CN211173386U CN201922071138.1U CN201922071138U CN211173386U CN 211173386 U CN211173386 U CN 211173386U CN 201922071138 U CN201922071138 U CN 201922071138U CN 211173386 U CN211173386 U CN 211173386U
Authority
CN
China
Prior art keywords
wall
base
upright post
construction safety
building construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922071138.1U
Other languages
Chinese (zh)
Inventor
贾建军
孙少品
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201922071138.1U priority Critical patent/CN211173386U/en
Application granted granted Critical
Publication of CN211173386U publication Critical patent/CN211173386U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Fencing (AREA)

Abstract

The utility model discloses a construction safety control rail belongs to building construction facility technical field. A building construction safety management fence comprises a base, wherein the top of the base is connected with two sleeves, the inner walls of the two sleeves are respectively detachably connected with a first upright post and a second upright post, two cross rods are connected between the first upright post and the second upright post, a vertical rod is connected between the two cross rods, two cavities are formed in the base, the top of the base is connected with an inlet communicated with the cavities, threaded holes are formed in the base, threaded rods are movably connected in the threaded holes, the tops of the threaded rods are connected with a handle, one ends of the threaded rods, far away from the handle, are connected with a bottom plate, two sides of the bottom wall of the bottom plate are both connected with idler wheels; the utility model discloses a set up the gyro wheel at the base, make things convenient for the removal of rail, and the rail dismantles the convenience, can not occupation space, the transport of being convenient for.

Description

Building construction safety control rail
Technical Field
The utility model relates to a construction facility technical field especially relates to a construction safety control rail.
Background
When a building is built, the building construction site has certain dangerousness, foreign people are generally not allowed to enter and exit the building construction site at will, in order to prevent a main structure from falling from high altitude during construction, workers from falling from high altitude during building of brick walls and the like, a fence is generally installed on the periphery of construction, pedestrians and vehicles can be prevented from being too close to a construction area by the fence, the building construction safety management fence is used for enhancing safety warning marks and construction site safety facility management, a safe and clear construction environment is created, safety and health of the constructors are guaranteed, a safety culture atmosphere is created, and site safety management level is improved.
Present building construction safety control rail all surrounds the soil through the mode of building the wall, and this kind of mode is not only inefficient, and is disposable in addition, non-used repeatedly, and extravagant resource, what in addition enclose through a plurality of iron rail to improve stability through the counter weight base, but the general integrated into one piece of this kind of rail structure, because the volume is too big when the transport, the transport difficulty, it is inconvenient to use.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem existing in the prior art and providing a building construction safety management rail.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a construction safety control rail, includes the base, the top of base is connected with two sleeves, two the sleeve inner wall can be dismantled respectively and be connected with first stand and second stand, be connected with two horizontal poles, two between first stand and the second stand be connected with the pole setting between the horizontal pole, it has two cavitys to open the chisel in the base, the top of base is connected with the import that is linked together with the cavity, open the chisel threaded hole in the base, threaded hole swing joint has the screw rod, the top of screw rod is connected with the handle, the one end that the handle was kept away from to the screw rod is connected with the bottom plate, the diapire both sides of bottom plate all are connected with the gyro wheel, the bottom both sides of base still are.
Preferably, the inner wall of the cavity is connected with a fixed shaft, the outer wall of the fixed shaft is sleeved with a torsion spring, the outer wall of the fixed shaft is further connected with a closing plate, and the closing plate abuts against the outer wall of the cavity.
Preferably, the sleeve outer wall is chiseled a groove, sliding connection has the locating lever in the groove, the locating lever outer wall is connected with elastic element, elastic element keeps away from the one end of locating lever and links to each other with the recess inner wall, first stand outer wall is chiseled and is had the locating hole with locating lever matched with.
Preferably, the outer wall of the first upright post is connected with a sliding block, and the outer wall of the sleeve is provided with a sliding groove matched with the sliding block in a chiseled mode.
Preferably, the outer wall of the first upright post is connected with a fixed frame, a hanging piece is movably connected in the fixed frame, and the hanging piece is connected to the outer wall of the cross rod.
Preferably, both ends of the vertical rod are provided with inserting plates, and the outer wall of the cross rod is provided with inserting grooves matched with the inserting plates in a chiseling mode.
Compared with the prior art, the utility model provides a construction safety control rail possesses following beneficial effect:
1. when the fence is installed, the handle is rotated to enable the screw rod to drive the bottom plate to move upwards, the idler wheel leaves the ground, the ground plate is contacted with the ground, fine sand is poured into the inlet and enters the cavity to increase the weight of the base, the fence is prevented from being inclined by wind force, the positioning rod is pushed to extrude the elastic element, the first upright post and the second upright post are placed in the sleeve, the sliding blocks at the bottom ends of the first upright post and the second upright post are aligned to the sliding grooves of the sleeve, the positioning rod is loosened to facilitate the positioning rod to enter the positioning hole to fix the first upright post and the second upright post, then the cross rods between the posts are built, the hanging pieces at two sides of the cross rods are firstly placed in the fixing frames at the outer walls of the first upright post and the second upright post, then the vertical rods are installed in the cross rod slots at the lower part through the inserting plates at the end parts of the, the horizontal pole of top begins to install, make the slot of top horizontal pole aim at the pole setting picture peg that has already installed respectively, accomplish the installation of rail, when needs carry the rail, according to the step, dismantle the horizontal pole of top, pole setting, the horizontal pole of below in proper order, extrude the locating lever again, make the stand shift out the sleeve, later through pulling the closure plate, make the inside fine sand of cavity pour out, alleviate the weight of base, rotatory handle makes the screw rod drive the bottom plate and moves down, the gyro wheel contacts with ground gradually, and make the ground plate leave ground, accomplish the preparation work before carrying, convenient transportation.
The part that does not relate to among the device all is the same with prior art or can adopt prior art to realize, the utility model discloses a set up the gyro wheel at the base, make things convenient for the removal of rail, and the rail dismantles conveniently, can not occupation space, the transport of being convenient for.
Drawings
Fig. 1 is a schematic structural view of a building construction safety management fence according to the present invention;
fig. 2 is a schematic structural view of a building construction safety management fence base provided by the utility model;
fig. 3 is a schematic structural view of a building construction safety management fence sleeve provided by the present invention;
fig. 4 is the utility model provides a structural schematic of construction safety control rail horizontal pole and pole setting.
In the figure: 1. a base; 2. a sleeve; 201. a groove; 202. positioning a rod; 203. an elastic element; 204. positioning holes; 3. a first upright post; 301. a slider; 302. a chute; 4. a second upright post; 5. a cross bar; 501. a slot; 6. erecting a rod; 7. a cavity; 701. an inlet; 702. a fixed shaft; 703. a torsion spring; 704. a closing plate; 8. a threaded hole; 9. a screw; 10. a handle; 11. a base plate; 12. a roller; 13. a ground plate; 14. a fixing frame; 15. hanging parts; 16. and (4) inserting plates.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-2, a building construction safety management rail, including base 1, base 1's top is connected with two sleeves 2, two sleeve 2 inner walls can be dismantled respectively and be connected with first stand 3 and second stand 4, be connected with two horizontal poles 5 between first stand 3 and the second stand 4, be connected with pole setting 6 between two horizontal poles 5, it has two cavities 7 to open the chisel in base 1, base 1's top is connected with the import 701 that is linked together with cavity 7, open the chisel in base 1 has screw hole 8, swing joint has screw rod 9 in the screw hole 8, the top of screw rod 9 is connected with handle 10, the one end that handle 10 was kept away from to screw rod 9 is connected with bottom plate 11, the diapire both sides of bottom plate 11 all are connected with gyro wheel 12, base 1's bottom both sides still are.
Referring to fig. 2, a fixing shaft 702 is connected to the inner wall of the cavity 7, a torsion spring 703 is sleeved on the outer wall of the fixing shaft 702, a closing plate 704 is further connected to the outer wall of the fixing shaft 702, and the closing plate 704 abuts against the outer wall of the cavity 7.
Referring to fig. 3, a groove 201 is cut in the outer wall of the sleeve 2, a positioning rod 202 is slidably connected in the groove 201, an elastic element 203 is connected to the outer wall of the positioning rod 202, one end of the elastic element 203, which is far away from the positioning rod 202, is connected to the inner wall of the groove 201, and a positioning hole 204 matched with the positioning rod 202 is cut in the outer wall of the first upright post 3.
Referring to fig. 3, a sliding block 301 is connected to the outer wall of the first upright 3, and a sliding groove 302 matched with the sliding block 301 is cut on the outer wall of the sleeve 2.
Referring to fig. 1, a fixed frame 14 is connected to the outer wall of the first upright 3, a hanging member 15 is movably connected in the fixed frame 14, and the hanging member 15 is connected to the outer wall of the cross bar 5.
Referring to fig. 4, the two ends of the vertical rod 6 are provided with the insertion plates 16, and the outer wall of the cross rod 5 is provided with a slot 501 matched with the insertion plates 16.
In the utility model, when installing the fence, the handle 10 is rotated to make the screw 9 drive the bottom plate 11 to move upwards, the roller 12 leaves the ground, the ground plate 13 contacts with the ground, the fine sand is poured into the inlet 701, the fine sand enters the cavity 7, the weight of the base 1 is increased, the fence is prevented from inclining by wind force, the positioning rod 202 is pushed to extrude the elastic element 203 by the positioning rod 202, the first upright post 3 and the second upright post 4 are placed in the sleeve 2, the sliding block 301 at the bottom end of the first upright post 3 and the second upright post 4 is aligned with the sliding groove 302 of the sleeve 2, the positioning rod 202 is released to facilitate the positioning rod 202 to enter the positioning hole 204, the first upright post 3 and the second upright post 4 are fixed, then the cross rod 5 between the posts is built, the lower cross rod 5 is placed firstly, the hanging pieces 15 at the two sides of the cross rod 5 are hung in the fixing frame 14 at the outer walls of the first upright post 3 and the second upright post 4, then the upright post 6 is, after the upright posts 6 are completely installed, the upper cross rods 5 are installed, the slots 501 of the upper cross rods 5 are respectively aligned with the installed upright post 6 insertion plates 16, the fence is installed, when the fence needs to be transported, the upper cross rods 5, the upright posts 6 and the lower cross rods 5 are sequentially disassembled according to the steps, then the positioning rods 202 are extruded, the upright posts are moved out of the sleeves 2, then fine sand in the cavities 7 is poured out by pulling the closing plates 704, the weight of the base 1 is reduced, the screw rods 9 drive the bottom plate 11 to move downwards, the rollers 12 are gradually contacted with the ground, the ground plate 13 is separated from the ground, the preparation work before transportation is completed, and transportation is facilitated; the utility model discloses a set up gyro wheel 12 at base 1, make things convenient for the removal of rail, and the rail dismantles the convenience, can not occupation space, the transport of being convenient for.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The building construction safety management fence comprises a base (1) and is characterized in that the top of the base (1) is connected with two sleeves (2), the inner walls of the sleeves (2) are respectively detachably connected with a first upright post (3) and a second upright post (4), two cross rods (5) are connected between the first upright post (3) and the second upright post (4), a vertical rod (6) is connected between the cross rods (5), two cavities (7) are formed in the base (1), the top of the base (1) is connected with an inlet (701) communicated with the cavities (7), a threaded hole (8) is formed in the base (1), a screw rod (9) is movably connected in the threaded hole (8), the top of the screw rod (9) is connected with a handle (10), and one end, far away from the handle (10), of the screw rod (9) is connected with a bottom plate (11), both sides of the bottom wall of the bottom plate (11) are connected with rollers (12), and both sides of the bottom of the base (1) are also connected with ground plates (13).
2. The building construction safety management fence according to claim 1, characterized in that a fixing shaft (702) is connected to the inner wall of the cavity (7), a torsion spring (703) is sleeved on the outer wall of the fixing shaft (702), a closing plate (704) is further connected to the outer wall of the fixing shaft (702), and the closing plate (704) abuts against the outer wall of the cavity (7).
3. The building construction safety management fence as claimed in claim 1, wherein a groove (201) is formed in the outer wall of the sleeve (2), a positioning rod (202) is slidably connected in the groove (201), an elastic element (203) is connected to the outer wall of the positioning rod (202), one end, away from the positioning rod (202), of the elastic element (203) is connected to the inner wall of the groove (201), and a positioning hole (204) matched with the positioning rod (202) is formed in the outer wall of the first upright (3).
4. A construction safety management fence according to claim 3, wherein a sliding block (301) is connected to the outer wall of the first upright (3), and a sliding groove (302) matched with the sliding block (301) is chiseled on the outer wall of the sleeve (2).
5. The building construction safety management fence according to claim 4, characterized in that a fixed frame (14) is connected to the outer wall of the first upright (3), a hanging member (15) is movably connected in the fixed frame (14), and the hanging member (15) is connected to the outer wall of the cross rod (5).
6. The construction safety management fence according to claim 5, wherein both ends of the vertical rods (6) are provided with inserting plates (16), and the outer wall of the cross rod (5) is provided with inserting grooves (501) matched with the inserting plates (16).
CN201922071138.1U 2019-11-27 2019-11-27 Building construction safety control rail Expired - Fee Related CN211173386U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922071138.1U CN211173386U (en) 2019-11-27 2019-11-27 Building construction safety control rail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922071138.1U CN211173386U (en) 2019-11-27 2019-11-27 Building construction safety control rail

Publications (1)

Publication Number Publication Date
CN211173386U true CN211173386U (en) 2020-08-04

Family

ID=71803061

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922071138.1U Expired - Fee Related CN211173386U (en) 2019-11-27 2019-11-27 Building construction safety control rail

Country Status (1)

Country Link
CN (1) CN211173386U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112342969A (en) * 2020-11-13 2021-02-09 邓利 But municipal construction is with retractable warning fence

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112342969A (en) * 2020-11-13 2021-02-09 邓利 But municipal construction is with retractable warning fence

Similar Documents

Publication Publication Date Title
CN211114718U (en) Scaffold for building construction
CN211173386U (en) Building construction safety control rail
CN207228674U (en) Movable municipal administration open caisson ramp-type platform
CN213710269U (en) Prefabricated T roof beam construction operation platform
CN216690258U (en) Plug-in type scaffold
CN212802236U (en) Ceramsite concrete member
CN211115144U (en) Rail guard for construction
CN216157001U (en) But reutilization and remove convenient architectural decoration guardrail
CN201802078U (en) Tool for bar planting
CN215369922U (en) Novel assembled isolation barrier for tunnel construction dust prevention and control
CN218667310U (en) Guardrail connecting structure
CN214739761U (en) Scaffold for multi-functional building site ground storehouse
CN211473425U (en) A floor is pour construction and is used support body platform for housing construction
CN214144795U (en) Steel construction platform
CN220815174U (en) Safety enclosure for river construction
CN218405137U (en) Safety warning fence is used in subway civil engineering construction
CN220978736U (en) Scaffold for building construction
CN212176527U (en) Quick installation mechanism of scaffold frame for building engineering
CN213382087U (en) Assembled bridge member casting mold
CN219952607U (en) Scaffold for construction
CN213709789U (en) Municipal administration drainage pipeline hole groove supporting construction
CN211949481U (en) Novel scaffold for building construction
CN213953239U (en) Modular safety is enclosed and is kept off for anticorrosive construction
CN220297514U (en) High-altitude transverse bar planting drilling device for upper part of side elevation of adjacent frame column
CN220849127U (en) Protective guard with quick disassembly function

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200804