CN211173129U - Building construction device - Google Patents
Building construction device Download PDFInfo
- Publication number
- CN211173129U CN211173129U CN201922069693.0U CN201922069693U CN211173129U CN 211173129 U CN211173129 U CN 211173129U CN 201922069693 U CN201922069693 U CN 201922069693U CN 211173129 U CN211173129 U CN 211173129U
- Authority
- CN
- China
- Prior art keywords
- frame
- construction
- main frame
- butt joint
- construction main
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a construction equipment, including the construction main frame, construction main frame both sides side is provided with the installation spout frame, the butt joint groove has been seted up at installation spout frame middle part, construction main frame one end side top is provided with the upper portion mounting bracket, construction main frame one end side below is provided with the lower part mounting bracket, the upper portion mounting bracket sets up with the lower part mounting bracket is corresponding, the bolt hole has been seted up with the corresponding position of lower part mounting bracket to the upper portion mounting bracket, the utility model relates to a construction technical field. This building construction device has reached the purpose that the frame function that the construction used is more perfect, and this device can the multiunit butt joint, and single body can not occupy too big position to adopt the mode of butt joint can guarantee holistic integrality, the device has set up can be along the butt joint groove and the work platform of the parallel removal of device, can make the device can install more subassemblies.
Description
Technical Field
The utility model relates to a construction technical field specifically is a building construction device.
Background
In the construction of building engineering, in order to meet the requirements of the construction of a main body structure of a building, construction openings such as electric appliances, kitchens and bathrooms are usually reserved on a floor slab, and after the main body structure is finished, the openings are plugged by secondary construction. The existing hole plugging mode is that a steel pipe frame and a bottom template are generally erected below a hole, the bottom template is supported through a top support arranged on the steel pipe frame so as to meet the requirement that cement slurry is supported by the bottom template when the hole is plugged, and the bottom template is detached after the cement slurry in the hole is solidified; the traditional construction frame for building is fastened by adopting a steel pipe and a fastener and a bolt, and the fastener is insecure due to corrosion of the bolt in the assembling process, so that the collapse of the construction frame and the casualties are frequently caused. The existing building scaffold forming assembly only has few functions, and the butt joint of workpieces is not firm.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a construction device has solved present building scaffold shaping subassembly and only can the function few to the insecure problem of work piece butt joint.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: a building construction device comprises a construction main frame, wherein installation sliding groove frames are arranged on two sides of the construction main frame, the middle part of the installation sliding chute frame is provided with a butt joint groove, an upper installation frame is arranged above one end side of the construction main frame, a lower mounting rack is arranged below one end side of the construction main rack, the upper mounting rack and the lower mounting rack are arranged correspondingly, the upper mounting rack and the lower mounting rack are provided with bolt holes corresponding to each other, mounting bolts are arranged in the bolt holes, a nut is arranged below the mounting bolt, a working sliding frame is arranged at the top of the construction main rack, the top of the working sliding frame is provided with a working platform, the working platform is provided with a screw mounting hole, the bottom of the working platform is provided with a sliding groove frame, the sliding groove frame is installed on the working sliding frame, and the sliding groove frame is connected with the working sliding frame in a sliding mode.
Preferably, one side of the construction main frame, which is far away from the upper mounting frame and the lower mounting frame, is provided with a butt joint hole.
Preferably, the butt joint hole is formed at a position corresponding to the bolt hole, and the aperture of the butt joint hole is larger than the diameter of the mounting bolt.
Preferably, the middle part of the construction main frame is provided with a middle assembling through hole.
Preferably, the sliding groove frame is provided with a locking knob on the outer side, the locking knob extends to the inner side of the sliding groove frame, and the locking knob is in threaded connection with the sliding groove frame.
Preferably, a supporting underframe is arranged at the bottom of the construction main frame.
(III) advantageous effects
The utility model provides a building construction equipment. The method has the following beneficial effects:
the building construction device has the advantages that the upper mounting rack and the lower mounting rack of the construction main rack can penetrate through the butt joint holes through the mounting bolts to assemble and connect a plurality of groups of racks together, the mounting chute frame at the side of the construction main rack is provided with the butt joint groove for mounting components needing to be moved, a working platform is arranged on the working sliding frame above the construction main frame through a sliding groove frame, the working platform can be provided with components needing to be arranged through screw mounting holes, the sliding groove frame is provided with the locking knob for positioning the working platform, so that the aim of more perfect function of the frame for building construction is fulfilled, the device can be in butt joint of a plurality of groups, a single body does not occupy too large position, and the overall integrity can be ensured by adopting a butt joint mode, and the device is provided with a butt joint groove and a working platform which can move in parallel along the device, so that more components can be installed on the device.
Drawings
Fig. 1 is a schematic overall structure diagram of the present invention;
FIG. 2 is a schematic structural view of the front side of the construction rack of the present invention;
fig. 3 is the structure schematic diagram of the rear side of the construction rack of the utility model.
In the figure: the construction method comprises the following steps of 1 construction main frame, 2 installation sliding groove frames, 3 upper installation frames, 4 lower installation frames, 5 installation bolts, 6 butt joint holes, 7 butt joint grooves, 8 support base frames, 9 working platforms, 10 locking knobs, 11 middle assembly through holes, 12 working sliding frames, 13 nuts and 14 sliding groove frames.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a construction device, including construction main frame 1, 1 both sides of construction main frame are provided with installation spout frame 2, butt joint groove 7 has been seted up at installation spout frame 2 middle part, 1 one end side top of construction main frame is provided with upper portion mounting bracket 3, 1 one end side below of construction main frame is provided with lower part mounting bracket 4, upper portion mounting bracket 3 sets up with lower part mounting bracket 4 is corresponding, the bolt hole has been seted up with the corresponding position of lower part mounting bracket 4 to upper portion mounting bracket 3, install mounting bolt 5 in the bolt hole, nut 13 is installed to mounting bolt 5 below, 1 top of construction main frame is provided with work balladeur train 12, work platform 9 is installed at work balladeur train 12 top, the screw mounting hole has been seted up on the work platform 9, work platform 9 bottom is provided with slide groove frame 14, slide groove frame 14 is installed on work balladeur train.
And one side of the construction main frame 1, which is far away from the upper mounting frame 3 and the lower mounting frame 4, is provided with a butt joint hole 6.
The position of the butt joint hole 6 corresponding to the bolt hole is provided, and the aperture of the butt joint hole 6 is larger than the diameter of the mounting bolt 5.
The middle part of the construction main frame 1 is provided with a middle assembling through hole 11.
The locking knob 10 is arranged on the outer side of the sliding groove frame 14, the locking knob 10 extends to the inner side of the sliding groove frame 14, and the locking knob 10 is in threaded connection with the sliding groove frame 14.
The bottom of the construction main frame 1 is provided with a supporting underframe 8.
During the use, the upper portion mounting bracket 3 and the lower part mounting bracket 4 of construction main frame 1 can run through butt joint hole 6 through construction bolt 5 and link together the equipment of multiunit frame, the installation chute frame 2 of construction main frame 1 avris has seted up butt joint groove 7 and has been used for installing the subassembly that needs the removal, work platform 9 has been installed through sliding groove frame 14 to work balladeur train 12 in construction main frame 1 top, work platform 9 can be through the subassembly that the screw mounting hole installation needs the installation, it is used for fixing a position work platform 9 to have set up locking knob 10 at sliding groove frame 14.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation. The use of the phrase "comprising one of the elements does not exclude the presence of other like elements in the process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a construction equipment, includes construction main frame (1), its characterized in that: the construction main frame (1) is provided with installation chute frames (2) on two side sides, a butt joint groove (7) is formed in the middle of each installation chute frame (2), an upper mounting frame (3) is arranged above one end of each construction main frame (1), a lower mounting frame (4) is arranged below one end of each construction main frame (1), the upper mounting frame (3) and the lower mounting frame (4) are arranged correspondingly, bolt holes are formed in positions of the upper mounting frame (3) corresponding to the lower mounting frame (4), mounting bolts (5) are installed in the bolt holes, nuts (13) are installed below the mounting bolts (5), a work sliding frame (12) is arranged on the top of the construction main frame (1), a work platform (9) is installed on the top of the work sliding frame (12), and screw mounting holes are formed in the work platform (9), the bottom of the working platform (9) is provided with a sliding groove rack (14), the sliding groove rack (14) is installed on the working sliding frame (12), and the sliding groove rack (14) is connected with the working sliding frame (12) in a sliding mode.
2. A construction device according to claim 1, wherein: and one side of the construction main frame (1) far away from the upper mounting frame (3) and the lower mounting frame (4) is provided with a butt joint hole (6).
3. A construction device according to claim 2, wherein: the butt joint holes (6) are formed in positions corresponding to the bolt holes, and the diameter of each butt joint hole (6) is larger than the diameter of each mounting bolt (5).
4. A construction device according to claim 1, wherein: the middle part of the construction main frame (1) is provided with a middle assembling through hole (11).
5. A construction device according to claim 1, wherein: the outer side of the sliding groove frame (14) is provided with a locking knob (10), the locking knob (10) extends to the inner side of the sliding groove frame (14), and the locking knob (10) is in threaded connection with the sliding groove frame (14).
6. A construction device according to claim 1, wherein: and a supporting underframe (8) is arranged at the bottom of the construction main frame (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922069693.0U CN211173129U (en) | 2019-11-27 | 2019-11-27 | Building construction device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922069693.0U CN211173129U (en) | 2019-11-27 | 2019-11-27 | Building construction device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211173129U true CN211173129U (en) | 2020-08-04 |
Family
ID=71802826
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922069693.0U Expired - Fee Related CN211173129U (en) | 2019-11-27 | 2019-11-27 | Building construction device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211173129U (en) |
-
2019
- 2019-11-27 CN CN201922069693.0U patent/CN211173129U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107989366B (en) | Be used for beam form bearing structure subassembly | |
CN211173129U (en) | Building construction device | |
CN204402039U (en) | A kind of aluminum alloy mould plate system exterior wall straightening board member | |
CN111155748B (en) | Quick jacking device for mounting building gypsum boards | |
CN216949411U (en) | Be used for inserted lift scaffold to hang and establish protection pocket net device | |
CN206144150U (en) | Aluminum mould board connecting piece | |
CN210463622U (en) | Support of balcony type solar water heater | |
CN203701570U (en) | Safety roof for building | |
CN211421549U (en) | Suspended ceiling stone connecting piece for curtain wall | |
CN109945519B (en) | Solar water heater and support thereof | |
CN215211559U (en) | Reinforced connecting device for building structure installation | |
CN217268882U (en) | Support arrangement for stair usefulness is laid in construction | |
CN205296413U (en) | Beam -column connecting joint of activity board house | |
CN220241871U (en) | Aluminum die plate lowering position error-proofing table device | |
CN213087491U (en) | Assembly type protection device for construction site | |
CN112681718B (en) | A novel pre-buried expansion bolts even wall spare for fixing overhanging type scaffold | |
CN211201135U (en) | Scaffold fixing device | |
CN219471277U (en) | Novel assembled building wall | |
CN218029013U (en) | Assembled falls board bearing structure | |
CN221052919U (en) | Assembled building wall | |
CN219528088U (en) | Curtain wall connecting piece | |
CN221004052U (en) | Quick hoist device | |
CN207122000U (en) | A kind of building body framework of connection component and its composition | |
CN218028931U (en) | Climb frame and attach wall support | |
CN214739407U (en) | Assembly type glass railing installation structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200804 Termination date: 20211127 |