CN211160320U - Utility tunnel assembled spary appurtenance - Google Patents

Utility tunnel assembled spary appurtenance Download PDF

Info

Publication number
CN211160320U
CN211160320U CN201921689561.1U CN201921689561U CN211160320U CN 211160320 U CN211160320 U CN 211160320U CN 201921689561 U CN201921689561 U CN 201921689561U CN 211160320 U CN211160320 U CN 211160320U
Authority
CN
China
Prior art keywords
template
spary
steel
spraying
channel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921689561.1U
Other languages
Chinese (zh)
Inventor
安晓龙
张敏
牛进
张安
贺玉赛
梁文强
闫伟
翟义
丁强强
张金平
乔彩红
王伟
李选梅
邢睿娟
刘泽斌
王涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Second Construction Group Co Ltd
Original Assignee
Shanxi Second Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Second Construction Group Co Ltd filed Critical Shanxi Second Construction Group Co Ltd
Priority to CN201921689561.1U priority Critical patent/CN211160320U/en
Application granted granted Critical
Publication of CN211160320U publication Critical patent/CN211160320U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model provides a utility tunnel assembled spary appurtenance, the spary that is mainly used for utility tunnel to obviously adorn ground bus, it comprises support frame, first spary template, second spary template, first spary template comprises 9 angle steel and a channel-section steel, and an angle steel is welded to channel-section steel one end, and 4 angle steel of channel-section steel both sides respectively welding, 4 angle steel equidistance set up between the adjacent angle steel, and the interval is 1.5m, and the middle equidistance of channel-section steel sets up a plurality of 100mm × 100mm and the contained angle is the parallelogram through-hole of 45 degrees, and the parallelogram through-hole position dislocation of first spary template and second spary template, the utility model discloses easy and simple to handle, efficient, practice thrift the cost, effectively shorten the time limit for a project.

Description

Utility tunnel assembled spary appurtenance
Technical Field
The utility model discloses be applied to the spraying and brushing technique of obviously adorning ground connection generating line among the building field ground system.
Background
In the building engineering, the ground bus usually adopts hot galvanizing flat steel, the surface of the ground bus is coated with yellow and green mutually-seen stripe marks with the same width of 15 mm-100 mm, but the manual coating is adopted when the marks are coated, so that the time and labor are wasted, the coating effect is poor, and the appearance quality is poor.
Disclosure of Invention
To obviously adorn ground wire colour and apply paint the difficulty with a brush, and apply paint the poor problem of quality with a brush, the utility model provides a utility tunnel assembled ground plate.
The utility model provides a utility tunnel assembled spary appurtenance, characterized by comprises support frame, first spary template, second spary template.
The support frame, the first spraying template and the second spraying template are all independent parts, and the independent parts are not connected with other parts.
The first spraying and brushing template is composed of 9 angle steels and a channel steel, wherein one end of the channel steel is welded with one angle steel, two sides of the channel steel are respectively welded with 4 angle steels, and the 4 angle steels are arranged at equal intervals. The distance between adjacent angle steels is 1.5 m.
A plurality of parallelogram through holes with the length of 100mm × 100mm and included angles of 45 degrees are arranged in the middle of the channel steel at equal intervals, and the parallelogram through holes of the first spraying template and the second spraying template are staggered.
Adopt the utility model discloses the difficulty of obviously adorning ground connection generating line sign has been solved to cooperation paint spraying machine spary generating line.
The utility model discloses convenient to use, labour saving and time saving, the quality of assurance, reduction of erection time promotes workman's operability.
Drawings
Fig. 1 is a schematic structural view of a first spraying template 3 in the present invention.
Fig. 2 is a schematic structural view of the second spraying template 4 of the present invention.
Fig. 3 is a structural diagram of the middle support frame 1 of the present invention.
Fig. 4 is a structural view of the medium flat steel 2 of the present invention.
In the figure: 1. the steel plate comprises a support frame, 2 parts of flat steel, 3 parts of a first spraying template, 4 parts of a second spraying template, 5 parts of angle steel, 6 parts of channel steel, 7 parts of hollow parts and 8 parts of solid cores.
Detailed Description
Fig. 1 shows that utility tunnel assembled spary appurtenance, characterized by comprises support frame 1, first spary template 3, second spary template 4.
The support frame 1, the first spraying template 3 and the second spraying template 4 are independent components, and the independent components are not connected with other components.
The first spraying and brushing template 3 is composed of 9 angle steels and a channel steel, wherein one end of the channel steel is welded with one angle steel, two sides of the channel steel are respectively welded with 4 angle steels, and the 4 angle steels are arranged at equal intervals. The distance between adjacent angle steels is 1.5 m.
A plurality of parallelogram through holes with the thickness of 100mm × 100mm and included angles of 45 degrees are arranged in the middle of the channel steel at equal intervals, and the shape of a solid body between every two adjacent parallelogram through holes is consistent with that of the parallelogram through holes.
The parallelogram through holes of the first spraying template 3 and the second spraying template 4 are different in position, and the parallelogram through holes of the first spraying template 3 and the parallelogram through holes in the second spraying template 4 are staggered. That is, the parallelogram via hole position of the first spray template 3 is a parallelogram solid position in the second spray template 4.
The first spraying and brushing template 3 and the second spraying and brushing template 4 both adopt 10# channel steel, the specification of the angle steel is 40mm × 4mm, the length of the angle steel is 0.12m, the lower part of the angle steel extends out of 0.058m below the channel steel, and the upper part of the angle steel is flush with a wing plate of the channel steel.
The support frame 1 adopts 10# channel steel.
The utility model discloses a construction method:
1) old newspapers are laid on a flat field, and the support frame 1 is placed on the newspapers. The flat steel 2 is placed on the support frame 1, the flat steel 2 is placed in the middle and is parallel to the support frame 1, and one end of the flat steel is flush with the support frame 1.
2) The first template 3 is placed on the support frame, the supporting legs 5 are perpendicular to the ground, the flat steel 2 is positioned between the support frame 1 and the first template 3, and yellow paint is uniformly sprayed to the parallelogram through hole part of the first template by a paint spraying machine until no color difference exists on the flat steel.
3) And after the yellow paint is completely condensed, taking down the first template 3, placing the second template 4 at the position of the first template 3, and uniformly spraying the green paint to the parallelogram through hole part of the second template by using a paint spraying machine until no color difference exists on the flat steel. And after the green paint is completely condensed, taking down the second template, namely successfully spraying the paint on the flat steel. And spraying paint on the flat steel to obtain the finished bus.

Claims (1)

1. An assembly type spraying auxiliary tool for a comprehensive pipe gallery is characterized by comprising a support frame, a first spraying template and a second spraying template, wherein the first spraying template comprises 9 angle steels and a channel steel, one angle steel is welded at one end of the channel steel, 4 angle steels are welded at two sides of the channel steel respectively and are arranged at equal intervals, the interval between every two adjacent angle steels is 1.5m, a plurality of parallelogram through holes with the included angle of 45 degrees and the length of 100mm × 100mm are arranged at equal intervals in the middle of the channel steel, and the parallelogram through holes of the first spraying template and the second spraying template are staggered in position.
CN201921689561.1U 2019-10-10 2019-10-10 Utility tunnel assembled spary appurtenance Active CN211160320U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921689561.1U CN211160320U (en) 2019-10-10 2019-10-10 Utility tunnel assembled spary appurtenance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921689561.1U CN211160320U (en) 2019-10-10 2019-10-10 Utility tunnel assembled spary appurtenance

Publications (1)

Publication Number Publication Date
CN211160320U true CN211160320U (en) 2020-08-04

Family

ID=71817029

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921689561.1U Active CN211160320U (en) 2019-10-10 2019-10-10 Utility tunnel assembled spary appurtenance

Country Status (1)

Country Link
CN (1) CN211160320U (en)

Similar Documents

Publication Publication Date Title
CN211160320U (en) Utility tunnel assembled spary appurtenance
CN209837607U (en) A high-efficient device of wipeing wall for building decoration
CN105216531A (en) Moulded concrete decoration plate with relief sculpture is produced and installation method
CN203257065U (en) Duel-roller wall painting device capable of feeding automatically
CN209753181U (en) Spraying shielding jig
CN207667892U (en) A kind of Control During Paint Spraying by Robot spray gun lengthening holder
CN215964282U (en) Surface paint brushing equipment for production of clamping and attaching type steel structure
CN218360464U (en) Grounding flat steel twill paint brushing device
CN217783521U (en) Leveling device
CN204645627U (en) A kind of un-bonded prestressed steel strand Special hole mold
CN211114741U (en) Spray device attached to lifting scaffold
CN207727929U (en) A kind of spray painting circle lattice tool of adjustable reuse for building
CN211850669U (en) Special glue gun support for beautiful seams
CN210976491U (en) Building engineering spraying device
CN205259636U (en) Combined pavilion
CN214515752U (en) Roller brush
CN213174338U (en) Prefabricated tenon buckle assembly type metal unit component of stay cable hanging metal curtain wall
CN213468320U (en) Plastic product tool that sprays paint
CN210152065U (en) Building steel structure crossbeam
CN205166824U (en) Pipeline joint crimping tool
CN218175522U (en) Road is laid and is used automatically cleaning spade
CN107288319B (en) Automatic device for plastering steel beam in fireproof protection
CN212418411U (en) Double-color paint spraying device capable of realizing quick paint spraying
CN215907215U (en) Assembled archaize building tile roof boarding
CN212069237U (en) Computer power button tool that sprays paint

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant