CN101976913B - Main driving motor hoisting method of roughing mill - Google Patents

Main driving motor hoisting method of roughing mill Download PDF

Info

Publication number
CN101976913B
CN101976913B CN2010105244019A CN201010524401A CN101976913B CN 101976913 B CN101976913 B CN 101976913B CN 2010105244019 A CN2010105244019 A CN 2010105244019A CN 201010524401 A CN201010524401 A CN 201010524401A CN 101976913 B CN101976913 B CN 101976913B
Authority
CN
China
Prior art keywords
rotor
stator
pedestal
crane
punching
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2010105244019A
Other languages
Chinese (zh)
Other versions
CN101976913A (en
Inventor
何志江
孙谦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Third Metallurgical Group Co Ltd
Original Assignee
China Third Metallurgical Group Co Ltd Electrical Installation Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Third Metallurgical Group Co Ltd Electrical Installation Engineering Co filed Critical China Third Metallurgical Group Co Ltd Electrical Installation Engineering Co
Priority to CN2010105244019A priority Critical patent/CN101976913B/en
Publication of CN101976913A publication Critical patent/CN101976913A/en
Application granted granted Critical
Publication of CN101976913B publication Critical patent/CN101976913B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Manufacture Of Motors, Generators (AREA)

Abstract

The invention relates to a main driving motor hoisting method of a roughing mill. In the method, a form of firstly hoisting and then assembling is adopted, and devices such as a crane, a jack, and the like are used for mounting a rotor and a stator of a main driving motor of the roughing mill, therefore, the problem of insufficient hoisting force of the crane is solved, the engineering construction efficiency is improved, and the requirement on the technical quality of construction is met. The method has the characteristics of safety, high efficiency, convenient operation, low cost, and the like and can be widely applied to assembling motors.

Description

A kind of roughing mill main driving motor hanging method
Technical field
The present invention relates to a kind of construction method, particularly relate to a kind of roughing mill main driving motor hanging method.
Background technology
In the installing engineering of hot continuous rolling large-tonnage roughing mill main driving motor, because the general design in workshop, roughing mill main driving motor place has only a 125/32t crane, and the roughing motor changes, the stator gross weight is about 180 tons; Exist crane to hang hypodynamic problem, former installation method need re-establish hanging device, and the preparation amount is big; And suspender is set up complicacy, uses dangerously relatively, and efficient is lower; Cost is high, thereby has strengthened the difficulty of site operation.
Summary of the invention
The present invention has overcome deficiency of the prior art, provides a kind of easy to operate, and cost is low, the roughing mill main driving motor hanging method of high efficiency.
In order to address the above problem, the present invention adopts following technical scheme:
A kind of roughing mill main driving motor hanging method, this method adopt the form of first handling, back assembling that the rotor and the stator of roughing mill main driving motor are installed, and concrete steps of the present invention are following:
1) build stator base and rotor pedestal in the installation site of motor, rotor pedestal is arranged on the stator base both sides, on stator base and rotor pedestal, cushion block is installed respectively, and cushion block is through on the bolt pedestal;
2) before the handling stator, cleaning stator interior and rotor surface, the diameter of axle position of laying bearing will bandage, and utilizes overhead traveling crane handling motor stator and motor stator is placed on the stator base, transfers four 50 tons of jack at the support ear of two sides of stator,
3) before the handling rotor, in the non-load side of rotor outrigger shaft is installed, length is looked motor size and is decided, and purpose is in the punching process, rotor shaft to be played a supporting role;
4) prepare punching with the crane rotor of slinging, rotor is sling the back with bar formula level meter survey axle horizontal, and rotor penetrates on the rotor pedestal of direction front end and fills up the steel pier; Pillar is built in another rotor pedestal outside by laying bricks or stones; Pillar top pad is gone up the steel pier, when rotor passes stator, the rotating shaft of rotor one end and the outrigger shaft of the other end is placed on the steel pier respectively; Guarantee that rotor and stator remain with the gap in vertical direction, be lined with sleeper between the rotor pedestal of rotor middle part and its below;
5) after rotor falls, utilize the crane stator of slinging, stator is moved to mounting center line position place, utilize crane that rotor is moved to the mounting center line position then;
6) sling rotor and moving down of crane, simultaneously, jack drives stator and falls after rise downwards, and the same moved further of stator and rotor remains with the gap all the time between them;
7) after punching finishes, rotor and stator are fixedly installed togather.
Described stator base and rotor pedestal adopt square brick to be built into.
Described cushion block adopts I-steel to process.
During punching, by the rotor load side to non-load side punching.
During punching, with the vulcan fibre pad at the stator inner hole place.
During the lifting rotor, steel wire rope and rotor position contacting are lined with vulcan fibre or Rubber washer.
Compared with prior art, the invention has the beneficial effects as follows:
The inventive method adopts the assembled in forms motor of first handling, back assembling, and easy to operate, high efficiency has alleviated the load of the each handling of crane, hangs hypodynamic problem thereby solved crane, has guaranteed to construct and has carried out smoothly.
Description of drawings
Fig. 1 builds the pedestal sketch map by laying bricks or stones for the present invention;
Fig. 2 is for utilizing crane handling rotor sketch map;
Fig. 3 moves the stator sketch map for utilizing crane;
Fig. 4 is for utilizing crane movable rotor sketch map;
Fig. 5 is stator and the rotor sketch map that is synchronized with the movement;
Fig. 6 accomplishes sketch map for the motor assembling.
Embodiment
A kind of roughing mill main driving motor hanging method, this method adopt the form of first handling, back assembling that the rotor 6 and the stator 4 of roughing mill main driving motor are installed, and concrete steps of the present invention are following, like Fig. 1~shown in Figure 6:
1) builds stator base 3 and rotor pedestal 1 in the installation site of motor; Stator base 3 adopts square brick to be built into rotor pedestal 1; Rotor pedestal 1 is arranged on stator base 3 both sides; Cushion block 2 is installed on stator base 3 and rotor pedestal 1 respectively, and cushion block 2 adopts I-steel to process, and cushion block 2 is through on the bolt pedestal;
2) before the handling stator 4; Cleaning stator 4 inner and rotor 6 surfaces, the diameter of axle position of laying bearing will bandage, and prevents that scratching damages in stator 4 installation processes; Prevent that pollutant from entering into stator 4 or rotor 6; Utilize crane 5 handling motor stators 4 and motor stator 4 is placed on the stator base 3, transfer four 50 tons of jack 12 at the support ear of 4 two sides of stator
3) before the handling rotor 6, in the non-load side of rotor 6 outrigger shaft 11 is installed, length is looked motor size and is decided, and purpose is in the punching process, rotor shaft 7 to be played a supporting role;
4) prepare punchings with sling rotor 6 of crane 5; Rotor 6 is sling the back with bar formula level meter survey axle horizontal; Rotor 6 penetrates on the rotor pedestal 1 of direction front end and fills up steel pier 9, and pillar 10 is built in another rotor pedestal 1 outside by laying bricks or stones, and pillar 10 top pads are gone up steel pier 9; When rotor 6 passes stator 4; The rotating shaft 7 of rotor 6 one ends and the outrigger shaft 11 of the other end are placed on respectively on the steel pier 9, guarantee that rotor 6 and stator 4 remain with the gap in vertical direction, be lined with sleeper 8 between the rotor pedestal 1 of rotor 6 middle parts and its below;
5) after rotor 6 falls, utilize crane 5 stator 4 of slinging, stator 4 is moved to mounting center line position place, utilize crane 5 that rotor 6 is moved to the mounting center line position then;
6) sling rotor 6 and moving down of crane 5, simultaneously, jack 12 drives stators 4 and falls downwards, and stator 4 and rotor 6 same moved further remain with the gap all the time between them;
7) after punching finishes, rotor 6 and stator 4 are fixedly installed togather.
In the installation process; Damage mutually for avoiding stator 4 endoporus or rotor 6 outer surfaces; During punching; Shield well with the vulcan fibre pad at stator 4 endoporus, shine to load side, so that can observe gapped sliding between punching process rotor 6 and the stator 4 by non-load side with lighting apparatus simultaneously at transmission side.During lifting rotor 6, steel wire rope and rotor 6 contact portions application vulcan fibre and Rubber washer are good, in order to avoid scratch rotor 6, and forbid on important mating surfaces such as axle journal, to lift by crane.Wherein hanging beam is suspended on crane 5 eave tiles and wants leveling.During rotor 6 liftings, must keep its level, in order to avoid thorax in wound bearing liner lining and the stator 4 with steady.

Claims (1)

1. a roughing mill main driving motor hanging method is characterized in that, this method adopts the form of first handling, back assembling that the rotor and the stator of roughing mill main driving motor are installed, and concrete steps of the present invention are following:
1) build stator base and rotor pedestal in the installation site of motor, rotor pedestal is arranged on the stator base both sides, on stator base and rotor pedestal, cushion block is installed respectively, and cushion block is through on the bolt pedestal;
2) before the handling stator, cleaning stator interior and rotor surface, the diameter of axle position of laying bearing will bandage, and utilizes overhead traveling crane handling motor stator and motor stator is placed on the stator base, transfers four 50 tons of jack at the support ear of two sides of stator,
3) before the handling rotor, in the non-load side of rotor outrigger shaft is installed, length is looked motor size and is decided, and purpose is in the punching process, rotor shaft to be played a supporting role;
4) prepare punching with the crane rotor of slinging, rotor is sling the back with bar formula level meter survey axle horizontal, and rotor penetrates on the rotor pedestal of direction front end and fills up the steel pier; Pillar is built in another rotor pedestal outside by laying bricks or stones; Pillar top pad is gone up the steel pier, when rotor passes stator, the rotating shaft of rotor one end and the outrigger shaft of the other end is placed on the steel pier respectively; Guarantee that rotor and stator remain with the gap in vertical direction, be lined with sleeper between the rotor pedestal of rotor middle part and its below;
5) after rotor falls, utilize the crane stator of slinging, stator is moved to mounting center line position place, utilize crane that rotor is moved to the mounting center line position then;
6) sling rotor and moving down of crane, simultaneously, jack drives stator and falls after rise downwards, and the same moved further of stator and rotor remains with the gap all the time between them;
7) after punching finishes, rotor and stator are fixedly installed togather;
Described stator base and rotor pedestal adopt square brick to be built into, and described cushion block adopts I-steel to process; During punching, by the rotor load side to non-load side punching, with the vulcan fibre pad at the stator inner hole place; During the lifting rotor, steel wire rope and rotor position contacting are lined with vulcan fibre or Rubber washer.
CN2010105244019A 2010-10-29 2010-10-29 Main driving motor hoisting method of roughing mill Active CN101976913B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105244019A CN101976913B (en) 2010-10-29 2010-10-29 Main driving motor hoisting method of roughing mill

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105244019A CN101976913B (en) 2010-10-29 2010-10-29 Main driving motor hoisting method of roughing mill

Publications (2)

Publication Number Publication Date
CN101976913A CN101976913A (en) 2011-02-16
CN101976913B true CN101976913B (en) 2012-11-21

Family

ID=43576769

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105244019A Active CN101976913B (en) 2010-10-29 2010-10-29 Main driving motor hoisting method of roughing mill

Country Status (1)

Country Link
CN (1) CN101976913B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102290931A (en) * 2011-08-26 2011-12-21 天津市天发重型水电设备制造有限公司 Disassembling and assembling method of radial bearing of tubular hydraulic generator
CN102983684B (en) * 2011-09-07 2016-08-10 五冶集团上海有限公司 The split base big electric motor mounting method of high speed major axis
CN102790481B (en) * 2012-08-08 2015-04-08 中国神华能源股份有限公司 Dismounting device for rotor of water supply pump motor
CN103683709B (en) * 2012-09-18 2016-03-30 上海宝冶集团有限公司 Large-size machine takes out the fast servo method of rotor online
CN104113167A (en) * 2013-04-17 2014-10-22 上海宝冶集团有限公司 Method for fast pushing up and online pulling out a rotor of a rolling mill main motor
CN105932832A (en) * 2016-06-07 2016-09-07 上海电气集团上海电机厂有限公司 Arrangement and installation method for large-scale synchronous generator
CN107425682B (en) * 2017-06-12 2020-03-17 中国三冶集团有限公司宁波分公司 Connecting and mounting method for rotor and stator of TRT (blast furnace Top gas turbine Generator)
CN107359759B (en) * 2017-09-01 2023-07-21 华菱安赛乐米塔尔汽车板有限公司 Device for finishing core penetration of large synchronous motor by utilizing flat car
CN107591965B (en) * 2017-09-06 2020-04-14 中国二十冶集团有限公司 Core penetrating method for hydraulic motor with short limit shaft
CN107579629A (en) * 2017-10-10 2018-01-12 中国二十冶集团有限公司 The method for dismounting of main driving motor

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1481063A (en) * 2003-01-25 2004-03-10 株洲九方自动化装备实业有限公司 Method for vertical assembling stator and rotor of electrical motor in large and medium size
CN2768291Y (en) * 2005-03-02 2006-03-29 重庆宗申技术开发研究有限公司 Motor stator lifting tongs
CN101114786A (en) * 2007-08-28 2008-01-30 天津二十冶建设有限公司 Hanging method using C-beam piercing core hanging large-scale electric motor and C-beam structure
CN101257238A (en) * 2008-04-10 2008-09-03 中国第一冶金建设有限责任公司 Method for electric motor with stationary rotor to on site penetrate rotor
CN101277049A (en) * 2007-03-28 2008-10-01 中国第二十冶金建设公司 Method for core-crossing hanging large-scale motor hydraulic ram lifting

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7266884B2 (en) * 2004-08-03 2007-09-11 General Electric, Company Apparatus for cutting and removing wedges of a stator core of an electrical machine

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1481063A (en) * 2003-01-25 2004-03-10 株洲九方自动化装备实业有限公司 Method for vertical assembling stator and rotor of electrical motor in large and medium size
CN2768291Y (en) * 2005-03-02 2006-03-29 重庆宗申技术开发研究有限公司 Motor stator lifting tongs
CN101277049A (en) * 2007-03-28 2008-10-01 中国第二十冶金建设公司 Method for core-crossing hanging large-scale motor hydraulic ram lifting
CN101114786A (en) * 2007-08-28 2008-01-30 天津二十冶建设有限公司 Hanging method using C-beam piercing core hanging large-scale electric motor and C-beam structure
CN101257238A (en) * 2008-04-10 2008-09-03 中国第一冶金建设有限责任公司 Method for electric motor with stationary rotor to on site penetrate rotor

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
JP特开2006-50893A 2006.02.16

Also Published As

Publication number Publication date
CN101976913A (en) 2011-02-16

Similar Documents

Publication Publication Date Title
CN101976913B (en) Main driving motor hoisting method of roughing mill
CN101277049B (en) Method for core-crossing hanging large-scale motor hydraulic ram lifting
CN102756975A (en) Method for hoisting rolling mill housing
CN109081247A (en) A kind of hanging method of vestibule large-span steel girder
CN102049335B (en) Installation and construction method of large-sized ball mill
CN107253673B (en) A kind of Architectural Equipment hanging apparatus
CN102010927A (en) Integral hydraulic jacking inverted construction method of large converter
CN105733613A (en) Coke oven door installing device and method
CN104550243B (en) Large-sized rolling mills frame bracket rotary hoisting method
CN110127530A (en) For hanging apparatus and its application method in restricted clearance workshop
CN202440231U (en) Gantry crane lifting hook device
CN203021213U (en) Rotary one-arm crane
CN202429882U (en) Movable lifting frame
CN202369321U (en) Vibration isolating support hoist
CN205500608U (en) Automatic change lifting device
CN205241155U (en) Hoisting device
CN104355238A (en) Portal crane with jib structure
CN104249979A (en) Guide rail type self-climb slewing crane
CN203976242U (en) A kind of generator unit stator associating hanging apparatus
CN205312917U (en) Portable jack -up hoist and mount transportation equipment
CN204224987U (en) A kind of continuous girder bridge multiple pipeline installation structure
CN202449728U (en) Double-pulley lifting hook device of gantry crane
CN202429891U (en) Crane hook device
CN201694777U (en) Self hoisting device of hydraulic turbine volute
CN211169483U (en) Change parallel support that lifts by crane of transition for hoist engine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA THIRD METALLURGICAL GROUP CO., LTD.

Free format text: FORMER OWNER: CHINA THIRD METALLURGICAL GROUP CO., LTD. ELECTRICAL INSTALLATION ENGINEERING COMPANY

Effective date: 20140808

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 114003 ANSHAN, LIAONING PROVINCE TO: 114039 ANSHAN, LIAONING PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20140808

Address after: 114039 Anshan province Liaoning City Mountain Road No. 105 building materials

Patentee after: CHINA THREE METALLURGICAL GROUP CO., LTD.

Address before: 114003, Iron East Street, Anshan, Liaoning Province, No. 8, furnace Street

Patentee before: China Third Metallurgical Group Co., Ltd. Electrical Installation Engineering Company