novel engineering cost budgets toolbox, the power distribution box comprises a box body, the top of box is connected with the case lid through the hinge rotation, the top central point department of putting of case lid passes through bolt fixedly connected with handle, the welding has the baffle on one side inner wall of box, and the inside of box is close to one side position department rotation of baffle and is connected with the levogyration lead screw, the one end welding of levogyration lead screw has the hand wheel, and the other end welding has the dextrorotation lead screw, all close soon through the screw thread on one side outer wall of levogyration lead screw and dextrorotation lead screw and be connected with the movable. This novel engineering cost budgets toolbox through the storage rack of the over-and-under type that has the baffle, can realize on the one hand that the classification of budget statement and drawing is placed, avoids appearing placing mixed and disorderly problem that is difficult to take, and on the other hand can press from both sides budget statement and drawing tightly, avoids appearing the problem of mixed and disorderly fold in the removal in-process, improves the integrality of budget statement and drawing.

Description

Novel engineering cost budgets toolbox
Technical Field
The utility model relates to an engineering cost technical field specifically is novel engineering cost budgets toolbox.
Background
The project cost directly means the construction price of a project, the project cost means all expenses spent on carrying out certain project construction, the core content of the project cost is investment estimation, design approximate calculation, correction approximate calculation, construction drawing budget, project settlement, completion settlement and the like, and the main tasks of the project cost are as follows: according to the drawing, the quota and the list specification, direct fees (manual fees, materials and equipment fees, and utilization fees of construction machines) contained in the project, enterprise management fees, measure fees, planning fees, profits, taxes and the like are calculated.
The engineering cost on the market at present needs to be subjected to chart drawing and data measurement during budget assessment, measured charts and measured equipment need to be placed through a tool box, the existing engineering cost tool box is difficult to protect a measured tight instrument when in use, collision between the tool box and the instrument is easy to occur and damage is caused, in addition, a drawing and a report generated by budget are difficult to be placed in a classified mode, and the chart and the report can shake, so that inconvenience in subsequent taking is caused.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a novel engineering cost budgets toolbox to it is difficult to protect the instrument to solve among the above-mentioned background art to propose current engineering cost budgets toolbox, drawing statement is difficult to categorised the problem of placing and taking inconvenience.
In order to achieve the above object, the utility model provides a following technical scheme: the novel engineering cost budget tool box comprises a box body, wherein the top of the box body is rotatably connected with a box cover through a hinge, the central position of the top of the box cover is fixedly connected with a handle through a bolt, a baffle is welded on the inner wall of one side of the box body, a left-handed screw is rotatably connected with the position of one side of the box body close to the baffle, one end of the left-handed screw is welded with a hand wheel, the other end of the left-handed screw is welded with a right-handed screw, the outer walls of one sides of the left-handed screw and the right-handed screw are both connected with a movable plate through screw threads in a screwing manner, a first soft rubber pad is embedded on the outer wall of one side of each of the two movable plates, a second soft rubber pad is embedded on the inner wall of one side of the box body, the bottom of the inner part of the box body is fixedly connected with a fixed, the one end of keeping away from first bull stick on the second bull stick rotates through the pivot and is connected with the third bull stick, the one end of third bull stick rotates through the pivot and is connected with the fourth bull stick, the one end of keeping away from the third bull stick on the fourth bull stick is provided with storage rack.
Preferably, a groove is formed in the outer wall of one side of the box body, close to the hand wheel.
Preferably, a label slot is formed in the outer wall of one side of the storage rack.
Preferably, a partition plate is arranged on the inner wall of one side of the storage rack.
Preferably, a support rod is embedded in the storage rack at a position close to one side of the partition.
Preferably, the outer wall of the supporting rod is sleeved with a spring, and a pressing block is welded at the top end of the spring.
Compared with the prior art, the beneficial effects of the utility model are that: this novel engineering cost budgets toolbox, storage rack through the over-and-under type that has the baffle, on the one hand can realize the classification of budget statement and drawing and place, avoid appearing placing mixed and disorderly problem of being difficult to take, on the other hand can press from both sides budget statement and drawing tightly, avoid appearing the problem of mixed and disorderly fold at the removal in-process, improve the integrality of budget statement and drawing, in addition, can fix the required precision equipment of engineering cost budget through the removal board in opposite directions or the opposite removal, avoid appearing rocking the striking and cause the equipment to damage, improve the protective capacities of toolbox.
Drawings
FIG. 1 is a schematic view of the internal structure of the present invention;
fig. 2 is a top view of the present invention;
FIG. 3 is a front view of the storage rack of the present invention;
fig. 4 is a schematic view of the external structure of the present invention.
In the figure: 1. a box body; 2. a box cover; 3. a handle; 4. a baffle plate; 5. a left-handed lead screw; 6. a hand wheel; 7. a groove; 8. a right-handed screw; 9. moving the plate; 10. a first soft rubber cushion; 11. a second soft rubber cushion; 12. a fixing plate; 13. a first rotating lever; 14. a second rotating rod; 15. a third rotating rod; 16. a fourth rotating rod; 17. a storage rack; 18. a label slot; 19. a partition plate; 20. a support bar; 21. a spring; 22. and (7) briquetting.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: the novel engineering cost budget toolbox comprises a toolbox body 1, a toolbox body 2, a lifting handle 3, a baffle 4, a left-handed screw 5, a hand wheel 6, a groove 7, a right-handed screw 8, a moving plate 9, a first soft rubber cushion 10, a second soft rubber cushion 11, a fixing plate 12, a first rotating rod 13, a second rotating rod 14, a third rotating rod 15, a fourth rotating rod 16, a storage rack 17, a label groove 18, a baffle plate 19, a supporting rod 20, a spring 21 and a pressing block 22, wherein the top of the toolbox body 1 is rotatably connected with the toolbox body 2 through a hinge, the central position of the top of the toolbox body 2 is fixedly connected with the lifting handle 3 through a bolt, the baffle plate 4 is welded on the inner wall of one side of the toolbox body 1, the position of one side, close to the baffle plate 4, inside the toolbox body 1 is rotatably connected with the left-handed screw 5, the hand wheel 6 is welded at one end of the left-handed screw, all the embedding has first soft cushion 10 on the outer wall of one side of two movable plates 9, the embedding has the soft cushion 11 of second on the inner wall of one side of box 1, bolt fixedly connected with fixed plate 12 is passed through to the inside bottom of box 1, the top of fixed plate 12 is rotated through the pivot and is connected with first bull stick 13, the one end of first bull stick 13 is rotated through the pivot and is connected with second bull stick 14, the one end of keeping away from first bull stick 13 on the second bull stick 14 is rotated through the pivot and is connected with third bull stick 15, the one end of third bull stick 15 is rotated through the pivot and is connected with fourth bull stick 16, the one end of keeping away from third bull stick 15 on the fourth bull stick 16 is provided with storage rack 17.
Furthermore, a groove 7 is formed in the position, close to the hand wheel 6, on the outer wall of one side of the box body 1, so that the hand wheel 6 is prevented from protruding, and the flatness of the outer wall of the box body 1 is guaranteed.
Furthermore, a label slot 18 is formed in the outer wall of one side of the storage rack 17, so that the corresponding type of the engineering cost chart can be conveniently written.
Furthermore, a partition plate 19 is arranged on the inner wall of one side of the storage rack 17, so that the multi-layer classified storage is convenient to realize.
Furthermore, a support rod 20 is embedded in one side of the storage rack 17 close to the partition 19, so as to limit the lifting position of the pressing block 22.
Furthermore, the outer wall of the support rod 20 is sleeved with a spring 21, and a pressing block 22 is welded at the top end of the spring 21, so that the chart can be conveniently fixed.
The working principle is as follows: when the device is used, equipment required by engineering cost budget is placed between the two moving plates 9, the hand wheel 6 is rotated, the hand wheel 6 drives the left-handed screw 5 to rotate, the left-handed screw 5 drives the right-handed screw 8 to rotate, the two moving plates 9 move oppositely to clamp the equipment tightly through the screwing connection of the left-handed screw 5 and the right-handed screw 8 with the moving plates 9, the fixation of the equipment is completed, the damage caused by shaking impact is avoided, the storage rack 17 is pulled out from the box body 1 through the rotation among the first rotating rod 13, the second rotating rod 14, the third rotating rod 15 and the fourth rotating rod 16, the budget report and the drawing are classified and placed between the two clapboards 19, the pressing block 22 is lifted on the supporting rod 20 through the elastic deformation of the spring 21, the budget and the drawing are clamped through the pressing block 22, the problem of disordered fold of the report in the moving process is avoided, the box body 1 is moved through the handle 3 on the box cover 2, the portability of the tool box is improved.
It should be finally noted that the above only serves to illustrate the technical solution of the present invention, and not to limit the scope of the present invention, and that simple modifications or equivalent replacements performed by those skilled in the art to the technical solution of the present invention do not depart from the spirit and scope of the technical solution of the present invention.

Claims (6)

1. Novel engineering cost budgets toolbox, including box (1), its characterized in that: the box is characterized in that the top of the box body (1) is rotatably connected with a box cover (2) through a hinge, the top central position of the box cover (2) is connected with a handle (3) through a bolt fixedly connected with, a baffle (4) is welded on the inner wall of one side of the box body (1), a left-handed screw (5) is rotatably connected with the position of one side of the box body (1) close to the baffle (4), a hand wheel (6) is welded at one end of the left-handed screw (5), a right-handed screw (8) is welded at the other end of the left-handed screw, movable plates (9) are respectively connected on the outer walls of one sides of the left-handed screw (5) and the right-handed screw (8) through screw threads in a screwing manner, a first soft rubber pad (10) is embedded on the outer wall of one side of the two movable plates (9), a second soft rubber pad (11) is embedded on the, the top of fixed plate (12) is rotated through the pivot and is connected with first bull stick (13), the one end of first bull stick (13) is rotated through the pivot and is connected with second bull stick (14), the one end of keeping away from first bull stick (13) on second bull stick (14) is rotated through the pivot and is connected with third bull stick (15), the one end of third bull stick (15) is rotated through the pivot and is connected with fourth bull stick (16), the one end of keeping away from third bull stick (15) on fourth bull stick (16) is provided with storage rack (17).
2. The new project cost budgeting kit of claim 1, wherein: a groove (7) is formed in the position, close to one side of the hand wheel (6), on the outer wall of one side of the box body (1).
3. The new project cost budgeting kit of claim 1, wherein: and a label groove (18) is formed in the outer wall of one side of the storage rack (17).
4. The new project cost budgeting kit of claim 1, wherein: a partition plate (19) is arranged on the inner wall of one side of the storage rack (17).
5. The new project cost budgeting kit of claim 4, wherein: a support rod (20) is embedded in one side position of the inner part of the storage rack (17) close to the partition plate (19).
6. The new project cost budgeting kit of claim 5, wherein: the outer wall of the supporting rod (20) is sleeved with a spring (21), and a pressing block (22) is welded at the top end of the spring (21).
CN201922071727.XU 2019-11-27 2019-11-27 Novel engineering cost budgets toolbox Expired - Fee Related CN211186133U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922071727.XU CN211186133U (en) 2019-11-27 2019-11-27 Novel engineering cost budgets toolbox

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922071727.XU CN211186133U (en) 2019-11-27 2019-11-27 Novel engineering cost budgets toolbox

Publications (1)

Publication Number Publication Date
CN211186133U true CN211186133U (en) 2020-08-07

Family

ID=71859198

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922071727.XU Expired - Fee Related CN211186133U (en) 2019-11-27 2019-11-27 Novel engineering cost budgets toolbox

Country Status (1)

Country Link
CN (1) CN211186133U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112672553A (en) * 2020-11-16 2021-04-16 兰州交通大学 Railway engineering cost budget system and budget equipment based on internet of things

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112672553A (en) * 2020-11-16 2021-04-16 兰州交通大学 Railway engineering cost budget system and budget equipment based on internet of things
CN112672553B (en) * 2020-11-16 2022-07-26 兰州交通大学 Railway engineering cost budget system and budget equipment based on internet of things technology

Similar Documents

Publication Publication Date Title
CN211186133U (en) Novel engineering cost budgets toolbox
CN205896609U (en) Audit multifunctional support for calculator
CN215186935U (en) Bracket is put to hand-held type scanner that electronic commerce used
CN213975050U (en) Portable toolbox for construction
CN210539472U (en) Novel engineering cost budgets toolbox
CN211904046U (en) Engineering cost mapping device
CN212630151U (en) Toolbox for engineering cost
CN213259415U (en) Novel engineering cost budget toolbox
CN110859389A (en) Novel engineering cost budgets toolbox
CN215789769U (en) Engineering cost specialized tool case
CN209927134U (en) On-spot mapping device that engineering cost used
CN209037231U (en) A kind of portable multi-function book of accounts
CN216265918U (en) Engineering cost budgets toolbox convenient to store different specification instruments
CN210870239U (en) Stationery box for financial accounting professionals
CN214418761U (en) Toolbox for building engineering cost
CN209547239U (en) A kind of project cost budget tool box
CN208398831U (en) A kind of three coordinate measuring machine
CN216293255U (en) Novel engineering cost budget toolbox
CN214151693U (en) Engineering cost construction site cost liquidation recording device
CN214580208U (en) Mapping support device for city planning
CN217074459U (en) Medical instrument transportation device convenient to move
CN215217726U (en) Module box for IC card water meter module
CN213320065U (en) Portable engineering cost budgets instrument strorage device
CN212947433U (en) Fixing clamp for electronic component production
CN211956832U (en) Multi-functional colleges and universities teaching management equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200807

Termination date: 20211127