CN211169483U - Change parallel support that lifts by crane of transition for hoist engine - Google Patents

Change parallel support that lifts by crane of transition for hoist engine Download PDF

Info

Publication number
CN211169483U
CN211169483U CN201922102753.4U CN201922102753U CN211169483U CN 211169483 U CN211169483 U CN 211169483U CN 201922102753 U CN201922102753 U CN 201922102753U CN 211169483 U CN211169483 U CN 211169483U
Authority
CN
China
Prior art keywords
hoisting
frame body
bracket
balance
replacing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922102753.4U
Other languages
Chinese (zh)
Inventor
戴恒仙
梁卫锋
杜友尧
常李
张海涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Shagang Group Co Ltd
Zhangjiagang Hongchang Steel Plate Co Ltd
Original Assignee
Jiangsu Shagang Group Co Ltd
Zhangjiagang Hongchang Steel Plate Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Shagang Group Co Ltd, Zhangjiagang Hongchang Steel Plate Co Ltd filed Critical Jiangsu Shagang Group Co Ltd
Priority to CN201922102753.4U priority Critical patent/CN211169483U/en
Application granted granted Critical
Publication of CN211169483U publication Critical patent/CN211169483U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model relates to a change parallel support that lifts by crane of transition for hoist engine belongs to the mechanical equipment field. The utility model discloses a transition parallel hoisting bracket for replacing a winch, which comprises a balance bracket body, wherein a hoisting part and a counterweight part are arranged on the balance bracket body; lifting lugs for hoisting are arranged on the balance frame body; the hoisting part is used for being internally provided with a lifting hook; a balancing weight is arranged in the balancing weight part. The method is characterized in that: the balance frame body is a square frame body, a support is arranged in the balance frame body, and the support is positioned in the middle of the square frame body; is positioned on the upper end surface of the bracket. The utility model provides a transition parallel hoisting bracket for replacing a winch; the position of the winch does not need to be set according to the requirement of a field, and the hoisting and replacing operation of the motor can be carried out on site by adopting a travelling crane or other hoisting equipment to be matched with the hanging bracket; the purpose of quickly replacing the motor is achieved, and the maintenance time of the blast furnace is shortened.

Description

Change parallel support that lifts by crane of transition for hoist engine
Technical Field
The utility model relates to a change parallel support that lifts by crane of transition for hoist engine belongs to the mechanical equipment field.
Background
In a factory workshop, equipment needs to be replaced and maintained regularly, and safety accidents are avoided. When the motors are replaced, the two motors of the main winch are positioned on two sides of the main winch base, and the lifting points of the motors deviate from lifting hooks of a travelling crane due to the limitation of the travel of the travelling crane when the motors are replaced, so that the travelling crane is difficult to lift, and the maintenance time of the blast furnace is greatly influenced.
SUMMERY OF THE UTILITY MODEL
The utility model provides a change parallel of transition and lift by crane for the hoist engine to the aforesaid not enough.
The utility model adopts the following technical scheme:
the utility model discloses a transition parallel hoisting bracket for replacing a winch, which comprises a balance bracket body, wherein a hoisting part and a counterweight part are arranged on the balance bracket body; lifting lugs for hoisting are arranged on the balance frame body; the hoisting part is used for being internally provided with a lifting hook; a balancing weight is arranged in the balancing weight part. The method is characterized in that: the balance frame body is a square frame body, a support is arranged in the balance frame body, and the support is positioned in the middle of the square frame body; is positioned on the upper end surface of the bracket.
The utility model discloses a change transition parallel hoisting support for hoist engine, hoist and mount portion include the hoisting frame body, hoisting frame body and balance frame body welding form an organic whole structure; the lifting hook is positioned on the lower end surface of the lifting frame body.
Change parallel support that lifts by crane of transition for hoist engine, counter weight portion be frame construction, frame construction and balanced support body welding form a body structure.
Change parallel lifting by crane support of transition for hoist engine, balanced support body, hoist and mount portion and counter weight portion in-line arrangement.
Advantageous effects
The utility model provides a transition parallel hoisting bracket for replacing a winch; the position of the winch does not need to be set according to the requirement of a field, and the hoisting and replacing operation of the motor can be carried out on site by adopting a travelling crane or other hoisting equipment to be matched with the hanging bracket; the purpose of quickly replacing the motor is achieved, and the maintenance time of the blast furnace is shortened.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
in the figure, 1 is a balancing stand body, 2 is a hoisting part, 3 is a counterweight part, 4 is a lifting lug, and 5 is a lifting hook.
Detailed Description
In order to make the purpose and technical solution of the embodiments of the present invention clearer, the following description will clearly and completely describe the technical solution of the embodiments of the present invention by combining the drawings of the embodiments of the present invention. It is to be understood that the embodiments described are only some of the embodiments of the present invention, and not all of them. All other embodiments, which can be obtained by a person skilled in the art without any inventive work based on the described embodiments of the present invention, belong to the protection scope of the present invention.
As shown in fig. 1: a transition parallel hoisting bracket for replacing a winch comprises a balance bracket body 1, wherein a hoisting part 2 and a counterweight part 3 are arranged on the balance bracket body 1; the balance frame body 1 is provided with a lifting lug 4 for lifting; the hoisting part is used for being internally provided with a lifting hook; a balancing weight is arranged in the balancing weight part.
The utility model discloses a change transition parallel lifting support for hoist engine, its balancing frame body becomes square support body, is equipped with the support in the balancing frame body, the support is located the middle part of square support body; is positioned on the upper end surface of the bracket. The hoisting part comprises a hoisting frame body, and the hoisting frame body and the balance frame body are welded to form an integral structure; the lifting hook is positioned on the lower end surface of the lifting frame body; the counterweight part is of a frame structure, and the frame structure and the balance frame body are welded to form an integral structure.
The utility model discloses calculate the distance of the terminal point of driving stroke apart from the motor hoisting point, make balancing unit with H shaped steel, four hoisting points of one side welding of device, every hoisting point goes up four hoisting points of hanging the hoist of four 1 tons and wearing four hoisting points of hanging the motor, balancing unit's opposite side is with 16 mm's steel sheet preparation weight box, the weight (motor weight) of 4 1 tons of incasement, two hoisting points of balancing unit's upper portion welding, one is close to the counter weight, be convenient for lift by crane balancing unit, an intermediate position at balancing unit, be convenient for change the motor. When the motor needs to be replaced, the crane firstly hangs the balance device to the linear position of the motor on the main winch base and is placed on a movable support which is manufactured in advance, the crane hook for replacing the crane is hung with the middle of the balance device, meanwhile, four hoists are respectively hung at four points of the motor, and the crane moves the motor to the ground. And hoisting the new motor to the motor installation position by the same hoisting method. After the motor is replaced by the balancing device, the replacement time of the whole motor is shortened by two thirds, and the overhaul time of the blast furnace is greatly shortened.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any changes or substitutions that can be easily conceived by those skilled in the art within the technical scope of the present invention should be covered by the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (5)

1. The utility model provides a change parallel support that lifts by crane of transition for hoist engine which characterized in that: the balance frame body is provided with a hoisting part and a counterweight part; lifting lugs for hoisting are arranged on the balance frame body; the hoisting part is used for being internally provided with a lifting hook; a balancing weight is arranged in the balancing weight part.
2. The transitional parallel hoisting bracket for replacing the hoist of claim 1, characterized in that: the balance frame body is a square frame body, a support is arranged in the balance frame body, and the support is positioned in the middle of the square frame body; is positioned on the upper end surface of the bracket.
3. The transitional parallel hoisting bracket for replacing the hoist of claim 1, characterized in that: the hoisting part comprises a hoisting frame body, and the hoisting frame body and the balance frame body are welded to form an integral structure; the lifting hook is positioned on the lower end surface of the lifting frame body.
4. The transitional parallel hoisting bracket for replacing the hoist of claim 1, characterized in that: the counterweight part is of a frame structure, and the frame structure and the balance frame body are welded to form an integral structure.
5. The transitional parallel hoisting bracket for replacing the hoist of claim 1, characterized in that: the balance frame body, the hoisting part and the counterweight part are arranged in a straight line.
CN201922102753.4U 2019-11-29 2019-11-29 Change parallel support that lifts by crane of transition for hoist engine Active CN211169483U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922102753.4U CN211169483U (en) 2019-11-29 2019-11-29 Change parallel support that lifts by crane of transition for hoist engine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922102753.4U CN211169483U (en) 2019-11-29 2019-11-29 Change parallel support that lifts by crane of transition for hoist engine

Publications (1)

Publication Number Publication Date
CN211169483U true CN211169483U (en) 2020-08-04

Family

ID=71819451

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922102753.4U Active CN211169483U (en) 2019-11-29 2019-11-29 Change parallel support that lifts by crane of transition for hoist engine

Country Status (1)

Country Link
CN (1) CN211169483U (en)

Similar Documents

Publication Publication Date Title
CN101976913B (en) Main driving motor hoisting method of roughing mill
CN211169483U (en) Change parallel support that lifts by crane of transition for hoist engine
CN104942564A (en) Mounting method of large-tonnage pin on jib of offshore shipborne jib type crane
CN204162319U (en) High strength crane-car
CN203767849U (en) Lifting tool for disassembling stainless steel leveling machine servo oil cylinder
CN203021213U (en) Rotary one-arm crane
CN202481984U (en) Electric block transferring device for lifting scaffolds
CN103803397B (en) A kind of suspender for installed vertical rolling mill universal axle and using method
CN205653106U (en) Explosion -proof wire rope electric block
CN204689351U (en) A kind of H profile steel structural elements suspender
CN203976242U (en) A kind of generator unit stator associating hanging apparatus
CN205222522U (en) Portable cantilever crane equipment
CN211769751U (en) Hanging beam device for lifting double overhead travelling cranes
CN201380286Y (en) Special lifting tool for entirely hoisting bale rotary table
CN211619794U (en) Low-space simple gantry hoisting device
CN210973587U (en) Small-size removal hoisting machine
CN211169515U (en) Lifting device for adjusting hydraulic cylinder of universal mill
CN207209840U (en) A kind of Multifunctional suspension bracket
CN204416909U (en) A kind of suspender for changing vertical miller roll
CN202924577U (en) Special hanger frame for small lid of electric furnace
CN205616428U (en) A hoist device for scraper engine
CN2668590Y (en) Electromagnetic hydraulic grappler
CN212924071U (en) Cast roll bearing box balance hoisting device
CN210480637U (en) Crane convenient to maintain
CN219652485U (en) Adjustable balance beam lifting appliance

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant